ATTACHMENT 5 - Contractor Badging - Guidance to Contractor.pdf

PDF 268 KB Posted

Attached to
Z2DA--Correct Electrical Deficiencies Building 1D Federal contract opportunity
Solicitation number
36E77620B0007
Issued by
Department of Veterans Affairs Headquarters

About this file

This document provides guidance for contractor badging requirements at a Department of Veterans Affairs medical center. It outlines six required items for obtaining either a temporary day badge or a permanent badge, including completing forms, undergoing fingerprinting and background checks, and ensuring badges are worn at all times on site. A supervisor must coordinate with the contracting officer's representative to schedule badge appointments and submit required documentation for their employees. Temporary day badges are valid for 15 days, while permanent badges issued within seven days are valid for up to one year on site. Strict processes are defined to mitigate security risks and ensure compliance with facility identification procedures.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Correct Electrical Deficiencies Building 1D, newest first.
File Type Posted
Technical Questions - FINAL - Reno Electrical 9-29-20.pdf PDF
ATTACHMENT 6 - Construction Wage Rates - Washoe County - 9-18-20.pdf PDF
36E77620B0007 0002.docx DOCX document
Building 1D Asbestos Report.pdf PDF
36E77620B0007 0001.docx DOCX document
Site Visit Sign-in Sheet - Reno Electrical 9-10-20.pdf PDF
36E77620B0007_1.docx DOCX document
ATTACHMENT 6 - Washoe County - 8-21-20.pdf PDF
ATTACHMENT 2 - Specifications.pdf PDF
ATTACHMENT 3 - Drawings.pdf PDF
ATTACHMENT 7 - Contractor Safety - Environmental Record Evaluation Form.docx DOCX document
ATTACHMENT 1 - SOW.pdf PDF
ATTACHMENT 4 - Drawings Addendum 1.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 4 Version 160503

Contractor Badging - Guidance to the Contractor Last update: 6 January 2020

1. General A. Badges must be worn at all times while on VA property whether temporary (day badge) or permanent.

B. The Super/PM (Super) is to ensure all employees are wearing a badge – if employee is on-site and working, and has no badge, that employee should be sent off-site for the rest of the day.

Unless extenuating circumstances, do not allow the employee to go down to the Police to get a day badge – they go home for the day! Contact your COR if you need Police escort. Ensure they know this ahead of time.

C. A permanent badge will be issued normally within seven days of bringing acceptable badging paperwork to the badging office. Day badges will be issued in the interim.

D. Types of badges

(1) Day badge. Issued daily by the Police not to exceed 15 days.

(2) Permanent badge. Issued for designated date range employee expects to be on-site. Date range not to exceed 365 days for the routine contractor badge. If over 365 days is anticipated, then a different badge is to be pursued requiring additional paperwork. This document only addresses the routine badge.

E. There are six items required in the badging process, four documents and two other items.

F. The first action for any type of badge is between the Super and the applicant to complete the documents. The next action is a scan and email by the Super to the COR group of several documents.

G. Emails related to badging with personal information are prohibited. Badging packets shall be hand carried to the COR by the Super.

2. Prior to applicant’s first time working on station A. The Super hopefully already have the necessary documents (detailed lower down). These documents might have been provided as an attachment in the contract, or provided by the COR.

B. The Super is to make the necessary hard copies to satisfy badging requirements indicated herein.

C. Super gets the documents completed and signed by the applicant. (There are a total of six items: four documents requiring signature and two cards carried always by the applicant).

D. Super reviews to confirm completeness and accuracy E. Super hand caries three of the six items to the COR group.

F. Super contacts COR, and based upon the badge action pursued:

(1) If request is only for a day badge, 24-hour advance notice appreciated.

(2) If for perm badge application, then Super schedules a badge meeting to include COR, Super, and applicants. The COR may elect to have a certain day/time designated for processing badging, especially if larger groups.

G. Application for a day badge is different than for a permanent badge. After the COR has received and approved the required documents, a day badge goal is a visit to the Police. A permanent badge requires a visit with the COR, then the badging office for fingerprinting, etc – a much longer process.

3. Day Badge A. If only applying for a day badge, then four (of the six) items are required:

(1) Rules of the Facility for Construction Contractors.

(2) VA Privacy Training.

Page 2 of 4 Version 160503

(3) Current OSHA Card.

(4) Government ID Card (driver’s license, passport, etc) to be presented to the police for the issue of a

Day Badge. Do Not E-Mail a copy of a Government ID Card.

B. The Super provides the first two documents to the applicant to be reviewed and signed.

C. The Super scans in the two signed documents and the OSHA card and sends an email to the COR group with those three items attached. Hard copy submission is not permitted.

(1) Only scan in the signed page of each document to keep scan file size down and be a little faster. Also, the OSHA card could be scanned on the same page as the Rules signed paged (just don’t hide the signature). All three items could be on one attachment.

(2) One email per applicant.

(3) The subj line of the email is to exactly follow this format: Last Name, First Name, Company Name, and the date of the email in format yymmdd, then “- Day Badge Application”. So, it would look like, “Smith, Joe, 170714 – Day Badge Application”. (This allows for an easy to find, sorted by last name, email in some email folder). The body of the email should include the name of the project and the date range the applicant is expected to be on-site. Example: “Project title is Renovate Bldg 1234. Joe is expected to be on-site 3 Mar 2023 – 30 Sep 2023.”

D. COR will review the email and, if approved, will forward to the Police with “Day badge is endorsed for subj contractor employee”, with a copy to the Super. Once the Super has seen this return email, the applicant may go straight to the Police and get the day badge (Bldg 1D, 1st floor). The Police will require physical presentation of the applicant’s government ID card.

E. Once the email is approved, no more emails are required for that applicant. If the COR does not approve, the return email will only be sent to the Super with the required correction indicated for email resubmission.

F. To repeat, the Police will issue no more than 15 day badges and will require sighting the applicant’s government ID card each of those 15 visits. After 15 day badges, the employee is not permitted on-station unless they have a permanent badge. It takes up to a week to get a permanent badge.

4. Permanent Badge A. Contractor employees expected to be on-site more than fifteen days will need to apply for permanent badging.

B. To repeat, Police only issue fifteen days of day badges. Unless the employee has a permanent badge by then, the employee is not authorized to be on-site. It takes up to seven days to get a permanent badge from the time the applicant’s fingerprints are taken at the badge office, and a couple days to schedule the appointment with the COR and badging office.

C. A contractor employee is permanently badged for a specific duration associated with one project on hospital grounds. During that time their services may be shared with another project if that scenario exists. (If they already have a permanent badge, they don’t need to reapply.)

D. To obtain a permanent badge, contractor employees are “sponsored” by the COR. You will see the word “Sponsor” several times on document VASNHCS Facility Identification Badge Request Form (described below).

E. Communicate with your COR regarding any preference the COR may have for days/times for processing badging. The badging office will accept up to three walk-ins a day (after COR meeting), any more than three requires 24-hour notice – let your COR know so they can schedule.

F. After the applicant has completed the paperwork and the Super has reviewed, the next stop is with the COR. The email with the attached three items associated with the day badge should have previously been sent and approved. The Super should accompany the applicant to see the COR, or arrange for other escort. Plan to meet about 30 minutes prior to the scheduled appointment with the badge office.

Page 3 of 4 Version 160503

G. Two additional documents are required for permanent badge application. Avoid delay by ensuring accuracy. The two additional documents are:

(1) Completed “Document VASNHCS Facility Identification Badge Request Form, Request for Personal

Identity Verification Card”

(2) Completed “Required Information for Fingerprinting”.

H. The badging office requires hard copy of these two documents.

I. The COR will validate completeness of these two additional documents, then sign the Document

0711, then send the applicant to the badging office with the two documents and government ID card. The badging office is located in building 1A, 1st floor, room D1447; check-in with the receptionist.

J. The badging office personnel will review the documents and take the applicant’s fingerprints.

K. The applicant may visit the badging office between the hours of 8a-3p any day of the work week to see if the permanent badge is ready for pickup. It normally takes 3-4 days but may take up to 7.

L. When the badge is no longer needed, it is critical the permanent badge gets returned – either to the badge office or to the COR.

5. Details of the Six Items A. An email from the Super to the COR group containing attachments detailed in paragraphs B-D below is required prior to the 1st day the applicant intends to work on-site (24 hour notice should suffice). Item E is physically required at every badge meeting, whether day badge or permanent. Items F&G (hard copy) are required for permanent badging; they are not required to be submitted the first day – but it is encouraged.

B. Rules of the Facility for Construction Contractors

(1) Applicant reviews document, signs, and dates.

(2) Super scans signature page and attaches to the COR group email.

C. VA Privacy Training

(1) Applicant reviews document, signs, and dates.

(2) Super scans signature and attaches to the COR group email.

D. Current OSHA Card

(1) Super scans and attaches to the COR group email. It may be on the same scan as the Rules document as long as the signature is not covered.

(2) 30 hour card required for superintendent and safety officer, 10 hour card for all others.

E. Identification

(1) One of the following forms of government identification is to be physically presented at every badge meeting whether day badge or permanent:

(a) Driver’s License

(b) Nevada Identification Card (also issued by DMV).

(c) Passport

(d) An ID card with photo from any US government agency will normally suffice.

F. “Document VASNHCS Facility Identification Badge Request Form, Request for Personal Identity Verification Card”

(1) Legibility is critical. The badging office will reject any documents which are not legible.

(2) Requires input by both the applicant and the COR.

(3) Section I – Applicant completes all fields. Ensure field 7, “Home Address”, is current. Ensure the applicant signs and dates form.

(4) Section II – Sponsor completes.

(a) Part B: Sponsor completes.

(b) Part C: Sponsor completes.

(c) Part D: Sponsor completes.

(5) Section III – Badging office completes

(a) Part B: Badging office completes

Page 4 of 4 Version 160503

G. “Required Information for Fingerprinting”

(1) Legibility is critical. The badging office will reject any documents which are not legible.

(2) Applicant fills down to the horizontal double bar.

Contractor Badging - Guidance to the Contractor
Last update: 6 January 2020
Last update: 6 January 2020
1. General
A. Badges must be worn at all times while on VA property whether temporary (day badge) or permanent.
B. The Super/PM (Super) is to ensure all employees are wearing a badge – if employee is on-site and working, and has no badge, that employee should be sent off-site for the rest of the day. Unless extenuating circumstances, do not allow the employee ...
C. A permanent badge will be issued normally within seven days of bringing acceptable badging paperwork to the badging office. Day badges will be issued in the interim.
D. Types of badges
(1) Day badge. Issued daily by the Police not to exceed 15 days.
(2) Permanent badge. Issued for designated date range employee expects to be on-site. Date range not to exceed 365 days for the routine contractor badge. If over 365 days is anticipated, then a different badge is to be pursued requiring additional ...
E. There are six items required in the badging process, four documents and two other items.
F. The first action for any type of badge is between the Super and the applicant to complete the documents. The next action is a scan and email by the Super to the COR group of several documents.
G. Emails related to badging with personal information are prohibited. Badging packets shall be hand carried to the COR by the Super.
2. Prior to applicant’s first time working on station
A. The Super hopefully already have the necessary documents (detailed lower down). These documents might have been provided as an attachment in the contract, or provided by the COR.
B. The Super is to make the necessary hard copies to satisfy badging requirements indicated herein.
C. Super gets the documents completed and signed by the applicant. (There are a total of six items: four documents requiring signature and two cards carried always by the applicant).
D. Super reviews to confirm completeness and accuracy
E. Super hand caries three of the six items to the COR group.
F. Super contacts COR, and based upon the badge action pursued:
(1) If request is only for a day badge, 24-hour advance notice appreciated.
(2) If for perm badge application, then Super schedules a badge meeting to include COR, Super, and applicants. The COR may elect to have a certain day/time designated for processing badging, especially if larger groups.

G. Application for a day badge is different than for a permanent badge. After the COR has received and approved the required documents, a day badge goal is a visit to the Police. A permanent badge requires a visit with the COR, then the badging offi...

3. Day Badge
A. If only applying for a day badge, then four (of the six) items are required:
(1) Rules of the Facility for Construction Contractors.
(2) VA Privacy Training.
(3) Current OSHA Card.
(4) Government ID Card (driver’s license, passport, etc) to be presented to the police for the issue of a Day Badge. Do Not E-Mail a copy of a Government ID Card.
B. The Super provides the first two documents to the applicant to be reviewed and signed.
C. The Super scans in the two signed documents and the OSHA card and sends an email to the COR group with those three items attached. Hard copy submission is not permitted.
(1) Only scan in the signed page of each document to keep scan file size down and be a little faster. Also, the OSHA card could be scanned on the same page as the Rules signed paged (just don’t hide the signature). All three items could be on one at...
(2) One email per applicant.
(3) The subj line of the email is to exactly follow this format: Last Name, First Name, Company Name, and the date of the email in format yymmdd, then “- Day Badge Application”. So, it would look like, “Smith, Joe, 170714 – Day Badge Application”. ...
D. COR will review the email and, if approved, will forward to the Police with “Day badge is endorsed for subj contractor employee”, with a copy to the Super. Once the Super has seen this return email, the applicant may go straight to the Police and ...
E. Once the email is approved, no more emails are required for that applicant. If the COR does not approve, the return email will only be sent to the Super with the required correction indicated for email resubmission.
F. To repeat, the Police will issue no more than 15 day badges and will require sighting the applicant’s government ID card each of those 15 visits. After 15 day badges, the employee is not permitted on-station unless they have a permanent badge. It...
4. Permanent Badge
A. Contractor employees expected to be on-site more than fifteen days will need to apply for permanent badging.
B. To repeat, Police only issue fifteen days of day badges. Unless the employee has a permanent badge by then, the employee is not authorized to be on-site. It takes up to seven days to get a permanent badge from the time the applicant’s fingerprin...
C. A contractor employee is permanently badged for a specific duration associated with one project on hospital grounds. During that time their services may be shared with another project if that scenario exists. (If they already have a permanent bad...
D. To obtain a permanent badge, contractor employees are “sponsored” by the COR. You will see the word “Sponsor” several times on document VASNHCS Facility Identification Badge Request Form (described below).
E. Communicate with your COR regarding any preference the COR may have for days/times for processing badging. The badging office will accept up to three walk-ins a day (after COR meeting), any more than three requires 24-hour notice – let your COR kn...
F. After the applicant has completed the paperwork and the Super has reviewed, the next stop is with the COR. The email with the attached three items associated with the day badge should have previously been sent and approved. The Super should accom...
G. Two additional documents are required for permanent badge application. Avoid delay by ensuring accuracy. The two additional documents are:
(1) Completed “Document VASNHCS Facility Identification Badge Request Form, Request for Personal Identity Verification Card”
(2) Completed “Required Information for Fingerprinting”.
H. The badging office requires hard copy of these two documents.
I. The COR will validate completeness of these two additional documents, then sign the Document 0711, then send the applicant to the badging office with the two documents and government ID card. The badging office is located in building 1A, 1st floor...
J. The badging office personnel will review the documents and take the applicant’s fingerprints.
K. The applicant may visit the badging office between the hours of 8a-3p any day of the work week to see if the permanent badge is ready for pickup. It normally takes 3-4 days but may take up to 7.
L. When the badge is no longer needed, it is critical the permanent badge gets returned – either to the badge office or to the COR.
5. Details of the Six Items
A. An email from the Super to the COR group containing attachments detailed in paragraphs B-D below is required prior to the 1st day the applicant intends to work on-site (24 hour notice should suffice). Item E is physically required at every badge m...
B. Rules of the Facility for Construction Contractors
(1) Applicant reviews document, signs, and dates.
(2) Super scans signature page and attaches to the COR group email.
C. VA Privacy Training
(1) Applicant reviews document, signs, and dates.
(2) Super scans signature and attaches to the COR group email.
D. Current OSHA Card
(1) Super scans and attaches to the COR group email. It may be on the same scan as the Rules document as long as the signature is not covered.
(2) 30 hour card required for superintendent and safety officer, 10 hour card for all others.
E. Identification
(1) One of the following forms of government identification is to be physically presented at every badge meeting whether day badge or permanent:
(a) Driver’s License
(b) Nevada Identification Card (also issued by DMV).
(c) Passport
(d) An ID card with photo from any US government agency will normally suffice.
F. “Document VASNHCS Facility Identification Badge Request Form, Request for Personal Identity Verification Card”
(1) Legibility is critical. The badging office will reject any documents which are not legible.
(2) Requires input by both the applicant and the COR.
(3) Section I – Applicant completes all fields. Ensure field 7, “Home Address”, is current. Ensure the applicant signs and dates form.
(4) Section II – Sponsor completes.
(a) Part B: Sponsor completes.
(b) Part C: Sponsor completes.
(c) Part D: Sponsor completes.
(5) Section III – Badging office completes
(a) Part B: Badging office completes
G. “Required Information for Fingerprinting”
(1) Legibility is critical. The badging office will reject any documents which are not legible.