Attachment 5 - AF66 Schedule of Material Submittals 23-1024.xlsx

XLSX spreadsheet 143 KB Posted

Attached to
RPR School HVAC B314 Federal contract opportunity
Solicitation number
FA557525B0014
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

The document is a Schedule of Material Submittals for Project QUUG 23-1024, detailing the RPR School HVAC System renovation at Moron Air Base in Spain. The comprehensive submittal schedule covers multiple construction sections including general conditions, demolition, masonry, structural steel, insulation, firestopping, HVAC systems, cybersecurity, electrical distribution, and fire alarm systems. The project requires 137 specific material and documentation submittals across various technical disciplines, with each item specifying the number of required copies and precise submission timeline relative to contract award or inspection dates.

The associated federal contract opportunity is a solicitation (FA557525B0014) for the HVAC system project, valued between $500,000 and $1,000,000. The project is specifically restricted to local Spanish sources authorized to execute government works. Key procurement dates include a pre-proposal conference on 25 Jul 2025, question submission deadline of 4 Aug 2025, and bid submission deadline of 10:00 hours local time on 18 Aug 2025. The procurement is being conducted by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa, with multiple contracting points of contact provided. Notable requirements include using Spanish material, labor, and equipment whenever feasible, and compliance with Spanish legislative standards for government work execution.

View the file

Other files for this federal contract opportunity

Other files attached to RPR School HVAC B314, newest first.
File Type Posted
Attachment 1 - Specifications Eng 23-1024.pdf PDF
Solicitation - FA557525B0014.pdf PDF
Attachment 2 - Especificaciones Sp 23-1024.pdf PDF
Attachment 4 - Blank Cost Estimate 23-1024.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedul

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 23-1024PROJECT TITLE
RPR SCHOOL HVAC SYSTEM, B #314SOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNUMBER OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
CERTIFICATE OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTS
APPROVED

: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

DISAPPROVED

: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

SECTION 01 11 01

GENERAL CONDITIONS

01Warranty letter1Acceptance+15
02Construction Schedule1Contract Award+7
03Progress Schedule1Contract Award+10
04Work Plan1Contract Award+7
05DD Form 13541Final Inspection-10
06As-Built drawings1Final Inspection-5
07Mobility Plan1Contract Award+15
08Project Sign1Contract Award+15
09Quality Control Plan1Final Inspection+15
10Waste & construction debris management1Final Inspection
11Key Staff1Final Inspection+15
12Environmental Protection Plan1As-Built Drawings+10
13Spatial Data1Final Inspection-5
14Health and safety Plan1Contract Award+15
SECTION 02 41 00

DEMOLITION

15Demolition Plan1CWC + 15
16Existing conditions1
17Authorized dump or treatment and recovery plant1
18Delivery and disposal certificate1
SECTION 04 20 00

MASONRY

19Brick111
SECTION 05 12 00

STRUCTURAL STEEL

20Welding procedures and qualifications1
SECTION 05 50 13

MISCELLANEOUS METAL FABRICATIONS

21Handrails11
22Steel welding inspection results1
23Welding procedures and qualifications1
SECTION 07 22 00

ROOF AND DECK INSULATION

24Roofing Panels/siding Panels11
25Flashing111
26Mastic11
27Sealant for Expansion Joints11
28Watertight test1
29Watertight test1
SECTION 07 84 00

FIRESTOPPING

30Fillers1
31Firestopper Products11
SECTION 07 92 00

JOINT SEALANTS

32Sealants, Primers and Bond Brakers1
SECTION 09 29 00

GYPSUM BOARD

33Water resistant gypsum boards1
34Gypsum board11
35Suspension system1
36Instructions1
37Asbestos Free Materials1
SECTION 09 51 00

ACOUSTICAL CEILINGS

38Acoustic Waterproof Ceiling111
SECTION 09 90 00

PAINTS AND COATINGS

39Coating1111
40Lead Coating1
41Delivery Tickets1
SECTION 23 00 00

AIR SUPPLY, DISTRIBUTION, VENTILATION AND EXHAUST SYSTEMS

42Dedicated Outdoor Air System DX (DOAS)11
43VRF systems units11
44Air curtain11
45Exhaust fans11
46Copper pipes for refrigerants11
47Operation and Maintenance Manuals1
48Extra Materials for Maintenance1
SECTION 23 05 48.19

SEISMIC BRACING FOR HVAC

49Equipment Requirements11
50Cupling and Bracing11
51Seismic System1
52Seismic System Certification1
SECTION 23 07 00

THERMAL INSULATION FOR MECHANICAL SYSTEMS

53Refrigerant piping insulation1
54Duct insulation1
55Insulation aluminum jacket1
SECTION 23 09 23.02

BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS

56Configuration Software1
57Controller Configuration Settings1
58Programming Software1
59Proprietary Multi-Split Engineering Tool Software1
60Manufacturer´s Product Data1
61Niagara Framework Supervisory Gateway Backups1
62Niagara Framework Engineering Tool1
63Niagara Framework Wizards1
64Existing Conditions Report1
65Pre-Construction Quality Control (QC) Checklist1
66Post-Construction Quality Control (QC) Checklist1
67Start-Up Testing Report1
68Performance Verification Test Report1
69Closeout Quality Control (QC) Checklist1
70Training Documentation1
SECTION 23 31 13.00 40

METAL DUCTS

71Supply, Exhaust and Return Grilles (interior and outside)1
72Sheet metal for rectangular ducts.1
73Sheet metal for circular ducts.1
74Manual balancing dampers.1
75Diffusers1
76Supply and Return Grills and Diffusers1
77Fire dampers1
78Low leakage dampers1
79Flexible duct materials1
80Testing and balancing of ductwork systems.1
81Cleaning Report1
82Duct cleaning company quality certificate1
83Independent TAB Agency and Personnel Qualifications1
SECTION 25 05 11

CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS

84Network Communication Report1
85Cybersecurity Riser Diagram/Network Architecture Diagram1
86Wireless and Wired Broadcast Communication Request1
87Account Lock Exception Request1
88Multiple Ethernet Connection Device Request1
89Contractor Computer Cybersecurity Compliance Statements1
90Contractor Temporary Network Cybersecurity Compliance Statements1
91Cybersecurity Interconnection Schedule1
92Proposed STIG and SRG Applicability Report1
93Control System Cybersecurity Documentation1
94Control System Cybersecurity Testing Procedures1
95Control System Cybersecurity Testing Report1
96Enclosure Keys1
97Software and Configuration Backups1
98Auditing Front End Software1
99Device Audit Record Upload Software1
100System Maintenance Tool Software1
101Control System Scanning Tools1
102STIG, SRG and Vendor Guide Compliance Result Report1
103Control System Inventory Report1
104Software Licenses1
105Accounts1
106Hardware List1
107Software List1
108Questionnaire1
SECTION 26 20 00

INTERIOR DISTRIBUTION SYSTEM

109Circuit Breakers1
110Conduit and fittings (one of each type)1
111Wires and cables1
112Junction boxes1
113Panel Board1
114Panel Board1
115Panel Board1
116Surge Protective Device1
117Surface raceways1
118Labels1
119Safety switches1
120Emergency HVAC Shut-Off Push Buttons1
121Damper actuators and transformers1
1220.6/1 kV insulation test.1
123Electrical Systems1
SECTION 28 31 76

INTERIOR FIRE ALARM SYSTEM

124Duct smoke detector1
125Smoke detector1
126Fire Alarm Control Panel (FACP)1
127Control panel interior wiring diagrams1
128Point-to-point wiring diagrams1
129Battery power calculations1
130Nameplates1
131Wiring Diagrams1
132Operation and Maintenance (O&M) Instructions1
133Instruction of Government Employees1
134Field Quality Control1
135Testing Procedures1
136System Operation1
137Fire Alarm1

&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 23-1012TÍTULO DE PROYECTO:
EDI: ADD MUNITIONS PERIMETER ROAD, F2010SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNNUMBER OF COPIES REQUIREDFECHA DE ENTREGAFECHA RECEPCIÓN EN CONTRATACIÓNFECHA EN INGENIERíA CIVILFECHA LÍMITE DE DEVOLUCIÓNNÚMERO DE MUESTRAFECHA NOTIFICACIÓN A CONTRATISTASEGUNDA PRESENTACIÓN DEL CONTRATISTAAPROBACIÓN FINALOBSERVACIONES
CERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPO
APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

SECCIÓN 01 11 01

CONDICIONES GENERALES

01Carta de garantía1Acceptance+15
02Programa de obra1Contract Award+7
03Programa de avance de obra1Contract Award+10
04Plan de obra1Contract Award+7
05DD Form 13541Final Inspection-10
06Planos As-Built1Final Inspection-5
07Plan de movilización1Contract Award+15
08Proyecto firmado1Contract Award+15
09Plan de control de calidad1Final Inspection+15
10Certificado de gestión de residuos y escombros1Final Inspection
11Personal clave1Final Inspection+15
12Plan de protección medioambiental1As-Built Drawings+10
13Datos especiales1Final Inspection-5
14Plan de salud y seguridad1Contract Award+15
SECCIÓN 03 30 00

HORMIGÓN VERTIDO IN SITU

15Certificado de la inspección de la central de fabricación1
16Programa de ensayo de control de hormigón1
17Resultado de los ensayos de control de hormigón1
18Catálogo de la lámina de polietileno1
19Programa de control de calidad1
SECCIÓN 31 00 00

MOVIMIENTO DE TIERRA

20Excavación o pozos1
21Rellenos y terraplenes1
22Material para relleno1
23Material para explanada1
SECCIÓN 31 05 19

GEOTEXTIL

24Geotextile11
25Control de ejecución1
SECCIÓN 32 03 30

TERRAPLENES

26Identificación de suelo tolerable1
27Control de procedencia de suelo seleccionado1
28Tramo de prueba del suelo tolerable1
29Tramo de prueba del suelo seleccionado1
30Plantas1
31Control de recepción de suelo tolerable1
32Control de recepción de suelo seleccionado1
SECCIÓN 32 05 10

ZAHORRA

33Control de procedencia de los áridos11
34Fórmula de trabajo1
35Tramo de prueba1
36Control de recepción1
SECCIÓN 32 05 30

RIEGO DE IMPRIMACIÓN

37Superficies existentes1
38Control de procedencia del riego de imprimación11
39Control de procedencia del árido de cobertura11
40Dotación del riego de imprimación a aplicar1
41Dotación del árido de cobertura a extender1
42Control de ejecución1
SECCIÓN 32 05 31

RIEGO DE ADHERENCIA

43Control de procedencia del riego de adherencia11
44Dotación del riego de adherencia a aplicar1
45Control de ejecución1
46Control de recepción tras la colocación de la siguiente capa1
SECCIÓN 32 05 32

RIEGO DE CURADO

47Control de procedencia del riego de curado11
48Control de procedencia del árido de cobertura11
49Doptación del riego de curado a aplicar1
50Dotación del árido de cobertura a extender1
51Control de ejecución1
SECCIÓN 32 05 42

MEXCLAS BITUNIMOSAS TIPO HORMIGÓN BITUMINOSO

52Control de procedencia del betún11
53Control de procedencia de los áridos11
54Control de procedencia del polvo mineral11
55Central de fabricación1
56Fórmula de trabajo1
57Tramo de prueba1
58Plan de pavimento1
59Control de fabricación11
60Control de extensión y compactación1
61Control de recepción1
SECCIÓN 32 07 00

MARCAS VIALES

62Marcado CE de pintura1
63Marcado CE de microesferas de vidrio1
64Sistema de señalización durante la pintura1
65Ensayos de comprobación1
SECCIÓN 32 07 01

SEÑALES Y CARTELES VERTICALES DE CIRCULACIÓN RETRORREFLECTANTES

66Marcado CE de la señal1
67Systema de señalización durante la instalación1
68Dimensionado de la cimentación1
SECCIÓN 32 31 13.53

VALLAS Y PUERTAS DE ALTA SEGURIDAD

69Malla metálica11
70Cable de rechazo de vehículos1
71Postes1
72Tirantes y Rieles1
73Barras de camilla1
74Alambres de atar1
75Alambre de tensión1
76Alambre de espino1
77Soportes para alambre de espino1
SECCIÓN 33 40 00

INSTALACIONES DE DRENAJE DE PLUVIALES

78Marcos1
79Sellantes1
80Marcos rectangulares11
81Pasatubos1
82Accesorios1
83Materiales de unión1
SECCIÓN 33 71 01

TRANSMISIÓN Y DISTRIBUCIÓN AÉREA

84Conductores, conectores y empalmes1
85Aisladores1
86Postes de hormigón1
87Postes de hormigón1
88Crucetas de acero galvanizado1
89Pruebas de resistencia a tierra1
90Control de calidad de campo1
91Comprobaciones y pruebas de aceptación1
SECCIÓN 33 71 02

DISTRIBUCIÓN ELÉCTRICA ENTERRADA

92Arquetas eléctricas y de telecomunicaciones1
93Trazado de líneas subterráneas1
94Cable de baja tensión1
95Cable de alta tensión1
96Kit de terminación de caucho de silicona1
97Picas de tierra1
98Cables de tierra1
99Soldadura Exotérmica Cadweld1
100Cinta de advertencia e identificación enterrada1
101Arquetas1
102Conductos (ambos tipos)1
103Informes de prueba1