Attachment 4 - Blank Cost Estimate 23-1024.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
RPR School HVAC B314 Federal contract opportunity
Solicitation number
FA557525B0014
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

The file is a detailed cost estimate spreadsheet for the RPR School HVAC B314 project at Moron Air Base, Spain, with a projected project value between $500,000 and $1,000,000. The comprehensive cost breakdown includes multiple work categories such as demolition, architectural works, sewage system, fire alarm system, HVAC system, electrical system, and cybersecurity system. The cost estimate template allows for itemized tracking of material costs, labor costs, and other direct costs, with provisions for calculating overhead and profit percentages.

The associated federal contract opportunity, issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa, specifies critical procurement details including a pre-proposal conference on 25 Jul 2025, a question submission deadline of 4 Aug 2025, and bid submission deadline of 18 Aug 2025 at 10:00 hours local time. The solicitation is exclusively for local sources (companies licensed and registered to conduct construction business in Spain) and notes that funds are not currently available, with bid acceptance valid through 31 Dec 2025. Contractors must comply with the Defense and Cooperation Agreement between the United States and Spain, prioritizing Spanish material, labor, and equipment when feasible.

View the file

Other files for this federal contract opportunity

Other files attached to RPR School HVAC B314, newest first.
File Type Posted
Solicitation - FA557525B0014.pdf PDF
Attachment 1 - Specifications Eng 23-1024.pdf PDF
Attachment 5 - AF66 Schedule of Material Submittals 23-1024.xlsx XLSX spreadsheet
Attachment 2 - Especificaciones Sp 23-1024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KTR-RPR SHCHOOL HVAC

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR SCHOOL HVAC SYSTEM, B 3140ERROR:#DIV/0!$
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 23-1024
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
DEMOLITION WORKS
TRABAJOS DE DEMOLICIÓN
Architecural Demolition
Trabajos de demolición de arquitectura
1Minor selective interior demolition (false ceiling, partitions, walls etc)
Demolición interiores selectiva menores(falso techo, particiones, muros,etc)Ls
2Roof selective demolition
Demolición selectiva de cubiertaLs
3Structural Couryard selective demolition
Demolición selectiva de patio de instalacionesLs
Demolition HVAC system
Trabajos de demolición del sistema de climaticación
4Selective HVAC system duct demolition and accesories
Demolición selectiva de conductos del sistema de climatización y accesoriosml
5Demolition HVAC equipment
Demolición de los equipos de climatizaciónUd
TOTAL DEMOLITION WORKS
TOTAL TRABAJO DE DEMOLICIÓN
NEW WORKS
NUEVOS TRABAJOS
Architectural works
Trabajos de arquitectura
6Minor selective works (false ceiling, partitions, etc)
Trabajos menores (falso techo, paredes, etc)Ls
7Galvanized steel structural (couryard) including handrail
Estructura acero galvanizada (patio de instalaciones)incluyendo barandillaml
8Tramex 30x2mm and accesories
Trámex 30x2mm y accesoriosm2
9Double galvnized mmicro performed sheetl siden panel 0,6mm and injected polyuretane rigid foam and galvanized steel structure
Panel de chapa de acero micro gracada galvanizada doble de 0,6mm con aislamiento de poliuretano y estructura galvanizada de acerom2
Total, Architectural Works
Total,trabajos de arquitectura
Sewage System
Sistema de saneamiento
10Dry well
Pozo secoUd
Total, Sewage Works
Total,trabajos de saneamiento
Fire Alarm System
Sistema de Alarmas contra Incendios
11Adjustment in the existing Fire Alarm System (duct smoke detector, etc)
Ajustes en el sistema de alarmas contra Incendios(sensor de humos en conductos)Ls
12Fire Alarm Control Panel FACP
Panel de control de Alarmas FACPUd
Total Fire Alarm System
Total del Sistema de Alarmas contra Incendios
HVAC System
Sistema de climatización
13Dedicated Out door Air System DX (DOAS)
Unidad de tratamiento de aire de expansión directaUd
14VRF Systems
Sistema VRFUd
15Exhaust fan system
Sistema de extractor de aireLs
16Cooper piping
Tuberías de cobreLs
17Metal Duct, diffusers and grilles
Conductos metálicos, difusores y rejillasLs
18Existing duct cleaning and disinfection
Limpieza y desinfección de conductos existentesUd
19Central Control (Bacnet)
Control central(Bacnet)Ud
Total HVAC System
Total Sistema de climatización
Electrical System
Sistema eléctrico
20Local panel (LP)
Panel Local (LP)Ud
21RGSC Conduits 2"
Conductos RGSC de 2"ml
22EMT Conduits 2"
Conductos EMT de 2"ml
23EMTConduits 1"
Conductos EMT de 1"ml
24Wiring Three Phase 35mm2
Cableado Trifásico 35mm2ml
25Wiring Three Phase 25mm2
Cableado Trifásico 25mm2ml
26Wiring Three Phase 16mm2
Cableado Trifásico 16mm2ml
27Wiring Three Phase 10mm2
Cableado Trifásico 10mm2ml
28Wiring Single Phase 4mm2
Cableado Monofásico 4mm2ml
29Safety switches 80A NEMA 3R 3P
Interruptores de seguridad 80A NEMA 3R 3FUd
30Safety switches 60A 3P
Interruptores de seguridad 60A 3FUd
31Safety switches 45A 3P
Interruptores de seguridad 45A 3FUd
32Safety switches 20A NEMA 2 2P
Interruptores de seguridad 20A NEMA 2 2FUd
33Fire Dampers
Compuerta cortafuegoUd
Total Electrical System
Total Sistema eléctrico
Cybersecurity System
Sistema de Ciberseguridad
34Cybersecurity
CiberseguridadLs
Total Cybersecurity System
Total Sistema de Ciberseguridad
TOTAL NEW WORKS
TOTAL TRABAJO DE NUEVA CONSTRUCCIÓN
TOTAL
TOTAL

TOTAL MATERIAL COSTS 0.00

TOTAL LABOR COSTS 0.00

TOTAL OTHER DIRECT COSTS 0.00

TOTAL DIRECT COSTS 0.00

OVERHEAD % 0.00

SUBTOTAL 0.00

PROFIT % 0.00

TOTAL PROJECT EUROS0.00
RATE $1€
TOTAL PROJECT US $ERROR:#DIV/0!
DATE:FIRM NAME:

TITLE: PREPARED BY:

These costs and overhead and profit will be applied in any possible future modifications

Page &P image1.png

File details come from the government source that posted it. Updated .