Attachment 5 - Accident Prevention Plan - Health and Safety Plan.pdf

PDF 176 KB Posted

Attached to
Building 45 DPW Repair Renovation
Solicitation number
W911QY26RA025
Issued by

About this file

This is a template for an Accident Prevention Plan and Health and Safety Plan required by the Department of the Army, US Army Installation Management Command at the Natick Soldiers Systems Center in Natick, Massachusetts.

The document serves as a structured framework that contractors must complete to demonstrate their safety and health management approach for Army projects. The template requires contractors to provide background information including contractor name, contract number, project name, and project description. Contractors must establish a written safety policy with documented goals and objectives, identify personnel responsible for safety and health at both corporate and project levels, and demonstrate equivalent training to OSHA 30-Hour Classes. The plan requires identification of all subcontractors and suppliers along with their assigned safety responsibilities, designation of specific individuals responsible for conducting safety inspections, and procedures for incident reporting and investigation including mishap investigations, reports, and exposure data logs. Additionally, contractors must develop site sanitation and housekeeping plans along with demolition and renovation plans as applicable to their project scope. The document requires signature authorization from the plan preparer, approver, and those providing concurrence, establishing clear lines of authority and accountability for occupational safety and health compliance throughout contract execution.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

US ARMY GARRISON DPW

NATICK SOLDIERS SYSTEMS CENTER

10 GENERAL GREENE AVENUE

NATICK MA 01760

1 | P a g e

ACCIDENT PREVENTION PLAN

HEALTH AND SAFETY PLAN

TABLE OF CONTENTS

A. Signature Sheet

1. Plan Preparer

2. Plan Approver

3. Plan Concurrence

B. Background Information

1. Contractor Name

2. Contract Number

3. Project Name

4. Brief Project Description

C. Statement of Health and Safety Policy

1. Contractor’s Written Safety Program Goals

2. Contractor’s Written Safety Program Objectives

3.

D. Responsibilities and Lines of Authority

1. Statement of Ultimate Responsibility

2. Identification and accountability of personnel responsible for safety and health at both the corporate and project level

3. Equivalent Training to the OSHA 30-Hour Classes is Being Presented as Qualification

E. Subcontractors and Suppliers

1. Identification of Subcontractors and Suppliers

2. Safety Responsibilities of Subcontractors and Suppliers

F. Safety and Health Inspections

1. Specific Assignment of Responsibilities

1.a Name(s) of Individual(S) Responsible for Conducting Safety Inspections

G. Incident Reporting and Investigation

1. Exposure Data

1.a Mishap Investigations, Reports and Logs

H. Plans, Programs and Procedures

1. Site Sanitation/Housekeeping Plan

2. Demolition/Renovation Plan

File details come from the government source that posted it. Updated .