Attachment 5- 692-24-103 Improve Campus Parking Lots and Roadways Pricing Workbook.xlsx

XLSX spreadsheet 306 KB Posted

Attached to
Z1LZ--692-24-103 Improve Campus Parking Lots and Roadways
Solicitation number
36C26024R0066
Issued by

About this file

This document is a Pricing Workbook for a federal construction contract opportunity with the Department of Veterans Affairs. The contract is for improving campus parking lots and roadways, and the pricing is broken down by construction work divisions such as demolition, concrete, finishes, and site work. The contract period of performance is from July 15, 2024 to September 18, 2024. The contract will be firm-fixed price, and all pricing must be valid for a minimum of 90 days. The contractor is required to provide an itemized list of any overhead, taxes, or other fees. This workbook provides instructions for completing the pricing schedule, but does not contain actual pricing information. The related federal contract opportunity is Solicitation Number 36C26024R0066 for the same project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS

1Offeror is solely responsible for determining accuracy of calulations of Subtotals andTotals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is firm fixed price and must be good, per page 1 of the SF1442, for a minimum of 90 days.
6For Lines 50 and 51 (overhead), pick a method of calculation.
7For any Lines requiring an itemized list, failure to provide an itemized list if costs are identified there may be determined as non-responsive.
8Fill in all Lines on this document relevant to your offer and mark all Lines not relevant as Not Applicable or N/A.
9For the "Items" tab- fill in only the highlighted field with the total price.

Price Breakout Worksheet

PRICE SCHEDULE BREAKDOWN
692-24-103 Improve Campus Parking Lots and Roadways
LIN 0001
RatesBase Item
General Requirements & Facility ConstructionPrice
Division Item 1 General RequirementsN/A
Division Item 2 Existing Conditions (demolition)N/A
Division Item 3 Concrete (furnish and install)N/A
Division Item 4 Masonry (furnish and install)N/A
Division Item 5 Metals (furnish and install)N/A
Division Item 6 Woods, Plastic and Composites (furnish and install)N/A
Division Item 7 Thermal and Moisture Protection (furnish and install)N/A
Division Item 8 Openings (furnish and install)N/A
Division Item 9 Finishes (furnish and install)N/A
Division Item 10 Specialties (furnish and install)N/A
Division Item 11 Equipment (furnish and install)N/A
Division Item 12 Furnishes (furnish and install)N/A
Division Item 13 Special Construction (furnish and install)N/A
Division Item 14 Conveying Equipment (furnish and install)N/A
Facility Services Subgroup
Division Item 21 Fire Suppression (furnish and install)N/A
Division Item 22 PlumbingN/A
Division Item 23 Heating, Ventilating and A/C (furnish and install)N/A
Division Item 25 Integrated AutomationN/A
Division Item 26 ElectricN/A
Division Item 27 CommunicationsN/A
Division Item 28 Electronic Safety & SecurityN/A
Site & Infrastructure Subgroup
Division Item 31 EarthworkN/A
Division Item 32 Exterior ImprovmentsN/A
Division Item 33 UtilitiesN/A
Division Item 34 TransportationN/A
Division Item 35 Waterway & Marine ConstructionN/A
Process Equipment Subgroup
Division Item 40 Process InterconnectionsN/A
Division Item 41 Material Processing & Handling EquipmentN/A
Division Item 42 Process Heating, Cooling, & Drying EquipmentN/A
Division Item 43 Process Gas & Liquid HandlingN/A
Division Item 44 Pollution & Waste Control EquipmentN/A
Division Item 45 Industry Specific Mfg. EquipmentN/A
Division Item 46 Water & Wastewater EquipmentN/A
Division Item 48 Electrical Power GenerationN/A

TOTAL DIVISIONS $0.00

Insurance / BondsN/A
Taxes / Other Fees (provide itemized list)N/A
O&M Manuals and Red Line DrawingsN/A
OverheadRate _______%
Overhead (daily rate)Per Day $0.00
SubContract Mark-UpRate _______%
ProfitRate _______%
SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS$0.00
TOTAL$0.00

Items

Item NumberSLINDescriptionRef CLINCommentInclude Comments in DocumentContract PeriodPop BeginPop EndQuantityUnit of MeasurePackaging MultipleReceipt TypeLine Item IsUnit PriceItem Discount Type NameItem DiscountDate UpdatedAddress1Address2Address3CityStateZipZip4CountryMark ForContact NameContact PhoneContact EmailDelivery DateFOBSpecial InstructionsInclude Instructions/Comments in DocumentInclude Data Values in DocumentPRINCIPAL NAICS CODEPRODUCT/SERVICE CODEUNSPSCSIC CODEMANUFACTURER PART NUMBER (MPN)NATIONAL STOCK NUMBERLOCAL STOCK NUMBERDM DOC IDDELIVERY REF. COUNTERUNIT TEXT/DESCRIPTIONDELIVERY REFERENCEITEM MASTER FILE NUMBEREXPENDABLE/NON-EXPENDABLEQUANTITY REQUESTED
0001692-24-103 Improve Campus Parking Lots and Roadways
All work in accordance with the scope documentsNoBase7/15/249/18/241JB0QuantityPriced0Percent0NONENoNo238990Z1LZ