This document is an amendment to Solicitation 36C26024R0066 for the project "Z1LZ--692-24-103 Improve Campus Parking Lots and Roadways". The purpose of this amendment is to provide additional details, clarify questions, and make changes to the original solicitation. Key details include:
The amendment provides a copy of the site visit agenda and sign-in sheet, and answers 17 questions related to the project scope. The questions cover topics such as handicap parking spaces, irrigation lines, lead paint abatement, surveying requirements, pavement thickness, parking curbs, tax exemption, personnel requirements, and applicable specification sections. The VA provides detailed responses to each question, clarifying requirements and making changes as necessary.
The solicitation is for a construction project to improve parking lots and roadways on the VA campus. The project does not appear to have any set-aside requirements. The VA anticipates awarding the project as soon as possible, but reserves the right to not make an award if it is not in the best interest of the government. Offerors must acknowledge receipt of this amendment prior to the offer due date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 692-24-103 36C260 NCO 20 Network Contracting Office
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661
To all Offerors/Bidders
36C26024R0066 06-06-2024
X X X x The purpose of this amendment is to provide a copy of the site visit agenda and sign in sheet, and answer questions.
1. Could we get clarification on the handicap spots located in parking lots (PL) O and G? Currently, there are several spaces that just have the handicap paint on the pavement but no signs. Could we get specific details on exactly which spaces are going to be designated for handicap?
Repaint all existing and blackened/masked handicap marks regardless of any post signs present or not.
1. The drip irrigation line that is running from PL K under Avenue N. Can we confirm the line is 2 3/4 inches? Also, our plan is to drill under the road for the irrigation line. Is the VA ok with us doing that?
A.2.
The existing shutoff valve box, 1.0”, PVC for new irrigation is shown above in red, the new irrigation line continues to the lot K & I islands, and add a drip system with a manual open/close valve type at the island K.
1. There is yellow paint around the curbs around most of the PLs, do we need to worry about lead paint abatement? Do we need to repaint all of this? If so, can you provide the paint specs?
A.3.
Curb painting is not included unless curb removal & replacement is required as means and methods. No asbestos presence at/near the curbs for ADA wheelchair ramps installation locations.
1. 1.12 PROFESSIONAL SURVEYING SERVICES
1. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.
Will we need to provide for a surveyor paid by the contractor to complete this portion of the project?
A.4.
It is non-restrictive for the contractor(s) to establish grades by their own means and methods.
1. Adjacent to building 228, there are several spots marked "GV Motor Pool Parking Only". What would you prefer the new markings to be?
A.5.
Mask existing “GV Motor Pool Parking Only” and paint as shown below, flat white, center justified, 8 inches tall letter, tail-end per stall;
GOV.
Parking Only
1. According to the specs, 3" asphalt is sufficient for the thickness of the pavement, but the specifications are unclear for the subgrade. Could you clarify the size and subgrade type under the new asphalt particularly PL O and G?
A.6.
The parking lots O and G require resealing, not repaving. See Section 31 20 00 Earthwork, for sub-grade requirements.
1. The plastic parking curbs in parking lot M were identified on the site walk to be removed and replaced with concrete parking curbs. We have not been able to identify a spec to remove the plastic curbs and replace with concrete curbs.
A.7.
Replace the plastic wheel stops with single continuous concrete wheel stop (6” H X 6’ L) per stall and use 2 X 9/16” X 15” L hold down bolts to secure onto the pavement.
1. Is this project tax-exempt?
At this time, the VA does not anticipate this project to be tax-exempt, but will update via subsequent amendment if notified otherwise.
1. Please confirm one person onsite can act as the superintendent, QCM, and safety officer.
A.9.
Yes.
1. Please confirm section 01 00 00, 1.28 Photographic Documentation and 1.29 Final Elevation Digital Images are not applicable to this project.
| A.10. | |
| Parking lots M & M1 will require “before and after” a digital image for record only | purpose, no extensive elevation images are not applicable. |
1. Section 03 30 53 – Cast in Place Concrete in included in the specifications. This is typically for structural or building concrete. Is this to be used for the curbs and ramps or should specification section 32 16 00 – Curbs, Gutters, Sidewalks, and Driveways be used.
A.11.
Section 03 30 50 is not applicable.
1. Please identify where spec section 07 11 13 – Bituminous Damp proofing is applicable for this project.
| A.12. | |
| Section 07 11 13 – Bituminous Damp proofing is not applicable. However, asphalt crack | filling is required before resealing. |
1. This project has 32 17 23 -Pavement Markings as part of the specifications. Specification section 09 91 00 – Painting is also included. Please identify where the 09 91 00- Painting spec is applicable or if it is N/A.
A.13.
Refer to section 32 17 23 for specific paint type, No. 97-traffic marking paint, latex, and section 09 91 00, part 3 for preparation and workmanship, etc.
1. Specification section 11 12 00 – Parking Control Equipment is provided with the project documents. I do not see any equipment shown or mentioned in the drawings or SOW. Please confirm this is N/A. If not, please identify what parking equipment is to be provided and installed.
A.14.
Section 11 12 00 is not applicable.
1. Please confirm if the area of new asphalt will need to be sealed?
A.15.
See the drawing sheet 2 and 4 for the specific areas of new asphalt pavement and reseal (1 coat) and all other areas will be resealed with 2 coats after filling cracks.
1. The only mention of asphalt sealant is in specification section 32 12 16 – Asphalt Paving. Please confirm Armor Seal (product data sheet attached) will be an acceptable asphalt sealer. This product has been successfully used on previous projects at the White City VA campus.
| A.16. | |
| Any material/product submittal(s) is subject for approval, it may be acceptable if specific | sealer meets consistent and suitable for this project. |
1. Please identify where the new drip irrigation line will be tied into the existing irrigation system.
A.17.
See A.2.
1. Will any temporary fencing be required for this project?
A.18 See Section 01 00 00, para.1.6, operations and storage areas.
1. Will any after-hours work be required?
A.19.
Working after regular business hours or over weekends may be necessary to minimize conditional interference with traffics and relieve periodic congestions. Coordinate with the current COR for after ours work at least 4 days in advance.
1. When does the VA anticipate awarding this project?
VA is aware that elements of scope require specific weather conditions and anticipates awarding the project as soon as VA is able to do so after the deadline for receipt of offers. However, VA is reserving the right to not make an award as a result of this solicitation if it is not in best interest of the Government.
See attached document: 5.20.2024 Site Walk.