Attachment 5 32 92 19 Seeding.pdf
PDF 152 KB Posted
- Attached to
- Solicitation- Demo F. 732 F. 735
- Solicitation number
- FA480021Q0022
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 32 92 19 Page 1
SECTION 32 92 19
SEEDING
10/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C 602 (2007) Agricultural Liming Materials
ASTM D 4427 (2007) Peat Samples by Laboratory Testing
ASTM D 4972 (2001; R 2007) pH of Soils
U.S. DEPARTMENT OF AGRICULTURE (USDA)
AMS Seed Act (1940; R 1988; R 1998) Federal Seed Act
DOA SSIR 42 (1996) Soil Survey Investigation Report No.
42, Soil Survey Laboratory Methods Manual, Version 3.0
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED NC (2009) Leadership in Energy and Environmental
Design Green Building Rating System for New
Construction and Major Renovations (LEED-NC
2009)
LEED Reference Guide (2009) LEED Reference Guide for Green
Building Design and Construction, including applicable updates, errata and addenda in place prior to date of project registration.
1.2 DEFINITIONS
1.2.1 Stand of Turf
95 percent ground cover of the established species.
1.3 RELATED REQUIREMENTS
Section 31 00 00 EARTHWORK, and Section 32 05 33 LANDSCAPE ESTABLISHMENT applies to this section for pesticide use and plant establishment requirements, with additions and modifications herein.
1.4 SUBMITTALS
../Word/31%2000%2000.doc ../Word/32%2005%2033.doc
Section 32 92 19 Page 2
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Wood cellulose fiber mulch
Fertilizer
Include physical characteristics, and recommendations.
Recycled Content Materials; G (LEED NC)
After submission of the LEED Implementation Plan, provide LEED documentation relative to recycled content credit in accordance with the LEED Reference Guide. Only include materials that are identified in the cumulative materials credits section of the
Implementation Plan. If recycled content of materials submitted varies from the Implementation Plan, include a revised
Implementation Plan for cumulative materials credits that supports project LEED requirements.
Local/Regional Materials; G, After submission of the LEED Implementation Plan, provide LEED documentation relative to regional materials credit in accordance with the Only include materials that are identified in the cumulative materials credits section of the Implementation Plan. If regional materials amount submitted varies from the Implementation
Plan, include a revised Implementation Plan for cumulative materials credits that supports project LEED requirements.
SD-06 Test Reports
Topsoil composition tests (reports and recommendations).
SD-07 Certificates
State certification and approval for seed
SD-08 Manufacturer's Instructions
Erosion Control Materials
SD-11 Closeout Submittals
Recycled Content Materials; G; (LEED NC)
LEED documentation relative to recycled content credit in accordance with the LEED Reference Guide.
Local/Regional Materials; G; (LEED NC)
../Word/01%2033%2000.doc
Section 32 92 19 Page 3
LEED documentation relative to regional materials credit in accordance with LEED Reference Guide.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
1.5.1.1 Seed Protection
Protect from drying out and from contamination during delivery, on-site storage, and handling.
1.5.1.2 Fertilizer Gypsum Sulfur Iron and Lime Delivery
Deliver to the site in original, unopened containers bearing manufacturer's chemical analysis, name, trade name, trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer gypsum sulphur iron and lime may be furnished in bulk with certificate indicating the above information.
1.5.2 Storage
1.5.2.1 Seed, Fertilizer Gypsum Sulfur Iron and Lime Storage
Store in cool, dry locations away from contaminants.
1.5.2.2 Topsoil
Prior to stockpiling topsoil, treat growing vegetation with application of appropriate specified non-selective herbicide. Clear and grub existing vegetation three to four weeks prior to stockpiling topsoil.
If existing quantity of stripped topsoil is insufficient, the Contractor shall procure additional topsoil in quantity required to finish disturbed and newly graded areas from a commercial source at his expense.
1.5.2.3 Handling
Do not drop or dump materials from vehicles.
1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS
1.6.1 Restrictions
Do not plant when the ground is frozen, snow covered, muddy, or when air temperature exceeds 90 degrees Fahrenheit.
1.7 TIME LIMITATIONS
1.7.1 Seed
Apply seed within twenty four hours after seed bed preparation.
1.8 LEED DOCUMENTATION
Work of this section is intended to contribute to the achievement of, or compliance with, the requirements of LEED Prerequisites and attempted
Section 32 92 19 Page 4
Credits. Refer to Section 01 33 29 LEED DOCUMENTATION for specific documentation requirements and list of Prerequisites and attempted Credits.
Comply with product, material content, performance criteria, activity, documentation, and other technical requirements as described in the LEED
Reference Guide.
Collect, organize, and submit product data, drawings, diagrams, photos and cost information necessary to demonstrate compliance with LEED Reference
Guide requirements.
1.8 SUSTAINABLE DESIGN REQUIREMENTS
1.9 RECYCLED CONTENT MATERIALS
At a minimum, use materials or products with recycled content in accordance with the LEED Implementation Plan. See Section 01 33 29 LEED DOCUMENTATION for cumulative materials requirements and LEED Implementation Plan. If recycled content minimum is specified in this section, the greater of the two percentages governs.
1.8.2 Local/Regional Materials
Use materials or products extracted, harvested, or recovered, as well as manufactured, within a 500 mile radius from the project site, if available from a minimum of three sources. See Section 01 33 29 LEED DOCUMENTATION for cumulative materials requirements and LEED Implementation Plan.
PART 2 PRODUCTS
2.1 SEED
2.1.1 Classification
Provide State-certified State-approved Endophyte-enhanced seed of the latest season's crop delivered in original sealed packages, bearing producer's guaranteed analysis for percentages of mixtures, purity, germination, weedseed content, and inert material. Label in conformance with AMS Seed
Act and applicable state seed laws. Wet, moldy, or otherwise damaged seed will be rejected. Field mixes will be acceptable when field mix is performed on site in the presence of the Contracting Officer.
2.1.2 Planting Dates
Contractor shall distribute seed in accordance with local seeding parameters.
2.1.3 Seed Purity
Seed purity shall maintain a minimum of 95%.
2.1.4 Seed Mixture by Weight
Seed variety mixtures shall conform to mixes which are locally available and viable for the project area.
../Word/01%2033%2029.doc ../Word/01%2033%2029.doc
Section 32 92 19 Page 5
Proportion seed mixtures by weight. Temporary seeding must later be replaced by plantings for a permanent stand of grass. The same requirements of turf establishment apply for temporary seeding.
2.2 TOPSOIL
2.2.1 On-Site Topsoil
Surface soil stripped and stockpiled on site and modified as necessary to meet the requirements specified for topsoil in paragraph entitled
"Composition." When available topsoil shall be existing surface soil stripped and stockpiled on-site in accordance with Section 31 00 00
EARTHWORK.
2.2.2 Off-Site Topsoil
Conform to requirements specified in paragraph entitled "Composition."
Additional topsoil shall be furnished by the Contractor.
2.2.3 Composition
Containing from 5 to 10 percent organic matter as determined by the topsoil composition tests of the Organic Carbon, 6A, Chemical Analysis Method described in DOA SSIR 42. Maximum particle size, 3/4 inch, with maximum 3 percent retained on 1/4 inch screen. The pH shall be tested in accordance with ASTM D 4972. Topsoil shall be free of sticks, stones, roots, and other debris and objectionable materials. Other components shall conform to the following limits:
Silt 25-50 percent
Clay 10-30 percent
Sand 20-35 percent pH 5.5 to 7.0
Soluble Salts 600 ppm maximum
2.3 SOIL CONDITIONERS
Add conditioners to topsoil as required to bring into compliance with
"composition" standard for topsoil as specified herein.
2.3.1 Lime
Commercial grade hydrate or burnt limestone containing a calcium carbonate equivalent (C.C.E.) as specified in ASTM C 602.
2.3.2 Aluminum Sulfate
Commercial grade.
2.3.3 Sulfur
100 percent elemental
2.3.4 Iron
100 percent elemental
../Word/31%2000%2000.doc
Section 32 92 19 Page 6
2.3.5 Peat
Natural product of peat moss derived from a freshwater site and conforming to ASTM D 4427. Shred and granulate peat to pass a 1/2 inch mesh screen and condition in storage pile for minimum 6 months after excavation.
2.3.6 Sand
Clean and free of materials harmful to plants.
2.3.7 Perlite
Horticultural grade.
2.3.8 Composted Derivatives
Ground bark, nitrolized sawdust, humus or other green wood waste material free of stones, sticks, and soil stabilized with nitrogen and having the following properties:
2.3.8.1 Particle Size
Minimum percent by weight passing:
No. 4 mesh screen 95
No. 8 mesh screen 80
2.3.8.2 Nitrogen Content
Minimum percent based on dry weight:
Fir Sawdust 0.7
Fir or Pine Bark 1.0
2.3.9 Gypsum
Coarsely ground gypsum comprised of calcium sulfate dihydrate 61 percent, calcium 22 percent, sulfur 17 percent; minimum 96 percent passing through 20 mesh screen, 100 percent passing thru 16 mesh screen.
2.3.10 Calcined Clay
Calcined clay shall be granular particles produced from montmorillonite clay calcined to a minimum temperature of 1200 degrees F. Gradation: A minimum
90 percent shall pass a No. 8 sieve; a minimum 99 percent shall be retained on a No. 60 sieve; and a maximum 2 percent shall pass a No. 100 sieve.
Bulk density: A maximum 40 pounds per cubic foot.
2.4 FERTILIZER
2.4.1 Granular Fertilizer
Organic or synthetic, granular controlled release fertilizer containing the following minimum percentages, by weight, of plant food nutrients:
18 percent available nitrogen
24 percent available phosphorus
Section 32 92 19 Page 7
6 percent available potassium
- percent sulfur
2 percent iron
2.4.2 Hydroseeding Fertilizer
Controlled release fertilizer, to use with hydroseeding and composed of pills coated with plastic resin to provide a continuous release of nutrients for at least 6 months and containing the following minimum percentages, by weight, of plant food nutrients.
18 percent available nitrogen
24 percent available phosphorus
6 percent available potassium
- percent sulfur
2 percent iron
2.5 MULCH
Mulch shall be free from noxious weeds, mold, and other deleterious materials.
2.5.1 Straw
Stalks from oats, wheat, rye, barley, or rice. Furnish in air-dry condition and of proper consistency for placing with commercial mulch blowing equipment. Straw shall contain no fertile seed.
2.5.2 Hay
Air-dry condition and of proper consistency for placing with commercial mulch blowing equipment. Hay shall be sterile, containing no fertile seed.
2.5.3 Wood Cellulose Fiber Mulch
Use recovered materials of either paper-based (100 percent) or wood-based
(100 percent) hydraulic mulch. Processed to contain no growth or germination-inhibiting factors and dyed an appropriate color to facilitate visual metering of materials application. Composition on air-dry weight basis: 9 to 15 percent moisture, pH range from 5.5 to 8.2. Use with hydraulic application of grass seed and fertilizer.
2.6 WATER
Source of water shall be approved by Contracting Officer and of suitable quality for irrigation, containing no elements toxic to plant life.
2.7 EROSION CONTROL MATERIALS
Erosion control material shall conform to the following:
2.7.1 Hydrophilic Colloids
Hydrophilic colloids shall be physiologically harmless to plant and animal life without phytotoxic agents. Colloids shall be naturally occurring, silicate powder based, and shall form a water insoluble membrane after curing. Colloids shall resist mold growth.
Section 32 92 19 Page 8
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 EXTENT OF WORK
Provide soil preparation (including soil conditioners as required), fertilizing, seeding, and surface topdressing of all newly graded finished earth surfaces, unless indicated otherwise, and at all areas inside or outside the limits of construction that are disturbed by the Contractor's operations.
3.1.1.1 Topsoil
Provide 4 inches of off-site topsoil or existing soil to meet indicated finish grade. After areas have been brought to indicated finish grade, incorporate fertilizer pH adjusters soil conditioners into soil a minimum depth of 4 inches by disking, harrowing, tilling or other method approved by the Contracting Officer. Remove debris and stones larger than 3/4 inch in any dimension remaining on the surface after finish grading. Correct irregularities in finish surfaces to eliminate depressions. Protect finished topsoil areas from damage by vehicular or pedestrian traffic.
3.1.1.2 Soil Conditioner Application Rates
Apply soil conditioners at rates as determined by laboratory soil analysis of the soils at the job site.
3.1.1.3 Fertilizer Application Rates
Apply fertilizer at rates as determined by laboratory soil analysis of the soils at the job site.
3.2 SEEDING
3.2.1 Seed Application Seasons and Conditions
Immediately before seeding, restore soil to proper grade. Do not seed when ground is muddy frozen snow covered or in an unsatisfactory condition for seeding. If special conditions exist that may warrant a variance in the above seeding dates or conditions, submit a written request to the
Contracting Officer stating the special conditions and proposed variance.
Apply seed within twenty four hours after seedbed preparation. Sow seed by approved sowing equipment. Sow one-half the seed in one direction, and sow remainder at right angles to the first sowing.
3.2.2 Seed Application Method
Seeding method shall be broadcasted and drop seeding, drill seeding, or hydroseeding.
3.2.2.1 Broadcast and Drop Seeding
Seed shall be uniformly broadcast at the rate of 6 pounds per 1000 square feet. Use broadcast or drop seeders. Sow one-half the seed in one direction, and sow remainder at right angles to the first sowing. Cover
Section 32 92 19 Page 9 seed uniformly to a maximum depth of 1/4 inch in clay soils and 1/2 inch in sandy soils by means of spike-tooth harrow, cultipacker, raking or other approved devices.
3.2.2.2 Drill Seeding
Seed shall be drilled at the rate of 6 pounds per 1000 square feet. Use cultipacker seeders or grass seed drills. Drill seed uniformly to average depth of 1/2 inch.
3.2.2.3 Hydroseeding
First, mix water and fiber. Wood cellulose fiber, paper fiber, or recycled paper shall be applied as part of the hydroseeding operation. Fiber shall be added at 1,000 pounds, dry weight, per acre. Then add and mix seed and fertilizer to produce a homogeneous slurry. Seed shall be mixed to ensure broadcasting at the rate of 6 pounds per 1000 square feet. When hydraulically sprayed on the ground, material shall form a blotter like cover impregnated uniformly with grass seed. Spread with one application with no second application of mulch.
3.2.3 Mulching
3.2.3.1 Hay or Straw Mulch
Hay or straw mulch shall be spread uniformly at the rate of 2 tons per acre. Mulch shall be spread by hand, blower-type mulch spreader, or other approved method. Mulching shall be started on the windward side of relatively flat areas or on the upper part of steep slopes, and continued uniformly until the area is covered. The mulch shall not be bunched or clumped. Sunlight shall not be completely excluded from penetrating to the ground surface. All areas installed with seed shall be mulched on the same day as the seeding. Mulch shall be anchored immediately following spreading.
3.2.3.2 Mechanical Anchor
Mechanical anchor shall be a V-type-wheel land packer; a scalloped-disk land packer designed to force mulch into the soil surface; or other suitable equipment.
3.2.3.3 Asphalt Adhesive Tackifier
Asphalt adhesive tackifier shall be sprayed at a rate between 10 to 13 gallons per 1000 square feet. Sunlight shall not be completely excluded from penetrating to the ground surface.
3.2.3.4 Non-Asphaltic Tackifier
Hydrophilic colloid shall be applied at the rate recommended by the manufacturer, using hydraulic equipment suitable for thoroughly mixing with water. A uniform mixture shall be applied over the area.
3.2.3.5 Asphalt Adhesive Coated Mulch
Hay or straw mulch may be spread simultaneously with asphalt adhesive applied at a rate between 10 to 13 gallons per 1000 square feet, using
Section 32 92 19 Page 10 power mulch equipment which shall be equipped with suitable asphalt pump and nozzle. The adhesive-coated mulch shall be applied evenly over the surface.
Sunlight shall not be completely excluded from penetrating to the ground surface.
3.2.4 Rolling
Immediately after seeding, firm entire area except for slopes in excess of 3 to 1 with a roller not exceeding 90 pounds for each foot of roller width. If seeding is performed with cultipacker-type seeder or by hydroseeding, rolling may be eliminated.
3.2.5 Erosion Control Material
Install in accordance with manufacturer's instructions, where indicated or as directed by the Contracting Officer.
3.2.6 Watering
Start watering areas seeded as required by temperature and wind conditions.
Apply water at a rate sufficient to insure thorough wetting of soil to a depth of 2 inches without run off. During the germination process, seed is to be kept actively growing and not allowed to dry out.
3.3 PROTECTION OF TURF AREAS
Immediately after turfing, protect area against traffic and other use.
3.4 RENOVATION OF EXISTING TURF AREA
3.5 RESTORATION
Restore to original condition existing turf areas which have been damaged during turf installation operations at the Contractor's expense. Keep clean at all times at least one paved pedestrian access route and one paved vehicular access route to each building. Clean other paving when work in adjacent areas is complete.
Contractor to maintain (irrigate and mow) new grass growth (stand of turf) until the project is accepted by the Government." This shall include any and all necessary reseeding in the event that the density of the turf does not meet normal regional standards and practices (95% coverage.)
3.6 MAINTENANCE
Contractor to maintain (irrigate and mow) new grass growth (stand of turf) density required until the project is accepted by the Government.
-- End of Section --
File details come from the government source that posted it. Updated .