Solicitation Attachment 1

STATEMENT OF WORK FOR

DEMOLITION SERVICES

Demolish Airfield Obstruction, LOX Facility, 1 MXG, Facility 732

PROJECT MUHJ 18-9000

Demolish Airfield Obstruction, Shop Facility, 1 MXG, Facility 735

PROJECT MUHJ 18- 9002

JBLE-LANGLEY, VA

Solicitation FA480021Q0022

30 June 2021

Attachment 3

Facility 732 & 735 Demolition

STATEMENT OF WORK (SOW)

FOR DEMOLITION SERVICES

DESCRIPTION OF SERVICE. The Contractor shall furnish all personnel, vehicles and equipment required to perform Contractor services to demolish Facility 732 and Facility 735 at JBLE-Langley, Virginia. All work shall be performed in accordance with attached drawings, specifications, and all applicable laws, regulations, standards and commercial practices as described in the statement of work with the focus on safety and customer service. The total period of performance is 160 days for both buildings as one contract. The Contractor is encouraged and expected to use innovative approaches to efficiently and effectively accomplish SOW requirements in a timely manner at reduced costs, and in a way, which fosters pride and ownership in the work performed.

1.1. SCOPE OF WORK

FACILITY 732

The work under this project consists of demolishing Facility 732 located at JBLE - Langley, VA.

Demolish all appurtenances including (but not limited to) foundation, footings, roofing, ceilings and walls, HVAC, concrete slab, fence, sidewalk, transformer, road, shrubs and underground utilities leaving a clean grassy site free of man-made obstructions.

The scope of work includes all required labor, equipment and material associated with the demolition of the facility, concrete pad and asphalt road. The following is a list of principal items:

Ensure all utilities are disconnected at the point of entry for each facility. Disconnect and cap underground water, sewage electrical and Communication to the building. Disconnect electrical service from the closest electrical device serving the facility. Contractor shall ensure demolition of all utilities will not disturb service to adjacent buildings to re- main.

Contractor shall coordinate with 633 CS/SCPX for the removal of communications equipment.

Adjoining property, roadways and other adjacent items shall be completely protected from damage during demolition activities.

All work shall be accomplished in accordance with specifications 01 11 00 Special Conditions, 01 12 00 Environmental Management Special Conditions, 02 41 00 Demolition and Deconstruction, and 32 92 19 Seeding, drawings, and terms and conditions of the contract. See Appendix C.

FACILITY 735

The work under this project consists of demolishing Facility 735 located at JBLE - Lang-ley, VA. Demolish all appurtenances including (but not limited to) foundation, footings, roofing, ceilings and walls, HVAC, storage shed, chain-linked fence, concrete slab, side-walk, transformer, road, shrubs and underground utilities leaving a clean grassy site free of man-made obstructions.

The scope of work includes all required labor, equipment and material associated with the demolition of the facility, concrete pad, chain linked fence, concrete storage unit and asphalt road. The following is a list of principal items:

Ensure all utilities are disconnected at the point of entry for each facility. Disconnect and cap underground water, sewage electrical and Communication to the building. Disconnect electrical service from the closest electrical device serving the facility. Contractor shall ensure demolition of all utilities will not disturb service to adjacent buildings to remain.

Contractor shall coordinate with 633 CS/SCPX for the removal of communications equipment.

Adjoining property, roadways and other adjacent items shall be completely protected from damage during demolition activities.

All work shall be accomplished in accordance with specifications 01 11 00 Special Conditions, 01 12 00 Environmental Management Special Conditions, 02 41 00 Demolition and Deconstruction, and 32 92 19 Seeding, drawings, and terms and conditions of the contract. See Appendix C

1.1.1 Demolition Notification. The Contractor shall provide written notification to the

Contracting Officer seven days prior to commencement of work identifying the following:

a. Building number

b. Demolition designation

c. Commencement date

d. Work hours, expected noise and vibration levels

e. Utility interruptions (dates and hours)

f. Demolition completion date

g. Contractor’s representative’s name and phone number for contract issues.

1.1.2. Demolition Debris. The Contractor shall use all reasonable means to divert demolition and demolition waste from landfills and incinerators and to facilitate their recycling or reuse.

Revenues or other savings obtained from salvaging or recycling shall accrue to the Contractor.

The recycle materials shall be submitted to the Contracting Officer at contract closeout. All demolished materials that cannot be recycled shall be legally disposed of off base. All concrete and asphalt shall be recycled. All dump receipts shall be provided to the Contracting Officer.

The debris haul route will be the project access route listed Spec 01 11 00 section 1.8.4.

Drawings, Manuals and Checklists. The Contractor shall provide within 10 days of final inspection, an AutoCAD version of as-built record drawings on computer disc and one 24” x 36” paper copies of as-built record drawings. The drawings shall at a minimum provide utility locations, correct grade and elevation if changed, and all changes or modifications from the original design drawings. Ten days prior to final inspection, the Contractor shall complete a DD Form 1354, Transfer and Acceptance of Military Real Property for each building (Appendix A).

1.1.3. The Period of Performance (POP) is 160 calendar days. The specified POP includes the entire period allowed to; (1) demolish both buildings, (2) remove all debris,

(3) grade and seed all affected landscape, (4) grow/maintain seed/turf to achieve the minimal acceptable growth/coverage IAW specifications.32.92.12, (5) remove all remaining contractor equipment and fencing and, (6) complete any final mowing and government approval of the turf no later than the last day of the POP. The contractor shall plan sufficient time in the demolition schedule quote to meet this requirement.

2. SERVICE DELIVERY SUMMARY. The Service Delivery Summary (SDS) captures the service requirements that can be measured and are considered to be critical operational requirements. The SDS includes Performance Objectives that describe the de- sired end result or outcome the Contractor shall achieve. The Performance Thresholds states the minimum acceptable level of performance in terms of quality, timeliness and quantity in realistic and achievable standards. These thresholds are critical to mission success. The SOW paragraphs reference the details of the Performance Objective in the SOW. Each requirement includes a government-determined performance objective. (Note that the Performance Objective is merely a reference point for government personnel and does not relieve the Contractor of any other contractual requirements.)

2.1. SERVICE DELIVERY SUMMARY

PERFORMANCE OBJECTIVE SOW/

SPECS

PARA

PERFORMANCE

THRESHOLD

SURVEILLANCE

METHOD

Environmental Compliance:

Comply with all federal, state, local, and JBLE-Langley, VA Environmental Laws, Regulations, Instructions and Publications and the National Emission Standards for Hazardous Air Pollutants (NESHAP) and attached Specifications Sections

1.1 Zero Defects in

any environmental compliance requirement.

Periodic Inspection and customer complaints

Demolish Buildings 732 and 735,in accordance with the SoW, Demolition Specification and standard commercial

1.1. Does not exceed

2 valid customer complaints.

Periodic Inspection and customer complaints

Utilities. Provide notification of any disruption of service in accordance with Spec. 01 11 00.

1.18. Does not exceed 2

valid customer complaints.

Periodic Inspection and customer complaints

Perform site restoration in accordance with Specification 0111 00.

1.8.1, 1.8.11, and 1.28.1

Does not exceed 2 valid customer complaints.

Periodic Inspection and customer complaints

Submit plans, reports, and submittals as indicated in the Specification 01 11 00.

1.2 Does not exceed 2

valid customer complaints.

Periodic Inspection and customer complaints

3. GOVERNMENT-FURNISHED FACILITIES/SERVICES. The government may provide water and electricity. The connection costs to fire hydrants and electrical sources are the Contractor’s responsibility. State approved double backflow preventers shall be used for hydrant connections.

4. GENERAL INFORMATION

4.1. Normal Hours of Operation. Normal hours of operation are Monday through Fri- day, 7:00 am to 4:45 pm excluding federal holidays. Hours other than specified require approval from the Contracting Officer and will be negotiated on a case-by-case basis.

4.2. Security Requirements.

4.2.1. Work Site. The Contractor must ensure that the job site and equipment is secured at the end of the workday. The construction site and equipment shall be contained within a temporary 6’ high chain link fence with brown UV resistant “tennis” netting.

4.3. Sanitary Facilities. The Contractor shall provide chemical sanitary toilets at the work site. The chemical toilets must be serviced regularly, and will be subject to government inspection by the Base Medical Officer. All sanitary deficiencies shall be corrected within 24 hours after notification.

4.4. Submittals. The Contractor shall provide to the Contracting Officer submittals identified on the Submittal Register (see Appendix A). Number submittals sequentially (1, 2, 3, 4, etc.).

Re-submittals shall retain the original number in addition to an alpha suffix (1A, 1B, 1C, etc.).

The Contractor shall review, update and resubmit the submittal register at least every 30 days to reflect additions and changes.

4.4.1. Coordinate preparation and processing of submittals with the performance time of the contract. Transmit each submittal sufficiently in advance to ensure completion within the stated performance time. Allow sufficient review time so that installation will not be delayed as a result of the time required to process submittals, including time for resubmittals.

4.4.2. Allow two weeks for initial review. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. The Government will promptly advise the Contractor when a submittal being processed must be delayed for coordination

4.4.3. No extension of Contract Time will be authorized because of failure to transmit submittals to the Government sufficiently in advance of the Work to permit processing.

4.4.4. Prior to submittal, each respective line item on every transmittal form (AF Form 3000) shall be reviewed, signed and dated by the Contractor’s Quality Control (CQC) representative certifying that the accompanying submittal complies with the contract requirements. Include the following information:

a. Name of Contractor

b. Submittal Number

c. Line Item Number

d. Action Taken

e. Date of Review

f. CQC Representative Signature

g. Project number and title

4.4.5. All submittals shall include one completed AF Form 3000 and two copies of all attachments. One completed copy of the AF Form 3000 with attachments will be re- turned to the Contractor for action.

5. APPENDICES.

Appendix A - Publications, Instructions and Forms

Appendix B – Photos/Drawings

1) Facility 732 Site View with Construction Boundary Lines

2) Facility 732 Front View

3) Facility 732 Side View

4) Facility 732 Back View

5) Facility 732 Storage

6) Facility 735 Site View with Construction Boundary Lines

7) Facility 735 Front View

8) Facility 735Side View

9) Facility 735 Back View

10) Facility 732 Floor Plan

11) Facility 735 Floor Plan

Appendix C – Specifications

1) 01 11 00 Special Conditions

2) 01 12 00 Environmental Management Special Conditions

3) 02 41 00 Demolition and Deconstruction,

4) 32 92 19 Seeding

APPENDIX A

Publications and Forms

PUBLICATIONS

Title Date Corp of Engineers Manual, EM 385-1-1

Safety and Health Requirements Current Edition

FORMS

Department of Defense (DD) Form 1354, Transfer and Acceptance of Military Real Property

JBLE-Langley Submittal Register AF Form 103, Base Civil Engineering Work Clearance Request

APPENDIX B

Facility 732 Project Location

Facility 732; SITE VIEW with Construction Boundary Line

Facility 732; FRONT VIEW

Facility 732; SIDE VIEW

Facility 732; BACK VIEW

STORAGE UNIT

APPENDIX B

Facility 735 Project Location

Facility 735; SITE VIEW with Construction boundary Line

Facility 735; FRONT VIEW

Facility 735; SIDE VIEW

Facility 735; Back View

Labels

First Line Second Line Third Line Fourth Line

Room Number Spacetype Unit / Flight

Vacant or # of Personnel

Text in Magenta is gaps in data

NN

STG_WA

R E1CES /

CEO

NN

OFF_PRIVAT

E1CES /

CEO

NN

ME

C H

1CES / CEO

HOT_DESK

RR

RR

STG_WARE

HALLWAY

STG_WARE

0 5 10 20 Feet

ENT

R Y

BRE

A K

1CES / CEO

ACC Charrette Data Review

12 - 14 Jan 2009

Langley AFB Bldg. 732 Floor 1

Filename: Langley_732_1

FM Review:

Name / Title / Date

CE Review: _

Name / Title / Date

DEPARTMENT OF THE AIR FORCE

BLDG 735

ASST CHI EF OF STAFF/INSTALLATIONS -

WASHINGTON DC

1 CES/CEG

AIR COMBAT COMMAND

LANGLEY AIR FORCE BASE, VIRGINIA

G

EO

B A

SE

STATEMENT OF WORK (SOW) FOR DEMOLITION SERVICES
1.1. SCOPE OF WORK FACILITY 732
FACILITY 735
2.1. SERVICE DELIVERY SUMMARY
4. GENERAL INFORMATION
4.2. Security Requirements.
5. APPENDICES.
APPENDIX A
APPENDIX B