Attachment 5 - 15 AF 66-Submittal Register.xlsx

XLSX spreadsheet 122 KB Posted

Attached to
Repair HVAC Dormitory B2403 B2404 - DKGV 1073188
Solicitation number
FA441822R0003
Issued by

About this file

This submittal register outlines the required documentation for a federal contract to repair HVAC systems in two dormitories at Joint Base Charleston, South Carolina. Key submittals and certifications are needed for preconstruction plans, work schedules, safety protocols, inspection reports, product data and warranties. Testing and training documentation must also be provided after completion. This level of reporting is common for mechanical, electrical and plumbing renovations of this scale at federal facilities. Thorough planning and compliance documentation will be important to the success of this project.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Register

SUBMITTAL REGISTERCONTRACT NO.
DKGV-1073188
TITLE AND LOCATIONCONTRACTOR
Repair HVAC Dorms, Bldg 2403-2404COLUNMS thru 474 ROWS thru R TBD
ACTIVITY NOTRANSMITTAL NOSPEC SECTDESCRIPTION OF ITEM SUBMITTEDPARAGRAPH #CLASSIFICATION
GOVT OR A/E REVIEWCONTRACTOR
SCHEDULE DATESCONTRACTOR
ACTIONAPPROVING AUTHORITYRETURNED TO CONTR/
DATE RCD FRM APPV AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYACTION CODEDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD ROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERACTION CODEDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 11 00SD-01 Preconstruction Submittals
Outage Requests1.6.2G
Road Closure Requests1.6.2G
SD-01 - Work Clearance1.6G
01 14 00SD-01 Preconstruction Submittals
List of Contact Personnel1.2.1.1G
01 30 00SD-01 Preconstruction Submittals
Resume for the proposed Superintendent1.4.2G
01 32 16.00 20SD-01 Preconstruction Submittals
Qualifications1.2G
Project Schedule1.3CENM
Initial Contract Progress Report (AF IMT 3065)1.4.1CENM
Initial Contract Progress Schedule (AF IMT 3064)1.4.2CENM
SD-07 Certificates
Project Schedule Updates1.3.3CENM
Monthly Contract Progress Reports (AF IMT 3065)1.4.1G
Monthly Contract Progress Schedules (AF IMT 3064)1.4.2G
01 33 00SD-01 Preconstruction Submittals
Submittal Register1.6G
01 35 26SD-01 Preconstruction Submittals
Accident Prevention Plan (APP)1.6G
Activity Hazard Analysis (AHA)1.7G
Critical Lift Plan1.6.1.1G
Crane Operators1.5.1.3G
SD-06 Test Reports
Notifications and Reports1.11
Accident Reports1.11.2G
Crane Reports1.11.3
SD-07 Certificates
Confined Space Entry Permit1.8.1
Hot Work Permit1.8.1
License Certificates1.13
01 45 00SD-01 Preconstruction Submittals
QC Plan1.6G
01 45 35SD-01 Preconstruction Submittals
SIOR Letter of Acceptance3.1.1G
Project Manual3.1.1G
Project Manual3.1.1G
Written Practices3.1.1
NDT Procedures and Equipment Calibration Records3.1.1
SD-06 Test Reports
Daily Reports3.1.1
Daily Reports3.1.3
Daily Reports3.1.3
Biweekly Reports3.1.1
Biweekly Reports3.1.2
01 45 35SD-07 Certificates
Fabrication Plant2.1
Certificate of Compliance2.1
Special Inspector of Record3.1.1G
Special Inspector1.5G
Qualification Records3.1.1
SD-11 Closeout Submittals
Comprehensive Final Report3.1.1G
Comprehensive Final Report3.1.3G
01 50 00SD-01 Preconstruction Submittals
Construction Site Plan1.3G
Traffic Control Plan3.4.1G
SD-03 Product Data
Backflow Preventers1.4
SD-06 Test Reports
Backflow Preventer Tests2.2.5
SD-07 Certificates
Backflow Tester1.4.1
Backflow Preventers1.4
01 54 00.00 31SD-03 Product Data
Affirmative Procurement1.5.2.1G
Reporting Form
01 57 19.00 31SD-01 Preconstruction Submittals
Preconstruction Survey1.7.1G
Regulatory Notifications1.8.3G
Environmental Protection Plan1.5G
Dirt and Dust Control Plan1.6G
SD-06 Test Reports
Disposal Requirements3.9.2
Erosion and Sediment Control Inspection Reports1.8.4
Erosion and Sediment Control Inspection Reports3.4
Storm Water Inspection Reports for General Permit3.4
Solid Waste Disposal Report1.8.5G
SD-07 Certificates
Contractor 40 CFR employee training records1.8.2G
SD-11 Closeout Submittals
Storm Water Pollution Prevention Plan3.4.2G
Compliance notebook
Waste Determination Documentation1.8
Waste Determination Documentation3.7.2
Disposal Documentation for1.8.1
Hazardous and Regulated Waste
Contractor 40 CFR Employee Training Records1.8.2
Solid Waste Disposal Permit1.7.2
Solid Waste Disposal Report1.8.5
Hazardous Waste/Debris Management3.7.2
Regulatory Notifications1.8.3
01 57 20.00 31SD-01 Preconstruction Submittals
Material Safety Data Sheets (MSDS)1.4.1
SD-06 Test Reports
Green Procurement1.8
Recycling Report1.3
01 74 19.00 31SD-01 Preconstruction Submittals
Construction Waste Management Plan1.3.3G
01 78 00SD-03 Product Data
Warranty Management Plan1.5.1G
Warranty Tags1.5.4
Spare Parts Data1.4
SD-08 Manufacturer’s Instructions
Preventative Maintenance3.9
Condition Monitoring3.9
Inspection3.9
Instructions1.5.1
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals3.7G
SD-11 Closeout Submittals
As-Built Drawings3.1G
Record Drawings3.3G
As-Built Record of Equipment and Materials3.6
Final Approved Shop Drawings3.4
Construction Contract Specifications3.5
Interim DD FORM 13543.10G
Checklist for DD FORM 13543.10G
FINAL Interim DD FORM 13543.10G
02 05 09SD-01 Preconstruction Submittals
Demolition Plan1.4
02 41 00SD-01 Preconstruction Submittals
Demolition Plan1.2.1G
Existing Conditions1.10G
SD-07 Certificates
Notification1.6G
SD-11 Closeout Submittals
Receipts3.2.2
07 24 09SD-03 Product Data
Substrate2.1
Thermal Insulation2.3
Accessories2.4
Base Coat2.5
Reinforcing Fabric2.6
Finish Coat2.7
Warranty1.7
SD-04 Samples
Sealant2.8
Sample Installation3.4
SD-07 Certificates
Qualification of Installer1.4
SD-08 Manufacturer’s Instructions
Substrate2.1
SD-10 Operation and Maintenance Data
finish2.7
07 41 09SD-02 Shop Drawings
Metal3.2
07 60 09SD-02 Shop Drawings
Kynar Finish2.1.2G
Stainless Steel2.2.3G
Cleats3.1.4G
SD-04 Samples
Kynar Finish2.1.2G
Kynar 500 (Hylar 5000) finish2.1.3G
Fasteners2.3.1G
Waterproof Underlayment2.3.2G
Butyl Tape2.3.3G
07 84 00SD-02 Shop Drawings
Firestopping System2.1G
SD-03 Product Data
Firestopping Materials2.2G
SD-06 Test Reports
Inspection3.3G
SD-07 Certificates
Firestopping Materials2.2
Installer Qualifications1.5.1G
07 92 09SD-03 Product Data
Color Chart2.1.1.4
Sealants3.3
SD-04 Samples
Exterior Sealant2.1.1
SD-07 Certificates
Sealants3.3
Silicone Tape2.1.2.1
Primer2.2
Bond Breakers2.3
Backstops2.4
SD-08 Manufacturer’s Instructions
Sealants3.3
Silicone Tape2.1.2.1
Primer2.2
Backstops2.4
08 91 00SD-02 Shop Drawings
Wall louvers1.4G
Wall louvers1.5G
SD-03 Product Data
Metal Wall Louvers2.2G
SD-04 Samples
Wall louvers1.4G
Wall louvers1.5G
09 29 00SD-03 Product Data
Water-Resistant Gypsum Backing Board2.1.2
Accessories2.1.3
Submit for each type of gypsum board and for cementitious backer units
Gypsum Board2.1.1G
Recycled Content for Gypsum Board;2.1.1G
VOC Content of Joint Compound2.1.1
SD-07 CertificatesG
Asbestos Free Materials;2.1G
Indoor Air Quality for Gypsum Board2.1.1G
Indoor Air Quality for Non-aerosol Adhesives;2.1.4G
SD-08 Manufacturer's Instructions
Material Safety Data Sheets2.1
SD-10 Operation and Maintenance Data
Manufacturer Maintenance Instructions2.1G
21 13 13.00 20SD-02 Shop Drawings
Shop Drawings1.4.2G
SD-03 Product Data
Pipe2.1.1G
Fittings2.1.1G
Sprinklers2.1.4G
Pipe hangers and supports2.1.5G
Mechanical couplings2.1.1G
Seismic Bracing2.1.5G
SD-06 Test Reports
Request to schedule Preliminary Tests3.4G
Preliminary Test Report3.4G
Request to schedule Final Acceptance Test3.5G
Final Acceptance Test Report3.5G
SD-07 Certificates
Inspection by Fire Protection Engineer3.1G
Fire Protection Engineer1.4.1G
Sprinkler System Installer1.4.2G
SD-11 Closeout Submittals
As-built drawings3.5
23 00 00SD-02 Shop Drawings
Detail Drawings1.4.3G
SD-03 Product Data
Registers And Grilles2.8.4G
In-Line Centrifugal Fans2.9.1.1G
Air Handling Units2.10G
Variable Volume, Single Duct,2.11.1.1G
Fan-Powered Terminal Units
Energy Recovery Modules2.12G
Air Filters & Filter Modules2.9.3G
Test Procedures1.4.4G
Smoke Dampers2.8.3G
Fire Dampers2.8.2
Air Filters2.9.3.1G
SD-06 Test Reports
Performance Tests3.9G
Damper Acceptance Test3.7G
SD-08 Manufacturer’s Instructions
Manufacturer's Installation Instructions3.2G
23 00 00Operation and Maintenance Training3.11.2
SD-10 Operation and Maintenance Data
Operation and Maintenance Training3.11.1G
In-Line Centrifugal Fans2.9.1.1G
Air Handling Units2.10G
Variable Volume, Single Duct,2.11.1.1G
Fan-Powered Terminal Units
23 05 48.00 40SD-02 Shop Drawings
Installation Drawings1.2G
Outline Drawings1.2G
SD-03 Product Data
Equipment and Performance Data1.2G
SD-06 Test Reports
Allowable Deflection2.4G
Measured Deflection2.4G
23 05 93SD-01 Preconstruction Submittals
Record Of Existing Conditions1.3G
SD-02 Shop Drawings
TAB Schematic Drawings and1.3.3G
Report Forms
SD-03 Product Data
Equipment and Performance Data1.3G
SD-06 Test Reports
Certified Final DALT Report3.3.4G
SD-07 Certificates
Independent TAB Agency and1.5.1G
Personnel Qualifications
TAB Pre-Field Engineering Report3.4.2G
23 07 00SD-02 Shop Drawings
MICA Plates3.2.2.4G
Pipe Insulation Systems2.3G
Pipe Insulation Systems3.2G
Duct Insulation Systems3.3G
Equipment Insulation Systems3.4G
SD-03 Product Data
Pipe Insulation Systems2.3G
Pipe Insulation Systems3.2G
Duct Insulation Systems3.3G
Equipment Insulation Systems3.4G
SD-04 Samples
Thermal Insulation2.2.1.3G
SD-08 Manufacturer’s Instructions
Pipe Insulation Systems2.3G
Pipe Insulation Systems3.2G
Duct Insulation Systems3.3G
Equipment Insulation Systems3.4G
23 09 23.13 20SD-02 Shop Drawings
Control system drawings title sheet1.4.1.1G
List of I/O Points1.4.1.2G
Control System Components List1.4.1.3G
Control system schematics1.4.1.4G
HVAC Equipment Electrical Ladder diagrams1.4.1.5G
Component wiring diagrams1.4.1.6G
Terminal strip diagrams1.4.1.7G
BACnet communication1.4.1.8G
architecture schematic
SD-03 Product Data
Direct Digital Controllers2.1.1G
BACnet Gateways2.1.1.13G
BACnet Protocol Analyzer2.1.4G
DDC Software2.1.2G
BACnet Operator Workstation2.1.3G
BACnet Operator Workstation2.1.3.1G
DDC Software
Sensors and Input Hardware2.2G
Air Flow Monitoring Station2.2.6G
Output Hardware2.3G
Surge and transient protection2.4.2G
Indicators2.6G
Duct smoke detectors2.5.1G
Variable frequency (motor) drives2.7G
SD-05 Design Data
Performance Verification Testing Plan3.4.2G
Pre-Performance Verification3.4.4G
Testing Checklist
SD-06 Test Reports
Performance Verification Testing3.4.11G
Report
SD-07 Certificates
Contractor's Qualifications1.6.6G
SD-09 Manufacturer’s Field
Reports
Pre-PVT Checklist3.4.1G
SD-10 Operation and Maintenance Data
BACnet Direct Digital Control Systems1.4G
Controls System Operators Manuals3.3G
VFD Service Manuals2.7.2G
SD-11 Closeout Submittals
Training documentation3.5.1G
23 31 13.00 40SD-01 Preconstruction Submittals
Material, Equipment, and Fixture ListsPart 2G
Records of Existing Conditions2.1.1G
SD-02 Shop Drawings
Connection Diagrams2.1G
Offset Fitting Configurations2.2.1G
SD-03 Product Data
Equipment and Performance Data2.1.1
Galvanized Steel Ductwork Materials2.3.1G
Materials
Brazing Materials2.3.2
Mill-Rolled Reinforcing and Supporting Materials2.3.3
Round Sheet Metal Duct Fittings2.2.1G
Turning Vanes2.2.4G
Flexible Connectors2.2.6G
Power Operated Dampers2.2.11G
Gravity Backdraft and Relief Dampers2.2.10G
Manual Volume Dampers2.2.9G
SD-05 Design Data
Design Analysis and Calculations2.1.1G
SD-06 Test Reports
Ductwork Leakage Tests3.4.1G
SD-07 Certificates
Listing of Product Installations1.3
Galvanized Steel Ductwork Materials2.3.1
Brazing Materials2.3.2
Mill-Rolled Reinforcing and Supporting Materials2.3.3
Round Sheet Metal Duct Fittings2.2.1
Turning Vanes2.2.4
Dampers2.2.5
Flexible Connectors2.2.6
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals3.5.1G
Power Operated Dampers2.2.11G
SD-11 Closeout Submittals
Record Drawings3.5.2G
23 64 26SD-03 Product Data
Calibrated Balancing Valves2.4.3G
SD-06 Test Reports
Piping Welds NDE Report3.1.1.3
Pressure Tests Reports3.4.2G
SD-07 Certificates
Welding Procedures and Qualifications3.1.1.2
23 64 26Employer's Record Documents (For Welding)3.1.1.1
SD-10 Operation and Maintenance Data
Calibrated Balancing Valves2.4.3G
26 05 48.00 10SD-02 Shop Drawings
Lighting Fixtures in Buildings3.1
Equipment Requirements1.3
SD-03 Product Data
Lighting Fixtures in Buildings3.1G
Equipment Requirements1.3G
Contractor Designed Bracing1.2.4G
26 20 00SD-02 Shop Drawings
Panelboards2.9G
Wireways2.16G
Marking Strips3.1.6.1G
SD-03 Product Data
Circuit breakers2.9.1G
Switches2.7G
SD-06 Test Reports
600-volt wiring test3.4.2G
Grounding system test3.4.3G
SD-07 Certificates
Fuses2.8G
SD-10 Operation and Maintenance Data
Electrical Systems1.5.1G
28 31 76SD-01 Preconstruction Submittals
Qualified Fire Protection Engineer;1.3.2G
Fire alarm system designer;G
Supervisor;1.9.2.2G
Technician;1.9.2.3G
Installer;1.9.2.4G
Test Technician;1.9.2.5G
Fire Alarm System Site-Specific1.7G
Software Acknowledgement;
Fire Alarm Sub-Contractor verification of receiving andG
reading contract specification section 28 31 76;
SD-02 Shop Drawings
Nameplates;1.9.1.3G
Instructions;2.2.4G
Wiring Diagrams;1.9.1.4G
System Layout;1.9.1.5G
Notification Appliances;1.9.1.6G
Initiating devices;1.9.1.7G
Amplifiers;1.9.1.8G
Battery Power;1.9.1.9G
Voltage Drop Calculations;1.9.1.10G
SD-03 Product Data
Fire Alarm and Mass Notification Control Unit (FMCU);1.4.2G
Local Operating Console (LOC);1.4.4G
Amplifiers;1.9.1.8G
Tone Generators;2.5G
Digitalized voice generators;2.5G
LCD Annunciator;2.6.1G
Manual Stations;2.7G
Smoke Detectors;2.8G
Duct Smoke Detectors;2.8.2G
Heat Detectors;2.9G
Carbon monoxide detector;2.1G
Addressable Interface Devices;2.11G
Addressable Control Modules;2.12G
Notification Appliances;1.9.1.6G
Batteries;G
Battery Chargers;2.15.2G
Supplemental Notification Appliance Circuit Panels2.15.1.1G
Auxiliary Power Supply Panels;2.15.1.1G
Surge Protective Devices;2.16G
Alarm Wiring;2.17.1G
Back Boxes and Conduit;3.3.4G
Ceiling Bridges for Ceiling-Mounted Appliances;3.2.9G
Terminal Cabinets;1.4.5G
Automatic Fire Alarm Transmitters (including housing);2.19G
Radio Transmitter and Interface Panels;2.19.1G
Mass Notification Transceiver;2.18.1G
Environmental Enclosures or Guards;2.21G
Document Storage Cabinet;3.12.3G
SD-06 Test Reports
Test Procedures;3.8.1G
SD-07 Certificates
Verification of Compliant Installation;3.8.2.1G
Request for Government Final Test;3.8.2.2G
SD-10 Operation and Maintenance Data
Operation and Maintenance (O&M) Instructions;1.9.1.13G
Instruction of Government Employees;3.11G
SD-11 Closeout Submittals
As-Built Drawings1.9.1.14
Spare Parts1.11.1
32 92 23SD-03 Product Data
Fertilizer2.4
SD-06 Test Reports
Topsoil composition tests2.2.1
SD-07 Certificates
sods2.1

Submittal Register, Dec 2019 Page &P of &N