Attachment 4 - Total Cost Breakdown.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Construction of two ADA ramps at U. S. Embassy in Madrid
Solicitation number
19SP5026Q0011
Issued by

About this file

This is a Total Cost Breakdown spreadsheet for construction work at the U.S. Embassy in Madrid, Spain, specifically detailing the line items and quantities required for the construction of two ADA ramps. The spreadsheet outlines two distinct project lines: Line 1 (Cafeteria Patio) and Line 2 (Back Alley), with each containing 13 task categories spanning site preparation, demolition, structural work, finishing, and project management.

Line 1 encompasses the cafeteria patio ramp construction and includes tasks such as rerouting drainage and utilities, demolition and excavation to 23 cm depth (20 m²), waterproofing membrane installation (15 m²), brick wall construction, formwork (15 m²), steel mesh/rebar placement (15 m²), concrete slab HA 25 pour (3.75 m³), stainless steel AISI 304 handrail installation (25 ml), pavement tile placement 60x40 (15 m²), drainage grill (3 ml), and final cleaning, waste management, and safety measures. Line 2 covers the back alley ramp with similar task categories but smaller quantities: excavation (6 m²), waterproofing (6 m²), brick wall (5 m²), formwork (6 m²), rebar placement (6 m²), concrete (2 m³), handrail (5 ml), pavement tiles (6 m²), and drainage grill (1 ml). The document notes that all measurements are estimates and that each offeror is responsible for taking independent measurements with no price adjustments permitted for measurement errors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hoja1

All measurements included herein are estimates. Each Offeror is responsible for taking its own measurements. No adjustment in
price shall be made due to errors in Offeror's measurements.
Presupuesto
CódigoUdItemMesCanPresPres
LINE 1 : CAFETERIA PATIO
1PAReroute and relocate the drainage located on the base of the stairs and other utilities on the area before starting the works1
2PARerote installation1
3m2Demolition and excavation: Dig the ground to a depth of about 23 cm (the thickness of the slab and pavement ).20
4m2Placed a waterproofing membrane15
5m2Brick wall6
6m2Formwork15
7m2Place steel mesh or rebar inside the excavation before pouring the concrete15
8m3Slab concrete HA 253.75
9mlHandrail stainless steel AISI 30425
10m2Pavement tile 60x4015
11mlGrill on drainage3
12PACleaning and waste management1
13PASecurity and safety1
LINE 2 : BACK ALLEY
1PAReroute and relocate the drainage located on the base of the stairs and other utilities on the area before starting the works1
2PARerote installation1
3m2Demolition and excavation: Dig the ground to a depth of about 23 cm (the thickness of the slab and pavement ).6
4m2Placed a waterproofing membrane6
5m2Brick wall5
6m2Formwork6
7m2Place steel mesh or rebar inside the excavation before pouring the concrete6
8m3Slab concrete HA 252
9mlHandrail stainless steel AISI 3045
10m2Pavement tile 60x406
11mlGrill on drainage1
12PACleaning and waste management1
13PASecurity and safety1

Hoja2

Hoja3