Attachment 1 - Breakdown of Price by Divisions of Specifications.pdf

PDF 140 KB Posted

Attached to
Construction of two ADA ramps at U. S. Embassy in Madrid
Solicitation number
19SP5026Q0011
Issued by

About this file

This document is a pricing template attachment for RFQ No. 19SP5025Q0006 issued by the United States Department of State. The form serves as a breakdown of price by divisions of specifications and requires offerors to provide cost estimates organized by 16 construction-related divisions.

The pricing template requires offerors to break down costs across five columns for each division: Labor, Materials, Overhead, and Profit, with a Total column for each line item. The 16 divisions covered include General Requirements/Mobilization, Site Work, Concrete, Masonry, Metals, Wood and Plastic, Thermal and Moisture, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Systems, Mechanical, and Electrical. All pricing is to be submitted in Euros. The form indicates no allowance items are included and requires offerors to provide a Proposal Price Total in Euros. Any alternates must be listed separately without being totaled into the main price. The template requires signature and date fields for the offeror.

View the file

Other files

File Type Posted
Attachment 2 - Statement of Work.pdf PDF
Attachment 3 - Drawings.pdf PDF
RFQ 19SP5026Q0011.pdf PDF
Attachment 4 - Total Cost Breakdown.xlsx XLSX spreadsheet
Invitation letter.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ No. 19SP5025Q0006 Page 53 of 55

ATTACHMENT #4

UNITED STATES DEPARTMENT OF STATE

BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS

(1) Division/Description

(2) Labor

(3) Materials

(4) Overhead

(5) Profit

(6) Total

1. General Requirements/ Mobilization

2. Site Work

3. Concrete

4. Masonry

5. Metals

6. Wood and Plastic

7. Thermal and Moisture

8. Doors and Windows

9. Finishes

10. Specialties

11. Equipment

12. Furnishings

13. Special Construction

14. Conveying Systems

15. Mechanical

16. Electrical

TOTAL EUROS:

Allowance Items: NONE

PROPOSAL PRICE TOTAL EUROS:

Alternates (list separately; do not total):

Offeror:

Date

File details come from the government source that posted it. Updated .