Attachment 4 - Submittal Register.pdf
PDF 567 KB Posted
- Attached to
- Repair Ghost DFAC (Building 3757) Federal contract opportunity
- Solicitation number
- W912DW25BA013
About this file
This is a Submittal Register for the "Repair Ghost DFAC (Building 3757)" project, detailing the comprehensive documentation and approval process for various construction and installation activities. The register spans multiple specification sections, including preconstruction submittals, project management, environmental requirements, demolition, renovations, mechanical and electrical systems, and site work.
Key submittal categories include shop drawings, product data, samples, design data, test reports, and certificates across disciplines such as concrete, steel, roofing, insulation, HVAC, plumbing, electrical, cybersecurity, and communications systems. Submittals are classified with various approval levels (G for government review, S for sample submission) and require contractor action and government review at different project stages. The document outlines specific requirements for documentation like project schedules, quality control plans, sustainability checklists, operation and maintenance manuals, training documentation, and various technical specifications for equipment and materials to be used in the renovation of Building 3757.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 56 PAGES
Repair Ghost DFAC (Building 3757)
01 14 00 SD-01 Preconstruction Submittals
List of Contact Personnel and
Personnel List
01 30 00 SD-01 Preconstruction Submittals
1.3View Location Map
1.4Progress and Completion
Pictures
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.2 GPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.2 GPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.5.3.2 GFinal High Performance and
Sustainable Building Checklist
1.5.3.2 GFinal Sustainability eNotebook
1.5.3.2 GAmended Final Sustainability
eNotebook
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 56 PAGES
01 33 29 1.5.3.2 GAmended Final High
Performance and Sustainable
Building Checklist
GThird Party Certification
Certificate, Assessment, or
Validation and Compliance Report
01 35 26 SD-01 Preconstruction Submittals
1.8 GAccident Prevention Plan (APP)
1.15 GIndoor Air Quality (IAQ)
Management Plan
Activity Hazard Analysis (AHA);
G
Crane Critical Lift Plan; G
Proof Of Qualification For Crane
Operators; G
Critical Lift Plan, G
1.12.4 GStandard Lift Plan
SD-06 Test Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
1.5 GMonthly Exposure Reports
Crane Reports
SD-07 Certificates
Crane Operators/Riggers
1.9 GActivity Hazard Analysis (AHA)
1.12.4Certificate of Compliance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 56 PAGES
01 35 26 1.13Hot Work Permit
Confined Space Entry Permit
01 35 29.13 SD-02 Shop Drawings
3.9.1 GWork Zones
3.10.1 GDecontamination Facilities
SD-03 Product Data
1.4 GAmendments to the APP/SSHP
3.5Exposure Monitoring/Air
Sampling Program
01 45 00 SD-01 Preconstruction Submittals
1.5.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
1.12.3Verification Statement
SD-07 Certificates
1.6.6.1 GCertificate Of Readiness
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
3.1.1 GProject Manual
3.1.1Written NDT Practices
3.1.3Written NDT Practices
SD-06 Test Reports
3.1.1Special Inspection Daily Reports
3.1.2Special Inspection Daily Reports
3.1.3Special Inspection Daily Reports
3.1.3Special Inspection Daily Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 56 PAGES
01 45 35 3.1.1Special Inspection Biweekly
Reports
3.1.2Special Inspection Biweekly
Reports
SD-07 Certificates
2.1AISC Certified Steel Fabricator
1.5 GSpecial Inspector of Record
1.5.8 GSpecial Inspector of Record
1.5 GSpecial Inspector
Qualification Records for ND7 technicians
SD-11 Closeout Submittals
3.1.1 GComprehensive Final Report
3.1.3 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.3.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
SD-06 Test Reports
3.4Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.6.1Preconstruction Survey
1.6.2 GRegulatory Notifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 56 PAGES
01 57 19 1.6.4 GEnvironmental Manager
Qualifications
1.6.5 GEmployee Training Records
1.7 GEnvironmental Protection Plan
1.7.10.1 GDirt and Dust Control Plan
1.11 GSolid Waste Management Permit
3.2.1.1 GStormwater Pollution Prevention
Plan
3.2.1.2 GStormwater Notice of Intent
3.14.2 GSpill Prevention Control And
Countermeasure (SPCC) Plan
Hazardous Materials (A listing of all hazardous materials to be used on the project - including Safety
Data Sheets and unit(s) of measure for each item - as described in paragraph
HAZARDOUS MATERIAL
AUTHORIZATION AND
REPORTING. Allow a minimum 2 weeks for ED review); G
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 56 PAGES
01 57 19 Hazardous Material; G (Safety
Data Sheets and unit(s)of measure for each additional or reformulated hazardous material proposed after the start of work)
Hazardous Material Inventory; G
(hazardous material inventories on
HJB Form 953)
SD-06 Test Reports
1.11.1 GMonthly Solid Waste Disposal
Report
3.2.1.3Inspection Reports
3.7.1.1.2Laboratory Analysis
SD-07 Certificates
1.6.5 GEmployee Training Records
Erosion and Sediment Control
Inspector Qualification for projects that disturb more than 1 acre
1.6.5.1Certificate of Competency
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 56 PAGES
01 57 19 Environmental Officers, Hazardous Material Technicians, And Hazardous Waste
Technicians Qualifications, appointment letters, and JBLM
Environmental Operations
Management certificate (with date of completion within the past 365 days)
Pesticide Applicators (Current
Washington State pesticide applicator license and certifications)
Heating And Air Conditioning
Technicians (Evidence of current certification by an EPA-approved
Section 608 or 609 (as applicable) certification/licensing program)
Erosion And Sediment Control
Inspector Qualifications
SD-11 Closeout Submittals
1.6.2 GRegulatory Notifications
1.6.5 GAssembled Employee Training
Records
1.11 GSolid Waste Management Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 56 PAGES
01 57 19 3.2.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 GStormwater Notice of Termination
3.7.1 GWaste Determination
Documentation
3.7.2.1 GProject Solid Waste Disposal
Documentation Report
3.7.2.1 GSales Documentation
3.7.2.1Contractor Certification
3.7.3.1 GHazardous Waste/Debris
Management
3.7.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
01 74 19 SD-01 Preconstruction Submittals
1.6 GConstruction Waste Management
Plan
SD-06 Test Reports
1.8.2Quarterly Reports
1.8.3Annual Report
SD-11 Closeout Submittals
1.9 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.8.1Warranty Management Plan
1.8.5Warranty Tags
1.6Spare Parts Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 56 PAGES
01 78 00 SD-08 Manufacturer’s Instructions
1.8.1Instructions
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
2.2 GRecord Model
3.6As-Built Record of Equipment and Materials
1.8.1Warranted Equipment and
Materials
3.4 GFinal Approved Shop Drawings
3.5 GConstruction Contract
Specifications
2.3 GCertification of EPA Designated
Items
2.4 GCertification Of USDA Designated
Items
3.9 GInterim DD FORM 1354
GHigh Performance and
Sustainable Building (HPSB)
Checklist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 56 PAGES
01 78 00 3.9List Of Installed Building
Equipment Items For DD Form
01 78 23 SD-10 Operation and Maintenance
Data
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
3.2.1 GOperation And Maintenance
Manual, Progress Submittal
3.2.2 GOperation And Maintenance
Manual, Prefinal Submittal
3.2.3 GOperation And Maintenance
Manual, Final Submittal
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
3.1.1 GTraining Plan
1.5.6.7 GRecord Drawings And Utility
Systems
01 91 00.15 SD-06 Test Reports
3.5 GCompleted Construction
Observation Checklists
3.4 GInterim Construction Phase
Commissioning Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 56 PAGES
01 91 00.15 3.4 GFinal Construction Phase
Commissioning Plan
1.10 GIssues Log
SD-07 Certificates
1.8 GCommissioning Firm
SD-10 Operation and Maintenance
Data
3.9 GMaintenance and Service Life
Plan
3.8 GSystems Manual
SD-11 Closeout Submittals
3.10 GFinal Commissioning Report
3.11 GUpdated Final Commissioning
Report
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
02 82 00 SD-03 Product Data
1.2.2 GAmended Water
1.3.9 GSafety Data Sheets (SDS) for All
Materials
2.1 GEncapsulants
3.1.2.1 GRespirators
3.1.7 GLocal Exhaust Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 56 PAGES
02 82 00 3.1.7 GPressure Differential Automatic
Recording Instrument
3.1.8 GVacuums
3.1.10 GGlovebags
SD-06 Test Reports
1.5.5 GAir Sampling Results
1.5.6 GPressure Differential Recordings
for Local Exhaust System
3.2.12.2 GEncapsulation Test Patches
3.2.14.5 GClearance Sampling
3.3.3.2 GAsbestos Disposal Quantity
Report
SD-07 Certificates
1.3.4 GEmployee Training
1.3.5 GNotifications
1.3.7 GRespiratory Protection Program
1.3.10 GAsbestos Hazard Abatement Plan
1.3.11 GTesting Laboratory
1.3.12 GLandfill Approval
1.3.12 GDelivery Tickets
1.3.12 GWaste Shipment Records
1.3.13 GTransporter Certification
1.3.14 GMedical Certification
1.5.1 GPrivate Qualified Person
Documentation
1.5.2 GDesignated Competent Person
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 56 PAGES
02 82 00 1.5.3 GWorker's License
1.5.4 GContractor's License
1.5.8 GFederal, State or Local Citations
on Previous Projects
2.1 GEncapsulants
3.1 GEquipment Used to Contain
Airborne Asbestos Fibers
3.1.3.3 GWater Filtration Equipment
3.1.8 GVacuums
3.1.8 GVentilation Systems
SD-11 Closeout Submittals
1.3.5 GPermits and Licenses
1.3.5 GNotifications
1.3.7.1 GRespirator Program Records
1.5.7 GProtective Clothing
Decontamination Facility
Notification
1.7.1 GRental Equipment
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.4 GMedical Examinations
1.5.2.8 GLead, Cadmium, Chromium
Waste Management Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 56 PAGES
02 83 00 1.5.4 GLicenses, Permits and
Notifications
1.5.5 GOccupant Protection Plan
1.5.2.2 GLead, Cadmium, Chromium
Compliance Plan
3.1.1.6 GLead, Cadmium, Chromium
Compliance Plan
3.4.1.1 GInitial Sample Results
3.5.2.1 GWritten Evidence of TSD
Approval
SD-03 Product Data
1.6.1 GRespirators
1.6.4 GVacuum Filters
1.6.7 GNegative Air Pressure System
2.1 GMaterials and Equipment
2.1.1 GExpendable Supplies
3.1.1.5 GLocal Exhaust Equipment
3.1.1.5 GPressure Differential Automatic
Recording Instrument
3.1.1.6 GPressure Differential Log
SD-06 Test Reports
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.3 GSampling Results
1.5.3 GPressure Differential Recordings
For Local Exhaust System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 56 PAGES
02 83 00 SD-07 Certificates
1.5.1.3 GTesting Laboratory
1.5.1.4 GThird Party Consultant
Qualifications
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GHazardous Waste Manifest
3.5.2.1 GTurn-In Documents or Weight
Tickets
02 84 16 SD-07 Certificates
1.8.1 GQualifications of CIH
1.8.1 GTraining Certification
1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.1 GTransporter certification
3.2.4Certification of Decontamination
3.5.2Certificate of Disposal and/or recycling
3.3.1Testing results
03 01 00 SD-01 Preconstruction Submittals
1.5.3 GQualifications
1.5.5 GWork Plan
1.5.2 GQuality Control Plan
3.1.3.1 SForm Release Agents
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 56 PAGES
03 01 00 2.4 SConcrete
2.4 SConcrete Curing Agent
3.3.2.4 SPatching
2.1.2.1 SBlast Media
2.5.1 STwo-Component Epoxies
SD-03 Product Data
2.4Concrete
2.5Polymers
2.6Miscellaneous Materials and
Equipment
SD-04 Samples
2.3Reinforcement and
Reinforcement Supports
SD-05 Design Data
3.1.3 GFormwork
3.1.3.1 GFormwork
1.5.1 GRepair Procedures
2.7 GMixture Proportioning
SD-06 Test Reports
2.7Mixture Proportioning
3.1.5Quality Control
SD-07 Certificates
1.5.3Qualifications
2.3Reinforcement and
Reinforcement Supports
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 56 PAGES
03 01 00 3.1.3.1 SForm Release Agents
2.4 SConcrete
2.4 SConcrete Curing Agent
3.3.2.4 SPatching
2.1.2.1 SBlast Media
2.5.1 STwo-Component Epoxies
03 30 53 SD-02 Shop Drawings
1.4 GInstallation Drawings
SD-03 Product Data
2.2.3.1Air-Entraining Admixture
2.2.3.2Water-Reducing or Retarding
Admixture
2.2.11Curing Materials
2.2.6Expansion Joint Filler Strips, Premolded
2.2.7Joint Sealants - Field Molded
Sealants
3.1.4.3Batching and Mixing Equipment
3.2Conveying and Placing Concrete
2.2.8Formwork
2.3 GMix Design Data
2.3Ready-Mix Concrete
2.4.1Curing Compound
SD-06 Test Reports
2.2.2Aggregates
2.1.3 GConcrete Mixture Proportions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 56 PAGES
03 30 53 3.3.3.2Measurement of Floor Tolerances
3.8.3 GCompressive Strength Testing
3.8.3 GSlump
3.8.3Air Content
2.2.4Water
SD-07 Certificates
2.2.1Cementitious Materials
2.2.1.2Pozzolan
1.4.1CPG for recycled materials or appropriate Waiver Form
2.2.2Aggregates
2.3Delivery Tickets
SD-08 Manufacturer’s Instructions
2.4.1Curing Compound
04 03 00 SD-01 Preconstruction Submittals
1.5.2 GQualifications
SD-02 Shop Drawings
1.5.5Photographic Documentation
3.5.1 GStructural Upgrades
SD-03 Product Data
1.5.2Qualifications
1.5.6 GCleaning Methods
2.1 GCleaning Materials
2.1.3Biocides
2.2.2.1 GReplacement Mortar
2.4 GMortar Mix
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 56 PAGES
04 03 00 SD-04 Samples
1.5.7.1 GMock-ups
SD-05 Design Data
3.5.1 GStructural Upgrades
SD-06 Test Reports
1.5.1Matching
3.5.2Existing Sealants for Asbestos and PCBs
SD-07 Certificates
2.2Repair Materials
05 05 20 SD-01 Preconstruction Submittals
1.5.1.1 GInstaller Qualifications
1.5.1.2 G POPost-Installed Anchor Special
Inspector Qualifications
SD-03 Product Data
2.1.1.3 GMechanical Anchors in Concrete
2.1.1.4 GAdhesive Anchor System in
Concrete
2.1.1.5 GMechanical and Adhesive
Anchors in Masonry
3.1.3 GNon-Shrink, Non-Metallic Grout
SD-06 Test Reports
3.3.4 GPost-Installed Anchor Special
Inspections Report
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 56 PAGES
05 05 20 2.1.1.1 GPost-Installed Anchor
Certification
SD-08 Manufacturer’s Instructions
2.1.1.2 GManufacturer's Printed
Installation Instructions
3.1.3 GNon-Shrink, Non-Metallic Grout
1.5Manufacturer's Material Safety
Data Sheets
05 05 23.16 SD-01 Preconstruction Submittals
3.2 GWelding Quality Assurance Plan
SD-03 Product Data
1.3 GWelding Procedure Qualifications
1.3.4Welder, Welding Operator, and
Tacker Qualification
1.3.2Previous Qualifications
1.3.3 GPre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
3.2Weld Inspection Log
SD-07 Certificates
1.3.1Certified Welding Procedure
Specifications (WPS)
1.3.1Certified Procedure Qualification
Records (PQR)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 56 PAGES
05 05 23.16 1.3.1Certified Welder Performance
Qualifications (WPQ)
1.3.5Certified Welding Inspector
1.3.5Nondestructive Testing Personnel
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.4.2Non-Shrink Grout
2.3.2Tension Control Bolts
SD-05 Design Data
1.4.1.1 GTemporary Shoring and Bracing
SD-06 Test Reports
2.3Bolts, Nuts, and Washers
3.7.1.2Weld Inspection Reports
3.7.2.1Bolt Testing Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.3AISC Structural Steel Fabricator
Quality Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 56 PAGES
05 12 00 1.3AISC Structural Steel Erector
Quality Certification
1.4.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.7.1.1Certified Welding Inspector
3.7.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 30 00 SD-02 Shop Drawings
1.3.4 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.1.3Galvanizing Repair Paint
2.2.4Mechanical Fasteners
2.1.3Touch-Up Paint
2.1 SRecycled Content of Steel
Products
SD-04 Samples
2.1.1Metal Roof Deck Units
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.3.1Wind Storm Resistance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 56 PAGES
05 30 00 1.3.1Manufacturer's Certificate
05 50 13 SD-02 Shop Drawings
2.6 GAngles and Plates
SD-03 Product Data
2.4Corner Guards
2.5 GDownspout Terminations
2.1 SRecycled Content
SD-07 Certificates
2.1 GCertificates of Compliance
06 10 00 SD-01 Preconstruction Submittals
2.3.1 SAdhesives
2.2Plywood
2.2 SStructural-use
SD-02 Shop Drawings
1.8.1 GFabricated Structural Members
1.8.2 GModifications of Structural
Members
2.1.1 GNailing Strips
SD-03 Product Data
1.8.2 GModifications of Structural
Members
2.3.1Adhesives
SD-05 Design Data
1.8.2 GModifications of Structural
Members
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 56 PAGES
06 10 00 1.4.3Preservative-treated
SD-07 Certificates
1.10.1Certificates of Grade
2.2 SStructural-Use
2.2 SStructural-Use
1.7Preservative Treatment
2.3.1 SIndoor Air Quality for Aerosol
Adhesives
2.3.1 SIndoor Air Quality for Non-aerosol
Adhesives
SD-10 Operation and Maintenance
Data
2.3.1 SAdhesives
2.2Plywood
2.2 SStructural-use
07 21 16 SD-01 Preconstruction Submittals
2.1.1 SRecycled Content for Insulation
Materials
2.1.2 SInterior
2.4.1 SInterior
SD-03 Product Data
2.2Blanket Insulation
2.4Accessories
SD-08 Manufacturer’s Instructions
3.3.1Insulation
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 56 PAGES
07 21 16 2.1.1 SRecycled Content for Insulation
Materials
2.1.2 SInterior
2.4.1 SInterior
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
1.3 GVerification of Existing Conditions
SD-03 Product Data
2.1 GInsulation
1.4 GCover Board
2.4 GFasteners
2.3 GMoisture Control
2.1.2 SRecycled Content For Insulation
SD-05 Design Data
1.7 GWind Resistance
SD-06 Test Reports
1.8.1 GFlame Spread Rating
SD-07 Certificates
1.6 GInstaller Qualifications
2.1.3 SIndoor Air Quality For Insulation
2.1.4 SAcceptable Foam Blowing Agents
SD-08 Manufacturer’s Instructions
2.4 GFasteners
2.1 GInsulation
07 42 13 SD-01 Preconstruction Submittals
1.5.3 GQualification of Manufacturer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 56 PAGES
07 42 13 1.5.4 GQualification of Installation
Contractor
1.8 GWarranty
SD-02 Shop Drawings
1.5.1.1 GInstallation Drawings
SD-03 Product Data
2.2.1 GPanels
2.2.2Factory Color Finish
1.5.5Closure Materials
2.5.4.4Pressure Sensitive Tape
2.5.4.1Sealants and Caulking
1.5.3.1Galvanizing Repair Paint
1.5.5Accessories
2.5Accessories
SD-04 Samples
3.3.1 GMitered Corners
1.5.1 GColor chart and chips
SD-05 Design Data
1.5.1.2Wind load design analysis
1.5.1.2wind
SD-06 Test Reports
1.3.3Leakage
1.3.2Wind Load Tests
1.3.2Seismic
SD-07 Certificates
1.5.3.1Fasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 56 PAGES
07 42 13 SD-08 Manufacturer’s Instructions
3.3Installation
SD-09 Manufacturer’s Field
Reports
3.8.1Manufacturer's Field Reports
SD-11 Closeout Submittals
1.8Warranty
1.5.6Maintenance Instructions
1.8.120 year 'No Dollar Limit' warranty for labor and material
07 42 13.03 SD-01 Preconstruction Submittals
1.5.3 GQualification of Manufacturer
1.5.4 GQualification of Installation
Contractor
1.8 GWarranty
SD-02 Shop Drawings
1.5.1.1 GInstallation Drawings
SD-03 Product Data
2.1Recycled Content
2.2.1 GWall Panels
2.2.2Factory Color Finish
1.5.5Closure Materials
1.5.3.1Enamel Repair Paint
1.5.5Accessories
2.5Accessories
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 56 PAGES
07 42 13.03 2.2.1 GWall Panels
1.5.3.1 GFasteners
2.5.2 GMetal Closure Strips
SD-06 Test Reports
1.3.2 GWind Load Tests
2.2.2.5 GCoating
2.2.2.5 GChalking
SD-07 Certificates
1.5.3.1 GFasteners
1.5.3.1 GEnamel Repair Paint
SD-08 Manufacturer’s Instructions
3.3 GInstallation
SD-09 Manufacturer’s Field
Reports
3.8.1Manufacturer's Field Reports
SD-11 Closeout Submittals
1.8 GWarranty
1.5.6 GMaintenance Instructions
1.8.120 year 'No Dollar Limit' warranty for labor and material
07 53 23 SD-02 Shop Drawings
1.3.1Roof Plan Drawing
1.3.1Wind Load Calculations
1.3.1Boundaries of Enhanced
Perimeter
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 56 PAGES
07 53 23 1.3.1Corner Attachments of Roof
System Components
1.3.1Location of Perimeter Half-Sheets
1.3.1Spacing of Perimeter, Corner, and Infield Fasteners
1.3.1Slopes and Drain Locations
SD-03 Product Data
2.2Cement
2.1.1 GEPDM Sheet
2.1.2Grease Resistant Overlay
2.1.4Seam Tape
2.1.6Bonding Adhesive
2.1.5Lap Splice Adhesive
2.1.8Water Cutoff Mastic/Water Block
2.1.7Lap Cleaner, Lap Sealant, and
Edge Treatment
3.3Flashings
2.1.9Flashing Accessories
2.1.9.1Flashing Tape
2.1.10Fasteners and Plates
2.1.13Roof Insulation
2.1.11Pre-Manufactured Accessories
1.8 GWarranty
SD-05 Design Data
1.4.4 GWind Uplift Calculations
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 56 PAGES
07 53 23 1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
1.4.4 GWind Uplift Resistance
1.4.3 GFire Resistance
SD-08 Manufacturer’s Instructions
3.2 GApplication
3.2.3 GApplication Method
3.3.2 GMembrane Flashing
2.1.4Seam Tape
3.2.4Tape Seams / Lap Splices
3.2.5Adhesive Seams / Lap Splices
3.2.6Perimeter Attachment
3.2.4Primer
3.2.7Fasteners
2.1.11Pre-Manufactured Accessories
1.6 GCold Weather
SD-11 Closeout Submittals
1.8Warranty
3.10Information Card
3.9Instructions To Government
Personnel
07 60 00 SD-02 Shop Drawings
2.2.1 GExposed Sheet Metal
3.1.17 GGutters
3.1.18 GDownspouts
2.2.1 Gfascia
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 56 PAGES
07 60 00 3.1.21 GSplash Pans
3.1.11 GBase Flashing
3.1.12 GCounterflashing
3.1.25 GFlashing at Roof Penetrations
and Equipment Supports
2.2.6 GReglets
3.1.19 GScuppers
3.1.26 GCopings
3.1.16 GDrip Edges
3.1.20 GConductor Heads
3.1.22 GEave Flashing
2.1 SRecycled Content
SD-04 Samples
1.4.2 GFinish Samples
SD-07 Certificates
2.2.4.1 GWarranty on Finishes
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
SD-10 Operation and Maintenance
Data
1.4.3 GCleaning and Maintenance
07 61 14.00 20 SD-02 Shop Drawings
1.2.5 GRoofing
SD-03 Product Data
2.1 GRoofing Panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 56 PAGES
07 61 14.00 20 2.1 SEnergy Star Label for Steel
Roofing Product
2.1.1 SRecycled Content for Steel
Roofing Product
2.3Attachment Clips
2.4.1Closures
2.4Accessories
2.4.2Fasteners
2.4.3Sealants
1.7 GWarranty
SD-04 Samples
2.1Panel
2.4Accessories
2.4.3Sealants
2.2Intermediate Support
SD-05 Design Data
1.5Design Calculations
SD-06 Test Reports
3.6Field Inspection
1.3.3Structural Performance
1.6.6Finish
SD-07 Certificates
1.6.3Manufacturer's Technical
Representative
1.6.4Installer's Qualifications
2.1 GCoil Stock
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 56 PAGES
07 61 14.00 20 SD-08 Manufacturer’s Instructions
3.3 GInstallation
SD-11 Closeout Submittals
3.8Information Card
1.7Warranty
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
2.5 GCaulking
2.6 GCleaning Solvents
3.1 GField Adhesion
SD-07 Certificates
2.2Indoor Air Quality
2.1.1 SInterior Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 56 PAGES
07 92 00 2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.5 SIndoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.3 GFrames
2.3 GFrames
2.2Accessories
SD-03 Product Data
2.1 GDoors
2.1 SRecycled Content for Steel Door
Product
2.3 GFrames
2.3 SRecycled Content for Steel Frame
Product
2.2Accessories
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.2.6 GKeying System
SD-03 Product Data
2.2 GHardware Items
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 56 PAGES
08 71 00 3.1Installation
09 22 00 SD-02 Shop Drawings
2.1 GMetal Support Systems
SD-03 Product Data
2.1Metal Support Systems
2.1 SRecycled Content for Metal
Support Systems
09 23 82 SD-02 Shop Drawings
1.5.3 GInstallation Drawings
SD-03 Product Data
1.5.1 GManufacturer's Catalog Data
SD-04 Samples
1.5.2 GPlaster Sample
SD-07 Certificates
1.5.4 GCertificates of Conformance
SD-08 Manufacturer’s Instructions
1.5.4 GManufacturer's Instructions
1.5.4 GSpecial Provisions
09 29 00 SD-03 Product Data
2.1.5Cementitious Backer Units
2.1.4Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.3Water-Resistant Gypsum Backing
Board
2.1.9Accessories
2.1.1Gypsum Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 56 PAGES
09 29 00 2.1.1 SRecycled Content for Gypsum
Board
2.1.6 SVOC Content of Joint Compound
SD-07 Certificates
2.1 GAsbestos Free Materials
2.1.1 SIndoor Air Quality for Gypsum
Board
2.1.8 SIndoor Air Quality for Non-aerosol
Adhesives
2.1.8 SIndoor Air Quality for Aerosol
Adhesives
SD-08 Manufacturer’s Instructions
2.1Safety Data Sheets
SD-10 Operation and Maintenance
Data
2.1Manufacturer Maintenance
Instructions
09 30 10 SD-03 Product Data
2.1 GPorcelain Tile
2.1.1 GQuarry Tile
2.1.3 GGlazed Ceramic Wall Tile
2.2 GSetting-Bed
2.4 GMortar, Grout, and Adhesive
2.5.1 GCementitious Backer Units
2.5.2 GGlass-Mat Gypsum
Water-Resistant Backing Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 56 PAGES
09 30 10 2.7 GWaterproof Membrane
SD-04 Samples
2.1 GTile
2.6.1 GMetal Strips
2.4.4 GGrout
SD-07 Certificates
2.4 SIndoor Air Quality for Adhesives
2.4.9 SIndoor Air Quality for Sealants
SD-08 Manufacturer’s Instructions
3.8Manufacturer's Approved
Cleaning Instructions
SD-10 Operation and Maintenance
Data
2.1 GPorcelain Tile
2.1.1 GQuarry Tile
2.1.2 GMosaic Tile
2.1.3 GGlazed Ceramic Wall Tile
09 51 00 SD-01 Preconstruction Submittals
2.2Acoustical Ceiling Systems
2.2 SAcoustical Ceiling Tile
1.3.1.2Adhesives
1.3.1.2 SSealants
SD-03 Product Data
2.2 GAcoustical Ceiling Systems
SD-04 Samples
1.3.1.1 GCeiling Tiles
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 56 PAGES
09 51 00 SD-11 Closeout Submittals
2.2Acoustical Ceiling Systems
2.2 SAcoustical Ceiling Tile
1.3.1.2Adhesives
1.3.1.2 SSealants
09 90 00 SD-04 Samples
2.2 GColor
SD-07 Certificates
1.5.3Indoor Air Quality for Paints and
Primers
SD-08 Manufacturer’s Instructions
3.2.1Application Instructions
3.5.2Mixing
1.7.1Manufacturer's Safety Data
Sheets
10 26 00 SD-02 Shop Drawings
2.2 GPanels
SD-03 Product Data
2.2 GPanels
SD-04 Samples
2.2 GPanels
SD-07 Certificates
2.2 SIndoor air quality for wall panels
2.5 SIndoor air quality for adhesives
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 56 PAGES
10 26 00 2.2 GPanels
11 48 00 SD-01 Preconstruction Submittals
1.3 GContractor's Field Verification
Data
2.3 SEnergy Efficient Products
SD-02 Shop Drawings
1.5.6 GDetail Drawings
1.5.6 GInstallation Instructions and
Diagrams
SD-03 Product Data
1.5.6 GFood Service Cleaning and
Disposal Equipment
2.1 GFood Service Cleaning and
Disposal Equipment
2.3 SEnergy Star Label for Commercial
Dishwasher
SD-05 Design Data
1.5.6 GManufacturer's Descriptive and
Technical Literature
SD-06 Test Reports
1.5.6 GManufacturer's Test Data
3.2.2 GField Test Reports
SD-07 Certificates
2.2NSF Certification
2.2UL Certification
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 56 PAGES
11 48 00 1.5.6 GManufacturer's Instructions
SD-10 Operation and Maintenance
Data
1.5.6 GFood Service Cleaning and
Disposal Equipment
2.1 GFood Service Cleaning and
Disposal Equipment
SD-11 Closeout Submittals
3.4Manufacturer's Warranty
3.8Contractor's Warranty for
Installation
22 00 00 SD-02 Shop Drawings
3.9.1 GPlumbing System
SD-03 Product Data
2.4Fixtures
2.4.1Flush Valve Water Closets
2.4.1.2 SWaterSense Label for Flush
Valve Water Closet
2.4.2Flush Valve Urinals
2.4.2 SWaterSense Label for Urinal
2.4.3Countertop Lavatories
2.9 GWater Heaters
2.11 GPumps
1.6.1Welding
3.4 GVibration-Absorbing Features
3.9.1Plumbing System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 56 PAGES
22 00 00 2.3.3Temperature Controlled Mixing
Valve
2.3.4Point-Of-Use Mixing Valve
SD-06 Test Reports
3.9Tests, Flushing and Disinfection
SD-07 Certificates
1.4Materials and Equipment
2.1.1Bolts
SD-10 Operation and Maintenance
Data
3.9.1 GPlumbing System
23 05 15 SD-02 Shop Drawings
1.2 GRecord Drawings
1.2 GConnection Diagrams
1.2 GCoordination Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.2 GPipe and Fittings
2.3 GPiping Specialties
2.4 GValves
2.5 GMiscellaneous Materials
2.6 GSupporting Elements
SD-04 Samples
1.2 GManufacturer's Standard Color
Charts
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 56 PAGES
23 05 15 2.2 GPipe and Fittings
2.3 GPiping Specialties
2.4 GValves
SD-06 Test Reports
3.1 GHydrostatic Tests
3.1 GAir Tests
3.1 GValve-Operating Tests
3.1 GDrainage Tests
3.1 GPneumatic Tests
3.1 GNon-Destructive Electric Tests
3.1 GSystem Operation Tests
SD-07 Certificates
1.4.2 GRecord of Satisfactory Field
Operation
1.4.3 GList of Qualified Permanent
Service Organizations
1.2 GListing of Product Installations
3.1 GSurface Resistance
3.1 GShear and Tensile Strengths
3.1 GTemperature Ratings
3.1 GBending Tests
3.1 GFlattening Tests
3.1 GTransverse Guided Weld Bend
Tests
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 56 PAGES
23 05 15 3.12 GOperation and Maintenance
Manuals
23 05 48.19 SD-02 Shop Drawings
3.1Coupling and Bracing
3.2Flexible Couplings or Joints
2.2Equipment Restraint
1.2.4 GContractor Designed Bracing
SD-03 Product Data
3.1 GCoupling and Bracing
3.2 GFlexible Couplings Or Joints
2.2 GEquipment Restraint
1.2.4 GContractor Designed Bracing
3.8Anchor Bolts
2.2.2Vibration Isolators
SD-05 Design Data
1.2.4Design Calculations
SD-06 Test Reports
3.8 GAnchor Bolts
23 05 93 SD-01 Preconstruction Submittals
1.3.3 GRecords of Existing Conditions
1.5.3.1 GTAB Firm
1.2 GTAB Team Assistants
1.2 GTAB Team Engineer
1.5.3.2 GTAB Specialist
1.2 GTAB Team Field Leader
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 56 PAGES
23 05 93 1.3.3 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .