About this file

This document outlines performance standards for a federal contract to provide comprehensive solid and medical waste management services at the National Institutes of Health campus. The contractor will be responsible for collection and disposal of solid waste, medical pathological waste, and recycling materials from buildings and exterior containers across the NIH campus on scheduled days. Performance will be evaluated on key criteria such as timely collection from dumpsters and containers, proper handling and treatment of medical waste, and responsiveness to service requests. The contractor can earn or lose points based on their ability to meet the acceptable quality levels for each performance standard, with total possible annual points of 100 that factor into contract award fees.

View the file

Other files

File Type Posted
75N98023R00017 Questions and Answers-FINAL.docx DOCX document
75N98023R00017 Amendment 00002.pdf PDF
Comprehensvie Solid and Medical Pathological Waste and REcycling services Statement of Work Dated 08232023.docx DOCX document
Attachement 9 - Estimates for Solication Revised August 4 2023.xlsx XLSX spreadsheet
2024 Statement of Work -08042023.docx DOCX document
75N98023R00017 Amendment 00001.pdf PDF
Attachment 18 Proposal Summary and Data Record NIH2043 (1).pdf PDF
Attachment 14 On-site and Off Campus Dumpster Location.pdf PDF
Attachment 38 Disclosure of Lobbying Activities OMB Form SF-LLL.pdf PDF
Attachment 5 Specifications for Recycling Collection Containers.pdf PDF
Attachement 9 - Estimates for Solication.xlsx XLSX spreadsheet
Attachment 2 Statement of Work .pdf PDF
Attachment 8 Government Provided Equipment Final.pdf PDF
Attachment 31 Instructions for Completing Form NIH 2706.pdf PDF
Attachment 1 NIH Installations Waste Services Solicitation.pdf PDF
Attachment 10 Exterior Recycling Containers.pdf PDF
Attachment 3 Annual Solid Waste Quantities.pdf PDF
Attachment 11 Chemical Waste Tag.pdf PDF
Attachment 7 Off-Campus MPW Collection Schedule-2024 Solicitation.pdf PDF
Attachment 6 Interior Recycling Containers.pdf PDF
RFP 75N98023R00017.pdf PDF
Attachment 12 Radioactive Waste Pickup Receipt.pdf PDF
Attachment 40 REPRESENTATIONS CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS-Solicitation FAR 52.204-8 12-2.pdf PDF
Attachment 13 Radioactive Warning Label.pdf PDF
Attachment 21 Offerors Points of Contact.pdf PDF
Attachment 20 Breakdown of Proposed Estimated Costs Plus fee Excel Spreadsheet.xlsx XLSX spreadsheet
Attachment 33 Safety and Health HHSAR 352.223-70 (DEC 2015).pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4: Statement of Work - Performance Standards Comprehensive Multiple Component Waste Management Services Including Solid

Waste and Refuse, Medical Pathological Waste and Recycling Solid Waste Required Service Performance

Standards Acceptable Quality Level (AQL) Deviation from Performance Standard

Monitoring Method (Quality Assurance Plan)

Incentives or Penalties Related to Quality of Performance

Safe removal and disposal of solid waste for the NIH Campus.

Provide and install dumpsters at required locations with no interruption of service.

No required equipment missing or out of service for more than 2 hours during core hours unless replacement container provided.

Random inspection of any main campus containers or customer complaints.

(+ or -) 4 points

Empty dumpsters on schedules that allow continuous loading from the dock.

No dumpsters full and unable to receive additional trash on main campus during core hours.

Random inspection of any main campus containers and customer complaints.

(Exception: 1 of the 2 B2 dock and 35 dock trash dumpsters allowed to be full.)

(+ or -) 8 points

Maintain a compactor capable of accepting waste at Bldg 10 B2 loading dock at all times. (M-F).

Solid waste pulls from the Bldg 10 B2 Dock will be switched when both compactors are full and unable to receive additional trash or when second compactor is down due to mechanical failure.

Monthly observation of the switching process.

Timely and efficient collection of solid waste from exterior CRUs, Big Belly Units, Front Ends and other randomly located containers on the main campus.

No containers full and unable to receive additional trash between the hours of 9:00 am and 4:00 pm.

Random inspections and customer complaints.

(+ or -) 2 points

Maintain housekeeping around containers.

No trash or debris around immediate area of Solid Waste containers.

Random inspections or customer complaints.

(+ or -) 2 points

Scanning of all solid waste compactors pulled from Bldg 10 and CRC by Radiation Safety Branch (RSB) prior to transport off NIH campus.

No containers shall be transported off NIH campus prior to RSB scanning.

RSB reports of pulls that were not scanned or rejected loads from Montgomery Co Transfer.

(+ or-) 8 points

Total Points (+ or -) (+ or -) 32 points

Medical Waste

Required Service Performance Standards

Acceptable Quality Level (AQL) Deviation from Performance Standard

Monitoring Method (Quality Assurance Plan)

Incentives or Penalties Related to Quality of Performance

Collection, Processing, and Treatment or Disposal of Medical Pathological Waste

Timely and efficient collection of MPW from within Bldg 10 clinical marshaling areas and labs to loading dock marshaling area.

No complaints from the NIH community of failure to collect MPW containers within 3 hours of being set out by generator during Bldg 10 working hours: 7 am to 3:30 pm M to-Sun.

Random monitoring and tracking of MPW awaiting collection via a customer complaint log.

(+ or -) 4 points

Timely and efficient collection of MPW containers from building interiors and loading docks on main campus.

No complaints from the NIH community of failure to collect MPW containers within 3 hours of being set out by generators during NIH main campus working hours; 8 am to 3:30 pm M- Fri.

Random monitoring and tracking of MPW awaiting collection via a customer complaint log.

(+ or -) 4 points

Timely and efficient collection of MPW containers from off-site installations.

100% of all MPW containers collected from storage areas or docks on collection days. M-W-Fri scheduled collection days as outlined in SOW (Attch 7).

Random monitoring and tracking of MPW awaiting collection via a customer complaint log.

(+ or -) 4 points

Radioactive monitoring of all MPW containers processed in compliance with SOP for MPW Radiation Monitoring.

Inspection of 100% of all collected containers as per

SOP.

Random visual inspection of MPW processing.

(+ or -) 4 points

Inspection of all MPW containers processed for leakage and refrigerated holding.

100% inspection for leakers with all leakers over-packed prior to loading and no unrefrigerated holding of MPW containers in Bldg 25.

Random visual inspection of MPW processing.

(+ or -) 3 points

Ship MPW or other hazardous materials in compliance with all applicable local, state and federal regulations.

No shipments with identified DOT discrepancies as per Government inspections.

Pre and post-shipment inspections of vehicles and shipping papers for each shipment.

Prompt off-site treatment of MPW

NIH MPW received at off-site facility on day of shipment and treated within 7 days of shipping as verified on a Certificate of Disposal from the Treatment Facility.

Monthly review of MPW Certificates of Disposal.

(+ or -) 2 points

Total Points (+ or -) (+ or -) 24 points

Recycling and Construction Debris

Acceptable Quality Level (AQL) Deviation from Performance Standard

Monitoring Method (Quality Assurance Plan)

Incentives or Penalties Related to Quality of Performance

Collection, processing, consolidation and recycling or reuse of recyclable materials

Collection of recyclable materials from interior and exterior containers.

Liners replaced as required in the SOW.

No containers full and unable to receive additional materials.

Random weekly inspections or customer complaints.

Receive service requests for recycling collection, delivery or removal of interior recycling containers from Project Officer or customers by phone or electronic means. Document electronically and deliver within 24 hours.

100% of all service request calls completed within 24 hours as documented in the electronic log or stating reasons outside Contractor’s control why service could not be provided.

Daily review of Contractor’s Recycling Service Request Log and complaints received by

DEP.

(+ or -) 4 points

Deliver properly labeled recycling containers.

100% of all containers properly labeled with the NIH logo centered on front of container opposite hinge and recycling label at front top edge of container.

Random inspections per contractor’s recycling service request log.

(+ or -) 2 points

Removal of wooden pallets and loose cardboard from main campus building loading docks and consolidation for recycling.

Discarded pallets and cardboard removed within 3 hrs.

Weekly inspection of select loading docks on main campus.

(+ or -) 3 points

Safe removal and disposal of construction debris and scrap metal recycling containers for the NIH Campus

Empty dumpsters on schedules that allows continuous loading from the dock with no interruption in service.

No dumpsters full and unable to receive additional material on main campus during core hours.

Random inspections or customer complaints.

(+ or -) 4 points

Total Points (+ or -)

(+ or -) 21 points

Management

Acceptable Quality Level (AQL) Deviation from Performance Standard

Monitoring Method (Quality Assurance Plan)

Incentives or Penalties Related to Quality of Performance

General Contract Management

Submission of monthly invoices

Invoices shall be 100% complete and accurate.

Review invoices and score monthly.

Management including electronic reports and copies.

General Contract Management

Dumpster labels. All dumpsters shall be clearly labeled as to content on both dock and street sides. If missing, must replace within 2 business days.

Random Inspections (+ or -) 2 points

General Contract Management

Safe Driving All Contract drivers shall obey all State and local traffic laws and signage.

Random inspections and / or customer complaints

(+ or -) 3 points

General Contract Management

Contract employees shall be courteous to customer base.

No more than 1 verified customer complaints per month.

Review of complaints by Govt. staff.

Total Points (+ or -)

(+ or -) 11 points

Annual Performance

Acceptable Quality Level (AQL) Deviation from Performance Standard

Monitoring Method (Quality Assurance Plan)

Incentives or Penalties Related to Quality of Performance

Performance Standards to be Scored on an Annual Basis Only.

Recovery Operation Support Services provided if requested (retrieval of hazardous materials from solid waste containers).

Contractor responds and meets SOW specified time frames, containment criteria and reloading requirements.

On-site monitoring per event.

(+ or -) 6 points

Performance Standards to be Scored on an Annual Basis Only.

Delivery of required reports including electronic copies.

100% on-time required. Monthly review of required reports.

(+ or -) 6 points

Total Points (+ or -) (+ or -) 12 points Total Annual Points Available

(+ or -) 100 points

Attachment 4: Statement of Work - Performance Standards

File details come from the government source that posted it. Updated .