Attachment 4 SOW.docx
DOCX document 14 KB Posted
- Attached to
- Z1DA--Amend5 SATOC - 2021 Roseburg
- Solicitation number
- 36C26020R0069
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26020R0069 0005.docx | DOCX document | |
| Price Schedule - CoEfficient Rate.docx | DOCX document | |
| 36C26020R0069 0004.docx | DOCX document | |
| 36C26020R0069 0003_1.docx | DOCX document | |
| Attachment 1 SATOC RFI LOG Final.docx | DOCX document | |
| 36C26020R0069 0002.docx | DOCX document | |
| Attachment 1 SATOC RFI LOG.docx | DOCX document | |
| Attachment 2 Pre-Bid Agenda.docx | DOCX document | |
| 36C26020R0069 0001_1.docx | DOCX document | |
| 36C26020R0069_2.docx | DOCX document | |
| Attachment 2 Proposal Inquiry Form.docx | DOCX document | |
| 36C26020R0069_2.docx | DOCX document | |
| Attachment 3 Rules of Behavior.pdf | ||
| Attachment 1 General Contractor Reference Form.docx | DOCX document | |
| Attachment 5 Roseburg VA Site Map.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
One Indefinite Delivery/Indefinite Quantity (ID/IQ) Single Award Task Order Contract (SATOC) will be awarded for repairs, renovations, environmental abatement, and minor alterations to existing facilities and/or infrastructure such as roads, parking, drainage system and utility systems in accordance with the scope of work and applicable specifications at the time of task order issuance. Task Orders shall be based on individual projects. This is a SATOC that encompasses a broad range of scope that is primarily construction in nature but may contain ancillary maintenance activities.
The SATOC Contractor will furnish all necessary qualified personnel, supervision, material, equipment and services to perform the tasks in the Statement of Work prepared specifically for each Task Order.
Contractors should have a staffed office within the surrounding local commuting area, as routine travel costs will not be accepted at the task order level. Contractors are required to respond to any emergency situation within a 2-hour window of being contacted.
File details come from the government source that posted it. Updated .