36C26020R0069_2.docx
DOCX document 171 KB Posted
- Attached to
- Z1DA--Amend5 SATOC - 2021 Roseburg
- Solicitation number
- 36C26020R0069
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26020R0069 0005.docx | DOCX document | |
| Price Schedule - CoEfficient Rate.docx | DOCX document | |
| 36C26020R0069 0004.docx | DOCX document | |
| 36C26020R0069 0003_1.docx | DOCX document | |
| Attachment 1 SATOC RFI LOG Final.docx | DOCX document | |
| 36C26020R0069 0002.docx | DOCX document | |
| Attachment 1 SATOC RFI LOG.docx | DOCX document | |
| Attachment 2 Pre-Bid Agenda.docx | DOCX document | |
| 36C26020R0069 0001_1.docx | DOCX document | |
| 36C26020R0069_2.docx | DOCX document | |
| Attachment 2 Proposal Inquiry Form.docx | DOCX document | |
| Attachment 3 Rules of Behavior.pdf | ||
| Attachment 1 General Contractor Reference Form.docx | DOCX document | |
| Attachment 5 Roseburg VA Site Map.pdf | ||
| Attachment 4 SOW.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26020R0069 Section J Contract Opportunity Combined Synopsis/Solicitation Notice
PRODUCT SERVICE CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
RESPONSE DATE/TIME/ZONE
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field Contract Opportunity Combined Synopsis/Solicitation Notice
Z1DA
SATOC - 2021 Roseburg (VA-21-00000652) 98662 36C26020R0069 06-14-2021 14:00
PACIFIC TIME, LOS ANGELES, USA
N
SDVOSBC
236220 Department of Veterans Affairs Network Contracting Office 20 ATTN: Matthew Wheeler 5115 NE 82nd Ave, Suite 102 Vancouver WA 98662 Consultant - VA Support Kwame Dankyi kwame.dankyi@va.gov 3608529884
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4.
CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE
WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
3. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiab
le. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offe rs are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government accepta nce after the date offers are due will not be considered and will be rejected.
36C26020R0069 X 5-1 -2021
TBD
Per task order
VISN 20 SATOC
Department of Veterans Affairs Network Contracting Office 20 ATTN: Matthew Wheeler 5115 NE 82nd Ave, Suite 102 Vancouver WA 98662 Department of Veterans Affairs Network Contracting Office 20 ATTN: Matthew Wheeler 5115 NE 82nd Ave, Suite 102 Vancouver WA 98662 Dennis Einarson 360-852-9884 This solicitation is 100% Service Disabled Veteran Owned Small Business (SDVOSB) set-aside.
Indefinite Delivery Indefinite Quantity (IDIQ) Single Award Ta sk Order Contract (SATOC) for general construction, renovation, maintenance, minor repair, and services ancillary to construction services.
The NAICS code for this procurement is 236220, Commercial and Institutional Building Construction. The small business size standard for NAICS code 236220 is $36.5 million.
Offerors shall meet all solicitation requirements and ensure current registration as an SDVOSB under NAICS code 236220 in the System for Award Management (SAM) and the Center for Veterans Enterprise (CVE) Vendor Information Pages (VIP).
The maximum capacity of the IDIQ SATOC is $6,500,000 million, to include the base year and all options combined.
Period of Performance: For IDIQ SATOC, see schedule, for task order, see individual task order.
All work is to be performed at the Roseburg, Oregon VA Medical Center located at 913 NW Garden Valley Blvd, Roseburg, Oregon 97471.
Per order Per order X X 52.211-10 X Per order 2:00 6-14-2021
X
Page 1 of
Page 1 of
14. NAME AND ADDRESS OF
OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25.
OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on t his form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR
OR PERSON AUTHORIZED
31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Department of Veterans Affairs Network Contracting Office 20 5115 NE 82nd Ave, Suite 102 Vancouver WA 98662 Department of Veterans Affairs
FMS-VA-2(101)
Financial Services Center PO Box 149971 Austin TX 78714-9971
Page 1 of Page 1 of Table of Contents
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 8 |
| SECTION 2 GENERAL TERMS, CONDITIONS AND STANDARDS | 18 |
| 2.1 52.216-1 TYPE OF CONTRACT (APR 1984) | 18 |
| 2.2 52.217-5 EVALUATION OF OPTIONS (JUL 1990) | 18 |
| 2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 18 |
| 2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 18 |
| 2.5 52.225-9 BUY AMERICAN-CONSTRUCTION MATERIALS (Feb 2021) | 20 |
| 2.6 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 24 |
| 2.7 52.225-22 NOTICE OF REQUIRED USE OF AMERICAN IRON, STEEL, AND MANUFACTURED GOODS—BUY AMERICAN STATUTE—CONSTRUCTION MATERIALS (MAY 2014) | 26 |
| 2.8 52.233-2 SERVICE OF PROTEST (SEP 2006) | 27 |
| 2.9 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) | 27 |
| 2.10 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984) | 28 |
| 2.11 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 28 |
| 2.12 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (JAN 2008) | 29 |
| 2.13 VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESS EVALUATION FACTORS (JUL 2016)(DEVIATION) | 29 |
| 2.14 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008) | 29 |
| 2.15 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 30 |
| 2.16 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011) | 30 |
| REPRESENTATIONS AND CERTIFICATIONS | 32 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2017) | 32 |
| 3.2 52.209-5 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID TAX LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (DEVIATION)(MAR 2012) | 36 |
| 3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) | 36 |
| GENERAL CONDITIONS | 38 |
| 4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 38 |
| 4.2 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016) | 38 |
| 4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) | 39 |
| 4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984) | 41 |
| 4.5 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984) | 41 |
| 4.6 52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA (OCT 2010) | 41 |
| 4.7 52.216-18 ORDERING (OCT 1995) | 42 |
| 4.8 52.216-19 ORDER LIMITATIONS (OCT 1995) | 43 |
| 4.9 52.216-22 INDEFINITE QUANTITY (OCT 1995) | 43 |
| 4.10 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 44 |
| 4.11 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 44 |
| 4.12 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013) | 44 |
| 4.13 52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS—PRICE ADJUSTMENT (NONE OR SEPARATELY SPECIFIED METHOD) (MAY 2014) | 46 |
| 4.14 52.222-31 CONSTRUCTION WAGE RATE REQUIREMENTS—PRICE ADJUSTMENT (PERCENTAGE METHOD) (MAY 2014) | 46 |
| 4.15 52.222-32 CONSTRUCTION WAGE RATE REQUIREMENTS—PRICE ADJUSTMENT (ACTUAL METHOD) (JAN 2017) | 47 |
| 4.16 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015) | 49 |
| 4.17 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 49 |
| 4.18 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014) | 51 |
| 4.19 52.223-20 AEROSOLS (JUN 2016) | 51 |
| 4.20 52.224-3 PRIVACY TRAINING (JAN 2017) | 52 |
| 4.21 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014) | 53 |
| 4.22 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (OCT 2016) | 56 |
| 4.23 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000) | 61 |
| 4.24 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014) | 61 |
| 4.25 52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR (APR 1984) | 65 |
| 4.26 52.236-4 PHYSICAL DATA (APR 1984) | 65 |
| 4.27 52.245-2 GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES (APR 2012) | 66 |
| 4.28 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) | 66 |
| 4.29 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 67 |
| 4.30 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008) | 71 |
| 4.31 VAAR 852.203-71 DISPLAY OF DEPARTMENT OF VETERAN AFFAIRS HOTLINE POSTER (DEC 1992) | 71 |
| 4.32 VAAR 852.211-73 BRAND NAME OR EQUAL (JAN 2008) | 71 |
| 4.33 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION) | 72 |
| 4.34 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 73 |
| 4.35 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 74 |
| 4.36 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012) | 74 |
| 4.37 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (JUL 2002) | 75 |
| 4.38 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (JUL 2002) ALTERNATE I | 75 |
| 4.39 VAAR 852.236-74 INSPECTION OF CONSTRUCTION (JUL 2002) | 76 |
| 4.40 VAAR 852.236-76 CORRESPONDENCE (APR 1984) | 76 |
| 4.41 VAAR 852.236-77 REFERENCE TO "STANDARDS" (JUL 2002) | 76 |
| 4.42 VAAR 852.236-78 GOVERNMENT SUPERVISION (APR 1984) | 77 |
| 4.43 VAAR 852.236-79 DAILY REPORT OF WORKERS AND MATERIAL (APR 1984) | 77 |
| 4.44 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 1984) ALTERNATE I (JUL 2002) | 77 |
| 4.45 VAAR 852.236-83 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING NAS) (JUL 2002) | 78 |
| 4.46 VAAR 852.236-84 SCHEDULE OF WORK PROGRESS (NOV 1984) | 81 |
| 4.47 ADDITIONAL REQUIREMENTS FOR BAR CHART SCHEDULE | 82 |
| 4.48 VAAR 852.236-85 SUPPLEMENTARY LABOR STANDARDS PROVISIONS (APR 1984) | 82 |
| 4.49 VAAR 852.236-86 WORKER'S COMPENSATION (JAN 2008) | 83 |
| 4.50 VAAR 852.236-87 ACCIDENT PREVENTION (SEP 1993) | 83 |
| 4.51 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002) | 83 |
| 4.52 VAAR 852.236-89 BUY AMERICAN ACT (JAN 2008) | 85 |
| 4.53 VAAR 852.236-90 RESTRICTION ON SUBMISSION AND USE OF EQUAL PRODUCTS (NOV 1986) | 86 |
| 4.54 VAAR 852.236-91 SPECIAL NOTES (JUL 2002) | 86 |
| 4.55 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984) | 87 |
| 4.56 VAAR 852.246-74 SPECIAL WARRANTIES (JAN 2008) | 87 |
| 4.57 VAAR 852.246-75 WARRANTY FOR CONSTRUCTION--GUARANTEE PERIOD SERVICES (JAN 2008) | 88 |
| 4.58 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 88 |
| 4.59 MANDATORY WRITTEN DISCLOSURES | 88 |
| PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS | 89 |
| SECTION J - LIST OF ATTACHMENTS | 89 |
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 INSTRUCTIONS TO OFFERORS
1. STATEMENT OF WORK, PERIOD OF PERFORMANCE, AND CONTINUED PERFORMANCE
1. GENERAL DESCRIPTION OF WORK:
One Firm Fixed Price, Indefinite Delivery/Indefinite Quantity (ID/IQ) Single Award Task Order Contract (SATOC) may be awarded for repairs, renovations, environmental abatement, and minor alterations to existing facilities and/or infrastructure such as roads, parking, drainage system and utility systems in accordance with the scope of work and applicable specifications at the time of task order issuance. Task Orders shall be based on individual projects. This is a SATOC that encompasses a broad range of scope that is primarily construction in nature but may contain ancillary maintenance activities.
One ID/IQ contract may be awarded to the following facility and location:
| VA ROSEBURG HEALTHCARE SYSTEM (653) |
| 913 NW Garden Valley Blvd., Roseburg, OR 97471-6513 |
During the contract period, the facility staff will identify projects for Task Orders that will be issued by the Contracting Officer. The Contracting Officer has the right to withdraw proposed Task Orders before and after the receipt of the Contractor’s proposal for the requested Task Orders.
The SATOC Contractor shall furnish all necessary qualified personnel, supervision, material, equipment and services to perform the tasks in the Statement of Work prepared specifically for each Task Order.
The acquisition will be set-aside for competition among Service Disabled Veteran Owned Small Business (SDVOSBs) concerns. The NAICS code for this procurement will be 236220, Commercial and Institutional Building Construction, and the small business standard is $36.5 million.
The Government intends to award one contract; however, the government reserves the right to award two or more SATOCs if in the best interests of the Government. Contractors should have a staffed office within the surrounding local commuting area, as routine travel costs shall not be accepted at the task order level. Contractors are required to respond to any emergency situation within a 2-hour window of being contacted.
In accordance with 5 CFR 351.203 Local commuting area is defined as the geographic area that usually constitutes one area for employment purposes. It includes any population center (or two or more neighboring ones) and the surrounding localities in which people live and can reasonably be expected to travel back and forth daily to their usual employment.
1. PERIOD OF PERFORMANCE AND IDIQ VALUE:
The contract will be awarded as a one 1-year base ID/IQ with two 2-year Options for a total of 5 years. Task Orders shall be based on individual projects. The majority of the Task Orders will be awarded between $25,000 and $100,000 with a Task Order maximum of the Simplified Acquisition Threshold (currently $250,000). The contract capacity will not exceed $6,500,000.00 across the life of the contract.
In accordance with FAR 36.204 Disclosure of the magnitude of construction projects, the project magnitude will be disclosed at the issuance of each task order solicitation.
The guaranteed minimum contract value of this contract is $2,000 over the entire life of the contract.
1. MAINTAINING CONTINUED PERFORMANCE
In order to be to be considered eligible for continued contract ordering, the Contractor shall maintain continued satisfactory performance as assessed by the DVA technical personnel and/or current Contracting Officer’s Representative (COR) reports. Failure to maintain satisfactory performance will result in a termination of all future option years and Task Order awards.
1. TASK ORDER PRICING AND COEFFICIENT
1. TASK ORDER PRICING
The Contractor shall furnish pricing (proposals) for each individual Task Order on a LINE ITEM BASIS separated at a minimum by labor, materials, equipment, and subcontractors. Each line item price shall consist of Direct Costs only, and shall NOT include (INDIRECT) costs, such as: overhead (OH), general and administrative (G&A) cost, and profit. The contractor’s OH/G&A, and profit are to be included in the coefficient factor.
Direct costs shall be the total cost for each line item using the applicable total column multiplied by the number of units required for the project. Line item unit costs shall be added together and then multiplied by the coefficient to determine the Task Order firm fixed price.
If a fair and reasonable price is not reached through the Task Order proposal process, the individual project will be withdrawn and the Contracting Officer may use another vehicle to meet the needs of the Government.
1. COEFFICIENT
The price evaluation factor is the Coefficient Rate. Coefficient is defined as a multiplier which is applied to the total of all unburdened Direct Costs that results in a firm fixed price for that scope of work. Examples of coefficient cost components include, but are not limited to: overhead, profit, insurance, tax, bonding, and administrative costs.
Specifically, the coefficient should only include those items that cannot be identified as a separate cost item. Any cost that cannot be directly accounted for against a specific scope of work shall be included into the coefficient rate.
The coefficient rate shall be applied to the summation of the unburdened Direct Cost to determine the Task Order firm fixed price. The contractors OH/G&A, and profit are to be included in the coefficient factor plus any other multipliers deemed appropriate. Therefore, when Task Order pricing is submitted only one number (the coefficient rate) is to be applied to the summation of all direct costs.
The coefficient rate may be re-evaluated at the time that a Contract Option period is exercised.
II. PROPOSAL SUBMISSION FOR SATOC ID/IQ
To be eligible for award, the SDVOSB offeror must be listed as a verified SDVOSB for the applicable NAICS code at the time of submission of offers/quotes and prior to award. Determination of SDVOSB status will be by verification of a contractor’s status at www.VetBiz.va.gov. The firm shall meet all requirements for being 51% owned, managed and the day-to-day operations conducted by the service-disabled veteran and/or qualifying family members.
A. SUBMITTAL - PROPOSAL DELIVERY INSTRUCTIONS
1. Proposals shall reach the designated Government office on the date and by the time specified on the SF 1442 included in the solicitation. It is your responsibility to ensure that your Proposal reaches the designated email in a timely manner.
2. Proposals shall be submitted via email attachment only, to the email box identified below:
Dennis.Einarson@va.gov@va.gov
3. Proposals shall be formatted such that no email submission is greater than 5 megabits in size. Multiple emails will be accepted so long as the Subject line clearly identifies the number of emails in the series when more than one email is submitted for this proposal.
| Subject Line of emails should be structured as follows: |
| Subject: Solicitation Number – Contractor Name – email X of Y |
4. Determination of a timely proposal will be based on the time and date of receipt of the last email received completing the submittal as shown by the email system. A late Proposal will not be accepted except as set forth at FAR 52.215-1c(3).
5. Correct spelling of the email address is the responsibility of the Contractor. Misspelling of the email address and the subsequent failure of the VA to receive the email submission will not excuse or forgive an untimely / late submission.
6. You are highly encouraged not to wait until the last minute to submit your proposal, as multiple files arriving at one time could jeopardize your submission. It is your responsibility to ensure that your proposal reaches the designated email box electronically before the closing date and time.
7. Questions: Offerors shall submit questions regarding the solicitation and attachments to Contracting Specialist, Dennis Einarson, at e-mail: dennis.einarson@va.gov no later than 12PM PST on 24 May 2021. Questions shall be submitted only to the Contract Officer. Questions submitted to other than the Contracting Officer (e.g. COR, architect and engineering firm, etc.) will be rejected and not answered. Additionally, the government is not obligated to answer any question received after this date. Please use the Proposal Inquiry Form found in Attachment 2.
Caution: No oral or written statements made by the contract parties or other interested parties will take precedence over the written terms and conditions of the solicitation or resultant contract.
B. PROPOSAL PREPARATION INSTRUCTIONS
A complete proposal shall consist of all the following:
1. FILE NAME: Solicitation Number – Contractor Name - Register of Electronic Submission Provide a listing of the electronic submission like the example provided below.
| Email Name (s) |
| File Name (s) |
| 36C26020R0069- VENDOR- email 1 of 3 |
| 36C26020R0069 - VA Contractor – Register of Electronic Submission |
36C26020R0069 - VA Contractor – Cover Letter 36C26020R0069 – VA Contractor – SF1442 36C26020R0069 – VA Contractor – Safety Experience Modification Rate (EMR) 3 Years of Reporting
36C26020R0069- VENDOR- email 2 of 3
36C26020R0069 – VA Contractor – Part I Technical Proposal file X of Y
| 36C26020R0069- VENDOR- email 3 of 3 |
| 36C26020R0069 – VA Contractor – Part II Price Proposal |
36C26020R0069 – VA Contractor – Other files
2. FILE NAME: Solicitation Number – Contractor Name - Cover Letter. Cover letter shall include the following information: solicitation number; company name and address; DUNS number; Tax-Id number; company authorized representative point of contact information (name, telephone number and e-mail address). Company representative shall be an authorized officer authorized to sign contract action documents.
The Cover Letter file can be pdf so long as it is a searchable file.
3. FILE NAME: Solicitation Number – Contractor Name – SF 1442.
An executed SF 1442 requires the offeror to complete blocks 14 (include DUNS number); block 15; block 16 (if different from block 14); and block 19 if applicable. SF 1442 shall be signed by an officer of your company authorized to sign contract actions. If offeror is a Corporation, offer shall be signed on behalf of Corporation and by an officer authorized to bind the Corporation. The SF 1442 file can be pdf so long as it is a searchable file.
4. FILE NAME: Solicitation Number – Contractor Name – Safety Experience Modification Rate (EMR) 3 Years of Reporting
5. FILE NAME: Solicitation Number – Contractor Name – Part I Technical Proposal file X of Y The Technical Proposal file(s) should be structured to meet the requirements of the RFP. Multiple Technical Proposal files can be included so long as the files in the series are clearly identified in the file title.
Technical Proposal file can be pdf so long as it is a searchable file.
Technical Proposal Format and Page Limitations:
Offerors are herewith cautioned that pages in excess of the maximum page limitations specified shall be removed from the proposals prior to evaluation and that information contained in the removed pages shall not be evaluated. This may result in your firm receiving an unacceptable evaluation. Incomplete proposals may be a basis for determination of unacceptability and removal from consideration.
A page is defined as one side of a sheet, 8 ½ x 11, with one inch margins on all sides, using not smaller than 12-point type. Title pages and tables of contents are excluded from the page counts.
| Best Value Trade-Off Proposal |
| Page Limit |
Pass/Fail Safety Experience Modification Rating 3 years of Reporting 3 Pages
Part I: Technical Proposal Factor 1: Experience (15 pages) Factor 2: Past Performance (10 pages)
25 Pages
| Part II: Price Proposal |
| 1 Pages |
Total Pages for Best Value Trade-Off Proposal:
29 Pages
6. FILE NAME: Solicitation Number – Contractor Name – Part II Price Proposal The Price Proposal should include the Proposal Price Schedule Summary included in the text portion of the solicitation. The Price Proposal file can be pdf so long as it is a searchable file.
7. FILE NAME: Solicitation Number – Contractor Name – Other Information Files X of Y The Other Information file should be structured to meet the requirements of the RFP, and only contain that information that is not contained in other files where the information more clearly is addressed, such as Acknowledgement of Amendments, bid bond/guarantees, reps and certs, list of subcontractors, identification of self-performed work tasks, signed Rules of Behavior etc. Multiple Other Information files can be included so long as the files in the series are clearly identified in the file title.
Other Information file(s) can be pdf so long as it is a searchable file.
C. PASS/FAIL EVALUATION FACTOR - Safety - Experience Modification Rating (EMR) (3 pages maximum) Offerors shall provide documented evidence of the past three (3) EMR’s. An offeror will be found unacceptable if their EMR is above 1.0 for any year within the three (3) years of reporting, and no further consideration will be given. The documented evidence of the past three (3) EMR’s should be no more than three (3) pages, maximum.
D. EVALUATION PROCESS
This acquisition is utilizing the Trade-off Process under FAR Part 15. As best value trade-off is being applied, the Government will not necessarily award to the offeror with the lowest price or the highest rated technical proposal. Since trade-off between overall proposal assessment and price is possible, the resulting award may not be the lowest price proposal.
Technical Evaluation Factors A and B are of the same importance and of equal weight. When Factors A and B are combined they are of the same importance and equal weight as Factor C.
EVALUATION FACTOR A – EXPERIENCE (15 pages maximum) Offerors shall provide examples of no more than 5 and no less than 3 relevant examples of performing construction type work in hospitals, medical facilities or other facilities where infection control is of concern over the past 5 years. The information provided will assist the Government in accurately evaluating an Offeror’s experience. Offerors may submit proposals for only their firm, or they may choose to compile a team consisting of the Offeror as the prime and one or more key subcontractors. When developing proposals, the Offeror should keep in mind that the Government will evaluate the experience of the entire team – the Offeror and all proposed subcontractors. The Offeror shall provide a list of all proposed team key subcontractors including relevant and recent work examples. The list of references for subcontractors should contain the same information as the Offeror’s list. The Offeror is reminded that the proposed team evaluated by the Government is the team that is expected to be utilized on the projects performed under the SATOC contracts. An unapproved change in the make-up of the team may be cause for default on the part of the Contractor.
a. Relevant. The VA considers the most relevant experience to be work performed in hospitals, followed by work performed in other medical facilities followed by work performed in other facilities where infection control is a concern. In addition to a list of work examples, experience is demonstrated in the resumes of key personnel, including subcontractors.
b. Recent. The more recent the experience the more relevant it is. The preference is that the experience will be within the past 3 years and experience that is more than 5 years old tends to lose its relevance.
EVALUATION FACTOR B – Past Performance (10 pages maximum) Past Performance verification will be obtained primarily from the Past Performance Information Retrieval System (PPIRS), but may also be obtained from any available sources to include, but not limited to, the Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officer, and interviews with project points of contact/References identified in the proposal.
The Government reserves the right to obtain past performance information from any available source and may contact sources other than those identified by the contractor when evaluating past performance.
In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror will be determined to have an unknown past performance. In this event, past performance will be rated as “neutral” (see FAR 15.305 (a)(2)(iv)).
Additionally, the Offeror shall complete the General Contract Reference Form for each sample project that is being submitted. The form is located in Attachment 1.
The Government reserves the right to contact any one or all of the firms represented in the Offeror’s sample projects for past performance information. If it is determined that represented firms will be contacted, a standard list of questions will be developed so that all contacted firms are asked for the same information. All other Offerors will be rated in accordance with the responses received from their customers.
PRICE EVALUATION FACTOR C – Coefficient Rate The only price evaluation factor is the Coefficient Rate. Coefficient is defined as a multiplier which is applied to the total of all unburdened Direct Costs that results in a firm fixed price for that scope of work. Examples of coefficient cost components include, but are not limited to: overhead, profit, insurance, tax, bonding, administrative costs.
Specifically, the coefficient should only include those items that cannot be identified as a separate cost item. Any cost that cannot be directly accounted for against a specific scope of work will be included into the coefficient rate.
The coefficient rate will be applied to the summation of the unburdened Direct Cost to determine the Task Order firm fixed price. The contractors OH/G&A, and profit are to be included in the coefficient factor plus any other multipliers deemed appropriate. Therefore, when Task Order pricing is submitted only one number (the coefficient rate) is to be applied to the summation of all direct costs.
Working in an occupied hospital will not be an adjustment factor.
III. SPECIAL CONTRACT REQUIREMENTS (APPLICABLE TO ALL TASK ORDERS)
A. ID/IQ RESPONSE TIME
The standard response time for a Contractor to respond with a quote to a Task Order is 10 business days after receiving the request for quote. However, the response time may be increased or decreased depending on the specific needs of the facility. If a quote cannot be submitted within the required time period (standard 10 business days or other specified time) the Contractor shall immediately contact the DVA and provide a schedule for submittal.
B. SCHEDULING OF WORK/COMMUNICATIONS
Before commencement of work under an individual Task Order, the contractor shall confer with the COR, and agree on items including, but not limited to: 1) sequence of procedures; 2) means of access to premises and building; 3) delivery of materials; and 4) storage of materials and equipment.
The work shall, so far as practicable, be done in definite sections or divisions, and confined to limited areas which shall be completed before work in other sections or divisions is begun. Therefore, the contractor shall provide a schedule of contract milestones that the Government will approve prior to beginning any given project of which will be incorporated into the awarded Task Order.
The contractor shall provide the Contracting Officer and the COR with the name, telephone number, pager number, and/or cell phone number of the person who should be contacted in case of emergencies. This individual shall have the authority to enter into binding agreements with the Government.
All temporary outages of any utility services required for the performance of work shall be scheduled with the COR no less than 10 working days in advance of such outages. If outage is longer than 8-hours, notice in writing, shall be 15 working days in advance of proposed interruption. All requests for power outages shall be submitted in writing.
C. SPECIFICATIONS
Appropriate VA Master Specifications will be included in each individual Task Order issued. Work shall be accomplished in accordance with all VA specifications provided to the contractor during Task Order negotiation.
In addition to any VA specifications that may be provided to the contractor, the contractor shall adhere to the requirements of any additional specifications provided at the Task Order level.
D. JOB SITE
This work is being performed in a hospital environment; therefore, the Contractor's performance of this contract shall not interfere with Patient Care or Hospital Operation. If necessary for reasons of patient care/hospital operation, the VA (COR) may direct the Contractor to stop work or limit the types of work that can be performed. This may occur with little or no advance notice.
The contractor shall have access to the area where work is to be performed. The movement of contractor personnel, equipment, materials, and tools shall be confined to this area so as not to interfere with ongoing hospital operations. Delivery of materials and equipment shall be made with minimum interference to Government operations and personnel. VA personnel shall not assist with contractor shipments or deliveries that are made to the job site.
The contractor shall be responsible for providing all work site protective barriers and site control devices. This includes, but is not limited to protective fences, protective tapes and protective signage. The contractor shall be responsible for providing all necessary traffic control (i.e., street blockages, traffic cones, and flagman) at no additional cost to the Government. Proposed traffic control methods shall be submitted to the COR for final approval. No street or access way shall be completely closed to traffic without prior approval from the COR.
The contractor shall take all precautions to ensure that no damage to private or public property will result from their operations. If such damages occur, the contractor shall make all necessary repairs and/or replacements at no cost to the Government.
The Contractor's personnel will be permitted to use toilet facilities on the premises, subject to regulation and control of the COR. In the event none are available, the Contractor shall, at his own expense, provide portable facilities, as required. In addition, toilet facilities desired at the Contractor's management office shall be provided at the expense of the Contractor.
E. SUBCONTRACTING
The contractor shall submit a list of subcontractors to be used on each individual Task Order. The Government may unilaterally reject the use of certain subcontractors if they have been debarred from Federal procurements or if their past performance is not satisfactory. Subcontractors shall maintain a satisfactory rating with all DVA technical personal and/or COR.
The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement after NTP has been provided if not identified on the original listing. Subcontracting a Task Order shall not relieve the SATOC Contractor of any responsibility under the award. Standard Form 1413 Statement And Acknowledgment will be required for individual Task Orders.
During performance Task Orders under this contract, the Contractor is solely responsible for work performed by its subcontractors. Work performed by subcontractors is expected to be at the same standard as work performed by the Contractor. In the event that the Contracting Officer deems a subcontractor to be incompetent, careless or otherwise objectionable, written direction may be issued to remove the subcontractor from the job site.
F. DAVIS-BACON WAGE DETERMINATIONS FOR TASK ORDERS
The contractor shall pay wages in accordance with the Davis-Bacon wage determinations at the time of Task Order award, when the work is deemed construction in nature.
G. SERVICE CONTRACT ACT WAGE DETERMINATIONS FOR AWARD AND OPTION PERIODS
When the scope of work is deemed to include ancillary services, a Service Contract Act Wage Determination will be included at the time of Task Order award. The contractor shall pay wages in accordance with the Service Contract Act Wage Determination for the services portion of work.
H. NORMAL WORKING HOURS
Onsite work will be performed during normal business hours unless otherwise stated in the scope of work or directed by the Contracting Officer.
I. ORDER OF PRECEDENCE
In accordance with FAR 52.215-8, any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(a) The Schedule (Contract Form (SF1442), Pricing Schedule, Scope of Work);
(b) Representations and other instructions;
(c) Contract clauses/
(d) Other documents exhibits and attachments;
(e) The project-specific specifications;
J. WORK BY THE GOVERNMENT
The Government reserves the right to undertake performance by Government forces or other contractors, for the same type or similar work as contracted for herein, as the Government deems necessary or desirable, and to do so will not breach or otherwise violate this contract.
K. SECURITY
The Contractor shall ensure that its employees and subcontractor’s employees receive background investigations and understand the VA security policies prior to access to the medical center and VA property. To ensure timely and efficient issuance of identification badges, employees shall report for fingerprinting immediately after Task Order award but prior to the notice to proceed. Subject to the approval of the Contracting Officer the Contractor may forgo investigations of Contractor personnel who have proof of a recent security clearance and have a current badge. During the performance of any Task Order badges shall always be worn by the contractor employees and displayed, unless displaying the badge creates a safety hazard.
L. CONTRACTING OFFICER/CONTRACTING OFFICERS REPRESENTITIVE
The Contracting Officer has the overall responsibility for the administration of this contract. The Contracting Officer alone, without delegation, is authorized to take actions on behalf of the Government to amend, modify or deviate from the contract terms, conditions, requirements, specifications, details and/or delivery schedules; issue Task Orders against the contract; make final decisions on disputed deductions from contract payments for nonperformance, or unsatisfactory performance; terminate the contract for convenience or default; and issue final decisions regarding contract questions or matters under dispute. However, the Contracting Officer may delegate certain other responsibilities to the COR. All delegated duties will be specified in writing in the COR Appointment and Delegation Notice.
M. LEGAL HOLIDAYS
The Federal Government observes the following days as holidays.
| New Year’s Day |
| January 1st* |
| Martin Luther King’s Birthday |
| Third Monday in January |
| Presidents’ Day |
| Third Monday in February |
| Memorial Day |
| Last Monday in May |
| Independence Day |
| July 4th* |
| Labor Day |
| First Monday in September |
| Columbus Day |
| Second Monday in October |
| Veterans’ Day |
| November 11th* |
| Thanksgiving Day |
| Fourth Thursday in November |
| Christmas Day |
| December 25th* |
*If the date falls on a Saturday, the Government holiday is the preceding Friday. If the date falls on a Sunday, the Government holiday is the following Monday.
In addition to the days designated as holidays, the Government observes the following days:
| Any other day designated by Federal Statute |
| Any other day designated by Executive Order |
| Any other day designated by the President’s Proclamation |
N. WRITTEN DELIVERABLES
Written deliverables and copies of all correspondence requiring a signature shall be sent to the COR and the Contracting Officer. Additional reporting requirements are found in the specifications for the individual Task Order.
O. GOVERNMENT FURNISHED PROPERTY
Government property to be used for any given project will be addressed in Task Order.
P. INVOICES, INVOICING AND PAYMENT
Unless otherwise specified, the Contractor shall submit all payment requests in electronic form, in accordance with VAAR 832.7002 and 832.7002-1. All payments shall be made by electronic transfer of funds (EFT).
VA’s Electronic Invoice Presentment and Payment System – The FSC uses a third-party contractor, Tungsten, to transition vendors from paper to electronic invoice submission. Please go to this website: http://www.tungsten-network.com/US/en/veterans-affairs/ for information on submitting electronic invoices.
Page 1 of Page 1 of
SECTION 2 GENERAL TERMS, CONDITIONS AND STANDARDS
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Single, Indefinite Quantity contract resulting from this solicitation.
(End of Provision)
2.2 52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of Provision)
2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) *FAR 52.222-23 will be updated/revised at the issuance of each task order*
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The current goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
| Goals for minority participation for each trade |
| Goals for female participation for each trade |
| 2.4 % |
| 6.9 % |
The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area will be revised and updated with each task order.
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Douglas County and Roseburg, Oregon.
(End of Provision)
2.5 52.225-9 BUY AMERICAN-CONSTRUCTION MATERIALS (Feb 2021)
(a) Definitions. As used in this clause— Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if–
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .