Attachment 4 SOW DDGM BF ECP Form.xlsx

XLSX spreadsheet 866 KB Posted

Attached to
Digital Video Surveillance System Federal contract opportunity
Solicitation number
N6449825R4020
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This is an Engineering Change Proposal (ECP) form template, version 2.14 dated February 1, 2023, used for DDG 51 Class Backfit Modernization projects. The form is a comprehensive Excel workbook containing multiple tabs for tracking costs and implementation details related to ship modifications, including Program Management, MCS Software, UCC DIU, RSC, and EC components.

The template includes sections for documenting ECP details such as hull impacts, training site impacts, classification levels, technical refresh requirements, installation duration, priority attributes, executive summary, change descriptions, logistics impacts, hardware/software impacts, and implementation matrices. It contains detailed cost estimation worksheets broken down by engineering tasks, procurement, installation, testing, and lifecycle support activities. The form requires approval signatures from multiple stakeholders including DDGM MCS/EC/RSC/DVSS ILS POC, PMS 443 IBC ILS POC, NSWCPD DDG 51 Class Modernization Backfit DPM, and other technical authorities. While comprehensive in structure, this is only a blank template without any specific ECP information filled in.

View the file

Other files for this federal contract opportunity

Other files attached to Digital Video Surveillance System, newest first.
File Type Posted
N6449825R4020 Amendment 0001.pdf PDF
Attachment 2_GfpAttachmentTemplate.xlsx XLSX spreadsheet
Attachment 1 -NSWCPD SBPCD RFP 24R4018.xlsx XLSX spreadsheet
Exhibit 2 DD254 DVSS.pdf PDF
N6449825R4020 DVSS.pdf PDF
Attachment 3 SOW GFI DVSS.docx DOCX document
DVSS CDRLs.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DDGM BF ECP Originator DDGM BF ECP Form Revision 2.14, 2/1/2023

(All Previous Revisions are Obsolete)DDG 51 Class Backfit Modernization
Engineering Change Proposal (DDGM BF ECP)Expedite:

cathleen.bjornberg: Instructions: Select if this ECP must be expedited.

OriginatorInstructions
APV NLT Date:

cathleen.bjornberg: Instructions: Enter the 'No Later Than' date (mm-dd-yyyy). This is the date by when this ECP must be approved.

Checking Expedite checkbox will open the Approval NLT Date for entry. Enter Approval NLT Date if Expediting.

Temporary cathleen.bjornberg: Instructions: Check off box if this change is only temporary.

(NPC):Duration:
cathleen.bjornberg: Instructions: Enter duration period for the Temporary ECP.Duration Lapse Action:Check Temporary if Change is Temporary and then enter Duration and what action is to be taken when Duration Lapses
1. DDGM BF ECP Number####
nathan.d.pickard1: Instructions: * Leave blank ** ECP Number will be assigned by the CCB Manager using sequential numbers recorded in the DDGM BF ECP Tracking Matrix.2. Rev.#.##

Greg R. Holin: Instructions: The revision number sequence begins with 0.01, then sequentially numbered, e.g., 0.02, 0.03, thru .99, until the DDGM ECP is approved.

Note: Revisions to DDGM ECPs shall only be made if the original has been signed and approved and a major issue has been identified during the execution phase. 3. Title Title Greg R. Holin: Instructions: Enter a brief title (six words or less) to identify the problem or recommended change, and the component, software, or system potentially affected by this DDGM ECP.

Note: Do not include the purpose or detailed description in the title; use Block 16 for complete description. 4. Date MM/DD/YY 4. Enter the initial submittal date of this ECP; or enter a new submittal date if the ECP has been previously approved and a new revision is required.

Note: Date format mm-dd-yyyy

5. Originator:a. Name:b. Work Phone:c. Phone (Other):
(Last, First, MI)d. Activity Code / Dept:e. Email:

6. Back-Fit Mod Hull: 8. DDG Hull Impacts: (check all that apply) 9. Training Site(s) Impacted: 6. Back-Fit Mod Hull is for changes fielded as part of MOD fielding plan.

Fiscal Year##
Greg R. Holin: Instructions: Enter the fiscal year (FY) that the first Production Cut-In is planned, or enter N/A.Does this change affect any Hardware (HW) Contracts?N/ALBESNorfolkSan DiegoDam NeckEnter the fiscal year (FY) when the first Back-Fit Mod Cut-In is planned or enter N/A.
First Hull##
Greg R. Holin: Instructions: Enter the Hull number of the first ship that Production Cut-In is planned, or enter N/AContract 1 HW (BF FY10-14 113-116)SWOSVMS ClassroomEnter the hull number of the first planned Back-Fit Mod Cut-In Ship enter N/A
(Enter first Hull # or N/A)Contract 2 HW (BF FY15-19 64,87,88,117-127)
Contract 3 HW (BF FY21-24 85,101,128-141)10. Classification:11. Tech Refresh:7. Enter the fiscal year (FY) when the first Retrofit Cut-In is planned or enter N/A.
# of Back-Fit Mod Hulls0Contract 4 HW (BF FY25-35 96,98,101-105,107-117,119)Class I (Major)YesEnter the hull number of the first planned Retrofit Cut or enter N/A
DDG 111-112Class II (Minor)No# of Hulls is computed automatically
7. Retrofit Installation Hull:Other:
Fiscal Year##
Greg R. Holin: Instructions: Enter the fiscal year (FY) that the first Retrofit Installation is planned, or enter N/ADoes this change affect any Software (SW) Baselines?12. Retrofit:13. OEM Impact:8. Check the baselines this change affects. If other list the applicable hulls
First Hull##Flight I/II (DDG51-78)YesYes
Flight IIA (DDG79-110)NoNo9. Check off training sites impacted. If a training site is selected, N/A check is removed.
(Enter first Hull # or N/A)Flight III (DDG111-141)
# of Retrofit Hulls0Other:14. Duration for install:10. Class 1 (Major): Form, Fit, Function changes, major SW upgrades impacting system functionality
(# of days)
Chuplis, Sean D CIV NSWC Philadelphia, 226: Instructions: Total number of days shipboard for installationClass II (Minor): Don't affect form, fit, and function, no major impact to ship's operability. E.g. "one for "One" HW replacement
15. Priority Attribute(s):
Greg R. Holin: Instructions: Select the appropriate attribute(s) that will be improved, or accomplished by implementation of this DDGM ECP. If "Other" is selected, please list the accomplishment / implementation in the space provided afterwards.a. Safetyd. Life Cycle/Maintenance Cost Savings
b. System Improvements in Operation/Reliabilitye. Warfighting Improvements/Survivability15. Select the appropriate attribute(s) that will be improved, or accomplished by implementation of this DDGM ECP.

If "Other" is selected, please list the accomplishment / implementation in the space provided afterwards.

c. Obsolescence f. Other (i.e. PM Direction)

16. Executive Summary:

moorela: Instructions: Provide a brief summary with key points to highlight the purpose of this DDGM ECP.

Note: This summary is used for ECP notification distribution.

16. Provide a brief summary with key points to highlight the purpose of this DDGM ECP.

Note: This summary is used for ECP notification distribution.

17. Description of Change:

moorela: Instructions: Provide descriptive details of the purpose of this DDGM ECP. The description shall provide sufficient detail to adequately describe the system, hardware, and/or software that is affected. Include a problem statement and recommended solution

17. Provide descriptive details of the purpose of this DDGM ECP. The description shall provide sufficient detail to adequately describe the system, hardware, and/or software that is affected. Include a problem statement and recommended solution

18. Impact if Change Not Accomplished:

moorela: Instructions: Provide an impact statement which substantiates the purpose of this DDGM ECP to include (but not limited to) the benefit Government, description of the defect, SW/HW or system failure, correct maintenance/ logistics problems, specific incident or malfunction, etc.

18. Provide an impact statement which substantiates the purpose of this DDGM ECP to include (but not limited to) the benefit Government, description of the defect, SW/HW or system failure, correct maintenance/ logistics problems, specific incident or malfunction, etc.

19. Impact(s):

moorela: Instructions: Check all that apply.

* If this ECP is ILS Only, at least one box in Block 20 must be checked.

* If the ACS box is checked, a summary statement must be provided in Block 32.Cyber SecurityHardware (HW)Software (SW)ILS OnlyACS19. Select the "areas" of impact.
(See Block 20)(See Block 31)
20. System(s) Impacted:
Greg R. Holin: Instructions: Check all that apply.Originator Only (±ILS or 514 Systems)*Multiple Systems:20. If ECP only impacts originator and possibly ILS, please select Originator Only checkbox. This affects review process only.
MCSUCCDryChill* MCS SW/ EC/ RSC/ TIWS/ UCC DIU fall under 957. Still Originator Only.
SWDIURSCECTIWSGEDMSIBNSSCSNAVRudderEPHECSFCSFDSVentAirWaterOnly Select Impacted Systems, "No Impact" will change as appropriate
ImpactIf an impacted system is not listed, Check off "Other" and input the system name in the line below.
No Impact<DO NOT CHANGE THIS LINE>
AIT/
CBMDVSSAHSSHHDSLADHMECSILSInstallOther
Impact
No Impact
21. Logistics Impacted:
Greg R. Holin: Instructions: Check all that apply.APLsCSOSSEOSSPMSSISCALSSRTMsTRNGOther21. Select the Logistics Impacted. If it is not listed, check off "Other" and list it on the blank line beneath it.
If any of these boxes are checked, ILS System Impacted checkbox above will be checked off.

22. HW Environmental Qual Test (EQT) Impact:

Greg R. Holin: Instructions: Check appropriate box.

* If the May Impact or Definite Impact box is checked, EMI and EQT signatures are required, and a summary statement must be provided in Blocks 27 and 33. No Impact * May Impact * Definite Impact 22. Select whether EQT is impacted or not. If "No Impact" is selected, the signature boxes will contain an "N/A".

If "* May Impact" or "* Definite Impact" are selected, signature boxes will be blank
23. ECP Cost Estimate Summary:

Greg R. Holin: Note: No entry required. The values displayed are cost summaries derived from the DDGM ECP Total Cost worksheet in this DDGM ECP workbook.

cathleen.bjornberg: Instructions: Check off box if this change is only temporary.

Hill, Kyle W: Instructions: Enter system name - if not mentioned elsewhere.

cathleen.bjornberg: Instructions: Enter duration period for the Temporary ECP.

nathan.d.pickard1: Instructions: * Leave blank ** ECP Number will be assigned by the CCB Manager using sequential numbers recorded in the DDGM BF ECP Tracking Matrix.

cathleen.bjornberg: Instructions: The information in this field is now manually inserted. The Originator should be the DDGM Technical Point of Contact (TPOC), DDGM Logistics Point of Contact (LPOC), DDGM DPM, or a Program Manager Representative (PMR) familiar with the program and the DDGM CCB procedures and process.

Hill, Kyle W: Instructions: Enter logistical impact - if not mentioned elsewhere.

cathleen.bjornberg: Instructions: Select if this ECP must be expedited.

Greg R. Holin: Instructions: The revision number sequence begins with 0.01, then sequentially numbered, e.g., 0.02, 0.03, thru .99, until the DDGM ECP is approved.

Note: Revisions to DDGM ECPs shall only be made if the original has been signed and approved and a major issue has been identified during the execution phase.

cathleen.bjornberg: Instructions: Enter the 'No Later Than' date (mm-dd-yyyy). This is the date by when this ECP must be approved.

cathleen.bjornberg: Instructions: Select if this ECP must be expedited.

Greg R. Holin: Instructions: Enter a brief title (six words or less) to identify the problem or recommended change, and the component, software, or system potentially affected by this DDGM ECP.

Note: Do not include the purpose or detailed description in the title; use Block 16 for complete description.

cathleen.bjornberg: Instructions: Enter the 'No Later Than' date (mm-dd-yyyy). This is the date by when this ECP must be approved.

Greg R. Holin: Instructions: Enter the fiscal year (FY) that the first Production Cut-In is planned, or enter N/A.

cathleen.bjornberg: Instructions: Select action to occur when duration lapses from drop down.

Greg R. Holin: Instructions: Enter the Hull number of the first ship that Production Cut-In is planned, or enter N/A NRE Cost Back-Fit Mod Cost per Hull Retrofit Cost per Hull ECP Total Cost 23. Costs are calculated from the "ECP Total" Spreadsheet.

$0$0$0$0Simple % Split
DDGM BF ECP Originator / Block 23. ECP Cost Estimate Summary: Select “Percentage Calculation”
Cost BreakdownDDGM BF ECP Originator / Block 23. ECP Cost Estimate Summary/Cost Percentages:
Enter the 407, 400D, and 443 percentages in row 75. The dollar amounts will be calculated.
Simple % SplitAll the totals and 400D percentages will be automatically calculated
Complex CalculationNRE$0Total Costs
Engineering/Procurement$0407 Total:Percentage Different Between Cost Factors
Cost Percentages (of NRE Costs Only)Installation$0$0DDGM BF ECP Originator / Block 23. ECP Cost Estimate Summary: Select "Complex Calculation"
Total$0400D Total:ECP Total/Engineering/ Funding: Provide description of what items have shared costs, who is sharing the costs, and
$0what the percentage breakdown is in email to code 226 Lead System Integrator.
443 Total:
407400D443$0
100%0%0%
$0$0$0
*Note - Retrofit costs are only funded by 407
24. Temporary/Permanent ECP Costs Breakout:

Greg R. Holin: Instructions: Please enter total costs associated if this ECP was checked as Temporary. These three totals should equal the DDGM BF ECP Total Cost above.

Greg R. Holin: Instructions: Enter the fiscal year (FY) that the first Retrofit Installation is planned, or enter N/A The system will automatically total the Cost Factors.

Temporary Total CostsTemporary Removal Total CostsPermanent Total Costs
$0

cathleen.bjornberg: Instruction: Enter Total Costs associated with Temporary Changes

Greg R. Holin: Instructions: Select the appropriate attribute(s) that will be improved, or accomplished by implementation of this DDGM ECP. If "Other" is selected, please list the accomplishment / implementation in the space provided afterwards.

moorela: Instructions: Provide a brief summary with key points to highlight the purpose of this DDGM ECP.

Note: This summary is used for ECP notification distribution.

moorela: Instructions: Provide descriptive details of the purpose of this DDGM ECP. The description shall provide sufficient detail to adequately describe the system, hardware, and/or software that is affected. Include a problem statement and recommended solution moorela: Instructions: Provide an impact statement which substantiates the purpose of this DDGM ECP to include (but not limited to) the benefit Government, description of the defect, SW/HW or system failure, correct maintenance/ logistics problems, specific incident or malfunction, etc.

Chuplis, Sean D CIV NSWC Philadelphia, 226: Instructions: Total number of days shipboard for installation moorela: Instructions: Check all that apply.

* If this ECP is ILS Only, at least one box in Block 20 must be checked.

* If the ACS box is checked, a summary statement must be provided in Block 32.

Greg R. Holin: Instructions: Check all that apply.

Hill, Kyle W: Instructions: All systems checked in this box, fall under MCS cost tab.

Greg R. Holin: Instructions: Check all that apply.

Greg R. Holin: Instructions: Check appropriate box.

* If the May Impact or Definite Impact box is checked, EMI and EQT signatures are required, and a summary statement must be provided in Blocks 27 and 33. $0 $0 These fields will only be available if this is a Temporary ECP.

EFFECTS ON FUNCTIONAL/ALLOCATED CONFIGURATION DOCUMENTATION
(All Blocks Must be filled out. N/A for Not Applicable)

25. Configuration Items/Spaces Affected (Hardware Changes) (i.e. UCC-DIU # X, IBNS # X, etc.)

Provide the configuration item nomenclature and numbers (e.g., UCC/DIU # X, IBNS, # X, etc) of the applicable components, Provide the shipboard space name and compartment number for the location of the HW affected by the change.

26. Lower Level Items Affected (Nomenclature, Part(s) #, NSN, etc.)

Provide nomenclature, part number, NSNs, etc. of the lower level component affected by the change.

27. Hardware Environmental Test Impact Description

The ISEA TPOC must provide a description of the environmental test impact to their system.

Note 1: Required if "May Impact" or "Definite Impact" is selected in Block 22.

Note 2: If there is an environmental test impact, the EQT and/or EMI must provide a summary statement in Block 33.

28. Identification & Functional Description of Software Packages and Interfaces Affected by this Change

Provide a list of software packages and interfaces affected by this DDGM ECP, and the level of effort required.

29. ILS Level of Effort Description for Affected Elements (Label plates shall be installed in accordance with MIL-DTL-15024, and General Specifications For Overhaul Of Surface Ships: S9AA0-AB-GOS-010 Section 507)

Provide a list of specific logistics products and HW support material details affected by this DDGM ECP, and the level of effort required.

Note: An ILS cost estimate worksheet must be completed if there are ILS impacts.

30. OEM Drawings Affected

Provide list of OEM drawings affected by this change. Updated/notional drawings and related information may be supplied by the OEM.

31. Ship Installation Drawings (SIDs) Affected

Provide a list of SIDs affected by the change. SIDs will be supplied by the Planning Yard.

32. AEGIS Combat Systems (ACS) Review/Impact Statement

If the ACS box in Block 19 is selected, a member of ACS will then review the DDGM ECP and provide a brief impact statement.

33. Hardware Environmental Test Impact Review Statement

If ‘May Impact’ or ‘Definite Impact’ is selected in Block 22, an EQT and EMI TPOC must provide a summary statement regarding the environmental test(s) required and impact on system or component.

34. Concurrent/Prerequisite DDGM BF ECPs or Other Upgrades to be Performed

Provide a list of DDGM ECP numbers/titles that should be accomplished prior to or concurrently with this DDGM ECP. Include a brief summary and recommended order of accomplishing this DDGM ECP.

35. Human Systems Integration (HSI) Impacts

Required for SCDs. Fill out to best of your ability or request Training POC to provide information.

35A. Manpower/Workload Impact

Required for SCDs. Fill out to best of your ability or request Training POC to provide information.

35B. Personnel Impact

Required for SCDs. Fill out to best of your ability or request Training POC to provide information.

35C. Training

Required for SCDs. Fill out to best of your ability or request Training POC to provide information.

35D. Human Factors Engineering

Required for SCDs. Fill out to best of your ability or request Training POC to provide information.

35E. Habitability

Required for SCDs. Fill out to best of your ability or request Training POC to provide information.

35F. Environment, Safety and Occupational Health

Required for SCDs. Fill out to best of your ability or request Training POC to provide information.

35G. Personnel Survivability

Required for SCDs. Fill out to best of your ability or request Training POC to provide information.

36. Additional Information

1. Add reason for Accelerated Review.

2. Add information that does not fit in a block above.

3. Add information that does not seem to belong to another block.

37. Reason For Revision (provide Rev #) / Differences From Original

Provide descriptive reason why there is a need to revise the original DDGM BF ECP. Provide a summary of key differences or changes from previous DDGM BF ECP.

&"Arial,Bold"&12&A Page &P of &N &"Arial,Bold"&12DDGM BF ECP Form Version 2.14 Dated 2-1-2023 (Previous editions are obsolete)

Signatures DDGM BF ECP Title: Title DDGM ECP Number: #### Rev - #.## Signatures

38. DDGM BF ECP Signatures Greg R. Holin: Instructions: The DDGM ECP must be signed, dated, and ‘Approved’ or ‘Disapproved’ selected.

Note: If disapproved, a disapproval rationale statement must be provided in Block 39. Approved With Digital Signature

DDGM MCS/EC/RSC/DVSS Integrated Logistics Support (ILS) POC Approved *Disapproved

PMS 443 IBC ILS POC Approved *Disapproved

NSWCPD DDG 51 Class Modernization Backfit DPM Approved *Disapproved

SEA21 PMS 443 SCS PARM POC Approved *Disapproved

SEA21 DDG 51 Class Modernization Backfit Ship Control Systems POC Approved *Disapproved

SEA21 DDG 51 Class Modernization Backfit Class Manager POC Approved *Disapproved

Environmental Qualification Testing (EQT) TPOC N/R Approved *Disapproved

Electromagnetic Interface (EMI) TPOC N/R Approved *Disapproved

39. DDGM BF ECP Disapproval Rationale

Greg R. Holin: Instructions: Completed by SEA21 DDG 51 Class Modernization POC or DDGM DPM if the change is disapproved.

Page &P of &N &"Arial,Bold"&12DDGM BF ECP Form Version 2.14 Dated 2-1-2023

Implementation DDGM BF ECP Title: Title DDGM ECP Number: #### Rev - #.## Implementation Matrix Instructions

a. Start Year (YY) ## Greg R. Holin: Instructions: Enter the planned 'begin' fiscal year.

b. End Year (YY) ## Greg R. Holin: Instructions: Enter the planned 'end' fiscal year

c. # of Ships0
nathan.d.pickard1: Instructions: Enter the total number of ships planned to be fitted with the ECP.d. Prod. Cut-in Ship ###

nathan.d.pickard1: Note: This cell will Auto-Fill with the first hull # planned for Production Cut-In.

Greg R. Holin: Instructions: Enter the planned 'begin' fiscal year.

a. Start Year: Enter fiscal year prior to first install

i. Fiscal Year##ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!TBD00b. End Year: Enter last fiscal year for install
ii. # of BF Mod Ships per FY000000000000000c. # of Ships: Total entered automaticallyTotal #'d ShipsTotal TBDs1st FY
iii. # of Retrofit Ships per FY00000000000000iii. Back-Fit Mod Hull Numbers: Enter Hulls from DDGM Fielding Profile. Back-Fit Mod Hulls should only be used when change is being cut inline with DDGM Fielding Profile.0Total # of Back-Fit Mod Hulls000
iii. Back-Fit Mod Hull Number
iv. Retrofit Hull Number: Please list hulls under fiscal year for planned installs related to retrofits or tech refreshes.
iv. Retrofit Hull NumberTotal #'d ShipsTotal TBDs1st FY
0Total # of Retrofit Hulls000
Assumptions:1. All NRE requested the FY prior to the first install
2. Recurring Engineering costs requested the FY prior to install
3. Install costs requested the FY of the install

v. Cost per Fiscal Year $ - Chuplis, Sean D CIV NSWC Philadelphia, 226: Chuplis, Sean D CIV NSWC Philadelphia, 226:

If no Production Hulls then Need to delete "-1" from final part of equation.

Greg R. Holin: Instructions: Enter the planned 'end' fiscal year nathan.d.pickard1: Instructions: Enter the total number of ships planned to be fitted with the ECP. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Page &P of &N &"Arial,Bold"&12DDGM BF ECP Form Version 2.14 Dated 2-1-2023

PM

DDGM ECP #:####DDGM BF ECP Title:TitleRev.#.##PMInstructions
PM Cost Estimation
Completed By:Last, First, MI###MM/DD/YYYYFill in the individual who filled out this form. Name Required
Name (Last, First, MI)Code/DeptDate (mm-dd-yyyy)
Tech Code:###FYFY ActualPriorityGov't Labor Hours (CR)Travel Costs (CR)Contracted Labor (DC)Material Procurement (DC)Material Stock System (CR)Outgoing Funding DOC (CR)NotesEnter TPS Number
System:PM
TPS Number:NAVxxxxxxx
Non-Recurring EngineeringNon-Recurring Engineering is for one time engineering costs.
1.0Program Management (Totals)$0.00$0.00$0.00$0.00$0.00$0.00
1.1SCD Development & Management------FY - Include fiscal years money will be requested
1.2POA&M Development & Management------Gov't Labor - Enter Hours and the total will be calculated.
1.3Requirement Management------Travel Costs - Enter costs and the total will be calculated including fees
2.0Requirements & System Design$0.00$0.00$0.00$0.00$0.00$0.00Contracted Labor - Enter costs and the total will be calculated including fees
2.1Technical Evaluations & Engineering Analysis------Material Procurement - Enter costs and the total will be calculated including fees
2.2System Documentation (CMMI Requirements)------Material Stock System - Enter costs and the total will be calculated including fees
2.3SRS Development------Outgoing Funding DOC - Enter costs and the total will be calculated
2.4Configuration Management Plan------
2.5Requirements Development & Review------
2.6Hardware------
2.7Software------
2.8Interface Identification & Development------
3.0System Development$0.00$0.00$0.00$0.00$0.00$0.00
3.1Drawing Development & Review------
3.2Software Development (Initial & Updates)------
3.3Ship checks------
3.4ECP------
3.5Available Work Specs------
3.6TDP Development------
4.0Verification and Validation$0.00$0.00$0.00$0.00$0.00$0.00
4.1Test Criteria Development------
4.2Test Procedure Development------
4.3Testing------
4.4First Article Testing Oversight------
4.5LBES Installation and Configuration------
4.6Hot Plant Testing (Labor & Operational Costs)------
4.7SIM/STIM Testing------
4.8Interface/Integration------
4.9Testing------
4.10Peer Reviews------
4.11External Reviews------
4.12Testing Audits------
5.0Hardware Procurement & Qualification$0.00$0.00$0.00$0.00$0.00$0.00
5.1Material Procurement (Incl. Contractor Testing, Packaging, shipping)------
5.2Environmental/Shock Qualifications------
5.3OBRPs/INCOs------
6.0Contracting & Procurement$0.00$0.00$0.00$0.00$0.00$0.00
6.1Contracting/SOW Development------
6.2Proposal------
6.3Review/Evaluation/Selection------
6.4Code 30 Contracting Review & Development Support------
7.0Installation & Repair$0.00$0.00$0.00$0.00$0.00$0.00
7.1Oversight------
7.2On-Site Rep------
7.3AIT------
7.4Planning Yard------
7.5MSMO------
7.6Calibration------
7.7Shipboard Testing------
7.8Operational Training------
7.9Maintenance Training------
8.0Logistics - Technical Code Efforts$0.00$0.00$0.00$0.00$0.00$0.00
8.1ILS Certification------
8.2Provisional Support------
8.3Config Overhaul Planning (COP) Work Files-----
8.4Technical Manual Development Support------
8.5PMS Support------
8.6EOSS Support------
8.7CSOSS------
8.8SISCALL & Instrumentation Support------
8.9Navy Training Support Plan (NTSP)------
8.10Front End Analysis------
8.11Curriculum Development------
8.12Personnel Qualifications Standard (PQS) Support------
8.13Department LPA Support------
9.0Logistics - Dept 30 Efforts$0.00$0.00$0.00$0.00$0.00$0.00
9.1ILS Certification------
9.2Provisioning Support------
9.3Config Overhaul Planning (COP) Work Files------
9.4Technical Manual Support------
9.5PMS Support------
9.6EOSS Support------
9.7CSOSS------
9.8SISCALL & Instrumentation Support------
9.9Navy Training Support Plan (NTSP)------
9.10Front End Analysis------
9.11Curriculum Development------
9.12Personnel Qualifications Standard (PQS) Support------
10.0Life Cycle/ISEA Support$0.00$0.00$0.00$0.00$0.00$0.00
10.1Configuration Management & Status Accounting------
10.2SSA Infrastructure------
10.3Tech Refresh------
11.0Pre Avail Ship Assessment$0.00$0.00$0.00$0.00$0.00$0.00
11.1Pre Avail Ship Assessment------
12.0Information Assurance$0.00$0.00$0.00$0.00$0.00$0.00
12.1Vulnerability Discovery------
12.2Vulnerability Remediation------
12.3Support to IAM------
12.4IA Documentation------
12.5PIT/IA - Archival From FY14------
------
Summary$0.00$0.00$0.00$0.00$0.00$0.00
Back-Fit Mod Ships (Recurring Costs)Back-Fit Mod Ships covers ships on MOD Fielding Profile
1.0Program Management (Totals)$0.00$0.00$0.00$0.00$0.00$0.00
1.1SCD Development & Management------FY - Include fiscal years money will be requested
1.2POA&M Development & Management------Gov't Labor - Enter Hours and the total will be calculated.
1.3Requirement Management------Travel Costs - Enter costs and the total will be calculated including fees
2.0Requirements & System Design$0.00$0.00$0.00$0.00$0.00$0.00Contracted Labor - Enter costs and the total will be calculated including fees
2.1Technical Evaluations & Engineering Analysis------Material Procurement - Enter costs and the total will be calculated including fees
2.2System Documentation (CMMI Requirements)------Material Stock System - Enter costs and the total will be calculated including fees
2.3SRS Development------Outgoing Funding DOC - Enter costs and the total will be calculated
2.4Configuration Management Plan------
2.5Requirements Development & Review------
2.6Hardware------
2.7Software------
2.8Interface Identification & Development------
3.0System Development$0.00$0.00$0.00$0.00$0.00$0.00
3.1Drawing Development & Review------
3.2Software Development (Initial & Updates)------
3.3Ship checks------
3.4ECP------
3.5Available Work Specs------
3.6TDP Development------
4.0Verification and Validation$0.00$0.00$0.00$0.00$0.00$0.00
4.1Test Criteria Development------
4.2Test Procedure Development------
4.3Testing------
4.4First Article Testing Oversight------
4.5LBES Installation and Configuration------
4.6Hot Plant Testing (Labor & Operational Costs)------
4.7SIM/STIM Testing------
4.8Interface/Integration------
4.9Testing------
4.10Peer Reviews------
4.11External Reviews------
4.12Testing Audits------
5.0Hardware Procurement & Qualification$0.00$0.00$0.00$0.00$0.00$0.00
5.1Material Procurement (Incl. Contractor Testing, Packaging, shipping)------
5.2Environmental/Shock Qualifications------
5.3OBRPs/INCOs------
6.0Contracting & Procurement$0.00$0.00$0.00$0.00$0.00$0.00
6.1Contracting/SOW Development------
6.2Proposal------
6.3Review/Evaluation/Selection------
6.4Code 30 Contracting Review & Development Support------
7.0Installation & Repair$0.00$0.00$0.00$0.00$0.00$0.00
7.1Oversight------
7.2On-Site Rep------
7.3AIT------
7.4Planning Yard------
7.5MSMO------
7.6Calibration------
7.7Shipboard Testing------
7.8Operational Training------
7.9Maintenance Training------
8.0Logistics - Technical Code Efforts$0.00$0.00$0.00$0.00$0.00$0.00
8.1ILS Certification------
8.2Provisional Support------
8.3Config Overhaul Planning (COP) Work Files-----
8.4Technical Manual Development Support------
8.5PMS Support------
8.6EOSS Support------
8.7CSOSS------
8.8SISCALL & Instrumentation Support------
8.9Navy Training Support Plan (NTSP)------
8.10Front End Analysis------
8.11Curriculum Development------
8.12Personnel Qualifications Standard (PQS) Support------
8.13Department LPA Support------
9.0Logistics - Dept 30 Efforts$0.00$0.00$0.00$0.00$0.00$0.00
9.1ILS Certification------
9.2Provisioning Support------
9.3Config Overhaul Planning (COP) Work Files------
9.4Technical Manual Support------
9.5PMS Support------
9.6EOSS Support------
9.7CSOSS------
9.8SISCALL & Instrumentation Support------
9.9Navy Training Support Plan (NTSP)------
9.10Front End Analysis------
9.11Curriculum Development------
9.12Personnel Qualifications Standard (PQS) Support------
10.0Life Cycle/ISEA Support$0.00$0.00$0.00$0.00$0.00$0.00
10.1Configuration Management & Status Accounting------
10.2SSA Infrastructure------
10.3Tech Refresh------
11.0Pre Avail Ship Assessment$0.00$0.00$0.00$0.00$0.00$0.00
11.1Pre Avail Ship Assessment------
12.0Information Assurance$0.00$0.00$0.00$0.00$0.00$0.00
12.1Vulnerability Discovery------
12.2Vulnerability Remediation------
12.3Support to IAM------
12.4IA Documentation------
12.5PIT/IA - Archival From FY14------
------
Summary$0.00$0.00$0.00$0.00$0.00$0.00
Total Back-Fit Mod Cost0$0.00$0.00$0.00$0.00$0.00$0.00
Retrofit Ships (Recurring Costs)Retrofit Ships cover all retrofits and tech refresh
1.0Program Management (Totals)$0.00$0.00$0.00$0.00$0.00$0.00
1.1SCD Development & Management------FY - Include fiscal years money will be requested
1.2POA&M Development & Management------Gov't Labor - Enter Hours and the total will be calculated.
1.3Requirement Management------Travel Costs - Enter costs and the total will be calculated including fees
2.0Requirements & System Design$0.00$0.00$0.00$0.00$0.00$0.00Contracted Labor - Enter costs and the total will be calculated including fees
2.1Technical Evaluations & Engineering Analysis------Material Procurement - Enter costs and the total will be calculated including fees
2.2System Documentation (CMMI Requirements)------Material Stock System - Enter costs and the total will be calculated including fees
2.3SRS Development------Outgoing Funding DOC - Enter costs and the total will be calculated
2.4Configuration Management Plan------
2.5Requirements Development & Review------
2.6Hardware------
2.7Software------
2.8Interface Identification & Development------
3.0System Development$0.00$0.00$0.00$0.00$0.00$0.00
3.1Drawing Development & Review------
3.2Software Development (Initial & Updates)------
3.3Ship checks------
3.4ECP------
3.5Available Work Specs------
3.6TDP Development------
4.0Verification and Validation$0.00$0.00$0.00$0.00$0.00$0.00
4.1Test Criteria Development------
4.2Test Procedure Development------
4.3Testing------
4.4First Article Testing Oversight------
4.5LBES Installation and Configuration------
4.6Hot Plant Testing (Labor & Operational Costs)------
4.7SIM/STIM Testing------
4.8Interface/Integration------
4.9Testing------
4.10Peer Reviews------
4.11External Reviews------
4.12Testing Audits------
5.0Hardware Procurement & Qualification$0.00$0.00$0.00$0.00$0.00$0.00
5.1Material Procurement (Incl. Contractor Testing, Packaging, shipping)------
5.2Environmental/Shock Qualifications------
5.3OBRPs/INCOs------
6.0Contracting & Procurement$0.00$0.00$0.00$0.00$0.00$0.00
6.1Contracting/SOW Development------
6.2Proposal------
6.3Review/Evaluation/Selection------
6.4Code 30 Contracting Review & Development Support------
7.0Installation & Repair$0.00$0.00$0.00$0.00$0.00$0.00
7.1Oversight------
7.2On-Site Rep------
7.3AIT------
7.4Planning Yard------
7.5MSMO------
7.6Calibration------
7.7Shipboard Testing------
7.8Operational Training------
7.9Maintenance Training------
8.0Logistics - Technical Code Efforts$0.00$0.00$0.00$0.00$0.00$0.00
8.1ILS Certification------
8.2Provisional Support------
8.3Config Overhaul Planning (COP) Work Files-----
8.4Technical Manual Development Support------
8.5PMS Support------
8.6EOSS Support------
8.7CSOSS------
8.8SISCALL & Instrumentation Support------
8.9Navy Training Support Plan (NTSP)------
8.10Front End Analysis------
8.11Curriculum Development------
8.12Personnel Qualifications Standard (PQS) Support------
8.13Department LPA Support------
9.0Logistics - Dept 30 Efforts$0.00$0.00$0.00$0.00$0.00$0.00
9.1ILS Certification------
9.2Provisioning Support------
9.3Config Overhaul Planning (COP) Work Files------
9.4Technical Manual Support------
9.5PMS Support------
9.6EOSS Support------
9.7CSOSS------
9.8SISCALL & Instrumentation Support------
9.9Navy Training Support Plan (NTSP)------
9.10Front End Analysis------
9.11Curriculum Development------
9.12Personnel Qualifications Standard (PQS) Support------
10.0Life Cycle/ISEA Support$0.00$0.00$0.00$0.00$0.00$0.00
10.1Configuration Management & Status Accounting------
10.2SSA Infrastructure------
10.3Tech Refresh------
11.0Pre Avail Ship Assessment$0.00$0.00$0.00$0.00$0.00$0.00
11.1Pre Avail Ship Assessment------
12.0Information Assurance$0.00$0.00$0.00$0.00$0.00$0.00
12.1Vulnerability Discovery------
12.2Vulnerability Remediation------
12.3Support to IAM------
12.4IA Documentation------
12.5PIT/IA - Archival From FY14------
------
Summary$0.00$0.00$0.00$0.00$0.00$0.00
Total Retrofit Cost0$0.00$0.00$0.00$0.00$0.00$0.00
Total PM Cost$0.00$0.00$0.00$0.00$0.00$0.00

&"Arial,Bold"&12&A Page &P of &N &"Arial,Bold"&12DDGM BF ECP Form Version 2.14 Dated 2-1-2023

MCS SW

DDGM ECP #:####DDGM BF ECP Title:TitleRev.#.##MCS SWInstructions
MCS SW Cost Estimation
Completed By:Last, First, MI###MM/DD/YYYYFill in the individual who filled out this form. Name Required
Name (Last, First, MI)Code/DeptDate (mm-dd-yyyy)
Tech Code:###FYFY ActualPriorityGov't Labor Hours (CR)Travel Costs (CR)Contracted Labor (DC)Material Procurement (DC)Material Stock System (CR)Outgoing Funding DOC (CR)NotesEnter TPS Number
System:MCS SW
TPS Number:NAVxxxxxxx
Non-Recurring EngineeringNon-Recurring Engineering is for one time engineering costs.
1.0Program Management (Totals)$0.00$0.00$0.00$0.00$0.00$0.00
1.1SCD Development & Management------FY - Include fiscal years money will be requested
1.2POA&M Development & Management------Gov't Labor - Enter Hours and the total will be calculated.
1.3Requirement Management------Travel Costs - Enter costs and the total will be calculated including fees
2.0Requirements & System Design$0.00$0.00$0.00$0.00$0.00$0.00Contracted Labor - Enter costs and the total will be calculated including fees
2.1Technical Evaluations & Engineering Analysis------Material Procurement - Enter costs and the total will be calculated including fees
2.2System Documentation (CMMI Requirements)------Material Stock System - Enter costs and the total will be calculated including fees
2.3SRS Development------Outgoing Funding DOC - Enter costs and the total will be calculated
2.4Configuration Management Plan------
2.5Requirements Development & Review------
2.6Hardware------
2.7Software------
2.8Interface Identification & Development------
3.0System Development$0.00$0.00$0.00$0.00$0.00$0.00
3.1Drawing Development & Review------
3.2Software Development (Initial & Updates)------
3.3Ship checks------
3.4ECP------
3.5Available Work Specs------
3.6TDP Development------
4.0Verification and Validation$0.00$0.00$0.00$0.00$0.00$0.00
4.1Test Criteria Development------
4.2Test Procedure Development------
4.3Testing------
4.4First Article Testing Oversight------
4.5LBES Installation and Configuration------
4.6Hot Plant Testing (Labor & Operational Costs)------
4.7SIM/STIM Testing------
4.8Interface/Integration------
4.9Testing------
4.10Peer Reviews------
4.11External Reviews------
4.12Testing Audits------
5.0Hardware Procurement & Qualification$0.00$0.00$0.00$0.00$0.00$0.00
5.1Material Procurement (Incl. Contractor Testing, Packaging, shipping)------
5.2Environmental/Shock Qualifications------
5.3OBRPs/INCOs------
6.0Contracting & Procurement$0.00$0.00$0.00$0.00$0.00$0.00
6.1Contracting/SOW Development------
6.2Proposal------
6.3Review/Evaluation/Selection------
6.4Code 30 Contracting Review & Development Support------
7.0Installation & Repair$0.00$0.00$0.00$0.00$0.00$0.00
7.1Oversight------
7.2On-Site Rep------
7.3AIT------
7.4Planning Yard------
7.5MSMO------
7.6Calibration------
7.7Shipboard Testing------
7.8Operational Training------
7.9Maintenance Training------
8.0Logistics - Technical Code Efforts$0.00$0.00$0.00$0.00$0.00$0.00
8.1ILS Certification------
8.2Provisional Support------
8.3Config Overhaul Planning (COP) Work Files-----
8.4Technical Manual Development Support------
8.5PMS Support------
8.6EOSS Support------
8.7CSOSS------
8.8SISCALL & Instrumentation Support------
8.9Navy Training Support Plan (NTSP)------
8.10Front End Analysis------
8.11Curriculum Development------
8.12Personnel Qualifications Standard (PQS) Support------
8.13Department LPA Support------
9.0Logistics - Dept 30 Efforts$0.00$0.00$0.00$0.00$0.00$0.00
9.1ILS Certification------
9.2Provisioning Support------
9.3Config Overhaul Planning (COP) Work Files------
9.4Technical Manual Support------
9.5PMS Support------
9.6EOSS Support------
9.7CSOSS------
9.8SISCALL & Instrumentation Support------
9.9Navy Training Support Plan (NTSP)------
9.10Front End Analysis------
9.11Curriculum Development------
9.12Personnel Qualifications Standard (PQS) Support------
10.0Life Cycle/ISEA Support$0.00$0.00$0.00$0.00$0.00$0.00
10.1Configuration Management & Status Accounting------
10.2SSA Infrastructure------
10.3Tech Refresh------
11.0Pre Avail Ship Assessment$0.00$0.00$0.00$0.00$0.00$0.00
11.1Pre Avail Ship Assessment------
12.0Information Assurance$0.00$0.00$0.00$0.00$0.00$0.00
12.1Vulnerability Discovery------
12.2Vulnerability Remediation------
12.3Support to IAM------
12.4IA Documentation------
12.5PIT/IA - Archival From FY14------
------
Summary$0.00$0.00$0.00$0.00$0.00$0.00
Back-Fit Mod Ships (Recurring)Back-Fit Mod Ships covers ships on MOD Fielding Profile
1.0Program Management (Totals)$0.00$0.00$0.00$0.00$0.00$0.00
1.1SCD Development & Management------FY - Include fiscal years money will be requested
1.2POA&M Development & Management------Gov't Labor - Enter Hours and the total will be calculated.
1.3Requirement Management------Travel Costs - Enter costs and the total will be calculated including fees
2.0Requirements & System Design$0.00$0.00$0.00$0.00$0.00$0.00Contracted Labor - Enter costs and the total will be calculated including fees
2.1Technical Evaluations & Engineering Analysis------Material Procurement - Enter costs and the total will be calculated including fees
2.2System Documentation (CMMI Requirements)------Material Stock System - Enter costs and the total will be calculated including fees
2.3SRS Development------Outgoing Funding DOC - Enter costs and the total will be calculated
2.4Configuration Management Plan------
2.5Requirements Development & Review------
2.6Hardware------
2.7Software------
2.8Interface Identification & Development------
3.0System Development$0.00$0.00$0.00$0.00$0.00$0.00
3.1Drawing Development & Review------
3.2Software Development (Initial & Updates)------
3.3Ship checks------
3.4ECP------
3.5Available Work Specs------
3.6TDP Development------
4.0Verification and Validation$0.00$0.00$0.00$0.00$0.00$0.00
4.1Test Criteria Development------
4.2Test Procedure Development------
4.3Testing------
4.4First Article Testing Oversight------
4.5LBES Installation and Configuration------
4.6Hot Plant Testing (Labor & Operational Costs)------
4.7SIM/STIM Testing------
4.8Interface/Integration------
4.9Testing------
4.10Peer Reviews------
4.11External Reviews------
4.12Testing Audits------
5.0Hardware Procurement & Qualification$0.00$0.00$0.00$0.00$0.00$0.00
5.1Material Procurement (Incl. Contractor Testing, Packaging, shipping)------
5.2Environmental/Shock Qualifications------
5.3OBRPs/INCOs------
6.0Contracting & Procurement$0.00$0.00$0.00$0.00$0.00$0.00
6.1Contracting/SOW Development------
6.2Proposal------
6.3Review/Evaluation/Selection------
6.4Code 30 Contracting Review & Development Support------
7.0Installation & Repair$0.00$0.00$0.00$0.00$0.00$0.00
7.1Oversight------
7.2On-Site Rep------
7.3AIT------
7.4Planning Yard------
7.5MSMO------
7.6Calibration------
7.7Shipboard Testing------
7.8Operational Training------
7.9Maintenance Training------
8.0Logistics - Technical Code Efforts$0.00$0.00$0.00$0.00$0.00$0.00
8.1ILS Certification------
8.2Provisional Support------
8.3Config Overhaul Planning (COP) Work Files-----
8.4Technical Manual Development Support------
8.5PMS Support------
8.6EOSS Support------
8.7CSOSS------
8.8SISCALL & Instrumentation Support------
8.9Navy Training Support Plan (NTSP)------
8.10Front End Analysis------
8.11Curriculum Development------
8.12Personnel Qualifications Standard (PQS) Support------
8.13Department LPA Support------
9.0Logistics - Dept 30 Efforts$0.00$0.00$0.00$0.00$0.00$0.00
9.1ILS Certification------
9.2Provisioning Support------
9.3Config Overhaul Planning (COP) Work Files------
9.4Technical Manual Support------
9.5PMS Support------
9.6EOSS Support------
9.7CSOSS------
9.8SISCALL & Instrumentation Support------
9.9Navy Training Support Plan (NTSP)------
9.10Front End Analysis------
9.11Curriculum Development------
9.12Personnel Qualifications Standard (PQS) Support------
10.0Life Cycle/ISEA Support$0.00$0.00$0.00$0.00$0.00$0.00
10.1Configuration Management & Status Accounting------
10.2SSA Infrastructure------
10.3Tech Refresh------
11.0Pre Avail Ship Assessment$0.00$0.00$0.00$0.00$0.00$0.00
11.1Pre Avail Ship Assessment------
12.0Information Assurance$0.00$0.00$0.00$0.00$0.00$0.00
12.1Vulnerability Discovery------
12.2Vulnerability Remediation------
12.3Support to IAM------
12.4IA Documentation------
12.5PIT/IA - Archival From FY14------
------
Summary$0.00$0.00$0.00$0.00$0.00$0.00
Total Back-Fit Mod Cost0$0.00$0.00$0.00$0.00$0.00$0.00
Retrofit Ships (Recurring)Retrofit Ships cover all retrofits and tech refresh
1.0Program Management (Totals)$0.00$0.00$0.00$0.00$0.00$0.00
1.1SCD Development & Management------FY - Include fiscal years money will be requested
1.2POA&M Development & Management------Gov't Labor - Enter Hours and the total will be calculated.
1.3Requirement Management------Travel Costs - Enter costs and the total will be calculated including fees
2.0Requirements & System Design$0.00$0.00$0.00$0.00$0.00$0.00Contracted Labor - Enter costs and the total will be calculated including fees
2.1Technical Evaluations & Engineering Analysis------Material Procurement - Enter costs and the total will be calculated including fees
2.2System Documentation (CMMI Requirements)------Material Stock System - Enter costs and the total will be calculated including fees
2.3SRS Development------Outgoing Funding DOC - Enter costs and the total will be calculated
2.4Configuration Management Plan------
2.5Requirements Development & Review------
2.6Hardware------
2.7Software------
2.8Interface Identification & Development------
3.0System Development$0.00$0.00$0.00$0.00$0.00$0.00
3.1Drawing Development & Review------
3.2Software Development (Initial & Updates)------
3.3Ship checks------
3.4ECP------
3.5Available Work Specs------
3.6TDP Development------
4.0Verification and Validation$0.00$0.00$0.00$0.00$0.00$0.00
4.1Test Criteria Development------
4.2Test Procedure Development------
4.3Testing------
4.4First Article Testing Oversight------
4.5LBES Installation and Configuration------
4.6Hot Plant Testing (Labor & Operational Costs)------
4.7SIM/STIM Testing------
4.8Interface/Integration------
4.9Testing------
4.10Peer Reviews------
4.11External Reviews------
4.12Testing Audits------
5.0Hardware Procurement & Qualification$0.00$0.00$0.00$0.00$0.00$0.00
5.1Material Procurement (Incl. Contractor Testing, Packaging, shipping)------
5.2Environmental/Shock Qualifications------
5.3OBRPs/INCOs------
6.0Contracting & Procurement$0.00$0.00$0.00$0.00$0.00$0.00
6.1Contracting/SOW Development------
6.2Proposal------
6.3Review/Evaluation/Selection------
6.4Code 30 Contracting Review & Development Support------
7.0Installation & Repair$0.00$0.00$0.00$0.00$0.00$0.00
7.1Oversight------
7.2On-Site Rep------
7.3AIT------
7.4Planning Yard------
7.5MSMO------

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .