Attachment 4 SOW DDGM BF ECP Form.xlsx
XLSX spreadsheet 866 KB Posted
- Attached to
- Digital Video Surveillance System Federal contract opportunity
- Solicitation number
- N6449825R4020
About this file
This is an Engineering Change Proposal (ECP) form template, version 2.14 dated February 1, 2023, used for DDG 51 Class Backfit Modernization projects. The form is a comprehensive Excel workbook containing multiple tabs for tracking costs and implementation details related to ship modifications, including Program Management, MCS Software, UCC DIU, RSC, and EC components.
The template includes sections for documenting ECP details such as hull impacts, training site impacts, classification levels, technical refresh requirements, installation duration, priority attributes, executive summary, change descriptions, logistics impacts, hardware/software impacts, and implementation matrices. It contains detailed cost estimation worksheets broken down by engineering tasks, procurement, installation, testing, and lifecycle support activities. The form requires approval signatures from multiple stakeholders including DDGM MCS/EC/RSC/DVSS ILS POC, PMS 443 IBC ILS POC, NSWCPD DDG 51 Class Modernization Backfit DPM, and other technical authorities. While comprehensive in structure, this is only a blank template without any specific ECP information filled in.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6449825R4020 Amendment 0001.pdf | ||
| Attachment 2_GfpAttachmentTemplate.xlsx | XLSX spreadsheet | |
| Attachment 1 -NSWCPD SBPCD RFP 24R4018.xlsx | XLSX spreadsheet | |
| Exhibit 2 DD254 DVSS.pdf | ||
| N6449825R4020 DVSS.pdf | ||
| Attachment 3 SOW GFI DVSS.docx | DOCX document | |
| DVSS CDRLs.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DDGM BF ECP Originator DDGM BF ECP Form Revision 2.14, 2/1/2023
| (All Previous Revisions are Obsolete) | DDG 51 Class Backfit Modernization | |
| Engineering Change Proposal (DDGM BF ECP) | Expedite: |
cathleen.bjornberg: Instructions: Select if this ECP must be expedited.
| Originator | Instructions | |
| APV NLT Date: |
cathleen.bjornberg: Instructions: Enter the 'No Later Than' date (mm-dd-yyyy). This is the date by when this ECP must be approved.
Checking Expedite checkbox will open the Approval NLT Date for entry. Enter Approval NLT Date if Expediting.
Temporary cathleen.bjornberg: Instructions: Check off box if this change is only temporary.
| (NPC): | Duration: | |||
| cathleen.bjornberg: Instructions: Enter duration period for the Temporary ECP. | Duration Lapse Action: | Check Temporary if Change is Temporary and then enter Duration and what action is to be taken when Duration Lapses |
| 1. DDGM BF ECP Number | #### | ||
| nathan.d.pickard1: Instructions: * Leave blank ** ECP Number will be assigned by the CCB Manager using sequential numbers recorded in the DDGM BF ECP Tracking Matrix. | 2. Rev. | #.## |
Greg R. Holin: Instructions: The revision number sequence begins with 0.01, then sequentially numbered, e.g., 0.02, 0.03, thru .99, until the DDGM ECP is approved.
Note: Revisions to DDGM ECPs shall only be made if the original has been signed and approved and a major issue has been identified during the execution phase. 3. Title Title Greg R. Holin: Instructions: Enter a brief title (six words or less) to identify the problem or recommended change, and the component, software, or system potentially affected by this DDGM ECP.
Note: Do not include the purpose or detailed description in the title; use Block 16 for complete description. 4. Date MM/DD/YY 4. Enter the initial submittal date of this ECP; or enter a new submittal date if the ECP has been previously approved and a new revision is required.
Note: Date format mm-dd-yyyy
| 5. Originator: | a. Name: | b. Work Phone: | c. Phone (Other): | |
| (Last, First, MI) | d. Activity Code / Dept: | e. Email: |
6. Back-Fit Mod Hull: 8. DDG Hull Impacts: (check all that apply) 9. Training Site(s) Impacted: 6. Back-Fit Mod Hull is for changes fielded as part of MOD fielding plan.
| Fiscal Year | ## | ||||||||||||||
| Greg R. Holin: Instructions: Enter the fiscal year (FY) that the first Production Cut-In is planned, or enter N/A. | Does this change affect any Hardware (HW) Contracts? | N/A | LBES | Norfolk | San Diego | Dam Neck | Enter the fiscal year (FY) when the first Back-Fit Mod Cut-In is planned or enter N/A. | ||||||||
| First Hull | ## | ||||||||||||||
| Greg R. Holin: Instructions: Enter the Hull number of the first ship that Production Cut-In is planned, or enter N/A | Contract 1 HW (BF FY10-14 113-116) | SWOS | VMS Classroom | Enter the hull number of the first planned Back-Fit Mod Cut-In Ship enter N/A | |||||||||||
| (Enter first Hull # or N/A) | Contract 2 HW (BF FY15-19 64,87,88,117-127) | ||||||||||||||
| Contract 3 HW (BF FY21-24 85,101,128-141) | 10. Classification: | 11. Tech Refresh: | 7. Enter the fiscal year (FY) when the first Retrofit Cut-In is planned or enter N/A. | ||||||||||||
| # of Back-Fit Mod Hulls | 0 | Contract 4 HW (BF FY25-35 96,98,101-105,107-117,119) | Class I (Major) | Yes | Enter the hull number of the first planned Retrofit Cut or enter N/A | ||||||||||
| DDG 111-112 | Class II (Minor) | No | # of Hulls is computed automatically | ||||||||||||
| 7. Retrofit Installation Hull: | Other: | ||||||||||||||
| Fiscal Year | ## | ||||||||||||||
| Greg R. Holin: Instructions: Enter the fiscal year (FY) that the first Retrofit Installation is planned, or enter N/A | Does this change affect any Software (SW) Baselines? | 12. Retrofit: | 13. OEM Impact: | 8. Check the baselines this change affects. If other list the applicable hulls | |||||||||||
| First Hull | ## | Flight I/II (DDG51-78) | Yes | Yes | |||||||||||
| Flight IIA (DDG79-110) | No | No | 9. Check off training sites impacted. If a training site is selected, N/A check is removed. | ||||||||||||
| (Enter first Hull # or N/A) | Flight III (DDG111-141) | ||||||||||||||
| # of Retrofit Hulls | 0 | Other: | 14. Duration for install: | 10. Class 1 (Major): Form, Fit, Function changes, major SW upgrades impacting system functionality | |||||||||||
| (# of days) | |||||||||||||||
| Chuplis, Sean D CIV NSWC Philadelphia, 226: Instructions: Total number of days shipboard for installation | Class II (Minor): Don't affect form, fit, and function, no major impact to ship's operability. E.g. "one for "One" HW replacement | ||||||||||||||
| 15. Priority Attribute(s): | |||||||||||||||
| Greg R. Holin: Instructions: Select the appropriate attribute(s) that will be improved, or accomplished by implementation of this DDGM ECP. If "Other" is selected, please list the accomplishment / implementation in the space provided afterwards. | a. Safety | d. Life Cycle/Maintenance Cost Savings | |||||||||||||
| b. System Improvements in Operation/Reliability | e. Warfighting Improvements/Survivability | 15. Select the appropriate attribute(s) that will be improved, or accomplished by implementation of this DDGM ECP. |
If "Other" is selected, please list the accomplishment / implementation in the space provided afterwards.
c. Obsolescence f. Other (i.e. PM Direction)
16. Executive Summary:
moorela: Instructions: Provide a brief summary with key points to highlight the purpose of this DDGM ECP.
Note: This summary is used for ECP notification distribution.
16. Provide a brief summary with key points to highlight the purpose of this DDGM ECP.
Note: This summary is used for ECP notification distribution.
17. Description of Change:
moorela: Instructions: Provide descriptive details of the purpose of this DDGM ECP. The description shall provide sufficient detail to adequately describe the system, hardware, and/or software that is affected. Include a problem statement and recommended solution
17. Provide descriptive details of the purpose of this DDGM ECP. The description shall provide sufficient detail to adequately describe the system, hardware, and/or software that is affected. Include a problem statement and recommended solution
18. Impact if Change Not Accomplished:
moorela: Instructions: Provide an impact statement which substantiates the purpose of this DDGM ECP to include (but not limited to) the benefit Government, description of the defect, SW/HW or system failure, correct maintenance/ logistics problems, specific incident or malfunction, etc.
18. Provide an impact statement which substantiates the purpose of this DDGM ECP to include (but not limited to) the benefit Government, description of the defect, SW/HW or system failure, correct maintenance/ logistics problems, specific incident or malfunction, etc.
19. Impact(s):
moorela: Instructions: Check all that apply.
* If this ECP is ILS Only, at least one box in Block 20 must be checked.
| * If the ACS box is checked, a summary statement must be provided in Block 32. | Cyber Security | Hardware (HW) | Software (SW) | ILS Only | ACS | 19. Select the "areas" of impact. | ||
| (See Block 20) | (See Block 31) | |||||||
| 20. System(s) Impacted: | ||||||||
| Greg R. Holin: Instructions: Check all that apply. | Originator Only (±ILS or 514 Systems)* | Multiple Systems: | 20. If ECP only impacts originator and possibly ILS, please select Originator Only checkbox. This affects review process only. |
| MCS | UCC | Dry | Chill | * MCS SW/ EC/ RSC/ TIWS/ UCC DIU fall under 957. Still Originator Only. | ||||||||||||||
| SW | DIU | RSC | EC | TIWS | GEDMS | IBNS | SCS | NAV | Rudder | EP | HECS | FCS | FDS | Vent | Air | Water | Only Select Impacted Systems, "No Impact" will change as appropriate | |
| Impact | If an impacted system is not listed, Check off "Other" and input the system name in the line below. | |||||||||||||||||
| No Impact | <DO NOT CHANGE THIS LINE> |
| AIT/ | |||||||||
| CBM | DVSS | AHSS | HHD | SLAD | HMECS | ILS | Install | Other | |
| Impact | |||||||||
| No Impact |
| 21. Logistics Impacted: | ||||||||||||
| Greg R. Holin: Instructions: Check all that apply. | APLs | CSOSS | EOSS | PMS | SISCAL | SSR | TMs | TRNG | Other | 21. Select the Logistics Impacted. If it is not listed, check off "Other" and list it on the blank line beneath it. | ||
| If any of these boxes are checked, ILS System Impacted checkbox above will be checked off. |
22. HW Environmental Qual Test (EQT) Impact:
Greg R. Holin: Instructions: Check appropriate box.
* If the May Impact or Definite Impact box is checked, EMI and EQT signatures are required, and a summary statement must be provided in Blocks 27 and 33. No Impact * May Impact * Definite Impact 22. Select whether EQT is impacted or not. If "No Impact" is selected, the signature boxes will contain an "N/A".
| If "* May Impact" or "* Definite Impact" are selected, signature boxes will be blank | |
| 23. ECP Cost Estimate Summary: |
Greg R. Holin: Note: No entry required. The values displayed are cost summaries derived from the DDGM ECP Total Cost worksheet in this DDGM ECP workbook.
cathleen.bjornberg: Instructions: Check off box if this change is only temporary.
Hill, Kyle W: Instructions: Enter system name - if not mentioned elsewhere.
cathleen.bjornberg: Instructions: Enter duration period for the Temporary ECP.
nathan.d.pickard1: Instructions: * Leave blank ** ECP Number will be assigned by the CCB Manager using sequential numbers recorded in the DDGM BF ECP Tracking Matrix.
cathleen.bjornberg: Instructions: The information in this field is now manually inserted. The Originator should be the DDGM Technical Point of Contact (TPOC), DDGM Logistics Point of Contact (LPOC), DDGM DPM, or a Program Manager Representative (PMR) familiar with the program and the DDGM CCB procedures and process.
Hill, Kyle W: Instructions: Enter logistical impact - if not mentioned elsewhere.
cathleen.bjornberg: Instructions: Select if this ECP must be expedited.
Greg R. Holin: Instructions: The revision number sequence begins with 0.01, then sequentially numbered, e.g., 0.02, 0.03, thru .99, until the DDGM ECP is approved.
Note: Revisions to DDGM ECPs shall only be made if the original has been signed and approved and a major issue has been identified during the execution phase.
cathleen.bjornberg: Instructions: Enter the 'No Later Than' date (mm-dd-yyyy). This is the date by when this ECP must be approved.
cathleen.bjornberg: Instructions: Select if this ECP must be expedited.
Greg R. Holin: Instructions: Enter a brief title (six words or less) to identify the problem or recommended change, and the component, software, or system potentially affected by this DDGM ECP.
Note: Do not include the purpose or detailed description in the title; use Block 16 for complete description.
cathleen.bjornberg: Instructions: Enter the 'No Later Than' date (mm-dd-yyyy). This is the date by when this ECP must be approved.
Greg R. Holin: Instructions: Enter the fiscal year (FY) that the first Production Cut-In is planned, or enter N/A.
cathleen.bjornberg: Instructions: Select action to occur when duration lapses from drop down.
Greg R. Holin: Instructions: Enter the Hull number of the first ship that Production Cut-In is planned, or enter N/A NRE Cost Back-Fit Mod Cost per Hull Retrofit Cost per Hull ECP Total Cost 23. Costs are calculated from the "ECP Total" Spreadsheet.
| $0 | $0 | $0 | $0 | Simple % Split |
| DDGM BF ECP Originator / Block 23. ECP Cost Estimate Summary: Select “Percentage Calculation” |
| Cost Breakdown | DDGM BF ECP Originator / Block 23. ECP Cost Estimate Summary/Cost Percentages: | |||||||
| Enter the 407, 400D, and 443 percentages in row 75. The dollar amounts will be calculated. | ||||||||
| Simple % Split | All the totals and 400D percentages will be automatically calculated | |||||||
| Complex Calculation | NRE | $0 | Total Costs | |||||
| Engineering/Procurement | $0 | 407 Total: | Percentage Different Between Cost Factors | |||||
| Cost Percentages (of NRE Costs Only) | Installation | $0 | $0 | DDGM BF ECP Originator / Block 23. ECP Cost Estimate Summary: Select "Complex Calculation" | ||||
| Total | $0 | 400D Total: | ECP Total/Engineering/ Funding: Provide description of what items have shared costs, who is sharing the costs, and | |||||
| $0 | what the percentage breakdown is in email to code 226 Lead System Integrator. | |||||||
| 443 Total: | ||||||||
| 407 | 400D | 443 | $0 | |||||
| 100% | 0% | 0% | ||||||
| $0 | $0 | $0 | ||||||
| *Note - Retrofit costs are only funded by 407 | ||||||||
| 24. Temporary/Permanent ECP Costs Breakout: |
Greg R. Holin: Instructions: Please enter total costs associated if this ECP was checked as Temporary. These three totals should equal the DDGM BF ECP Total Cost above.
Greg R. Holin: Instructions: Enter the fiscal year (FY) that the first Retrofit Installation is planned, or enter N/A The system will automatically total the Cost Factors.
| Temporary Total Costs | Temporary Removal Total Costs | Permanent Total Costs |
| $0 |
cathleen.bjornberg: Instruction: Enter Total Costs associated with Temporary Changes
Greg R. Holin: Instructions: Select the appropriate attribute(s) that will be improved, or accomplished by implementation of this DDGM ECP. If "Other" is selected, please list the accomplishment / implementation in the space provided afterwards.
moorela: Instructions: Provide a brief summary with key points to highlight the purpose of this DDGM ECP.
Note: This summary is used for ECP notification distribution.
moorela: Instructions: Provide descriptive details of the purpose of this DDGM ECP. The description shall provide sufficient detail to adequately describe the system, hardware, and/or software that is affected. Include a problem statement and recommended solution moorela: Instructions: Provide an impact statement which substantiates the purpose of this DDGM ECP to include (but not limited to) the benefit Government, description of the defect, SW/HW or system failure, correct maintenance/ logistics problems, specific incident or malfunction, etc.
Chuplis, Sean D CIV NSWC Philadelphia, 226: Instructions: Total number of days shipboard for installation moorela: Instructions: Check all that apply.
* If this ECP is ILS Only, at least one box in Block 20 must be checked.
* If the ACS box is checked, a summary statement must be provided in Block 32.
Greg R. Holin: Instructions: Check all that apply.
Hill, Kyle W: Instructions: All systems checked in this box, fall under MCS cost tab.
Greg R. Holin: Instructions: Check all that apply.
Greg R. Holin: Instructions: Check appropriate box.
* If the May Impact or Definite Impact box is checked, EMI and EQT signatures are required, and a summary statement must be provided in Blocks 27 and 33. $0 $0 These fields will only be available if this is a Temporary ECP.
| EFFECTS ON FUNCTIONAL/ALLOCATED CONFIGURATION DOCUMENTATION |
| (All Blocks Must be filled out. N/A for Not Applicable) |
25. Configuration Items/Spaces Affected (Hardware Changes) (i.e. UCC-DIU # X, IBNS # X, etc.)
Provide the configuration item nomenclature and numbers (e.g., UCC/DIU # X, IBNS, # X, etc) of the applicable components, Provide the shipboard space name and compartment number for the location of the HW affected by the change.
26. Lower Level Items Affected (Nomenclature, Part(s) #, NSN, etc.)
Provide nomenclature, part number, NSNs, etc. of the lower level component affected by the change.
27. Hardware Environmental Test Impact Description
The ISEA TPOC must provide a description of the environmental test impact to their system.
Note 1: Required if "May Impact" or "Definite Impact" is selected in Block 22.
Note 2: If there is an environmental test impact, the EQT and/or EMI must provide a summary statement in Block 33.
28. Identification & Functional Description of Software Packages and Interfaces Affected by this Change
Provide a list of software packages and interfaces affected by this DDGM ECP, and the level of effort required.
29. ILS Level of Effort Description for Affected Elements (Label plates shall be installed in accordance with MIL-DTL-15024, and General Specifications For Overhaul Of Surface Ships: S9AA0-AB-GOS-010 Section 507)
Provide a list of specific logistics products and HW support material details affected by this DDGM ECP, and the level of effort required.
Note: An ILS cost estimate worksheet must be completed if there are ILS impacts.
30. OEM Drawings Affected
Provide list of OEM drawings affected by this change. Updated/notional drawings and related information may be supplied by the OEM.
31. Ship Installation Drawings (SIDs) Affected
Provide a list of SIDs affected by the change. SIDs will be supplied by the Planning Yard.
32. AEGIS Combat Systems (ACS) Review/Impact Statement
If the ACS box in Block 19 is selected, a member of ACS will then review the DDGM ECP and provide a brief impact statement.
33. Hardware Environmental Test Impact Review Statement
If ‘May Impact’ or ‘Definite Impact’ is selected in Block 22, an EQT and EMI TPOC must provide a summary statement regarding the environmental test(s) required and impact on system or component.
34. Concurrent/Prerequisite DDGM BF ECPs or Other Upgrades to be Performed
Provide a list of DDGM ECP numbers/titles that should be accomplished prior to or concurrently with this DDGM ECP. Include a brief summary and recommended order of accomplishing this DDGM ECP.
35. Human Systems Integration (HSI) Impacts
Required for SCDs. Fill out to best of your ability or request Training POC to provide information.
35A. Manpower/Workload Impact
Required for SCDs. Fill out to best of your ability or request Training POC to provide information.
35B. Personnel Impact
Required for SCDs. Fill out to best of your ability or request Training POC to provide information.
35C. Training
Required for SCDs. Fill out to best of your ability or request Training POC to provide information.
35D. Human Factors Engineering
Required for SCDs. Fill out to best of your ability or request Training POC to provide information.
35E. Habitability
Required for SCDs. Fill out to best of your ability or request Training POC to provide information.
35F. Environment, Safety and Occupational Health
Required for SCDs. Fill out to best of your ability or request Training POC to provide information.
35G. Personnel Survivability
Required for SCDs. Fill out to best of your ability or request Training POC to provide information.
36. Additional Information
1. Add reason for Accelerated Review.
2. Add information that does not fit in a block above.
3. Add information that does not seem to belong to another block.
37. Reason For Revision (provide Rev #) / Differences From Original
Provide descriptive reason why there is a need to revise the original DDGM BF ECP. Provide a summary of key differences or changes from previous DDGM BF ECP.
&"Arial,Bold"&12&A Page &P of &N &"Arial,Bold"&12DDGM BF ECP Form Version 2.14 Dated 2-1-2023 (Previous editions are obsolete)
Signatures DDGM BF ECP Title: Title DDGM ECP Number: #### Rev - #.## Signatures
38. DDGM BF ECP Signatures Greg R. Holin: Instructions: The DDGM ECP must be signed, dated, and ‘Approved’ or ‘Disapproved’ selected.
Note: If disapproved, a disapproval rationale statement must be provided in Block 39. Approved With Digital Signature
DDGM MCS/EC/RSC/DVSS Integrated Logistics Support (ILS) POC Approved *Disapproved
PMS 443 IBC ILS POC Approved *Disapproved
NSWCPD DDG 51 Class Modernization Backfit DPM Approved *Disapproved
SEA21 PMS 443 SCS PARM POC Approved *Disapproved
SEA21 DDG 51 Class Modernization Backfit Ship Control Systems POC Approved *Disapproved
SEA21 DDG 51 Class Modernization Backfit Class Manager POC Approved *Disapproved
Environmental Qualification Testing (EQT) TPOC N/R Approved *Disapproved
Electromagnetic Interface (EMI) TPOC N/R Approved *Disapproved
39. DDGM BF ECP Disapproval Rationale
Greg R. Holin: Instructions: Completed by SEA21 DDG 51 Class Modernization POC or DDGM DPM if the change is disapproved.
Page &P of &N &"Arial,Bold"&12DDGM BF ECP Form Version 2.14 Dated 2-1-2023
Implementation DDGM BF ECP Title: Title DDGM ECP Number: #### Rev - #.## Implementation Matrix Instructions
a. Start Year (YY) ## Greg R. Holin: Instructions: Enter the planned 'begin' fiscal year.
b. End Year (YY) ## Greg R. Holin: Instructions: Enter the planned 'end' fiscal year
| c. # of Ships | 0 | ||
| nathan.d.pickard1: Instructions: Enter the total number of ships planned to be fitted with the ECP. | d. Prod. Cut-in Ship # | ## |
nathan.d.pickard1: Note: This cell will Auto-Fill with the first hull # planned for Production Cut-In.
Greg R. Holin: Instructions: Enter the planned 'begin' fiscal year.
a. Start Year: Enter fiscal year prior to first install
| i. Fiscal Year | ## | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | TBD | 0 | 0 | b. End Year: Enter last fiscal year for install | ||||||
| ii. # of BF Mod Ships per FY | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | c. # of Ships: Total entered automatically | Total #'d Ships | Total TBDs | 1st FY | ||||
| iii. # of Retrofit Ships per FY | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | iii. Back-Fit Mod Hull Numbers: Enter Hulls from DDGM Fielding Profile. Back-Fit Mod Hulls should only be used when change is being cut inline with DDGM Fielding Profile. | 0 | Total # of Back-Fit Mod Hulls | 0 | 0 | 0 | |||
| iii. Back-Fit Mod Hull Number |
| iv. Retrofit Hull Number: Please list hulls under fiscal year for planned installs related to retrofits or tech refreshes. | ||||||
| iv. Retrofit Hull Number | Total #'d Ships | Total TBDs | 1st FY | |||
| 0 | Total # of Retrofit Hulls | 0 | 0 | 0 |
| Assumptions: | 1. All NRE requested the FY prior to the first install |
| 2. Recurring Engineering costs requested the FY prior to install | |
| 3. Install costs requested the FY of the install |
v. Cost per Fiscal Year $ - Chuplis, Sean D CIV NSWC Philadelphia, 226: Chuplis, Sean D CIV NSWC Philadelphia, 226:
If no Production Hulls then Need to delete "-1" from final part of equation.
Greg R. Holin: Instructions: Enter the planned 'end' fiscal year nathan.d.pickard1: Instructions: Enter the total number of ships planned to be fitted with the ECP. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Page &P of &N &"Arial,Bold"&12DDGM BF ECP Form Version 2.14 Dated 2-1-2023
PM
| DDGM ECP #: | #### | DDGM BF ECP Title: | Title | Rev. | #.## | PM | Instructions | |||||
| PM Cost Estimation | ||||||||||||
| Completed By: | Last, First, MI | ### | MM/DD/YYYY | Fill in the individual who filled out this form. Name Required | ||||||||
| Name (Last, First, MI) | Code/Dept | Date (mm-dd-yyyy) | ||||||||||
| Tech Code: | ### | FY | FY Actual | Priority | Gov't Labor Hours (CR) | Travel Costs (CR) | Contracted Labor (DC) | Material Procurement (DC) | Material Stock System (CR) | Outgoing Funding DOC (CR) | Notes | Enter TPS Number |
| System: | PM | |||||||||||
| TPS Number: | NAVxxxxxxx | |||||||||||
| Non-Recurring Engineering | Non-Recurring Engineering is for one time engineering costs. | |||||||||||
| 1.0 | Program Management (Totals) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.1 | SCD Development & Management | - | - | - | - | - | - | FY - Include fiscal years money will be requested | ||||
| 1.2 | POA&M Development & Management | - | - | - | - | - | - | Gov't Labor - Enter Hours and the total will be calculated. | ||||
| 1.3 | Requirement Management | - | - | - | - | - | - | Travel Costs - Enter costs and the total will be calculated including fees | ||||
| 2.0 | Requirements & System Design | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Contracted Labor - Enter costs and the total will be calculated including fees | ||||
| 2.1 | Technical Evaluations & Engineering Analysis | - | - | - | - | - | - | Material Procurement - Enter costs and the total will be calculated including fees | ||||
| 2.2 | System Documentation (CMMI Requirements) | - | - | - | - | - | - | Material Stock System - Enter costs and the total will be calculated including fees | ||||
| 2.3 | SRS Development | - | - | - | - | - | - | Outgoing Funding DOC - Enter costs and the total will be calculated | ||||
| 2.4 | Configuration Management Plan | - | - | - | - | - | - | |||||
| 2.5 | Requirements Development & Review | - | - | - | - | - | - | |||||
| 2.6 | Hardware | - | - | - | - | - | - | |||||
| 2.7 | Software | - | - | - | - | - | - | |||||
| 2.8 | Interface Identification & Development | - | - | - | - | - | - | |||||
| 3.0 | System Development | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1 | Drawing Development & Review | - | - | - | - | - | - | |||||
| 3.2 | Software Development (Initial & Updates) | - | - | - | - | - | - | |||||
| 3.3 | Ship checks | - | - | - | - | - | - | |||||
| 3.4 | ECP | - | - | - | - | - | - | |||||
| 3.5 | Available Work Specs | - | - | - | - | - | - | |||||
| 3.6 | TDP Development | - | - | - | - | - | - | |||||
| 4.0 | Verification and Validation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 4.1 | Test Criteria Development | - | - | - | - | - | - | |||||
| 4.2 | Test Procedure Development | - | - | - | - | - | - | |||||
| 4.3 | Testing | - | - | - | - | - | - | |||||
| 4.4 | First Article Testing Oversight | - | - | - | - | - | - | |||||
| 4.5 | LBES Installation and Configuration | - | - | - | - | - | - | |||||
| 4.6 | Hot Plant Testing (Labor & Operational Costs) | - | - | - | - | - | - | |||||
| 4.7 | SIM/STIM Testing | - | - | - | - | - | - | |||||
| 4.8 | Interface/Integration | - | - | - | - | - | - | |||||
| 4.9 | Testing | - | - | - | - | - | - | |||||
| 4.10 | Peer Reviews | - | - | - | - | - | - | |||||
| 4.11 | External Reviews | - | - | - | - | - | - | |||||
| 4.12 | Testing Audits | - | - | - | - | - | - | |||||
| 5.0 | Hardware Procurement & Qualification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 5.1 | Material Procurement (Incl. Contractor Testing, Packaging, shipping) | - | - | - | - | - | - | |||||
| 5.2 | Environmental/Shock Qualifications | - | - | - | - | - | - | |||||
| 5.3 | OBRPs/INCOs | - | - | - | - | - | - | |||||
| 6.0 | Contracting & Procurement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 6.1 | Contracting/SOW Development | - | - | - | - | - | - | |||||
| 6.2 | Proposal | - | - | - | - | - | - | |||||
| 6.3 | Review/Evaluation/Selection | - | - | - | - | - | - | |||||
| 6.4 | Code 30 Contracting Review & Development Support | - | - | - | - | - | - | |||||
| 7.0 | Installation & Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 7.1 | Oversight | - | - | - | - | - | - | |||||
| 7.2 | On-Site Rep | - | - | - | - | - | - | |||||
| 7.3 | AIT | - | - | - | - | - | - | |||||
| 7.4 | Planning Yard | - | - | - | - | - | - | |||||
| 7.5 | MSMO | - | - | - | - | - | - | |||||
| 7.6 | Calibration | - | - | - | - | - | - | |||||
| 7.7 | Shipboard Testing | - | - | - | - | - | - | |||||
| 7.8 | Operational Training | - | - | - | - | - | - | |||||
| 7.9 | Maintenance Training | - | - | - | - | - | - | |||||
| 8.0 | Logistics - Technical Code Efforts | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 8.1 | ILS Certification | - | - | - | - | - | - | |||||
| 8.2 | Provisional Support | - | - | - | - | - | - | |||||
| 8.3 | Config Overhaul Planning (COP) Work Files | - | - | - | - | - | ||||||
| 8.4 | Technical Manual Development Support | - | - | - | - | - | - | |||||
| 8.5 | PMS Support | - | - | - | - | - | - | |||||
| 8.6 | EOSS Support | - | - | - | - | - | - | |||||
| 8.7 | CSOSS | - | - | - | - | - | - | |||||
| 8.8 | SISCALL & Instrumentation Support | - | - | - | - | - | - | |||||
| 8.9 | Navy Training Support Plan (NTSP) | - | - | - | - | - | - | |||||
| 8.10 | Front End Analysis | - | - | - | - | - | - | |||||
| 8.11 | Curriculum Development | - | - | - | - | - | - | |||||
| 8.12 | Personnel Qualifications Standard (PQS) Support | - | - | - | - | - | - | |||||
| 8.13 | Department LPA Support | - | - | - | - | - | - | |||||
| 9.0 | Logistics - Dept 30 Efforts | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 9.1 | ILS Certification | - | - | - | - | - | - | |||||
| 9.2 | Provisioning Support | - | - | - | - | - | - | |||||
| 9.3 | Config Overhaul Planning (COP) Work Files | - | - | - | - | - | - | |||||
| 9.4 | Technical Manual Support | - | - | - | - | - | - | |||||
| 9.5 | PMS Support | - | - | - | - | - | - | |||||
| 9.6 | EOSS Support | - | - | - | - | - | - | |||||
| 9.7 | CSOSS | - | - | - | - | - | - | |||||
| 9.8 | SISCALL & Instrumentation Support | - | - | - | - | - | - | |||||
| 9.9 | Navy Training Support Plan (NTSP) | - | - | - | - | - | - | |||||
| 9.10 | Front End Analysis | - | - | - | - | - | - | |||||
| 9.11 | Curriculum Development | - | - | - | - | - | - | |||||
| 9.12 | Personnel Qualifications Standard (PQS) Support | - | - | - | - | - | - | |||||
| 10.0 | Life Cycle/ISEA Support | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 10.1 | Configuration Management & Status Accounting | - | - | - | - | - | - | |||||
| 10.2 | SSA Infrastructure | - | - | - | - | - | - | |||||
| 10.3 | Tech Refresh | - | - | - | - | - | - | |||||
| 11.0 | Pre Avail Ship Assessment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 11.1 | Pre Avail Ship Assessment | - | - | - | - | - | - | |||||
| 12.0 | Information Assurance | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 12.1 | Vulnerability Discovery | - | - | - | - | - | - | |||||
| 12.2 | Vulnerability Remediation | - | - | - | - | - | - | |||||
| 12.3 | Support to IAM | - | - | - | - | - | - | |||||
| 12.4 | IA Documentation | - | - | - | - | - | - | |||||
| 12.5 | PIT/IA - Archival From FY14 | - | - | - | - | - | - | |||||
| - | - | - | - | - | - | |||||||
| Summary | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Back-Fit Mod Ships (Recurring Costs) | Back-Fit Mod Ships covers ships on MOD Fielding Profile | ||||||||
| 1.0 | Program Management (Totals) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 1.1 | SCD Development & Management | - | - | - | - | - | - | FY - Include fiscal years money will be requested | |
| 1.2 | POA&M Development & Management | - | - | - | - | - | - | Gov't Labor - Enter Hours and the total will be calculated. | |
| 1.3 | Requirement Management | - | - | - | - | - | - | Travel Costs - Enter costs and the total will be calculated including fees | |
| 2.0 | Requirements & System Design | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Contracted Labor - Enter costs and the total will be calculated including fees | |
| 2.1 | Technical Evaluations & Engineering Analysis | - | - | - | - | - | - | Material Procurement - Enter costs and the total will be calculated including fees | |
| 2.2 | System Documentation (CMMI Requirements) | - | - | - | - | - | - | Material Stock System - Enter costs and the total will be calculated including fees | |
| 2.3 | SRS Development | - | - | - | - | - | - | Outgoing Funding DOC - Enter costs and the total will be calculated | |
| 2.4 | Configuration Management Plan | - | - | - | - | - | - | ||
| 2.5 | Requirements Development & Review | - | - | - | - | - | - | ||
| 2.6 | Hardware | - | - | - | - | - | - | ||
| 2.7 | Software | - | - | - | - | - | - | ||
| 2.8 | Interface Identification & Development | - | - | - | - | - | - | ||
| 3.0 | System Development | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 3.1 | Drawing Development & Review | - | - | - | - | - | - | ||
| 3.2 | Software Development (Initial & Updates) | - | - | - | - | - | - | ||
| 3.3 | Ship checks | - | - | - | - | - | - | ||
| 3.4 | ECP | - | - | - | - | - | - | ||
| 3.5 | Available Work Specs | - | - | - | - | - | - | ||
| 3.6 | TDP Development | - | - | - | - | - | - | ||
| 4.0 | Verification and Validation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 4.1 | Test Criteria Development | - | - | - | - | - | - | ||
| 4.2 | Test Procedure Development | - | - | - | - | - | - | ||
| 4.3 | Testing | - | - | - | - | - | - | ||
| 4.4 | First Article Testing Oversight | - | - | - | - | - | - | ||
| 4.5 | LBES Installation and Configuration | - | - | - | - | - | - | ||
| 4.6 | Hot Plant Testing (Labor & Operational Costs) | - | - | - | - | - | - | ||
| 4.7 | SIM/STIM Testing | - | - | - | - | - | - | ||
| 4.8 | Interface/Integration | - | - | - | - | - | - | ||
| 4.9 | Testing | - | - | - | - | - | - | ||
| 4.10 | Peer Reviews | - | - | - | - | - | - | ||
| 4.11 | External Reviews | - | - | - | - | - | - | ||
| 4.12 | Testing Audits | - | - | - | - | - | - | ||
| 5.0 | Hardware Procurement & Qualification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 5.1 | Material Procurement (Incl. Contractor Testing, Packaging, shipping) | - | - | - | - | - | - | ||
| 5.2 | Environmental/Shock Qualifications | - | - | - | - | - | - | ||
| 5.3 | OBRPs/INCOs | - | - | - | - | - | - | ||
| 6.0 | Contracting & Procurement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 6.1 | Contracting/SOW Development | - | - | - | - | - | - | ||
| 6.2 | Proposal | - | - | - | - | - | - | ||
| 6.3 | Review/Evaluation/Selection | - | - | - | - | - | - | ||
| 6.4 | Code 30 Contracting Review & Development Support | - | - | - | - | - | - | ||
| 7.0 | Installation & Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 7.1 | Oversight | - | - | - | - | - | - | ||
| 7.2 | On-Site Rep | - | - | - | - | - | - | ||
| 7.3 | AIT | - | - | - | - | - | - | ||
| 7.4 | Planning Yard | - | - | - | - | - | - | ||
| 7.5 | MSMO | - | - | - | - | - | - | ||
| 7.6 | Calibration | - | - | - | - | - | - | ||
| 7.7 | Shipboard Testing | - | - | - | - | - | - | ||
| 7.8 | Operational Training | - | - | - | - | - | - | ||
| 7.9 | Maintenance Training | - | - | - | - | - | - | ||
| 8.0 | Logistics - Technical Code Efforts | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 8.1 | ILS Certification | - | - | - | - | - | - | ||
| 8.2 | Provisional Support | - | - | - | - | - | - | ||
| 8.3 | Config Overhaul Planning (COP) Work Files | - | - | - | - | - | |||
| 8.4 | Technical Manual Development Support | - | - | - | - | - | - | ||
| 8.5 | PMS Support | - | - | - | - | - | - | ||
| 8.6 | EOSS Support | - | - | - | - | - | - | ||
| 8.7 | CSOSS | - | - | - | - | - | - | ||
| 8.8 | SISCALL & Instrumentation Support | - | - | - | - | - | - | ||
| 8.9 | Navy Training Support Plan (NTSP) | - | - | - | - | - | - | ||
| 8.10 | Front End Analysis | - | - | - | - | - | - | ||
| 8.11 | Curriculum Development | - | - | - | - | - | - | ||
| 8.12 | Personnel Qualifications Standard (PQS) Support | - | - | - | - | - | - | ||
| 8.13 | Department LPA Support | - | - | - | - | - | - | ||
| 9.0 | Logistics - Dept 30 Efforts | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 9.1 | ILS Certification | - | - | - | - | - | - | ||
| 9.2 | Provisioning Support | - | - | - | - | - | - | ||
| 9.3 | Config Overhaul Planning (COP) Work Files | - | - | - | - | - | - | ||
| 9.4 | Technical Manual Support | - | - | - | - | - | - | ||
| 9.5 | PMS Support | - | - | - | - | - | - | ||
| 9.6 | EOSS Support | - | - | - | - | - | - | ||
| 9.7 | CSOSS | - | - | - | - | - | - | ||
| 9.8 | SISCALL & Instrumentation Support | - | - | - | - | - | - | ||
| 9.9 | Navy Training Support Plan (NTSP) | - | - | - | - | - | - | ||
| 9.10 | Front End Analysis | - | - | - | - | - | - | ||
| 9.11 | Curriculum Development | - | - | - | - | - | - | ||
| 9.12 | Personnel Qualifications Standard (PQS) Support | - | - | - | - | - | - | ||
| 10.0 | Life Cycle/ISEA Support | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 10.1 | Configuration Management & Status Accounting | - | - | - | - | - | - | ||
| 10.2 | SSA Infrastructure | - | - | - | - | - | - | ||
| 10.3 | Tech Refresh | - | - | - | - | - | - | ||
| 11.0 | Pre Avail Ship Assessment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 11.1 | Pre Avail Ship Assessment | - | - | - | - | - | - | ||
| 12.0 | Information Assurance | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 12.1 | Vulnerability Discovery | - | - | - | - | - | - | ||
| 12.2 | Vulnerability Remediation | - | - | - | - | - | - | ||
| 12.3 | Support to IAM | - | - | - | - | - | - | ||
| 12.4 | IA Documentation | - | - | - | - | - | - | ||
| 12.5 | PIT/IA - Archival From FY14 | - | - | - | - | - | - | ||
| - | - | - | - | - | - | ||||
| Summary | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Total Back-Fit Mod Cost | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Retrofit Ships (Recurring Costs) | Retrofit Ships cover all retrofits and tech refresh | ||||||||
| 1.0 | Program Management (Totals) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 1.1 | SCD Development & Management | - | - | - | - | - | - | FY - Include fiscal years money will be requested | |
| 1.2 | POA&M Development & Management | - | - | - | - | - | - | Gov't Labor - Enter Hours and the total will be calculated. | |
| 1.3 | Requirement Management | - | - | - | - | - | - | Travel Costs - Enter costs and the total will be calculated including fees | |
| 2.0 | Requirements & System Design | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Contracted Labor - Enter costs and the total will be calculated including fees | |
| 2.1 | Technical Evaluations & Engineering Analysis | - | - | - | - | - | - | Material Procurement - Enter costs and the total will be calculated including fees | |
| 2.2 | System Documentation (CMMI Requirements) | - | - | - | - | - | - | Material Stock System - Enter costs and the total will be calculated including fees | |
| 2.3 | SRS Development | - | - | - | - | - | - | Outgoing Funding DOC - Enter costs and the total will be calculated | |
| 2.4 | Configuration Management Plan | - | - | - | - | - | - | ||
| 2.5 | Requirements Development & Review | - | - | - | - | - | - | ||
| 2.6 | Hardware | - | - | - | - | - | - | ||
| 2.7 | Software | - | - | - | - | - | - | ||
| 2.8 | Interface Identification & Development | - | - | - | - | - | - | ||
| 3.0 | System Development | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 3.1 | Drawing Development & Review | - | - | - | - | - | - | ||
| 3.2 | Software Development (Initial & Updates) | - | - | - | - | - | - | ||
| 3.3 | Ship checks | - | - | - | - | - | - | ||
| 3.4 | ECP | - | - | - | - | - | - | ||
| 3.5 | Available Work Specs | - | - | - | - | - | - | ||
| 3.6 | TDP Development | - | - | - | - | - | - | ||
| 4.0 | Verification and Validation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 4.1 | Test Criteria Development | - | - | - | - | - | - | ||
| 4.2 | Test Procedure Development | - | - | - | - | - | - | ||
| 4.3 | Testing | - | - | - | - | - | - | ||
| 4.4 | First Article Testing Oversight | - | - | - | - | - | - | ||
| 4.5 | LBES Installation and Configuration | - | - | - | - | - | - | ||
| 4.6 | Hot Plant Testing (Labor & Operational Costs) | - | - | - | - | - | - | ||
| 4.7 | SIM/STIM Testing | - | - | - | - | - | - | ||
| 4.8 | Interface/Integration | - | - | - | - | - | - | ||
| 4.9 | Testing | - | - | - | - | - | - | ||
| 4.10 | Peer Reviews | - | - | - | - | - | - | ||
| 4.11 | External Reviews | - | - | - | - | - | - | ||
| 4.12 | Testing Audits | - | - | - | - | - | - | ||
| 5.0 | Hardware Procurement & Qualification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 5.1 | Material Procurement (Incl. Contractor Testing, Packaging, shipping) | - | - | - | - | - | - | ||
| 5.2 | Environmental/Shock Qualifications | - | - | - | - | - | - | ||
| 5.3 | OBRPs/INCOs | - | - | - | - | - | - | ||
| 6.0 | Contracting & Procurement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 6.1 | Contracting/SOW Development | - | - | - | - | - | - | ||
| 6.2 | Proposal | - | - | - | - | - | - | ||
| 6.3 | Review/Evaluation/Selection | - | - | - | - | - | - | ||
| 6.4 | Code 30 Contracting Review & Development Support | - | - | - | - | - | - | ||
| 7.0 | Installation & Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 7.1 | Oversight | - | - | - | - | - | - | ||
| 7.2 | On-Site Rep | - | - | - | - | - | - | ||
| 7.3 | AIT | - | - | - | - | - | - | ||
| 7.4 | Planning Yard | - | - | - | - | - | - | ||
| 7.5 | MSMO | - | - | - | - | - | - | ||
| 7.6 | Calibration | - | - | - | - | - | - | ||
| 7.7 | Shipboard Testing | - | - | - | - | - | - | ||
| 7.8 | Operational Training | - | - | - | - | - | - | ||
| 7.9 | Maintenance Training | - | - | - | - | - | - | ||
| 8.0 | Logistics - Technical Code Efforts | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 8.1 | ILS Certification | - | - | - | - | - | - | ||
| 8.2 | Provisional Support | - | - | - | - | - | - | ||
| 8.3 | Config Overhaul Planning (COP) Work Files | - | - | - | - | - | |||
| 8.4 | Technical Manual Development Support | - | - | - | - | - | - | ||
| 8.5 | PMS Support | - | - | - | - | - | - | ||
| 8.6 | EOSS Support | - | - | - | - | - | - | ||
| 8.7 | CSOSS | - | - | - | - | - | - | ||
| 8.8 | SISCALL & Instrumentation Support | - | - | - | - | - | - | ||
| 8.9 | Navy Training Support Plan (NTSP) | - | - | - | - | - | - | ||
| 8.10 | Front End Analysis | - | - | - | - | - | - | ||
| 8.11 | Curriculum Development | - | - | - | - | - | - | ||
| 8.12 | Personnel Qualifications Standard (PQS) Support | - | - | - | - | - | - | ||
| 8.13 | Department LPA Support | - | - | - | - | - | - | ||
| 9.0 | Logistics - Dept 30 Efforts | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 9.1 | ILS Certification | - | - | - | - | - | - | ||
| 9.2 | Provisioning Support | - | - | - | - | - | - | ||
| 9.3 | Config Overhaul Planning (COP) Work Files | - | - | - | - | - | - | ||
| 9.4 | Technical Manual Support | - | - | - | - | - | - | ||
| 9.5 | PMS Support | - | - | - | - | - | - | ||
| 9.6 | EOSS Support | - | - | - | - | - | - | ||
| 9.7 | CSOSS | - | - | - | - | - | - | ||
| 9.8 | SISCALL & Instrumentation Support | - | - | - | - | - | - | ||
| 9.9 | Navy Training Support Plan (NTSP) | - | - | - | - | - | - | ||
| 9.10 | Front End Analysis | - | - | - | - | - | - | ||
| 9.11 | Curriculum Development | - | - | - | - | - | - | ||
| 9.12 | Personnel Qualifications Standard (PQS) Support | - | - | - | - | - | - | ||
| 10.0 | Life Cycle/ISEA Support | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 10.1 | Configuration Management & Status Accounting | - | - | - | - | - | - | ||
| 10.2 | SSA Infrastructure | - | - | - | - | - | - | ||
| 10.3 | Tech Refresh | - | - | - | - | - | - | ||
| 11.0 | Pre Avail Ship Assessment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 11.1 | Pre Avail Ship Assessment | - | - | - | - | - | - | ||
| 12.0 | Information Assurance | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 12.1 | Vulnerability Discovery | - | - | - | - | - | - | ||
| 12.2 | Vulnerability Remediation | - | - | - | - | - | - | ||
| 12.3 | Support to IAM | - | - | - | - | - | - | ||
| 12.4 | IA Documentation | - | - | - | - | - | - | ||
| 12.5 | PIT/IA - Archival From FY14 | - | - | - | - | - | - | ||
| - | - | - | - | - | - | ||||
| Summary | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Total Retrofit Cost | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total PM Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&12&A Page &P of &N &"Arial,Bold"&12DDGM BF ECP Form Version 2.14 Dated 2-1-2023
MCS SW
| DDGM ECP #: | #### | DDGM BF ECP Title: | Title | Rev. | #.## | MCS SW | Instructions | |||||
| MCS SW Cost Estimation | ||||||||||||
| Completed By: | Last, First, MI | ### | MM/DD/YYYY | Fill in the individual who filled out this form. Name Required | ||||||||
| Name (Last, First, MI) | Code/Dept | Date (mm-dd-yyyy) | ||||||||||
| Tech Code: | ### | FY | FY Actual | Priority | Gov't Labor Hours (CR) | Travel Costs (CR) | Contracted Labor (DC) | Material Procurement (DC) | Material Stock System (CR) | Outgoing Funding DOC (CR) | Notes | Enter TPS Number |
| System: | MCS SW | |||||||||||
| TPS Number: | NAVxxxxxxx | |||||||||||
| Non-Recurring Engineering | Non-Recurring Engineering is for one time engineering costs. | |||||||||||
| 1.0 | Program Management (Totals) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.1 | SCD Development & Management | - | - | - | - | - | - | FY - Include fiscal years money will be requested | ||||
| 1.2 | POA&M Development & Management | - | - | - | - | - | - | Gov't Labor - Enter Hours and the total will be calculated. | ||||
| 1.3 | Requirement Management | - | - | - | - | - | - | Travel Costs - Enter costs and the total will be calculated including fees | ||||
| 2.0 | Requirements & System Design | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Contracted Labor - Enter costs and the total will be calculated including fees | ||||
| 2.1 | Technical Evaluations & Engineering Analysis | - | - | - | - | - | - | Material Procurement - Enter costs and the total will be calculated including fees | ||||
| 2.2 | System Documentation (CMMI Requirements) | - | - | - | - | - | - | Material Stock System - Enter costs and the total will be calculated including fees | ||||
| 2.3 | SRS Development | - | - | - | - | - | - | Outgoing Funding DOC - Enter costs and the total will be calculated | ||||
| 2.4 | Configuration Management Plan | - | - | - | - | - | - | |||||
| 2.5 | Requirements Development & Review | - | - | - | - | - | - | |||||
| 2.6 | Hardware | - | - | - | - | - | - | |||||
| 2.7 | Software | - | - | - | - | - | - | |||||
| 2.8 | Interface Identification & Development | - | - | - | - | - | - | |||||
| 3.0 | System Development | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1 | Drawing Development & Review | - | - | - | - | - | - | |||||
| 3.2 | Software Development (Initial & Updates) | - | - | - | - | - | - | |||||
| 3.3 | Ship checks | - | - | - | - | - | - | |||||
| 3.4 | ECP | - | - | - | - | - | - | |||||
| 3.5 | Available Work Specs | - | - | - | - | - | - | |||||
| 3.6 | TDP Development | - | - | - | - | - | - | |||||
| 4.0 | Verification and Validation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 4.1 | Test Criteria Development | - | - | - | - | - | - | |||||
| 4.2 | Test Procedure Development | - | - | - | - | - | - | |||||
| 4.3 | Testing | - | - | - | - | - | - | |||||
| 4.4 | First Article Testing Oversight | - | - | - | - | - | - | |||||
| 4.5 | LBES Installation and Configuration | - | - | - | - | - | - | |||||
| 4.6 | Hot Plant Testing (Labor & Operational Costs) | - | - | - | - | - | - | |||||
| 4.7 | SIM/STIM Testing | - | - | - | - | - | - | |||||
| 4.8 | Interface/Integration | - | - | - | - | - | - | |||||
| 4.9 | Testing | - | - | - | - | - | - | |||||
| 4.10 | Peer Reviews | - | - | - | - | - | - | |||||
| 4.11 | External Reviews | - | - | - | - | - | - | |||||
| 4.12 | Testing Audits | - | - | - | - | - | - | |||||
| 5.0 | Hardware Procurement & Qualification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 5.1 | Material Procurement (Incl. Contractor Testing, Packaging, shipping) | - | - | - | - | - | - | |||||
| 5.2 | Environmental/Shock Qualifications | - | - | - | - | - | - | |||||
| 5.3 | OBRPs/INCOs | - | - | - | - | - | - | |||||
| 6.0 | Contracting & Procurement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 6.1 | Contracting/SOW Development | - | - | - | - | - | - | |||||
| 6.2 | Proposal | - | - | - | - | - | - | |||||
| 6.3 | Review/Evaluation/Selection | - | - | - | - | - | - | |||||
| 6.4 | Code 30 Contracting Review & Development Support | - | - | - | - | - | - | |||||
| 7.0 | Installation & Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 7.1 | Oversight | - | - | - | - | - | - | |||||
| 7.2 | On-Site Rep | - | - | - | - | - | - | |||||
| 7.3 | AIT | - | - | - | - | - | - | |||||
| 7.4 | Planning Yard | - | - | - | - | - | - | |||||
| 7.5 | MSMO | - | - | - | - | - | - | |||||
| 7.6 | Calibration | - | - | - | - | - | - | |||||
| 7.7 | Shipboard Testing | - | - | - | - | - | - | |||||
| 7.8 | Operational Training | - | - | - | - | - | - | |||||
| 7.9 | Maintenance Training | - | - | - | - | - | - | |||||
| 8.0 | Logistics - Technical Code Efforts | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 8.1 | ILS Certification | - | - | - | - | - | - | |||||
| 8.2 | Provisional Support | - | - | - | - | - | - | |||||
| 8.3 | Config Overhaul Planning (COP) Work Files | - | - | - | - | - | ||||||
| 8.4 | Technical Manual Development Support | - | - | - | - | - | - | |||||
| 8.5 | PMS Support | - | - | - | - | - | - | |||||
| 8.6 | EOSS Support | - | - | - | - | - | - | |||||
| 8.7 | CSOSS | - | - | - | - | - | - | |||||
| 8.8 | SISCALL & Instrumentation Support | - | - | - | - | - | - | |||||
| 8.9 | Navy Training Support Plan (NTSP) | - | - | - | - | - | - | |||||
| 8.10 | Front End Analysis | - | - | - | - | - | - | |||||
| 8.11 | Curriculum Development | - | - | - | - | - | - | |||||
| 8.12 | Personnel Qualifications Standard (PQS) Support | - | - | - | - | - | - | |||||
| 8.13 | Department LPA Support | - | - | - | - | - | - | |||||
| 9.0 | Logistics - Dept 30 Efforts | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 9.1 | ILS Certification | - | - | - | - | - | - | |||||
| 9.2 | Provisioning Support | - | - | - | - | - | - | |||||
| 9.3 | Config Overhaul Planning (COP) Work Files | - | - | - | - | - | - | |||||
| 9.4 | Technical Manual Support | - | - | - | - | - | - | |||||
| 9.5 | PMS Support | - | - | - | - | - | - | |||||
| 9.6 | EOSS Support | - | - | - | - | - | - | |||||
| 9.7 | CSOSS | - | - | - | - | - | - | |||||
| 9.8 | SISCALL & Instrumentation Support | - | - | - | - | - | - | |||||
| 9.9 | Navy Training Support Plan (NTSP) | - | - | - | - | - | - | |||||
| 9.10 | Front End Analysis | - | - | - | - | - | - | |||||
| 9.11 | Curriculum Development | - | - | - | - | - | - | |||||
| 9.12 | Personnel Qualifications Standard (PQS) Support | - | - | - | - | - | - | |||||
| 10.0 | Life Cycle/ISEA Support | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 10.1 | Configuration Management & Status Accounting | - | - | - | - | - | - | |||||
| 10.2 | SSA Infrastructure | - | - | - | - | - | - | |||||
| 10.3 | Tech Refresh | - | - | - | - | - | - | |||||
| 11.0 | Pre Avail Ship Assessment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 11.1 | Pre Avail Ship Assessment | - | - | - | - | - | - | |||||
| 12.0 | Information Assurance | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 12.1 | Vulnerability Discovery | - | - | - | - | - | - | |||||
| 12.2 | Vulnerability Remediation | - | - | - | - | - | - | |||||
| 12.3 | Support to IAM | - | - | - | - | - | - | |||||
| 12.4 | IA Documentation | - | - | - | - | - | - | |||||
| 12.5 | PIT/IA - Archival From FY14 | - | - | - | - | - | - | |||||
| - | - | - | - | - | - | |||||||
| Summary | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Back-Fit Mod Ships (Recurring) | Back-Fit Mod Ships covers ships on MOD Fielding Profile | ||||||||
| 1.0 | Program Management (Totals) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 1.1 | SCD Development & Management | - | - | - | - | - | - | FY - Include fiscal years money will be requested | |
| 1.2 | POA&M Development & Management | - | - | - | - | - | - | Gov't Labor - Enter Hours and the total will be calculated. | |
| 1.3 | Requirement Management | - | - | - | - | - | - | Travel Costs - Enter costs and the total will be calculated including fees | |
| 2.0 | Requirements & System Design | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Contracted Labor - Enter costs and the total will be calculated including fees | |
| 2.1 | Technical Evaluations & Engineering Analysis | - | - | - | - | - | - | Material Procurement - Enter costs and the total will be calculated including fees | |
| 2.2 | System Documentation (CMMI Requirements) | - | - | - | - | - | - | Material Stock System - Enter costs and the total will be calculated including fees | |
| 2.3 | SRS Development | - | - | - | - | - | - | Outgoing Funding DOC - Enter costs and the total will be calculated | |
| 2.4 | Configuration Management Plan | - | - | - | - | - | - | ||
| 2.5 | Requirements Development & Review | - | - | - | - | - | - | ||
| 2.6 | Hardware | - | - | - | - | - | - | ||
| 2.7 | Software | - | - | - | - | - | - | ||
| 2.8 | Interface Identification & Development | - | - | - | - | - | - | ||
| 3.0 | System Development | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 3.1 | Drawing Development & Review | - | - | - | - | - | - | ||
| 3.2 | Software Development (Initial & Updates) | - | - | - | - | - | - | ||
| 3.3 | Ship checks | - | - | - | - | - | - | ||
| 3.4 | ECP | - | - | - | - | - | - | ||
| 3.5 | Available Work Specs | - | - | - | - | - | - | ||
| 3.6 | TDP Development | - | - | - | - | - | - | ||
| 4.0 | Verification and Validation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 4.1 | Test Criteria Development | - | - | - | - | - | - | ||
| 4.2 | Test Procedure Development | - | - | - | - | - | - | ||
| 4.3 | Testing | - | - | - | - | - | - | ||
| 4.4 | First Article Testing Oversight | - | - | - | - | - | - | ||
| 4.5 | LBES Installation and Configuration | - | - | - | - | - | - | ||
| 4.6 | Hot Plant Testing (Labor & Operational Costs) | - | - | - | - | - | - | ||
| 4.7 | SIM/STIM Testing | - | - | - | - | - | - | ||
| 4.8 | Interface/Integration | - | - | - | - | - | - | ||
| 4.9 | Testing | - | - | - | - | - | - | ||
| 4.10 | Peer Reviews | - | - | - | - | - | - | ||
| 4.11 | External Reviews | - | - | - | - | - | - | ||
| 4.12 | Testing Audits | - | - | - | - | - | - | ||
| 5.0 | Hardware Procurement & Qualification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 5.1 | Material Procurement (Incl. Contractor Testing, Packaging, shipping) | - | - | - | - | - | - | ||
| 5.2 | Environmental/Shock Qualifications | - | - | - | - | - | - | ||
| 5.3 | OBRPs/INCOs | - | - | - | - | - | - | ||
| 6.0 | Contracting & Procurement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 6.1 | Contracting/SOW Development | - | - | - | - | - | - | ||
| 6.2 | Proposal | - | - | - | - | - | - | ||
| 6.3 | Review/Evaluation/Selection | - | - | - | - | - | - | ||
| 6.4 | Code 30 Contracting Review & Development Support | - | - | - | - | - | - | ||
| 7.0 | Installation & Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 7.1 | Oversight | - | - | - | - | - | - | ||
| 7.2 | On-Site Rep | - | - | - | - | - | - | ||
| 7.3 | AIT | - | - | - | - | - | - | ||
| 7.4 | Planning Yard | - | - | - | - | - | - | ||
| 7.5 | MSMO | - | - | - | - | - | - | ||
| 7.6 | Calibration | - | - | - | - | - | - | ||
| 7.7 | Shipboard Testing | - | - | - | - | - | - | ||
| 7.8 | Operational Training | - | - | - | - | - | - | ||
| 7.9 | Maintenance Training | - | - | - | - | - | - | ||
| 8.0 | Logistics - Technical Code Efforts | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 8.1 | ILS Certification | - | - | - | - | - | - | ||
| 8.2 | Provisional Support | - | - | - | - | - | - | ||
| 8.3 | Config Overhaul Planning (COP) Work Files | - | - | - | - | - | |||
| 8.4 | Technical Manual Development Support | - | - | - | - | - | - | ||
| 8.5 | PMS Support | - | - | - | - | - | - | ||
| 8.6 | EOSS Support | - | - | - | - | - | - | ||
| 8.7 | CSOSS | - | - | - | - | - | - | ||
| 8.8 | SISCALL & Instrumentation Support | - | - | - | - | - | - | ||
| 8.9 | Navy Training Support Plan (NTSP) | - | - | - | - | - | - | ||
| 8.10 | Front End Analysis | - | - | - | - | - | - | ||
| 8.11 | Curriculum Development | - | - | - | - | - | - | ||
| 8.12 | Personnel Qualifications Standard (PQS) Support | - | - | - | - | - | - | ||
| 8.13 | Department LPA Support | - | - | - | - | - | - | ||
| 9.0 | Logistics - Dept 30 Efforts | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 9.1 | ILS Certification | - | - | - | - | - | - | ||
| 9.2 | Provisioning Support | - | - | - | - | - | - | ||
| 9.3 | Config Overhaul Planning (COP) Work Files | - | - | - | - | - | - | ||
| 9.4 | Technical Manual Support | - | - | - | - | - | - | ||
| 9.5 | PMS Support | - | - | - | - | - | - | ||
| 9.6 | EOSS Support | - | - | - | - | - | - | ||
| 9.7 | CSOSS | - | - | - | - | - | - | ||
| 9.8 | SISCALL & Instrumentation Support | - | - | - | - | - | - | ||
| 9.9 | Navy Training Support Plan (NTSP) | - | - | - | - | - | - | ||
| 9.10 | Front End Analysis | - | - | - | - | - | - | ||
| 9.11 | Curriculum Development | - | - | - | - | - | - | ||
| 9.12 | Personnel Qualifications Standard (PQS) Support | - | - | - | - | - | - | ||
| 10.0 | Life Cycle/ISEA Support | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 10.1 | Configuration Management & Status Accounting | - | - | - | - | - | - | ||
| 10.2 | SSA Infrastructure | - | - | - | - | - | - | ||
| 10.3 | Tech Refresh | - | - | - | - | - | - | ||
| 11.0 | Pre Avail Ship Assessment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 11.1 | Pre Avail Ship Assessment | - | - | - | - | - | - | ||
| 12.0 | Information Assurance | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 12.1 | Vulnerability Discovery | - | - | - | - | - | - | ||
| 12.2 | Vulnerability Remediation | - | - | - | - | - | - | ||
| 12.3 | Support to IAM | - | - | - | - | - | - | ||
| 12.4 | IA Documentation | - | - | - | - | - | - | ||
| 12.5 | PIT/IA - Archival From FY14 | - | - | - | - | - | - | ||
| - | - | - | - | - | - | ||||
| Summary | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Total Back-Fit Mod Cost | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Retrofit Ships (Recurring) | Retrofit Ships cover all retrofits and tech refresh | ||||||||
| 1.0 | Program Management (Totals) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 1.1 | SCD Development & Management | - | - | - | - | - | - | FY - Include fiscal years money will be requested | |
| 1.2 | POA&M Development & Management | - | - | - | - | - | - | Gov't Labor - Enter Hours and the total will be calculated. | |
| 1.3 | Requirement Management | - | - | - | - | - | - | Travel Costs - Enter costs and the total will be calculated including fees | |
| 2.0 | Requirements & System Design | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Contracted Labor - Enter costs and the total will be calculated including fees | |
| 2.1 | Technical Evaluations & Engineering Analysis | - | - | - | - | - | - | Material Procurement - Enter costs and the total will be calculated including fees | |
| 2.2 | System Documentation (CMMI Requirements) | - | - | - | - | - | - | Material Stock System - Enter costs and the total will be calculated including fees | |
| 2.3 | SRS Development | - | - | - | - | - | - | Outgoing Funding DOC - Enter costs and the total will be calculated | |
| 2.4 | Configuration Management Plan | - | - | - | - | - | - | ||
| 2.5 | Requirements Development & Review | - | - | - | - | - | - | ||
| 2.6 | Hardware | - | - | - | - | - | - | ||
| 2.7 | Software | - | - | - | - | - | - | ||
| 2.8 | Interface Identification & Development | - | - | - | - | - | - | ||
| 3.0 | System Development | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 3.1 | Drawing Development & Review | - | - | - | - | - | - | ||
| 3.2 | Software Development (Initial & Updates) | - | - | - | - | - | - | ||
| 3.3 | Ship checks | - | - | - | - | - | - | ||
| 3.4 | ECP | - | - | - | - | - | - | ||
| 3.5 | Available Work Specs | - | - | - | - | - | - | ||
| 3.6 | TDP Development | - | - | - | - | - | - | ||
| 4.0 | Verification and Validation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 4.1 | Test Criteria Development | - | - | - | - | - | - | ||
| 4.2 | Test Procedure Development | - | - | - | - | - | - | ||
| 4.3 | Testing | - | - | - | - | - | - | ||
| 4.4 | First Article Testing Oversight | - | - | - | - | - | - | ||
| 4.5 | LBES Installation and Configuration | - | - | - | - | - | - | ||
| 4.6 | Hot Plant Testing (Labor & Operational Costs) | - | - | - | - | - | - | ||
| 4.7 | SIM/STIM Testing | - | - | - | - | - | - | ||
| 4.8 | Interface/Integration | - | - | - | - | - | - | ||
| 4.9 | Testing | - | - | - | - | - | - | ||
| 4.10 | Peer Reviews | - | - | - | - | - | - | ||
| 4.11 | External Reviews | - | - | - | - | - | - | ||
| 4.12 | Testing Audits | - | - | - | - | - | - | ||
| 5.0 | Hardware Procurement & Qualification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 5.1 | Material Procurement (Incl. Contractor Testing, Packaging, shipping) | - | - | - | - | - | - | ||
| 5.2 | Environmental/Shock Qualifications | - | - | - | - | - | - | ||
| 5.3 | OBRPs/INCOs | - | - | - | - | - | - | ||
| 6.0 | Contracting & Procurement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 6.1 | Contracting/SOW Development | - | - | - | - | - | - | ||
| 6.2 | Proposal | - | - | - | - | - | - | ||
| 6.3 | Review/Evaluation/Selection | - | - | - | - | - | - | ||
| 6.4 | Code 30 Contracting Review & Development Support | - | - | - | - | - | - | ||
| 7.0 | Installation & Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 7.1 | Oversight | - | - | - | - | - | - | ||
| 7.2 | On-Site Rep | - | - | - | - | - | - | ||
| 7.3 | AIT | - | - | - | - | - | - | ||
| 7.4 | Planning Yard | - | - | - | - | - | - | ||
| 7.5 | MSMO | - | - | - | - | - | - |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .