This document provides details on a federal contract opportunity for radiation therapy expansion at the Jamaica Plain Campus of the Department of Veterans Affairs. The solicitation number is 36C77622B0038 and seeks proposals for expanding radiation therapy services at the Jamaica Plain location. Interested parties should respond with final drawings by the specified due date. The contracting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The opportunity aims to enhance radiation therapy infrastructure and services for veterans.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JAMAICA PLAINS MASSACHUSETTS

VA MEDICAL CENTER

JAMAICA PLAIN, MA

VA PROJ. NO. 523-417

RADIATION THERAPY EXPANSION

VAMC

100% BID DOCUMENTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

100% BID DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

www.abovegroupinc.com COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

FULLY SPRINKLERED

523-417

JAMAICA PLAIN, MA

RADIATION THERAPY EXPANSION

VAMC

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

B

IM

/0

V A

B o s to n

R a d ia ti o n T h e ra p y /0

V A

B o s to n

R a d ia ti o n T h e ra p y D iv

R

.r v t

/1

/2

:5

:2

A

M

09/17/2021

GI100

COVER SHEET

09/17/21 ADL JJAAllen D. Lantz, P.E.

MD License #41513

JAMAICA PLAIN, MA

NTS

ACHITECTURE / INTERIOR DESIGN

CIVIL ENGINEERING

PRIME ENGINEER - PROJECT MANAGEMENT,

MECHANICAL, ELECTRICAL, PLUMBING, FIRE

PROTECTION, TELECOM, STRUCTURAL ENGINEERING

CITP / LIFE SAFETY ENVIRONMENTAL ENGINEERING

GEOTECHNICAL ENGINEERINGESTIMATING SERVICES

DRAWING SHEET INDEX

Sheet Number Sheet Name

FP404 FIRE PROTECTION ENLARGED PLAN

FP501 FIRE PROTECTION DETAILS

P-001 PLUMBING LEGENDS, SYMBOLS, NOTES & SPECIFICATIONS

P-101 PLUMBING FLOOR PLANS

P-102 PLUMBING ROOF PLAN

P-401 PLUMBING ENLARGED PLANS

P-402 PLUMBING ENLARGED PLANS

P-501 PLUMBING DETAILS

M-001 MECHANICAL LEGENDS AND SYMBOLS

MD101 MECHANICAL - HVAC FLOOR PLAN - PRE-DEMO

MH101 MECHANICAL - HVAC FLOOR PLAN - OVERALL

MH102 MECHANICAL - HVAC ROOF PLAN - NEW

MH401 MECHANICAL ENLARGED PLAN

MH402 MECHANICAL ENLARGED PLAN

MH403 MECHANICAL ENLARGED PLAN

MH404 MECHANICAL ENLARGED PLAN

MP401 MECHANICAL ENLARGED PLAN

M-501 MECHANICAL - DETAILS

M-502 MECHANICAL - DETAILS

M-701 MECHANICAL - CONTROLS

M-801 MECHANICAL - SCHEDULES

E-001 ELECTRICAL LEGENDS AND SYMBOLS

E-002 ELECTRICAL GENERAL NOTES

E-101 ELECTRICAL - OVERALL FLOOR PLAN

E-401 ELECTRICAL ENLARGED PLANS - PHASE 1

E-402 ELECTRICAL ENLARGED PLANS - PHASE 2 AND 3

E-403 ELECTRICAL ENLARGED PLANS - PHASE 4 AND 5

E-404 ELECTRICAL ENLARGED PLANS - PHASE 6

E-501 ELECTRICAL - DETAILS

E-801 ELECTRICAL - SCHEDULES

FA001 FIRE ALARM LEGEND AND ABBREVIATIONS

FA101 FIRE ALARM OVERALL FLOOR PLAN

FA401 FIRE ALARM ENLARGED PLANS - PHASE 1

FA402 FIRE ALARM ENLARGED PLANS - PHASES 2 AND 3

FA403 FIRE ALARM ENLARGED PLANS - PHASES 4 AND 5

FA404 FIRE ALARM ENLARGED PLANS - PHASE 6

FA501 FIRE ALARM DETAILS

FA601 FIRE ALARM DIAGRAMS

T-001 TELECOM LEGEND AND ABBREVIATIONS

T-100 TELECOM CONNECTIONS PLAN

T-101 TELECOM OVERALL PLAN

T-102 TELECOM ROOF PLAN

T-401 TELECOM ENLARGED PLANS - PHASE 1

T-402 TELECOM ENLARGED PLANS - PHASE 2

T-403 TELECOM ENLARGED PLANS - PHASE 3

T-404 TELECOM ENLARGED PLANS - PHASE 4

T-405 TELECOM ENLARGED PLANS - PHASE 5

T-406 TELECOM ENLARGED PLANS - PHASE 6

T-407 TELECOM ENLARGED DATA ROOM RT004

T-501 TELECOM DETAILS

T-502 TELECOM DETAILS

T-601 TELECOM DIAGRAMS

DRAWING SHEET INDEX

Sheet Number Sheet Name

GI100 COVER SHEET

GI002 SYMBOLS AND ABBREVIATIONS

GI003 PHASING PLANS

GI004 PHASING PLANS

LS001 LIFE SAFETY BUILDING CODES ANALYSIS

LS002 LIFE SAFETY BUILDING CODES ANALYSIS

LS101 LIFE SAFETY FLOOR PLAN - EXISTING

LS102 LIFE SAFETY FLOOR PLAN - PHASING

LS103 LIFE SAFETY FLOOR PLAN - PHASING

LS104 LIFE SAFETY FLOOR PLAN - NEW

CS101 EXISTING CONDITIONS AND DEMOLITION PLAN

CS102 SITE, GRADING & UTILITY PLANS

CS103 ACCESS ROAD PLAN

CS104 CONSTRUCTION DETAILS

AD101 REMOVALS PLAN

AD102 CEILING REMOVALS PLAN

AE101 PROPOSED PLAN

AE102 PROPOSED ROOF PLAN

AE103 PROPOSED REFLECTED CEILING PLAN

AE201 BUILDING ELEVATIONS & 3D VIEW

AE202 INTERIOR ELEVATIONS

AE203 INTERIOR ELEVATIONS

AE204 INTERIOR ELEVATIONS

AE205 INTERIOR ELEVATIONS

AE301 BUILDING SECTIONS

AE302 WALL SECTIONS

AE303 WALL SECTIONS

AE501 WALL DETAILS

AE502 WALL DETAILS

AE503 ROOF DETAILS

AE504 ROOF DETAILS

AE505 MILLWORK DETAILS

AE506 MILLWORK DETAILS

AE601 DOOR AND WINDOW SCHEDULE. TYPES AND DETAILS

AE602 EXTERIOR WALL AND PARTITION TYPES AND DETAILS

AE603 ROOF TYPES AND DETAILS

AE604 FINISH SCHEDULE AND DETAILS

AF701 FINISH FLOOR PLAN

AF702 EQUIPMENT PLAN

XK301 DUCTILE STEEL STUD WALL SYSTEM

S101 GENERAL NOTES

S201 FOUNDATION PLAN

S202 STAIR & RAMP FOUNDATION PLAN

S203 ROOF FRAMING PLAN

S204 FRAME SECTION

S301 FOUNDATION DETAILS

S302 STRUCTURAL DETAILS

S303 STAIR & RAMP FOUNDATION DETAILS

FP001 FIRE PROTECTION LEGENDS, SYMBOLS, & NOTES

FP101 FIRE PROTECTION FLOOR PLAN

FP401 FIRE PROTECTION ENLARGED PLAN

FP402 FIRE PROTECTION ENLARGED PLAN

FP403 FIRE PROTECTION ENLARGED PLAN

Revisions Date

NOTE: REFER TO STRUCTURAL, MECHANICAL,

AND/OR ELECTRICAL DRAWINGS FOR

ABBREVIATIONS SPECIFIC TO EACH DISCIPLINE.

AB ANCHOR BOLT, AUGER BORING

ABI ALTERNATE BID ITEM

AC ACOUSTIC AIR CONDITIONING, ASPHALTIC CONCRETE

AD ACCESS DOOR

ADD ALT ADDITIVE ALTERNATE

ADJ ADJUSTABLE

AFF ABOVE FINISH FLOOR

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZE

AP ACCESS PANEL

APC ACOUSTIC PANEL CEILING

APPROX APPROXIMATE

ARCH ARCHITECTURAL

ASB ASBESTOS

ASPH ASPHALT

AUTO AUTOMATIC

AWP ACOUSTIC WALL PANEL

BDRM BEDROOM

BIT. CONC BITUMINOUS CONCRETE

BJ BAR JOIST

BLDG BUILDING

BLK BLOCK

BM BEAM, BENCHMARK

BOT BOTTOM

BRD BOARD

BRG BEARING

BS BOTTOM OF STEP

BSMT BASEMENT

BTWN BETWEEN

BW BOTTOM OF WALL

CAB CABINET

CAP CAPACITY

CC CENTER TO CENTER

CEM CEMENT

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CI CAST IRON

CIR CIRCULATING

CJ CONSTRUCTION JOINT, CONTROL JOINT

CLG CEILING

CLO CLOSET

CLR CLEAR

CENTERLINE

CMU CONCRETE MASONRY UNITS

CMU G1 GLAZED CMU, ONE SIDE

CMU G2 GLAZED CMU, TWO SIDES

CO CLEANOUT

COL COLUMN

COMP'T COMPARTMENT

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS

CPT CARPET

CS/CI CONTRACTOR SUPPLIED/ CONTRACTOR INSTALLED

CS/OI CONTRACTOR SUPPLIED/OWNER INSTALLED

CSK COUNTER SUNK

CT CERAMIC TILE

CTE CONNECT TO EXISTING

CTR CENTER

CUH CABINET UNIT HEATER

Ø DIAMETER

DF DRINKING FOUNTAIN

DFD DOOR FRAME DIMENSION

DH DOUBLE HUNG

DIA DIAMETER

DIM DIMENSION

DN DOWN

DTL DETAIL

DWG DRAWING

E EAST

EA EACH

EL, ELEV ELEVATION

ELEC ELECTRIC

EMERG EMERGENCY

EPS EXTRUDED POLYSTYRENE

EQ EQUAL

EQUIP EQUIPMENT

ETC ETCETERA

EW EACH WAY

EXG EXISTING

EXP EXPANSION, EXPOSED

EXP JT EXPANSION JOINT

EXT EXTERIOR

FBO FURNISHED BY OTHERS

FCO FLOOR CLEAN-OUT

FD FLOOR DRAIN, FOOTING DRAIN

FE FIRE EXTINGUISHER

FF FINISH FLOOR

FFE FINISHED FLOOR ELEVATION

FG FINISH GRADE, FIBERGLASS

FHC FIRE HOSE CABINET

FIG FIGURE

FIN FINISH

FO FUEL OIL

FOF FACE OF FOUNDATION

FOR FUEL OIL RETURN

FOS FACE OF STUD, FUEL OIL SUPPLY

FOUND FOUNDATION

FP FIREPROOF

FR FRAME, FIRE RETARDANT

FRT FIRE RETARDANT TREATED

FS FLOOR SINK

FT FOOT, FEET, FINNED TUBE

FTG FOOTING

FWP FABRIC WALL PANEL

GA GAUGE

GALV GALVANIZED

GC GENERAL CONTRACTOR

GF/GI GOVT. FURNISHED/GOVT. INSTALLED

GF/CI GOVT. FURNISHED/CONTRACTOR INSTALLED

GI GALVANIZED IRON

GOV'T GOVERNMENT

GPM GALLONS PER MINUTE

GR GRADE

GRAN GRANULAR

GRD GROUND

GWB GYPSUM WALLBOARD

GYP GYPSUM

HGT HEIGHT

H&V HEATING AND VENTILATING

HB HOSE BIB

HC HANDICAPPED

HCWD HOLLOW CORE WOOD DOOR

HDC HANDICAPPED

HDW HARDWARE

HDWD HARDWOOD

HM HOLLOW METAL

HPR HIGH PERFORMANCE ROOFING

HVAC HEATING, VENTILATING, AND AIR CONDITIONING

IN INSIDE DIAMETER

INCL INCLUSIVE

INFO INFORMATION

INSUL INSULATION, INSULATED

INT INTERIOR

IWP IMPACT RESISTANT WALL PROTECTION

JAN JANITOR CLOSET

JCT JUNCTION

KV KILOVOLT

KW KILOWATT

LAB LABORATORY

LAV LAVATORY

LBS POUNDS

LF LINEAR FEET

LFC LINOLEUM FLOOR COVERING

LGR LEDGER

LP LOW POINT

LR LIVING ROOM

LT LIGHT

LWC LIGHT WEIGHT CONCRETE

LVL LAMINATED VENEER LUMBER

MACH MACHINE

MANUF MANUFACTURER

MAS MASONRY

MATL MATERIAL

MAX MAXIMUM

MB MARKER BOARD

MC MEDICINE CABINET

MCB METAL CORNER BEAD

MECH MECHANICAL

MIN MINIMUM

MIR MIRROR

MISC MISCELLANEOUS

MM MILLIMETER

MO MASONRY OPENING

MR MOISTURE RESISTANT

MS METAL STRIP

MTD MOUNTED

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OVER ALL

OB GL OBSCURE GLASS

OC ON CENTER

OD OUTSIDE DIAMETER

OPNG OPENING

OPP OPPOSITE

OS/CI OWNER SUPPLIED/CONTRACTOR INSTALLED

OS/OI OWNER SUPPLIED/OWNER INSTALLED

OVHD, OH OVERHEAD

P-1 PLUMBING FIXTURE TYPE

PART PARTITION

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLAST PLASTIC

PLYWD PLYWOOD

PNL PANEL

PNTD PAINTED

POL POLISHED

PRELIM PRELIMINARY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, POINT, PRESSURE TREATED

PT DISP PAPER TOWEL DISPENSER

PVC POLY VINYL CHLORIDE

PVMT PAVEMENT

QT QUARRY TILE

R RADIUS, RISER

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN, ROAD

RECEP RECEPTACLE

REF REFRIGERATOR

REINF REINFORCEMENT

REQ'D REQUIRED

REV REVISION

RF RESINOUS FLOOR

RL RAIN LEADER

RM ROOM

RO ROUGH OPENING

RS RESILIENT STAIR ACCESSORY

RT RUBBER TILE

S SOUTH

S DISP SOAP DISPENSER

S&V STAIN AND VARNISH

SCONC SEALED CONCRETE

SCWD SOLID CORE WOOD DOOR

SCH, SCHED SCHEDULE

SCR SUPPLY CEILING REGISTER

SECT SECTION

SF SQUARE FEET

SH SINGLE HUNG

SHT SHEET

SIM SIMILAR

SL SLOPE

SPECS SPECIFICATIONS

SQ SQUARE

SQ FT SQUARE FEET

SS SERVICE SINK, SANITARY SEWER, STAINLESS STEEL

SSURFACE SOLID SURFACE

ST STREET

STA STATION

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUP SUPPORT

SUSP SUSPEND

SV SHEET VINYL

SYM SYMMETRICAL

T TOP, TANGENT, THERMOMETER

TB TACK BOARD

TBA TOILET BATH ACCESSORIES

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

T.O.C. TOP OF CONCRETE

T.O.M. TOP OF MASONRY

T.O.S. TOP OF STEEL

T.O.W. TOP OF WALL

TEL TELEPHONE

TEMP TEMPERATURE, TEMPORARY

TERM TERMINAL

THK THICK

THRU THROUGH

TLT TOILET

TP TOILET PARTITION

TPH TOILET PAPER HOLDER

TRAN TRANSOM

TS TOP OF STEP, TOP OF SILL

TV TELEVISION

TYP TYPICAL

TYPE "X" UL APPROVED GWB

U&D UP AND DOWN

UC UNDERCUT

UNO UNLESS NOTED OTHERWISE

UV UNIT VENTILATOR

VB VAPOR BARRIER

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VTR VENT THROUGH ROOF

W WEST

WAIN WAINSCOT

WB RESILIENT WALL BASE

WC WALL COVERING

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WIDTH, WINDOW DIMENSION, WOOD

WGL WIRE GLASS

WP WATERPROOF, WEATHERPROOF

WS WEATHERSTRIPPING

WT WEIGHT

WW WELDED WIRE FABRIC

ROWS IDENTIFIED BY LETTERS

INCREASING TOWARD THE

BOTTOM OF SHEET

DRAWING TITLE

DRAWING COORDINATE

INDICATOR

SCALE OF DRAWING

COLUMNS IDENTIFIED BY

NUMBERS INCREASING TOWARD

THE RIGHT SIDE OF SHEET.

F

E

1 2 3

C4 DRAWING BLOCK TITLE

1 1/2" = 1'-0"F1

SCALE: 1/8" = 1'-0"

4' 8'0 16'

B3

D

C

B

A

SHEET NUMBER DETAIL

IS DRAWN ON

ROOM NAME

ROOM NUMBER

BREAK LINE

GRAPHIC SCALE

REVISION NUMBER

REVISION CLOUD

ELEVATION MARKER - SECTION

ELEVATION MARKER - PLAN

DOOR

NUMBER

REFERENCE

WINDOW TYPE REFERENCE

WALL TYPE REFERENCE

COLUMN GRID REFERENCE

SHEET NUMBER ELEVATION

IS DRAWN ON

INTERIOR ELEVATION

REFERENCE

BUILDING / WALL

SECTION

NUMBER

SHEET NUMBER BUILDING /

WALL SECTION IS DRAWN

ON

BUILDING ELEVATION

NUMBER

SHEET NUMBER

ELEVATION IS DRAWN ON

MATCH LINE

4 HOUR RATED PARTITION

3 HOUR RATED PARTITION

2 HOUR RATED PARTITION

1 HOUR RATED PARTITION

DETAIL NUMBER

SYMBOLS

LINETYPES

SMOKE BARRIER

STEEL & OTHER METAL PATTERN

CONCRETE BLOCK PATTERN

STONE CUT PATTERN

TERRA COTTA

CARPET AND PAD PATTERN

TILE, ACOUSTICAL

CEILING PATTERN

WOOD FLOORING PATTERN

BRICK PATTERN, GLAZED

SAND CLAY GRAVEL PATTERN

BRICK PATTERN

EROSION AND

SEDIMENTATION

CONTROL,

FILTRATION BED PATTERN

EARTHWORK GRAVEL

PATTERN, POROUS

FILL

EARTHWORK ROCK PATTERN

EARTHWORK PATTERN,

COMPACTED FILL

PATTERN

RIPRAP PATTERN

SAND PATTERN

GLASS ELEVATION PATTERN

GYPSUM BOARD FINISH PATTERN

SEALANT AND BACKER ROD

INSULATION,

RIGID

BOARD PATTERN

INSULATION,

LOOSE

FILL PATTERN

WOOD FINISH PATTERN

PARTICLE BOARD PATTERN

ORIENTED STRAND BOARD PATTERN

WOOD, GLUED-LAMINATED PATTERN

WOOD FRAMING,

CONTINUOUS

PATTERN

WOOD BLOCKING OR SHIM PATTERN

HATCH PATTERNS

EARTH, UNDISTURBED PATTERN

EARTH, CRUSHED

ROCK

GRAVEL PATTERN

EARTH, CRUSHED

ROCK

GRAVEL PATTERN

PLYWOOD PATTERN

10'-0"

Room name

B

M2

A101

SIM

CONCRETE POURED IN

PLACE, PRECAST

ALUMINUM PATTERN

ASPHALT SHINGLE PATTERN

1/2 HOUR RATED PARTITION

KEYNOTE TAG

A101

1 1

A1

AE101

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked DrawnWWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

www.abovegroupinc.com COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/1

/2

:3

:2

A

M U

A u to d e s k A u to s a ve s \R e vi t\

A

G V

A J

P R

A D

IA

T

IO

N

T H

E R

A P

Y

A R

C H

R jo c e ly n

.b o o th e w b rc a e

.c o m .r v t

GI002

523-417

BLDG 1, D-WING

RADIATION THERAPY EXPANSION

VAMC

JAMAICA PLAIN, MA

JRB SHW09/17/21

100% BID DOCUMENTSSYMBOLS AND ABBREVIATIONS

FULLY SPRINKLERED

NTS

ARCHITECTURAL ABBREVIATIONS

NTS

DRAWING AREA

NTS

ARCHITECTURAL SYMBOLS

Revisions: Revision Description Date: 9/13/2021

FEC

F E

C F

E C

F E

C

F E

C

F E

C

FEC

F E

C F

E C

F E

C

F E

C

F E

C

FEC

F E

C F

E C

F E

C

F E

C

F E

C

FEC

F E

C F

E C

F E

C

F E

C

F E

C

F E

C

C L

E A

R

M

IN

PHASING 1 NOTES:

- RELOCATE 4 OFFICES TO THE SWING OFFICE SPACE, ROOM RT-002

TEMP OFFICE

TELE/DATA

RT-004

ELEC

RT-006

CLEAN UTILITY

RT-024

OFFICE

RT-025

OFFICE

RT-026

OFFICE

RT-027

OFFICE

RT-030

OFFICE

RT-029

DOSIMETRY

RT-031

C L

E A

R

M

IN

OFFICE/SWING

RT-002

PHYSICIST

RT-036

CLEAR

5' - 0" MIN

PHASING 2 NOTES:

- RELOCATE 3 OFFICES PERMANENTLY TO THE NEW ADDITION

- RELOCATE 2 OFFICES TEMPORARILY TO THE NEW ADDITION

TEMP

OFFICE

TEMP

OFFICE

OFFICE

RT-033

OFFICE

RT-032

OFFICE

RT-027

OFFICE

RT-026OFFICE

RT-025

CLEAR

5' - 0" MIN

PHASING 3 NOTES:

- RELOCATE 2 OFFICES TEMPORARILY TO THE NEW ADDITION

- RELOCATE THE PATIENT HOLDING AREA TO EXAM ROOM RT-007

- CONSTRUCTION ACTIVITIES TO REMOVE SKYLIGHT IS TO BE DONE DURING OFF HOURS AND COORDINATED WITH THE VA TO MINIMIZE DISRUPTION TO PATIENTS. TEMPORARY ROOFING TO BE INSTALLED OVER SKYLIGHT

INFILL UNTIL ENTIRE ROOF IS REPLACED

- EXISTING NURSE STATION TO REMAIN OPERATIONAL THROUGHOUT THE PHASE

TEMP PATIENT

HOLDING

NEW

DOSIMETRY

DOSIMETRIST

RT-035

PHYSICIST

RT-036

NURSE

RT-016B

FOCUS

RT-037

MED CLOSET

RT-038

TEMP

OFFICE

TEMP

OFFICE

EXAM

RT-007

CLEAR

5' - 0" MIN

PHASING 4 NOTES:

- CYBERKNIFE TO BE OFF-LINE DURING PHASE 4

- RELOCATE THE PATIENT HOLDING AREA TO EXAM ROOM RT-007

- THE CONTROL ROOM AND CYBERKNIFE ROOM CANNOT BE SHUT DOWN FOR MORE THAN A (3) WEEK PERIOD.

CONSTRUCTION ACTIVITY MUST BE CONTINUOUS. COORDINATE CONSTRUCTION SHUTDOWN PERIOD WITH

THE VA.

TEMP PATIENT

HOLDING

CONTROL ROOM

RT-017

EXAM

RT-007

NEW WALL

EXISTING WALL

LEGEND:

TEMPORARY WALL

LOCATION OF TEMPORARY PARTITIONS IS

GENERAL IN NATURE. GC TO LOCATE ALL

TEMPORARY PARTITIONS AND DOORS AS

REQUIRED TO PROTECT THE AREA UNDER

CONSTRUCTION. SEE LIFE SAFETY SHEETS

FOR NOTES ON REQUIRED FIRE RATING.

PHASING 0 NOTES:

- PHASE 0 TO BE COMPLETED PRIOR TO THE START OF PHASE 1, AND TO BE REMOVED AND RETURNED TO THE ORIGINAL CONDITION PRIOR TO THE START OF PHASE 2.

- DURING PHASE 0 AND PHASE 1, RELOCATE PHYSICIST OFFICE RT-033 TO SWING OFFICE RT-002

4' - 6"

VIF

5' - 7 3/8"

DOSIMETRY

RT-034

PHYSICIST

RT-033

FIRE-RETARDANT TREATED WOOD STAIR ON EITHER

SIDE OF NEW TEMPORARY EGRESS DOOR. STAIRS

TO HAVE 11" MIN TREAD AND 7" MAX RISER

TEMPORARY HANDRAIL / GUARD RAIL ON BOTH SIDES

OF STAIRS. AT EXTERIOR STAIR, DO NOT ATTACH

HANDRAIL TO EXISTING BUILDING.

FIRE-RETARDANT TREATED WOOD LANDING ON

EITHER SIDE OF NEW TEMPORARY EGRESS DOOR.

REMOVE EXISTING STOREFRONT SYSTEM AND

SAVE FOR RE-INSTALLATION. INSTALL NEW

TEMPORARY CFMF OR FIRE-RETARDANT

TREATED WOOD WALL WITH INTERIOR GWB AND

EXTERIOR SHEATHING AND WATER PROOFING.

NEW WALL TO BE SEALED TO EXISTING AND

WEATHER TIGHT. PROVIDE 3' WIDE TEMPORARY

EGRESS DOOR WITH PANIC HARDWARE, DOOR

CONTACT SWITCH AND EGRESS ONLY LOCK.

STAIR, LANDING AND RAIL TO BE REMOVED

AFTER THE COMPLETION OF PHASE 1 AND

STOREFRONT SYSTEM TO BE RE-INSTALLED.

PROVIDE TEMPORARY

EGRESS SIGNAGE. DOOR

TO BE OPEN DURING

OCCUPIED HOURS

V

IF

4' - 0"

1' - 0"

DOSIMETRIST

RT-032

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

www.abovegroupinc.com COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/1

/2

:3

:3

A

M U

A u to d e s k A u to s a ve s \R e vi t\

A

G V

A J

P R

A D

IA

T

IO

N

T H

E R

A P

Y

A R

C H

R jo c e ly n

.b o o th e w b rc a e

.c o m .r v t

GI003

523-417

BLDG 1, D-WING

RADIATION THERAPY EXPANSION

VAMC

JAMAICA PLAIN, MA

JRB SHW09/17/21

100% BID DOCUMENTSPHASING PLANS

FULLY SPRINKLERED

3/32" = 1'-0"D1 PHASE 1

3/32" = 1'-0"D3 PHASE 2

3/32" = 1'-0"D6 PHASE 3

3/32" = 1'-0"D8 PHASE 4

KEY PLAN

3/16" = 1'-0"F1 PHASE 0

Revisions: Revision Description Date:

9/13/2021

FEC

E

C F

E C

F E

C

F E

C

F E

C

FEC

F E

C F

E C

F E

C

F E

C

F E

C

FEC

F E

C F

E C

F E

C

F E

C

F E

C

PHASING 5 NOTES:

- EXAM ROOMS TO BE COMPLETED IN 2 SUB-PHASES. KEEP A TOTAL OF 2 EXAM ROOMS OPERATIONAL AT ALL TIMES.

- RELOCATE THE PATIENT HOLDING AREA TO SWING ROOM RT-002

C L

E A

R

M

IN

C L

E A

R

M

IN

PHASE 5A PHASE 5B

CLEAR

5' - 0" MIN

HOLDING

RT-016A

INTERVIEW/VITALS

RT-015

EXAM

RT-014

EXAM

RT-013 PHASE 5B

PHASE 5B

TEMP PATIENT

HOLDING

OFFICE/SWING

RT-002

PHASING 6 NOTES:

- WAITING AND REGISTRATION TO BE MOVED TO SWING ROOM RT-002 AND WAITING ROOM RT-010

- TEMPORARY ROOFING TO BE INSTALLED OVER SKYLIGHT INFILL UNTIL ENTIRE ROOF IS REPLACED

TEMP WAITING

AND

REGISTRATION

C L

E A

R

M

IN

C L

E A

R

M

IN

TEMP

WAITING

RECEPTION

RT-001A

WAITING

RT-001

WHEELCHAIR

STORAGE

RT-009

OFFICE/SWING

RT-002

GOWNED

WAITING

RT-010

PHASING 7 NOTES:

- DOUBLE DOOR IS TO BE RELOCATED AND TEMPORARY EGRESS IS TO BE PROVIDED. SEE LIFE SAFETY SHEETS

- WAITING ROOM DOOR TO BE KEPT HELD OPEN DURING CONSTRUCTION PERIOD DURING HOURS OF OPERATION

PHASING 8 NOTES:

- REPLACE THE EXISTING ROOF TO THE EXTENTS SHOWN

- THE ROOF OVER THE NEW ADDITION IS TO BE COMPLETED AS PART OF PHASE 1

NEW WALL

EXISTING WALL

LEGEND:

TEMPORARY WALL

LOCATION OF TEMPORARY PARTITIONS IS

GENERAL IN NATURE. GC TO LOCATE ALL

TEMPORARY PARTITIONS AND DOORS AS

REQUIRED TO PROTECT THE AREA UNDER

CONSTRUCTION. SEE LIFE SAFETY SHEETS

FOR NOTES ON REQUIRED FIRE RATING.

TEMPORARY WALL SHALL RESIST PASSAGE OF SMOKE PER NFPA 241 AND BE 1HR RATED.

LOCATION OF TEMPORARY PARTITIONS IS GENERAL IN NATURE. GC TO LOCATE ALL

TEMPORARY PARTITIONS AND DOORS AS REQUIRED TO PROTECT THE AREA UNDER

CONSTRUCTION. SEE LIFE SAFETY DRAWING LS001 FOR OTHER NOTES.

TEMPORARY WALL TYPE: T1

5' MIN. CLEAR

PATIENT SIDECONSTRUCTION

SIDE

EXISTING STRUCTURAL DECK

NEW RATED PARTITION

TO EXTEND THROUGH

SUSPENDED CEILING TO

DECK. SEAL ALL

PENETRATIONS.

EXISTING APC CEILING

SEAL ALL JOINTS, TYP.

NEW LAYER 5/8" GWB ON

BOTH SIDES OF PARTITION

SECURED TO CFMF STUDS.

GWB TO BE PAINTED ON

CORRIDOR SIDE.

1 HR RATED (UL U419)

WHERE NON-RATED TEMPORARY PARTITIONS ARE ALLOWED TO BE USED, TEMPORARY

PARTITION SHALL RESIST PASSAGE OF SMOKE PER NFPA 241. LOCATION OF

TEMPORARY PARTITIONS IS GENERAL IN NATURE. GC TO LOCATE ALL TEMPORARY

PARTITIONS AND DOORS AS REQUIRED TO PROTECT THE AREA UNDER CONSTRUCTION.

SEE LIFE SAFETY DRAWING LS001 FOR OTHER NOTES.

TEMPORARY WALL TYPE: T2

5' MIN. CLEAR

PATIENT SIDECONSTRUCTION

SIDE

EXISTING STRUCTURAL DECK

NEW SMOKE TIGHT

PARTITION TO STOP AT

EXISTING SUSPENDED

CEILING.

EXISTING APC CEILING

SEAL ALL JOINTS, TYP.

NEW LAYER 5/8" GWB ON

BOTH SIDES OF PARTITION

SECURED TO CFMF STUDS.

GWB TO BE PAINTED ON

CORRIDOR SIDE.

SMOKE TIGHT PARTITION

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Project TitleDrawing Title

Approved:

Phase

Location

Issue Date

Project Number

Building Number

Drawing Number

Checked Drawn

TRUE NORTH

PROJECT NORTH

WWW.WBRCAE.COM

BANGOR, MAINE 207-947-4511

PORTLAND, MAINE 207-828-4511

SARASOTA, FLORIDA 941-556-0757

www.abovegroupinc.com COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

/1

/2

:3

:3

A

M U

A u to d e s k A u to s a ve s \R e vi t\

A

G V

A J

P R

A D

IA

T

IO

N

T H

E R

A P

Y

A R

C H

R jo c e ly n

.b o o th e w b rc a e

.c o m .r v t

GI004

523-417

BLDG 1, D-WING

RADIATION THERAPY EXPANSION

VAMC

JAMAICA PLAIN, MA

JRB SHW09/17/21

100% BID DOCUMENTSPHASING PLANS

FULLY SPRINKLERED

3/32" = 1'-0"D1 PHASE 5A & 5B

3/32" = 1'-0"D3 PHASE 6

3/32" = 1'-0"D6 PHASE 7

3/32" = 1'-0"D8 PHASE 8 ROOF PLAN

KEY PLAN

NTSF1 TEMPORARY PARTITIONS

1FB 1FB1FB 1FB1FB

2FB 2FB2FB 2FB2FB

SP SPSP SPSP

LIFE SAFETY LEGEND

OCCUPANT LOAD

EXIT CAPACITY (PERSONS)

COMMON PATH OF TRAVEL

DEAD END PATH

TOTAL TRAVEL DISTANCE

1-HOUR FIRE RATED BARRIER

2-HOUR FIRE RATED BARRIER

SMOKE PARTITION

FIRE EXTINGUISHER CABINET LOCATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% BID DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

FULLY SPRINKLERED

523-417

BLDG 1, D-WING

JAMAICA PLAIN, MA

RADIATION THERAPY EXPANSION

VAMC

C U s e rs \L th o m a s .S

T A

N T

O N

\D o c u m e n ts

\4

S E

S V

A J

P R

A D

IA

T

IO

N

T H

E R

A P

Y

F

IR

E R lt h o m a s N

Q U

.r v t

/1

/2

:5

:0

A

M

LS001

LIFE SAFETY BUILDING CODES

ANALYSIS

09/17/21 D.

FUECKER

D. LITTLE

THE INTENT OF THIS PROJECT IS TO CONSOLIDATE RADIATION THERAPY FUNCTIONS TO ONE AREA OF THE VA JAMAICA PLAIN MEDICAL CENTER AND IMPROVE PATIENT TREATMENT WORKFLOW. THE PROJECT INCLUDES 690SF ADDITION WITHIN THE EXISTING EXTERIOR COURTYARD. 775SF OF SPACE WITHIN THE EXISTING RADIATION THERAPY DEPARTMENT WILL BE REPURPOSED. 1,291SF OF EXISTING

SPACES WILL BE REFRESHED.

THE RADIATION THERAPY DEPARTMENT IS IN THE BASEMENT LEVEL, WING D.

THE SCOPE OF WORK INCLUDES THE RECONSTRUCTION OF EXISTING AREAS AND AN ADDITION.

THE EXISTING BUILDING WET-PIPE SPRINKLER SYSTEM WILL BE MODIFIED THROUGHOUT ALL HEATED/CONDITIONED AREAS OF THE RECONSTRUCTED BUILDING. THE EXISTING WET-PIPE SPRINKLER SYSTEM WILL BE EXTENDED THROUGHOUT ALL

HEATED/CONDITIONED AREAS OF THE BUILDING ADDITION.

THE EXISTING FIRE ALARM SYSTEM WILL BE MODIFIED TO INCLUDE NEW DEVICES FOR THE RECONSTRUCTED AREA AND EXTENDED TO

INCLUDE NEW DEVICES FOR THE ADDITION.

1.1 SCOPE OF WORK

VA HAS ADOPTED THE NATIONAL FIRE CODES (NFC) PUBLISHED BY THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), WHICH ESTABLISH A MINIMUM ACCEPTABLE LEVEL OF LIFE SAFETY AND PROPERTY PROTECTION. LIFE SAFETY REQUIREMENTS ARE SPECIFICALLY ADDRESSED IN THE LIFE SAFETY CODE, NFPA 101. WHERE CONFLICTS EXIST BETWEEN CODES, THE DESIGNER SHALL FOLLOW THE CODE SPECIFIED IN THE TEXT UNDER THE SUBJECT SECTION OF THIS VA FIRE PROTECTION DESIGN MANUAL. FIRE PROTECTION DESIGN SHALL BE BASED ON THE LATEST EDITIONS OF THE NFC AT THE DATE OF AWARD. SEE CODES AND STANDARDS

SECTION FOR EDITIONS USED.

FIRE PROTECTION FEATURES NOT ADDRESSED BY THE NFC OR OTHERWISE ADDRESSED BY THIS DOCUMENT SHALL BE DESIGNED TO COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE INTERNATIONAL BUILDING CODE (IBC).

FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS BY NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF

THE IBC REQUIREMENTS ARE DIFFERENT).

1.2 APPLICATION

BUILDING CONSTRUCTION AND SAFETY CODE NFPA 5000, 2021

STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS NFPA 241, 2019

STANDARD ON TYPES OF BUILDING CONSTRUCTION NFPA 220, 2021

STANDARD FOR FIRE SAFETY AND EMERGENCY SYMBOLS NFPA 170, 2021

LIFE SAFETY CODE NFPA 101, 2021

STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS NFPA 90A, 2021

NATIONAL FIRE ALARM AND SIGNALING CODE NFPA 72, 2019

NATIONAL ELECTRIC CODE NEC 70, 2020

STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS THEIR APPURTENANCES NFPA 24, 2019

STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS NFPA 13, 2019

FIRE CODE NFPA 1, 2021

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

INTERNATIONAL BUILDING CODE (IBC) 2021

ARCHITECTURAL BARRIERS ACT

VA A/E DESIGN SUBMISSION REQUIREMENTS FOR MINOR AND NRM CONSTRUCTION PROGRAM PG-18-15 VOLUME C, NOVEMBER 2008

PG-18-10, DESIGN MANUALS: FIRE PROTECTION EIGHTH EDITION, JUNE 2021

1.3 APPLICABLE FIRE PROTECTION AND LIFE SAFETY RELATED CODES AND STANDARDS

SEPARATE ALL OCCUPIED AREAS FROM DEMOLITION, RENOVATION, OR CONSTRUCTION ACTIVITIES BY TEMPORARY SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM BOARD OR OTHER APPROVED NON-COMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL.

PARTITIONS SHALL BE FULL HEIGHT, EXTENDING THROUGH SUSPENDED CEILINGS TO THE FLOOR SLAB OR ROOF DECK ABOVE AND SHALL BE ONE-HOUR FIRE RATED, UNLESS SPRINKLERS ARE INSTALLED AND ARE OPERATIONAL ON BOTH SIDES OF THE TEMPORARY PARTITION WHEREUPON THE PARTITION MAY BE PERMITTED TO TERMINATE AT THE CEILING IN ACCORDANCE WITH NFPA 241. WHERE THE CEILING ON ONE SIDE OF THE TEMPORARY CONSTRUCTION BARRIER HAS BEEN REMOVED, THE TEMPORARY PARTITION MUST

EXTEND TO THE DECK ABOVE.

PHASE CONSTRUCTION AS NECESSARY TO ENSURE THAT OBSTRUCTION OF EXITS IS MINIMIZED OR AVOIDED. IF EXITS ARE OBSTRUCTED DURING CONSTRUCTION, PROVIDE ALTERNATE EXIT ROUTES DURING EACH PHASE OF CONSTRUCTION AND IDENTIFY

THE ALTERNATE ROUTES ON THE CONSTRUCTION DRAWINGS.

MINIMIZE OR AVOID DISRUPTIONS TO FIRE ALARM AND SPRINKLER SYSTEMS. DELINEATE PHASING OF CONSTRUCTION TO ENSURE THAT INSTALLATIONS OF NEW SYSTEMS ARE EXPEDITED, AND WHERE POSSIBLE, MAINTAIN EXISTING SYSTEMS IN SERVICE UNTIL THE REPLACEMENT SYSTEM IS OPERATIONAL. IF FIRE PROTECTION SYSTEMS ARE TO BE DISRUPTED, ENSURE PROCEDURES ARE INCORPORATED TO MAINTAIN EQUIVALENT LEVELS OF FIRE PROTECTION AND PROVIDE FORMAL NOTIFICATION TO THE FACILITY WHILE SYSTEMS ARE DOWN. ALL PLANNED FIRE PROTECTION SYSTEM SHUTDOWNS OR OUTAGES ARE TO BE COORDINATED WITH THE VA COR

AT LEAST 3 BUSINESS DAYS IN ADVANCE.

1.4 FIRE PROTECTION DURING CONSTRUCTION

ANY BUILDING UNDERGOING RECONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE EXISTING OCCUPANCY

CHAPTERS AND §43.6 OF THE LIFE SAFETY CODE [NFPA 101 §43.1.2.1].

A RECONSTRUCTION SHALL COMPLY WITH ALL OF THE FOLLOWING [NFPA 101 §43.6.1]:

•NFPA 101 §43.6 – RECONSTRUCTION

•NFPA 101 §43.5 – MODIFICATION, EXCEPT THAT ANY STAIRWAY REPLACING AN EXISTING STAIRWAY SHALL BE PERMITTED TO COMPLY

WITH NFPA 101 §7.2.2.2.1.1(3)

•NFPA 101 §43.4 – RENOVATIONS

THE MEANS OF EGRESS SHALL COMPLY WITH THE REQUIREMENTS APPLICABLE TO THE EXISTING OCCUPANCY CHAPTER, AS MODIFIED BY NFPA 101 §43.6.2 [NFPA 101 §43.6.2]. MEANS OF EGRESS IN REHABILITATION WOK AREAS SHALL BE PROVIDED WITH ILLUMINATION, EMERGENCY LIGHTING, AND MARKING OF MEANS OF EGRESS IN ACCORDANCE WITH THE REQUIREMENTS OF OTHER SECTIONS OF

NFPA 101 APPLICABLE TO NEW CONSTRUCTION FOR THE OCCUPANCY.

ANY BUILDING UNDERGOING ADDITION SHALL COMPLY WITH THE REQUIREMENTS OF NFPA 101 §43.8 [NFPA 101 §43.1.2.3].

WHERE AN ADDITION IS MADE TO A BUILDING, BOTH OF THE FOLLOWING CRITERIA SHALL BE MET [NFPA 101 §43.8.1.1]:

1.THE ADDITION SHALL COMPLY WITH OTHER SECTIONS OF NFPA 101 APPLICABLE TO NEW CONSTRUCTION FOR THE OCCUPANCY 2.THE EXISTING PORTION OF THE BUILDING SHALL COMPLY WITH THE REQUIREMENTS OF NFPA 101 TO EXISTING BUILDING FOR THE

OCCUPANCY.

AN ADDITION SHALL NOT CREATE OR EXTEND ANY NON-CONFORMITY WITH REGARD TO FIRE SAFETY OR THE MEANS OF EGRESS IN THE

EXISTING BUILDING FOR WHICH THE ADDITION IS CONSTRUCTED [NFPA 101 §43.8.1.2].

ANY REPAIR, RENOVATION, ALTERATION, OR RECONSTRUCTION WORK WITHIN AN EXISTING BUILDING TO WHICH AN ADDITION IS BEING MADE SHALL COMPLY WITH THE REQUIREMENTS OF NFPA 101 §43.3, 43.4, 43.5, 43.6 [NFPA 101 §43.8.1.3].

THE EXISTING OCCUPANCY CLASSIFICATION OF THE RADIATION THERAPY DEPARTMENT IS BUSINESS IN ACCORDANCE WITH NFPA 101.

THE NEW OCCUPANCY USE OF AREA OF REHABILITATION AND THE ADDITION WILL BE BUSINESS.

1.5 NFPA 101 BUILDING REHABILITATION

TOTAL BUILDING AREA [SF] 12,000 69,000

FLOOR AREA PER STORY WITH FRONTAGE INCREASE [SF] 12,000 69,000

FLOOR AREA PER STORY WITHOUT FRONTAGE INCREASE [SF] 12,000 69,000

B

OCCUPANCY CLASSIFICATION PROVIDED LIMIT

OCCUPANCY CLASSIFICATION FLOOR AREA PER STORY

W/O FRONTAGE [SF]

FLOOR AREA PER STORY WITH

FRONTAGE [SF]

MAXIMUM FLOOR AREA PER STORY PROVIDED [SF] TOTAL BUILDING FLOOR AREA

PROVIDED [SF]

FRONTAGE INCREASE 0

WIDTH OF PUBLIC WAY OR OPEN SPACE [FT] 0

TOTAL BUILDING PERIMETER [FT] 0

BUILDING PERIMETER THAT FRONTS PUBLIC WAY OR OPEN SPACING ≥ 20 FT. [FT] 0

SPRINKLER SYSTEM SM

CONSTRUCTION TYPE IIB

BUILDING WHERE SCOPE OF WORK AREA IS LOCATED AND VA BUILDINGS THAT ARE ADJACENT TO THE WORK AREA ARE FULLY SPRINKLER PROTECTED. NO

BUILDING SEPARATION REQUIREMENTS ARE REQUIRED.

THE REQUIREMENTS FOR FIRE RESISTANCE RATINGS OF EXTERIOR WALLS, MAXIMUM AREA FOR EXTERIOR WALL OPENINGS, AND OPENING PROTECTION SHALL

COMPLY WITH THE IBC EXCEPT AS FOLLOWS:

THERE ARE NO REQUIREMENTS FOR SEPARATION OR OPENINGS BETWEEN VA BUILDINGS WHEN BOTH (ALL) BUILDINGS ARE FULLY SPRINKLER PROTECTED.

THIS EXCEPTION DOES NOT APPLY TO VA BUILDINGS THAT ARE ADJACENT TO NON-VA PROPERTY LINES.

BUILDING SEPARATION REQUIREMENTS ARE IDENTIFIED IN IBC TABLE 705.5 AND OPENING REQUIREMENTS ARE IDENTIFIED IN IBC TABLE 705.8. THERE ARE NO REQUIREMENTS IN THE IBC WHERE GREATER THAN 60 FEET OF SEPARATION BETWEEN BUILDINGS OR GREATER THAN 30 FEET OF SEPARATION BETWEEN A

BUILDING AND A PROPERTY LINE OCCURS.

2.2 BUILDING SEPARATION

NO INTERSTITIAL SPACE IS BEING PROVIDED AS PART OF THIS PROJECT. THIS SECTION IS NOT APPLICABLE.

2.3 VA HOSPITAL BUILDING SYSTEM (INTERSTITIAL)

BUSINESS [NFPA 101 §38.3.3.2] CLASS C CLASS C CLASS C N/A

OCCUPANCY USE EXIT ENCLOSURE LOBBIES AND CORRIDORS OTHER SPACES FLOOR FINISH

INTERIOR FINISH RATINGS PROVIDED MEET OR EXCEED THE MOST RESTRICTIVE REQUIREMENTS FOR EACH OCCUPANCY IDENTIFIED BELOW. WHERE AN OCCUPANCY REQUIRES A MORE RESTRICTIVE FINISH RATING WITHIN THE EXIT ENCLOSURE, LOBBY, CORRIDOR, OR FLOOR FINISH COLUMN(S) THAN ANOTHER OCCUPANCY, THE MOST RESTRICTIVE FINISH RATING WITHIN THAT COLUMN SHALL APPLY TO ALL OCCUPANCIES.

WHERE AN APPROVED AUTOMATIC SPRINKLER SYSTEM IS INSTALLED FINISH RATINGS ARE PERMITTED TO BE REDUCED. FINISH RATINGS IDENTIFIED BELOW INCLUDE THE REDUCTION FOR AN AUTOMATIC SPRINKLER SYSTEM INSTALLED WITHIN THE BUILDING [NFPA 101 §10.2.8.1 & §10.2.8.2].

2.4 INTERIOR FINISH

SITE ACCESS IS NOT MODIFIED BY THIS PROJECT.

ACCESS FOR EMERGENCY VEHICLES SHALL BE IN ACCORDANCE WITH NFPA 1.

2.5 SITE CONSIDERATIONS

COMPLY WITH IBC.

2.6 INSULATION, INCLUDING FOAM PLASTIC

ROOF COVERINGS SHALL BE APPROVED OR LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY FOR COMPLIANCE WITH UL STANDARD 790 AND

SHALL BE CLASS B MINIMUM.

ROOF DECK ASSEMBLIES SHALL BE FM CLASS I APPROVED OR SHALL BE UL LISTED AS FIRE-CLASSIFIED.

2.7 ROOF COVERINGS AND ROOF DECK ASSEMBLIES

(a)SEE NFPA 5000 §7.3.2.1.

(b)SEE NFPA 5000 §7.3.

(c)SEE NPFA 220 §4.3.2.12, §4.4.2.3, AND §4.5.6.8.

EXTERIOR NONBEARING WALLS(c) 0(b)/0

INTERIOR NONBEARING WALLS 0/0

ROOF/CEILING ASSEMBLIES 0/0

FLOOR/CEILING ASSEMBLIES 0/0

SUPPORTING A ROOF ONLY 0/0

SUPPORTING ONE FLOOR ONLY 0(b)/0

SUPPORTING MORE THAN ONE FLOOR, COLUMNS, OR OTHER BEARING WALLS 0(b)/0

BEAMS, GIRDERS, TRUSSES, AND ARCHES

SUPPORTING A ROOF ONLY 0/0

SUPPORTING ONE FLOOR ONLY 0(b)/0

SUPPORTING MORE THAN ONE FLOOR, COLUMNS, OR OTHER BEARING WALLS 0(b)/0

COLUMNS

SUPPORTING A ROOF ONLY 0/0

SUPPORTING ONE FLOOR ONLY 0(b)/0

SUPPORTING MORE THAN ONE FLOOR, COLUMNS, OR OTHER BEARING WALLS 0(b)/0

INTERIOR BEARING WALLS

SUPPORTING A ROOF ONLY 0/2

SUPPORTING ONE FLOOR ONLY 0(b)/2

SUPPORTING MORE THAN ONE FLOOR, COLUMNS, OR OTHER BEARING WALLS 0(b)/2

EXTERIOR BEARING WALLS(a)

BUILDING ELEMENT REQUIRED / PROVIDED [HOUR]

FIRE-RESISTANCE RATING FOR BUILDING ELEMENTS: II [000] [NFPA 220 TABLE 4.1.1]

EXISTING BUILDING IS TYPE II (200) CONSTRUCTION.

FIRE RESISTANCE RATINGS OF STRUCTURAL MEMBERS SHALL BE IN ACCORDANCE WITH NFPA 220.

2.1.A TYPES OF CONSTRUCTION [NFPA 5000]

NFPA 101 DOES NOT PROVIDE CONSTRUCTION REQUIREMENTS FOR BUSINESS

OCCUPANCIES. THE CONSTRUCTION TYPE AS WELL AS HEIGHT AND AREA LIMITATIONS

FOR THE BUILDING SHALL COMPLY WITH THE REQUIREMENTS OF THE IBC.

THE BUILDING CONTAINS BUSINESS OCCUPANCIES.

FOR BUILDINGS WHERE NFPA 101 PROVIDES CONSTRUCTION REQUIREMENTS FOR ONE

OR MORE OF THE OCCUPANCIES WITHIN THE BUILDING, THE TYPE OF CONSTRUCTION

AS WELL AS THE HEIGHT FOR THE BUILDING SHALL COMPLY WITH THE MOST

RESTRICTIVE OCCUPANCY CONSTRUCTION REQUIREMENTS OF NFPA 101.

FOR BUILDINGS WHERE NFPA 101 DOES NOT PROVIDE CONSTRUCTION REQUIREMENTS

FOR ANY OF THE OCCUPANCIES WITHIN THE BUILDING, THE CONSTRUCTION TYPE AS

WELL AS HEIGHT AND AREA LIMITATIONS FOR THE BUILDING SHALL COMPLY WITH THE

REQUIREMENTS OF THE IBC.

2.1.B NFPA 101 CONSTRUCTION REQUIREMENTS

NUMBER OF STORIES 1 4

HEIGHT [FT] 20 75

B

OCCUPANCY CLASSIFICATION PROVIDED

LIMIT

SPRINKLER SYSTEM SM

IIB

CONSTRUCTION TYPE

IBC

2.1.B.1 IBC HEIGHT AND STORIES RESTRICTIONS [IBC TABLE 504.3 AND TABLE 504.4]

COMPLY WITH IBC.

2.8 ROOF ACCESS

THERE ARE NO SHELTERS, PAVILIONS, CONNECTING CORRIDORS, OR SIMILAR STRUCTURES LOCATED NEAR THE ADDITION. THIS SECTION IS NOT APPLICABLE.

2.9 SHELTERS, PAVILIONS, OR SIMILAR STRUCTURES LOCATED NEAR HEALTH CARE BUILDINGS

PROTECTION FROM ANY AREA HAVING A

DEGREE OF HAZARD GREATER THAN THAT

NORMAL TO THE GENERAL OCCUPANCY - ROOMS

FOR GENERAL STORAGE, BOILER OR FURNANCE

ROOMS, AND MAINTENANCE SHOPS THAT

INCLUDE WOODWORKING AND PAINTING AREAS

[NFPA 101 §8.7]

SMOKE PARTITION N/A N/A N/A N/A

SEPARATION FROM HAZARDS

COMPONENTS WALLS AND

PARTITIONS [HOUR]

FIRE DOOR

ASSEMBLIES [HOUR]

MINIMUM FIRE

PROTECTION

WINDOW RATING

[HOUR]

MINIMUM

FIRE-RESISTANCE

WINDOW RATING

[HOUR]

MEP &

COMMUNICATION

PENETRATIONS

[HOUR]

FIRE AND SMOKE BARRIERS SHALL BE PROVIDED AS REQUIRED BY NFPA 101

OPENINGS IN FIRE RATED BARRIERS SHALL BE PROTECTED ACCORDING TO NFPA 101, 80, AND 90A. DOORS IN SUCH OPENINGS SHALL BE NORMALLY CLOSED, UNLESS EQUIPPED WITH ELECTROMAGNETIC DOOR HOLD OPEN DEVICES ARRANGED TO CLOSE UPON ACTIVATION OF THE FIRE ALARM SYSTEM OR SMOKE DETECTOR INSTALLED PROXIMATE TO THE DOOR. FIRE SHUTTERS SHALL BE PROVIDED TO PROTECT OPENINGS IN FIRE RATED BARRIERS DESIGNED TO BE NORMALLY OPEN. SHUTTERS SHALL BE DESIGNED TO CLOSE UPON ACTIVATION OF A SMOKE DETECTOR PROXIMATE TO THE SHUTTER. SUCH DETECTORS SHALL CLOSE ALL SHUTTERS WITHIN A FIRE BARRIER SERVED. CLOSING SPEED SHALL BE IN ACCORDANCE WITH NFPA 80. FIRE DAMPERS SHALL BE INSTALLED IN FIRE RATED BARRIERS IN ACCORDANCE WITH NFPA 90A. FIRE RATED GLAZING, WHERE USED, SHALL MEET APPLICABLE SAFETY STANDARDS.

2.10 & 2.11 RATED ASSEMBLY AND OPENING PROTECTION REQUIREMENTS

SUITES ARE NOT PROVIDED AS PART OF THIS PROJECT.

2.12 SUITES

TWO EXIT SIGNS ARE NOT REQUIRED TO BE VISIBLE IN AN EXIT ACCESS CORRIDOR.

EXIT SIGNS WITH TRITIUM ARE NOT PERMITTED.

2.13 EXIT SIGNS

B. ACCESS CONTROLLED WHERE PERMITTED BY THE OCCUPANCY CHAPTER

A. DELAYED EGRESS WHERE PERMITTED BY THE OCCUPANCY CHAPTER

DOORS ARE PERMITTED TO BE LOCKED IN THE DIRECTION OF EGRESS TRAVEL UNDER CONDITIONS AS IDENTIFIED IN NFPA 101 AS FOLLOWS:

2.14 DOOR LOCKING REQUIREMENTS

STORAGE ROOMS SHALL BE CONSIDERED HAZARDOUS AREAS AND SHALL COMPLY WITH APPROPRIATE OCCUPANCY CHAPTER REQUIREMENTS OF NFPA 101.

STORAGE

3 SPECIAL PROTECTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% BID DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

FULLY SPRINKLERED

523-417

BLDG 1, D-WING

JAMAICA PLAIN, MA

RADIATION THERAPY EXPANSION

VAMC

C U s e rs \L th o m a s .S

T A

N T

O N

\D o c u m e n ts

\4

S E

S V

A J

P R

A D

IA

T

IO

N

T H

E R

A P

Y

F

IR

E R lt h o m a s N

Q U

.r v t

/1

/2

:5

:2

A

M

LS002

LIFE SAFETY BUILDING CODES

ANALYSIS

09/17/21 D.

FUECKER

D. LITTLE

TOTAL 170

SOUTH

DIRECT TO

EXTERIOR

EXTERIOR 0 36 0 170 170

EXIT TYPE DISCHARGE STAIR WIDTH

[INCHES]

DOOR WIDTH

[INCHES]

STAIR CAPACITY DOOR CAPACITY LIMITING

CAPACITY

RADIATION THERAPY EXITS

EXISTING BUSINESS [NFPA 101 §39.2.5] 100 50 300

NEW BUSINESS [NFPA 101 §38.2.5] 100 50 300

OCCUPANCY MAXIMUM COMMON PATH

OF TRAVEL [FT]

MAXIMUM DEAD-END

CORRIDOR [FT]

MAXIMUM TRAVEL

DISTANCE [FT]

MEANS OF EGRESS SHALL BE ARRANGED TO MEET THE REQUIREMENTS OF THE LIFE SAFETY CODE. REFER TO TABLE PROVIDED FOR MAXIMUM COMMON PATH OF TRAVEL, DEAD-END CORRIDOR, AND TRAVEL DISTANCE ALLOWED. REFER TO LIFE SAFETY FLOOR PLANS FOR

MAXIMUM COMMON PATH OF TRAVEL, DEAD-END CORRIDOR, AND TRAVEL DISTANCE PROVIDED.

MEANS OF EGRESS FOR THE RECONSTRUCTION AREA SHALL COMPLY WITH THE REQUIREMENTS APPLICABLE TO THE EXISTING OCCUPANCY CHAPTER. MEANS OF EGRESS FOR THE ADDITION SHALL COMPLY WITH REQUIREMENTS APPLICABLE TO THE NEW

CONSTRUCTION FOR THE OCCUPANCY.

ARRANGEMENT OF MEANS OF EGRESS

THE RADIATION THERAPY DEPARTMENT CONTAINS BUSINESS OCCUPANCY.

OCCUPANCY CLASSIFICATIONS ARE DEFINED IN NFPA 101.

4 OCCUPANCY CLASSIFICATION

ASSEMBLY - LESS CONCENTRATED USE, WITHOUT FIXED SEATING NON-CONCENTRATED 15

STORAGE - IN OTHER THAN STORAGE AND MERCANTILE OCCUPANCIES STORAGE 500

GENERAL AND HIGH HAZARD INDUSTRIAL GEN. & HIGH HAZ. 100

BUSINESS BUSINESS 150

NFPA 101 OCCUPANCY USE ABBREVIATION OCCUPANT LOAD FACTOR

5.0 OCCUPANCY LOAD ABBREVIATION LEGEND

RT-038 OFFICE BUSINESS 81 150 GROSS BUSINESS

RT-039 MED CLOSET STORAGE 14 500 GROSS BUSINESS

RT-020A HOLDING BUSINESS 86 150 GROSS BUSINESS

RT-012 H.C. TOILET BUSINESS 45 150 GROSS BUSINESS

RT-000A CLOSET STORAGE 4 500 GROSS BUSINESS

RT-010 GOWNED WAITING NON-CONCENTRATED 84 15 5 BUSINESS

RT-001B CLOSET STORAGE 18 500 GROSS BUSINESS

RT-003 STAFF TOILET BUSINESS 42 150 GROSS BUSINESS

RT-008 PHYSICS LAB / SOILED UTILITY STORAGE 54 500 GROSS BUSINESS

RT-006 ELEC STORAGE 84 500 GROSS BUSINESS

RT-005 JAN STORAGE 8 500 GROSS BUSINESS

RT-009 WHEELCHAIR STORAGE STORAGE 102 500 GROSS BUSINESS

RT-007 EXAM BUSINESS 136 150 GROSS BUSINESS

RT-002 OFFICE/SWING BUSINESS 244 150 GROSS BUSINESS

RT-001A RECEPTION BUSINESS 157 150 GROSS BUSINESS

RT-001 WAITING NON-CONCENTRATED 495 15 33 BUSINESS

RT-018 TREATMENT BUSINESS 557 150 GROSS BUSINESS

RT-027 DOSIMETRY BUSINESS 168 150 GROSS BUSINESS

RT-025 CONTROL ROOM BUSINESS 95 150 GROSS BUSINESS

RT-029 OFFICE BUSINESS 75 150 GROSS BUSINESS

RT-028 OFFICE BUSINESS 76 150 GROSS BUSINESS

RT-030 OFFICE BUSINESS 151 150 GROSS BUSINESS

RT-024 OFFICE BUSINESS 91 150 GROSS BUSINESS

RT-023 CLEAN UTILITY STORAGE 86 500 GROSS BUSINESS

RT-017 NURSE BUSINESS 42 150 GROSS BUSINESS

RT-022 OFFICE BUSINESS 73 150 GROSS BUSINESS

RT-026 LIN ACC TREATMENT BUSINESS 586 150 GROSS BUSINESS

RT-032 DOSIMETRIST BUSINESS 77 150 GROSS BUSINESS

RT-031 OFFICE BUSINESS 153 150 GROSS BUSINESS

RT-033 PHYSICIST BUSINESS 79 150 GROSS BUSINESS

RT-021 OFFICE BUSINESS 100 150 GROSS BUSINESS

RT-020 CONTROL ROOM BUSINESS 87 150 GROSS BUSINESS

RT-004 TELE/DATA STORAGE 81 500 GROSS BUSINESS

RT-017A NURSE BUSINESS 80 150 GROSS BUSINESS

RT-037 ELEC STORAGE 22 500 GROSS BUSINESS

RT-035 CLOSET STORAGE 15 500 GROSS BUSINESS

RT-034 CLOSET STORAGE 24 500 GROSS BUSINESS

STORAGE STORAGE 51 500 GROSS BUSINESS

RT-019 H.C. TOILET BUSINESS 49 150 GROSS BUSINESS

RT-016 INTERVIEW/VITALS BUSINESS 62 150 GROSS BUSINESS

RT-014 EXAM BUSINESS 94 150 GROSS BUSINESS

RT-013 EXAM BUSINESS 96 150 GROSS BUSINESS

RT-011 CHANGING BUSINESS 47 150 GROSS BUSINESS

ROOM NUMBER ROOM NAME NFPA 101 USE AREA [SF]

OCCUPANT

LOAD

FACTOR

CALCULATED

OCCUPANT LOAD

NFPA

CLASSIFICATION

OCCUPANCY USE SUMMARY

NON-CONCENTRATED 579 15 38

STORAGE 563 500 2

BUSINESS 8,010 150 54

TOTAL 9,152 94

OCCUPANCY USE AREA [SF]

OCCUPANT

LOAD FACTOR

OCCUPANT LOAD

OCCUPANT LOAD SUMMARY

OCCUPANT LOAD 94

TOTAL EXIT CAPACITY 210

NUMBER OF HORIZONTAL EXITS / CAPACITY 0 / 0

NUMBER OF EXTERIOR EXITS / CAPACITY 1 / 210

NUMBER OF INTERIOR EXITS / CAPACITY 0 / 0

NUMBER OF EXITS REQUIRED / PROVIDED 2 / 3

MINIMUM CORRIDOR WIDTH - REQUIRED / PROVIDED [IN] 36 / 72

MINIMUM DOOR WIDTH - REQUIRED / PROVIDED [IN] 32 / 36

MINIMUM STAIR WIDTH - REQUIRED / PROVIDED [IN] N/A

NEW OR EXISTING FLOOR ADDITION COMPLY WITH NEW, MODIFICATION COMPLY

WITH EXISTING

RESTRICTIVE OCCUPANCY TYPE BUSINESS (NFPA 101 38.2.2 FOR NEW AND 39.2.2 FOR

EXISTING)

FLOOR BASEMENT FLOOR

RADIATION THERAPY EXPANSION MEANS OF EGRESS ANALYSIS

2FB

F

B F

B F

B F

B F

B F

B F

B

DN

B B

F

B CA D EA1 D1

5.1

WAITING

RT-001

CLOSET

OFFICE

OFFICE

RT-006

STORAGE

RAD THERAPY

CALIBRATION

LAB

RT-004

WOMEN'S

TOILET

RT-003AOFFICE/SWING

RT-002

EXAM

RT-007

GOWNED

WAITING

RT-010

H.C. TOILET

RT-012

EXAM

RT-013

EXAM

RT-014

NURSE

RT-016

STAFF TOILET

RT-019

STORAGE

RT-020

OFFICE

RT-021

LIN. ACC.

TREATMENT

RT-026

OFFICE

RT-023

OFFICE

RT-030

CLOSET

OFFICE

RT-031

PHYSICIST

RT-033

DOSIMETRY

RT-034

MECH

B10-A

ELEC

RT-037

Room

Room

Room

Room

Room

CYBERKNIFE

TREATMENT

RT-018

JAN

RT-005

CHANGING

RT-011

DOSIMETRIST

RT-032

CONTROL

ROOM

COURTYARD

CONTROL

ROOM

RECEPTION

HOLDING BAY

EQUIPMENT

ROOM

ENTRANCE

MAZE

ALCOVE

ALCOVE

ALCOVE

- 1

DE-1A

CP-1A

C P

-1 B

TP-1A

CP-1C

TP-1B

TP-1C

LEGEND

WORK AREA DURING PHASE

NOT IN WORK AREA

EXIT DISCHARGE PATH, FOR REFERENCE ONLY

B CA D EA1 D1

5.1

TEMP OFFICE

DE-1A

CP-1A

C P

-1 B

DE-1B

CP-1C

TP-1A

TP-1B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% BID DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

FULLY SPRINKLERED

523-417

BLDG 1, D-WING

JAMAICA PLAIN, MA

RADIATION THERAPY EXPANSION

VAMC

C U s e rs \L th o m a s .S

T A

N T

O N

\D o c u m e n ts

\4

S E

S V

A J

P R

A D

IA

T

IO

N

T H

E R

A P

Y

F

IR

E R lt h o m a s N

Q U

.r v t

/1

/2

:5

:1

A

M

LS101

LIFE SAFETY FLOOR PLAN -

EXISTING

09/17/21 D.

FUECKER

D. LITTLE

3/32" = 1'-0"F1

LIFE SAFETY FLOOR PLAN - EXISTING

0 4'-0" 8'-0" 16'-0"

1 EXISTING EXIT DISCHARGE INTO COURTYARD TO BE MAINTAINED

DURING DEMOLITION AND CONSTRUCTION.

2 MAINTAIN CLEAR WIDTH OF 44 INCHES.

3 PROTECTION OF PEDESTRIANS SHALL BE IN ACCORDANCE WITH IBC

SECTION 3306 DURING CONSTRUCTION AND DEMOLITION ACTIVITIES.

WALKWAY SHALL NOT BE LESS THAN 4 FEET IN WIDTH.

4 STAIRS TO BE PROVIDED FOR EXIT DISCHARGE PRIOR TO

DEMOLITION OF EXISTING EGRESS RAMP.

5 CONTINUATION OF EXIT DISCHARGE TO PUBLIC WAY.

6 EXISTING EGRESS RAMP TO BE DEMOLISHED AT START OF PHASE 1.

7 TEMPORARY EXIT DOOR AND STAIR TO BE COMPLETED PRIOR TO

START OF PHASE 1 AND TO BE REMOVED PRIOR TO START OF PHASE

2.

KEYED NOTES

3/32" = 1'-0"F5

LIFE SAFETY FLOOR PLAN - PHASE 1

0 4'-0" 8'-0" 16'-0"

GENERAL NOTES

A. SEPARATE ALL OCCUPIED AREAS FROM DEMOLITION, RENOVATION, OR

CONSTRUCTION ACTIVITIES BY TEMPORARY SMOKE-TIGHT

CONSTRUCTION PARTITIONS OF GYPSUM BOARD OR OTHER APPROVED

NON-COMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. PARTITIONS

SHALL BE FULL HEIGHT, EXTENDING THROUGH SUSPENDED CEILINGS

TO THE FLOOR SLAB OR ROOF DECK ABOVE AND SHALL BE ONE-HOUR

FIRE RATED, UNLESS SPRINKLERS ARE INSTALLED AND ARE

OPERATIONAL ON BOTH SIDES OF THE TEMPORARY PARTITION

WHEREUPON THE PARTITION MAY BE PERMITTED TO TERMINATE AT

THE CEILING IN ACCORDANCE WITH NFPA 241. WHERE THE CEILING ON

ONE SIDE OF THE TEMPORARY CONSTRUCTION BARRIER HAS BEEN

REMOVED, THE TEMPORARY PARTITION MUST EXTEND TO THE DECK

ABOVE.

B. PROVIDE TEMPORARY EXIT SIGNAGE AND WARNING SIGNS TO NOTIFY

OCCUPANTS OF TEMPORARY EGRESS ROUTES. CONTRACTOR TO

COORDINATE WITH THE MEDICAL CENTER SAFETY COMMITTEE TO

DETERMINE ILSMS IN ACCORDANCE WITH MEDICAL CENTER POLICY.

PHASE 1 TRAVEL PATHS

TYPE NAME DISTANCE [FT-IN]

COMMON PATH OF TRAVEL CP-1A 56' - 1"

COMMON PATH OF TRAVEL CP-1B 42' - 6"

COMMON PATH OF TRAVEL CP-1C 131' - 11"

DEAD END PATH DE-1A 37' - 5"

DEAD END PATH DE-1B 46' - 2"

TOTAL TRAVEL PATH TP-1A 261' - 5"

TOTAL TRAVEL PATH TP-1B 139' - 5"

EXISTING TRAVEL PATHS

TYPE NAME DISTANCE [FT-IN]

COMMON PATH OF TRAVEL CP-1A 56' - 2"

COMMON PATH OF TRAVEL CP-1B 42' - 6"

COMMON PATH OF TRAVEL CP-1C 90' - 8"

DEAD END PATH DE-1A 37' - 5"

TOTAL TRAVEL PATH TP-1A 126' - 10"

TOTAL TRAVEL PATH TP-1B 229' - 7"

TOTAL TRAVEL PATH TP-1C 142' - 1"

DN

B B

F

DN

B

B F

DN

B B

F

B CA D EA1 D1

5.1

TEMP

OFFICE

TEMP

OFFICE

TEMP

OFFICE

(FROM

PHASE 1)

DE-1A

CP-1A

C P

-1 B

DE-1B

TP-1A

CP-1C

TP-1B

TP-1C

CP-1D

TP-1D

B CA D EA1 D1

5.1

TEMP PATIENT

HOLDING

TEMP

OFFICE

TEMP

OFFICE

TEMP

OFFICE

(FROM

PHASE 1)

DE-1A

C P

-1 B

CP-1A

TP-1A

CP-1C

TP-1B

CP-1D

TP-1C

TP-1D

B CA D EA1 D1

5.1

TEMP

OFFICE

(MOVED

FROM

PHASE 1)

TEMP PATIENT

HOLDING

NEW

DOSYMETRY

TEMP

OFFICE

(MOVED

FROM

PHASE 2)

DE-1A

CP-1B

TP-1B

CP-1A

TP-1A

DE-1B

TP-1C

CP-1C

TP-1D

LEGEND

WORK AREA DURING PHASE

NOT IN WORK AREA

EXIT DISCHARGE PATH, FOR REFERENCE ONLY

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% BID DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

FULLY SPRINKLERED

523-417

BLDG 1, D-WING

JAMAICA PLAIN, MA

RADIATION THERAPY EXPANSION

VAMC

C U s e rs \L th o m a s .S

T A

N T

O N

\D o c u m e n ts

\4

S E

S V

A J

P R

A D

IA

T

IO

N

T H

E R

A P

Y

F

IR

E R lt h o m a s N

Q U

.r v t

/1

/2

:5

:3

A

M

LS102

LIFE SAFETY FLOOR PLAN -

PHASING

09/17/21 D.

FUECKER

D. LITTLE

3/32" = 1'-0"F1

LIFE SAFETY FLOOR PLAN - PHASE 2

0 4'-0" 8'-0" 16'-0" 3/32" = 1'-0"F3

LIFE SAFETY FLOOR PLAN - PHASE 3

0 4'-0" 8'-0" 16'-0" 3/32" = 1'-0"F6

LIFE SAFETY FLOOR PLAN - PHASE 4

0 4'-0" 8'-0" 16'-0"

1 EXISTING EXIT DISCHARGE INTO COURTYARD TO BE

MAINTAINED DURING DEMOLITION AND CONSTRUCTION.

2 MAINTAIN CLEAR WIDTH OF 44 INCHES.

3 PROTECTION OF PEDESTRIANS SHALL BE IN ACCORDANCE

WITH IBC SECTION 3306 DURING CONSTRUCTION AND

DEMOLITION ACTIVITIES. WALKWAY SHALL NOT BE LESS THAN

4 FEET IN WIDTH.

4 STAIRS TO BE PROVIDED FOR EXIT DISCHARGE PRIOR TO

DEMOLITION OF EXISTING EGRESS RAMP.

5 CONTINUATION OF EXIT DISCHARGE TO PUBLIC WAY.

KEYED NOTES

GENERAL NOTES

A. SEPARATE ALL OCCUPIED AREAS FROM DEMOLITION,

RENOVATION, OR CONSTRUCTION ACTIVITIES BY TEMPORARY

SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM BOARD OR

OTHER APPROVED NON-COMBUSTIBLE OR LIMITED-COMBUSTIBLE

MATERIAL. PARTITIONS SHALL BE FULL HEIGHT, EXTENDING

THROUGH SUSPENDED CEILINGS TO THE FLOOR SLAB OR ROOF

DECK ABOVE AND SHALL BE ONE-HOUR FIRE RATED, UNLESS

SPRINKLERS ARE INSTALLED AND ARE OPERATIONAL ON BOTH

SIDES OF THE TEMPORARY PARTITION WHEREUPON THE

PARTITION MAY BE PERMITTED TO TERMINATE AT THE CEILING IN

ACCORDANCE WITH NFPA 241. WHERE THE CEILING ON ONE SIDE

OF THE TEMPORARY CONSTRUCTION BARRIER HAS BEEN

REMOVED, THE TEMPORARY PARTITION MUST EXTEND TO THE

DECK ABOVE.

B. PROVIDE TEMPORARY EXIT SIGNAGE AND WARNING SIGNS TO

NOTIFY OCCUPANTS OF TEMPORARY EGRESS ROUTES.

CONTRACTOR TO COORDINATE WITH THE MEDICAL CENTER

SAFETY COMMITTEE TO DETERMINE ILSMS IN ACCORDANCE WITH

MEDICAL CENTER POLICY.

PHASE 2 TRAVEL PATHS

TYPE NAME DISTANCE [FT-IN]

COMMON PATH OF TRAVEL CP-1A 56' - 3"

COMMON PATH OF TRAVEL CP-1B 42' - 6"

COMMON PATH OF TRAVEL CP-1C 85' - 11"

COMMON PATH OF TRAVEL CP-1D 28' - 2"

DEAD END PATH DE-1A 37' - 5"

DEAD END PATH DE-1B 16' - 8"

TOTAL TRAVEL PATH TP-1A 151' - 0"

TOTAL TRAVEL PATH TP-1B 227' - 0"

TOTAL TRAVEL PATH TP-1C 42' - 11"

TOTAL TRAVEL PATH TP-1D 141' - 0"

PHASE 3 TRAVEL PATHS

TYPE NAME DISTANCE [FT-IN]

COMMON PATH OF TRAVEL CP-1A 56' - 1"

COMMON PATH OF TRAVEL CP-1B 42' - 6"

COMMON PATH OF TRAVEL CP-1C 87' - 0"

COMMON PATH OF TRAVEL CP-1D 26' - 11"

DEAD END PATH DE-1A 37' - 5"

TOTAL TRAVEL PATH TP-1A 152' - 2"

TOTAL TRAVEL PATH TP-1B 225' - 10"

TOTAL TRAVEL PATH TP-1C 42' - 0"

TOTAL TRAVEL PATH TP-1D 141' - 0"

PHASE 4 TRAVEL PATHS

TYPE NAME DISTANCE [FT-IN]

COMMON PATH OF TRAVEL CP-1A 55' - 4"

COMMON PATH OF TRAVEL CP-1B 42' - 6"

COMMON PATH OF TRAVEL CP-1C 27' - 4"

DEAD END PATH DE-1A 37' - 4"

DEAD END PATH DE-1B 16' - 8"

TOTAL TRAVEL PATH TP-1A 148' - 8"

TOTAL TRAVEL PATH TP-1B 152' - 11"

TOTAL TRAVEL PATH TP-1C 40' - 8"

TOTAL TRAVEL PATH TP-1D 141' - 3"

B

F

DN

B

B F

DN

B B

F

B CA D EA1 D1

5.1

NEW

DOSYMETRY

PHASE 5A PHASE 5B

TEMP

OFFICE

(MOVED

FROM

PHASE 2)

TEMP

OFFICE

(MOVED

FROM

PHASE 1)

DE-1A

CP-1A

C P

-1 B

DE-1B

CP-1C

TP-1A

TP-1B

CP-1D

TP-1C

TP-1D

B CA D EA1 D1

5.1

NEW

DOSYMETRY

TEMP WAITING

AND

REGISTRATION

TEMP

WAITING

TEMP

OFFICE

(MOVED

FROM

PHASE 2)

TEMP

OFFICE

(MOVED

FROM

PHASE 1)

DE-1A

DE-1B

CP-1A

C P

-1 B

TP-1B

CP-1C

TP-1A

CP-1D

TP-1C

B CA D EA1 D1

5.1

TEMP

OFFICE

(MOVED

FROM

PHASE 2)

TEMP

OFFICE

(MOVED

FROM

PHASE 1)

NEW

DOSYMETRY

TP-1A

DE-1B

D E

-1 C

TP-1B

CP-1C

TP-1C

CP-1D

TP-1D

LEGEND

WORK AREA DURING PHASE

NOT IN WORK AREA

EXIT DISCHARGE PATH, FOR REFERENCE ONLY

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% BID DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

FULLY SPRINKLERED

523-417

BLDG 1, D-WING

JAMAICA PLAIN, MA

RADIATION THERAPY EXPANSION

VAMC

C U s e rs \L th o m a s .S

T A

N T

O N

\D o c u m e n ts

\4

S E

S V

A J

P R

A D

IA

T

IO

N

T H

E R

A P

Y

F

IR

E R lt h o m a s N

Q U

.r v t

/1

/2

:5

:0

A

M

LS103

LIFE SAFETY FLOOR PLAN -

PHASING

09/17/21 D.

FUECKER

D. LITTLE

3/32" = 1'-0"F1

LIFE SAFETY FLOOR PLAN - PHASE 5

3/32" = 1'-0"F3

LIFE SAFETY FLOOR PLAN - PHASE 6

3/32" = 1'-0"F6

LIFE SAFETY FLOOR PLAN - PHASE 7

0 4'-0" 8'-0" 16'-0" 0 4'-0" 8'-0" 16'-0" 0 4'-0" 8'-0" 16'-0"

1 EXISTING EXIT DISCHARGE INTO COURTYARD TO BE MAINTAINED

DURING DEMOLITION AND CONSTRUCTION.

2 MAINTAIN CLEAR WIDTH OF 44 INCHES.

3 STAIRS TO BE PROVIDED FOR EXIT DISCHARGE PRIOR TO

DEMOLITION OF EXISTING EGRESS RAMP.

4 CONTINUATION OF EXIT DISCHARGE TO PUBLIC WAY.

5 CONSTRUCTION TO OCCUR DURING OFF-HOURS WHEN AREA IS

NOT OCCUPIED.

6 DOORS TO BE KEPT OPEN DURING CONSTRUCTION.

KEYED NOTES

GENERAL NOTES

A. SEPARATE ALL OCCUPIED AREAS FROM DEMOLITION,

RENOVATION, OR CONSTRUCTION ACTIVITIES BY TEMPORARY

SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM BOARD

OR OTHER APPROVED NON-COMBUSTIBLE OR LIMITED-

COMBUSTIBLE MATERIAL. PARTITIONS SHALL BE FULL HEIGHT,

EXTENDING THROUGH SUSPENDED CEILINGS TO THE FLOOR SLAB

OR ROOF DECK ABOVE AND SHALL BE ONE-HOUR FIRE RATED,

UNLESS SPRINKLERS ARE INSTALLED AND ARE OPERATIONAL ON

BOTH SIDES OF THE TEMPORARY PARTITION WHEREUPON THE

PARTITION MAY BE PERMITTED TO TERMINATE AT THE CEILING IN

ACCORDANCE WITH NFPA 241. WHERE THE CEILING ON ONE SIDE

OF THE TEMPORARY CONSTRUCTION BARRIER HAS BEEN

REMOVED, THE TEMPORARY PARTITION MUST EXTEND TO THE

DECK ABOVE.

B. PROVIDE TEMPORARY EXIT SIGNAGE AND WARNING SIGNS TO

NOTIFY OCCUPANTS OF TEMPORARY EGRESS ROUTES.

CONTRACTOR TO COORDINATE WITH THE MEDICAL CENTER

SAFETY COMMITTEE TO DETERMINE ILSMS IN ACCORDANCE WITH

MEDICAL CENTER POLICY.

PHASE 5 TRAVEL PATHS

TYPE NAME DISTANCE [FT-IN]

COMMON PATH OF TRAVEL CP-1A 57' - 0"

COMMON PATH OF TRAVEL CP-1B 40' - 11"

COMMON PATH OF TRAVEL CP-1C 84' - 11"

COMMON PATH OF TRAVEL CP-1D 27' - 1"

DEAD END PATH DE-1A 38' - 2"

DEAD END PATH DE-1B 16' - 8"

TOTAL TRAVEL PATH TP-1A 148' - 11"

TOTAL TRAVEL PATH TP-1B 225' - 5"

TOTAL TRAVEL PATH TP-1C 42' - 6"

TOTAL TRAVEL PATH TP-1D 140' - 11"

PHASE 6 TRAVEL PATHS

TYPE NAME DISTANCE [FT-IN]

COMMON PATH OF TRAVEL CP-1A 56'…