This document provides the scope of work for construction project number 523-417 to expand the Radiation Therapy Department at the Boston VA Medical Center in Jamaica Plain. The scope of work includes general construction, alterations, selective demolition, excavation, earthwork, foundations, concrete work, masonry, metals, mechanical, electrical, plumbing, fire protection, site work and other items. Work will be phased to minimize impacts on the medical center's normal operations. The entire project must be completed within 485 calendar days of receiving the notice to proceed from the contracting officer. The related federal contract opportunity is solicitation number 36C77622B0038 to be awarded by the Department of Veterans Affairs Technology Acquisition Center Austin.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction S.O.W., Project #523-307 Research Addition JP

Project No. 523-417

Radiation Therapy Expansion, Boston VAMC, Jamaica Plain Campus

Scope of Work

Provide all labor, materials, equipment, transportation, supervision, general demolition, general construction, alterations, mechanical and electrical work, testing and commissioning and certain other items. Work includes general construction, alterations, sidewalks, grading, drainage, mechanical and electrical work, utility systems, necessary removal of existing structures and construction and certain other items.

The project scope includes preparation of site for building operations including demolition and removal of existing pavement, utilities and or structures, furnish labor and materials and perform work for construction of an expansion of the Radiation Therapy Department in Building 1, Floor

1D, with foundation and other work being contained within an operating medical facility. Work includes, but is not limited to general construction, selective demolition, excavation, earthwork, special foundation work, casting concrete, precast concrete erection, ceilings, partitions, doors, windows, louvers, finishes, miscellaneous specialties, signage, masonry, metals, mechanical, electrical, plumbing, fire protection, telephone and data cabling, security systems, equipment, utility systems, site work and certain other items. Work effort is to include phasing to minimize impacts on the site, facility occupants and the normal operation of the Medical Center as a whole.

PERIOD OF PERFORMANCE

The entire scope of work, including but not limited to the required approval of submittals before construction commences, submission of written phasing request durations, testing and inspections, commissioning, final inspection and acceptance, final cleanup, and submission of close out documents, shall be completed for the base offer not later than 485 calendar days after contractor receipt of

Notice to Proceed from the Contracting Officer.

- - - E N D - - -