Attachment 4 - Quality Assurance Surveillance Plan.docx

DOCX document 56 KB Posted

Attached to
Lift & Tie (Crane, jacks, straps) inspection, repair, and maintenance - APG, MD
Solicitation number
W91ZLK-26-Q-A013
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) for the Lift and Tie Equipment inspection, maintenance, and repair contract at Aberdeen Proving Ground, Maryland, managed by the Army Contracting Command - Chemical Biological Center. The QASP establishes the methods and procedures the Government will use to ensure the contractor meets all contract terms, conditions, and specifications outlined in the accompanying Performance Work Statement. The contract is a hybrid Firm Fixed Price and Time and Material arrangement for a 12-month base period with four 12-month option periods, requiring all labor, supervision, materials, consumables, and equipment necessary to provide routine maintenance, operational testing, repairs, and emergency service response for emergency power supply systems at the Chemical Biological Center.

The QASP designates the Contracting Officer and Contracting Officer's Representative as responsible for quality oversight and surveillance, with monthly monitoring conducted through random sampling, periodic inspection, and customer feedback mechanisms. Nonconformances are classified into three levels—Level 1 (Minor), Level 2 (Major), and Level 3 (Critical)—with corresponding corrective action requirements and Government follow-up procedures. Key performance objectives include contractor personnel qualification reporting, monthly invoice accuracy and documentation, annual device inspections, preventative maintenance completion, load testing, and repairs or replacements in accordance with industry standards and manufacturer recommendations. Surveillance documentation, including monthly COR Status Reports, surveillance checklists, and nonconformance reports, must be filed in the Procurement Integrated Enterprise Environment by the 15th of each month. The contractor must also comply with contractor manpower reporting requirements through the System for Award Management and Contractor Performance Assessment Reporting System protocols.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan

For

INSPECTION, MAINTENANCE, AND REPAIR OF LIFT and TIE EQUIPMENT

Contract #

Ms. Terrijuana VealsMr. Todd McKinney
Contracting OfficerContracting Officer’s Representative
Army Contracting Command –Chemical Biological Center
Aberdeen Proving Ground, MDCombat Capabilities Development Command

TABLE OF CONTENTS

Subject Page Number

1. Overview

2. Description of Services

3. Roles and Responsibilities

4. Contract Quality Requirements

5. Government Surveillance

6. Nonconformance Reports (NCRs)

7. Deduct Plan

8. Data Analysis

9. Acceptance of Services

10. COR Status Report

11. Contractor Manpower Reporting Application (CMRA)

12. Contractor Performance Assessment Reporting System (CPARS)

13. Combating Trafficking In Persons

14. COR/Quality Assurance Surveillance Files

15. QASP Changes

1. Overview.

1.1. Purpose. The purpose of this Quality Assurance Surveillance Plan (QASP) is to identify the methods and procedures the Government will use to ensure it receives the services under this contract as identified in the Performance Work Statement (PWS).

1.2. Intent. The intent of this QASP is to: 1) ensure Contractor performance meets or exceeds contract terms, conditions and specifications; 2) hold the Contractor accountable for quality control; and 3) encourage the Contractor to take appropriate steps to control and improve quality. Accordingly, the Government will perform surveillance on the contract in accordance with this QASP, but reserves the right to monitor the contract in any manner necessary, at any times necessary, and at all places necessary to ensure that the rendered services conform to contract requirements. The Government also reserves the right to perform quality assurance at the Subcontractor level, if applicable. Resolution of non-conforming services discovered at the Subcontractor level will be addressed with the prime Contractor

2. Description of Services.

2.1. Scope of Work. This is a non-personal services contract to provide all labor, supervision, materials, consumables, and equipment necessary to provide routine maintenance, operational testing, repairs and emergency service response for the emergency power supply systems (EPSS) at the Chemical Biological Center (CBC). This effort is in direct support of the existing and future mission of U.S. Army Combat Capabilities Development Command (DEVCOM) Chemical Biological Center (CBC) by providing qualified personnel, to perform all work outlined, stated within this document. CBC is located at Aberdeen Proving Ground, Edgewood Area (APG-EA), Gunpowder, Maryland.

2.2. Type of Contract. This contract will be a hybrid with both Firm Fixed Price (FFP) and Time and Material (T&M) contract line items (CLIN) and will be a twelve (12) month base period with four (4) – twelve (12) month options.

3. Roles and Responsibilities.

3.1. Contracting Officer (KO). The KO is responsible for safeguarding the interests of the United States Government in contractual relationships. Only the KO is authorized to bind the Government and then, only to the extent of the authority delegated to them through the issuance of a warrant.

3.1.1 The KO delegates authority for inspection and/or acceptance in accordance with the terms of the contract.

3.1.2 The KO informs the Contractor of the names, duties and limitations of authority for all quality assurance personnel assigned to the contract.

3.2 Contracting Officer’s Representative (COR). The COR is responsible for quality assurance guidance and to ensure that contract quality requirements, provisions, standards, and thresholds are defined, practical, enforceable, necessary and verifiable.

3.2.1 The COR evaluates and documents Contractor performance in accordance with the QASP and PWS.

3.2.2 The COR notifies the Contracting Officer of any significant performance deficiencies using a Contractor Discrepancy Report with supporting documentation.

3.2.3 The COR maintains surveillance documentation.

3.2.4 The COR recommends improvements to the QASP and PWS throughout the life of the contract.

4. Contract Quality Requirements.

4.1. Contractor’s Quality Control Plan (QCP). The Contractor’s quality control program (IAW FAR Part 46 and applicable 52.246 Clause(s)) is the means by which the Contractor assures that work complies with the requirement of the contract. The Contractor shall ensure services are performed in accordance with this PWS. Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract. At a minimum, the QCP must include and answer the following to be acceptable:

(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team;

(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals);

(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses;

(d) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and

(e) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years. Comment by Gatch, Kristen M CIV USARMY DEVCOM CBC (USA): NEW LANGUAGE, review for accuracy

4.2. Government Quality Assurance. The Government shall evaluate the Contractor’s performance under this contract in accordance with this QASP. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance and minimum acceptable defect rate(s).

5. Government Surveillance.

5.1. Methods of Surveillance. The following Methods of Surveillance will be utilized in monitoring the Contractors’ performance:

5.1.1. Random Sampling

5.1.2. Periodic Inspection

5.1.3. Customer Feedback. The following procedures will be followed when a complaint is received regarding the Contractor/Contractor Employees.

· The COR will investigate and determine the validity of the complaint.

· If the complaint is determined to be invalid, the COR will inform the person who submitted the complaint of the reason(s) as soon as practical.

· For validated complaints that are true contractual non-conformances, the procedures in paragraph 6 below will be followed.

5.2. Surveillance Schedule. A Surveillance Schedule will be created for each month of Contractor performance and filed in the Procurement Integrated Enterprise Environment (PIEE), Surveillance and Performance Monitoring (SPM), Surveillance Documents Section of the Contract File using the Add Smart Form function. The schedule is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel

5.3. Surveillance Instructions/Checklists. Surveillance Checklists will be completed when surveillances are conducted and filed in the PIEE, SPM, Surveillance Documents Section of the Contract File using the Add Smart Form function.

5.4. Surveillance Documentation. No later than the 15th of each month surveillance documentation for the preceding month will be filed in the PIEE, SPM, Surveillance Documents Section. Surveillance documentation includes a COR Status Report, the Surveillance Schedule, all completed Surveillance Checklist(s) for the period the COR Status Report covers, Nonconformance Reports, if any, and Contractor Deliverables, if any

6. Nonconformance Reports (NCRs). Nonconformance occurs when a Contractor fails to meet Contract or Task Order terms, conditions and/or specifications or the services are defective in some manner. All instances of nonconformance will be documented via a Nonconfomance Report Worksheet, Attachment 2 and the Contracting Officer will notify the Contractor of the nonconforming performance via Letter. Resolution of nonconformance discovered at the Subcontractor level will be addressed with the prime Contractor. Nonconformance is classified as either: Level 1 (Minor); Level 2 (Major); or Level 3 (Critical). NCRs may contain multiple nonconformances, each characterized by a level and type. The level of the NCR should normally correspond to the highest level of nonconformance listed in the NCR. For example, if a NCR had one Level 3, one Level 2, and three Level 1 nonconfomrances, the NCR level would be Level 3. The exception might be when the aggregate of multiple nonconformances considered in whole associate to a more serious type of nonconformance defined in FAR 46.101 (e.g. if a NCR had three Level 2 nonconformances but the definition of critical nonconformance better describes the impact/effect when considered in whole, the NCR level would be 3).

6.1. Level 1 (Minor). Level 1 nonconformances are those that are ‘minor’ in nature such that they can be promptly corrected by the contractor, present no need for root cause analysis or determination if other contract requirements are affected, present no need for further preventive action, and do not materially reduce the usability of the supplies, services, construction, or deliverables. While the contractor must correct the nonconformance, further actions and Government follow-up are not required, and no written response from the contractor is needed.

6.2. Level 2 (Major). Level 2 nonconformance(s) are those that are ‘major’ in nature such that they are not promptly correctable, and/or warrant root cause analysis and preventive action, and/or need action by the contractor to determine if other contract requirements are affected. These nonconformances are serious enough to warrant not only correction of the nonconformance, but also a written response from the contractor in the form of a Corrective Action Plan (CAP), and Government follow-up. The qualifying distinction between a Level 1 and Level 2 nonconformance is the need for a CAP and Government follow-up. A NCR identifying a Level 2 nonconformance may also be issued after repetitive Level 1 instances of the same or similar nonconformance demonstrate the contractor is failing to institute effective corrective action and/or failing to implement effective quality and/or internal control(s). Repetitive Level 1/minor nonconformance of the same or similar requirement(s) increases the risk to the Government that continued, repetitious, or cumulative failures may materially reduce the usability of the supplies, services, construction, work, or deliverables for their intended purpose or is an indicator that root cause analysis and a CAP is required to fix the underlying conditions creating the nonconformance. Further, serious individual contractor employee misconduct discovered by the Government and traceable to contract requirements should normally result in a Level 2 nonconformance because the serious nature of misconduct necessitates contractor management conduct root cause analysis, take preventive actions, and requires Government follow-up (characteristics of a Level 2 NCR). Further, issue a NCR with a Level 3 nonconformance for serious contractor employee misconduct only when there is a trend demonstrating a breakdown in contractor management or processes allowing serious misconduct to repetitively occur, or the misconduct poses a hazardous or unsafe condition for the personnel receiving the contracted supply, service, or construction, and misconduct can be traced to nonconformance of contract requirements.

6.3. Level 3 (Critical). Level 3 nonconformance(s) are those that are ‘critical’ in nature such that they represent a serious weakness in internal controls and/or have actual or potential significant impact(s) on contract performance and/or the supported unit/Government operations. For these nonconformance(s), the qualifying distinction between a Level 2 and Level 3 nonconformance is the seriousness of the issue prompting the need for higher level management to address the nonconformance and resulting corrective action. Due to the nature of a Level 3 nonconformance, these types of nonconformance are candidates for contract remedies. Therefore, before issuance of a NCR with a Level 3 nonconformance, consideration should be made whether an NCR or contract remedy is more appropriate. Issuing a Level 3 NCR in lieu of a contract remedy would normally be considered the Government’s final attempt to work with the contractor to resolve a contractual nonconformance before contractual remedies are used. However, issuance of a Level 3 NCR is not a requirement before using contractual remedies. A NCR identifying a Level 3 nonconformance (or a contract remedy) may be issued after repetitive Level 2 instances of the same or similar nonconformance demonstrate the contractor is failing to institute effective corrective action or failing to implement effective quality/internal controls. Repetitive major nonconformances with the same or similar requirement(s) increase the risk to the Government that continued, repetitious, or cumulative failures may significantly impact the mission, or may result in hazardous/unsafe conditions.

6.4. Documenting NCRs. Use/fill out the Nonconformance Report Worksheet, Attachment 2, when nonconforming performance is identified. Documentation, as a minimum, will include: the Contract or Task Order number; reference to the specific contract requirement; the specific discrepancy to the requirement; where it was discovered; the date and time it was discovered; and the Contractor representative who was notified. Also, include a suspense date for Contractor response/corrective action for Level 2 and Level 3 NCRs. The Contracting Officer must ensure appropriate level review and approval of the NCR Worksheet and then addresses the NCR in Letter Format to the applicable level of Contractor management based on the seriousness of the nonconformance.

6.5. Tracking and Resolving NCRs. All NCRs will be included in the COR’s Status Report. The Government considers Level 1 nonconformance closed as of the issuance of the Letter to the Contractor. However, your attention to address Level 1 Minor nonconformance is still required. Repetitive nonconformance of the same or similar requirement would be an indication the contractor failed to institute effective corrective action and/or failed to implement effective quality control and may result in a Level 2 NCR requiring submission of a CAP to the Government. The COR and KO shall track Level 2 and Level 3 NCRs to ensure the Contractor identifies and takes appropriate corrective action to the root cause and the specific nonconformance is corrected within the required timeline. The KO will make a final written determination of the Government’s remedies if the non-conformance is not corrected by the Contractor after receiving notice and a reasonable opportunity to correct the work.

7. Deduct Plan. This acquisition does not include a Deduct Plan.

8. Data Analysis. Data Analysis will be performed to identify trends in cost, schedule and/or performance risks. The results of Data Analysis will be documented in COR Status Reports and may be used to make adjustments to surveillance schedules, increase or decrease surveillance, if deemed appropriate. Negative trends noted using Government data/observations could result in issuing the Contractor a Nonconformance Report. Trends noted using Contractor data will not result in a Nonconformance Report unless the Contractor is not addressing the negative trend.

9. Acceptance of Services. When all services have been deemed acceptable and there is documented objective quality evidence to support acceptable performance the COR will accept the services provided and authorize payment of the Contractor. This is accomplished by approving the Contractor’s invoices in WAWF.

10. COR Status Report. COR Status Reports will be submitted on a monthly basis, no later than the 15th of each month for the preceding frequency, to the Contracting Officer via PIEE, SPM, Surveillance Documents Section using the Add Smart Form function. COR Status Reports will provide a synopsis of the Contractors performance for the inclusive dates of the report. The synopsis will contain a summary of: surveillances performed; Customer Feedback, if any; Nonconformance Reports, if any; an analysis of the Contractors performance; recommended adjustments to surveillance schedules; and any other pertinent contract information.

11. Contractor Manpower Reporting Initiative. In accordance with Office of the Secretary of Defense Memorandum, Revised Department of Defense Contractor Manpower Reporting Initiative, dated Oct 16, 2019, the Contractor must report contractor manpower to the System for Award Management website at https://www.sam.gov NLT 31 October each year. All data shall be reported in accordance with applicable Federal Acquisition Regulation and supplements. The COR shall verify that the Contactor has complied with the required contractor manpower reporting annually and document the results in their October COR Status Report.

12. Contractor Performance Assessment Reporting System (CPARS). Documented surveillance data (COR Status Reports, Completed Surveillance Checklists, Customer Feedback, Deliverables, if any, and Nonconformance Reports, if any) will be used to support CPARS ratings. CPARS will be completed in accordance with AFARS, Subpart 5142.15 – Contractor Performance Information.

13. Combating Trafficking In Persons (CTIP). In accordance with PGI 222.17 and FAR 52.222-50, the KO will be notified immediately of any information from any source that alleges a Contractor employee, subcontractor and/or subcontractor employee has engaged in conduct that violates the United States Government “zero” tolerance policy regarding trafficking in persons.

14. COR/Quality Assurance Surveillance Files. The official COR/Quality Assurance Surveillance File will be maintained in PIEE, SPM IAW DoDI 5000.72, DoD Standard for COR Certification.

15. QASP Changes. This QASP is a living document and, as such, may be changed as needed based on Data Analysis (trends), contract modifications, etc. The COR will send any recommended changes to the KO for approval and the KO must approve all changes.

COR’S Signature Block

Contracting Officer’s Signature Block

Attachments: 1. Performance Requirements Summary (PRS) Attachment 1

Performance Requirements Summary (PRS)

PERFORMANCE OBJECTIVE
STANDARD
PERFORMANCE THRESHOLD ACCEPTABLE QUALITY LEVELS (AQLs)
METHOD OF SURVEILLANCE

PRS #1: Personnel Qualification Requirements

PWS Paragraph 1.8

Contractor shall submit to the COR an annual report listing all technicians supporting this PWS and their certificates within (15) days of contract award.

Promptly submit personnel listing as outlined in CDRL A001 to the COR/Contracting Officer
100% compliance.

Zero deviations from standard.

100% inspection

PRS #2: Monthly Invoice

PWS Paragraph 1.15

The Contractor shall provide Monthly Invoice.

The monthly invoice shall contain, in addition to the requirements stated in CDRL A005 the information outlined PWS Paragraphs 1.15

The invoice shall include number, Period of Performance (POP) that the invoice covers, contract number, and a detailed description of services to include itemized line items per individual piece of equipment, backup receipts for parts/equipment being billed, approved quote with COR approval of any repairs/replacements being billed, and total amounts invoiced

Report submitted by the 15th of each month.

95% accuracy with first submission. 100% accuracy, if edit required.

100% inspection

PRS #3: Inspections

PWS Paragraph 4.1 & 4.11 (a)

Contractor shall perform inspections and complete Device Inspection Sheet

Contractor shall perform inspections annually and complete required Device Inspection Sheet (CDRL 0006)

Report submitted by the end of each month they were completed.

95% accuracy with first submission. 100% accuracy, if edit required.

Periodic Inspection

PRS #4: Preventative Maintenance

PWS Paragraph 4.2 and 4.11(b)

The contractor shall perform all Preventative Maintenance, and submit all Repair and Modification Record Sheet. (CDRL 0007)

The contractor shall perform all Preventative Maintenance annually as described in section 4.2.1 and submitting Repair and Modification Record Sheet. (CDRL 0007)
Report submitted by the end of each month they were completed.

95% accuracy with first submission. 100% accuracy, if edit required.

Periodic Inspection

PRS #5: LOAD Test

PWS Paragraph 4.3 and 4.11.3

The contractor shall perform load tests on all items identified as requiring load tests annually of following any qualifying repair and submit Load Test Sheet (CDRL 0008) for each load test completed

Report submitted by the end of each month they were completed.

95% accuracy with first submission. 100% accuracy, if edit required.

Periodic Inspection

PRS #7 Repairs/Modernization/ Replacement

The Contractor shall be responsible for any repairs, modernization, replacement needed on any piece of equipment listed in “Technical Exhibit A – Lifting Devices”.

PWS 4.4 and 4.11(b) All repair/replacement/ modernization work must be done in accordance with (IAW) industry standards and manufacturer recommendations and contractor must submit Repair and Modification Record Sheet. (CDRL 0007)

Report submitted by the end of each month they were completed.

95% accuracy with first submission. 100% accuracy, if edit required.

Periodic Inspection