Attachment 4 - Pricing Schedule.pdf
PDF 89 KB Posted
- Attached to
- Replacement of Fresno Jet Fuel Complex
- Solicitation number
- W9123820R0054
About this file
This document includes an attachment providing a pricing schedule for the replacement of a jet fuel complex at the Fresno Air National Guard base in Fresno, California. The pricing schedule lists line item costs for fuel storage tanks, a pumphouse, truck fillstands, truck off-loading, site work and utilities, demolition, and optional items including a leak detector system, automatic tank gauging equipment, disposal of contaminated soil, removal of residual oily water and sludge, and installation of a standby generator and new barrier wall. It also requests the contractor provide its general and administrative rate and proposed profit percentage.
The related federal contract opportunity is a solicitation issued by the Department of the Army Corps of Engineers Engineering District Sacramento. The project scope includes constructing new above-ground steel storage tanks, a pump house, truck loading and unloading facilities, site preparation, utility work, security fencing, an emergency generator, lighting and fire protection systems. It will replace an existing jet fuel complex and involves demolition and removal of underground tanks, loading and parking facilities, and asbestos-containing materials.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fresno Jet Fuel Pricing Schedule
Base CLIN Components Fuel Storage Tanks Job $ Pumphouse Job $ Truck Fillstands Job $ Truck Off-Load Job $ Site Work and Utilities Job $ Demolition Job $ Base CLIN Total $
Optional CLINS Option 1 – Leak Detector Job $ Option 2 – Automatic Tank Gauging System Equipment
Job $
Option 3 – Disposal of Contaminated Soil
Cubic Yards
575 $ /per CY
Option 4 – Removal & Disposal of Residual Oily Water and Sludge
Gallon 15,500 $
/per Gallon
Option 5 – Furnish & Install Standby Generator
Job $
Option 6 – Demolish Existing Barrier Wall & install new barrier wall
Job $
Option CLINS Total $
GRAND TOTAL $
Please list your G&A rate here Please list your Profit percentage here