This is a preventive maintenance specification document from Modula Inc. outlining different maintenance levels required for their vertical lift module systems. The document details four maintenance levels:
Level 1 PM requires annual maintenance performed by certified technicians at minimum once per year or every 15,000 missions, involving routine inspections, calibration, lubrication, and adjustments. Levels 2-4 involve parts replacement at specific intervals: Level 2 (every 30,000 missions) requires replacement of sprockets, chains, pawls, guides, and door parts; Level 3 (every 45,000 missions) requires replacement of wheel-tubes and external bay slides; and Level 4 (every 150,000 missions) requires replacement of vertical belts, pulleys, E-chains, cradle movement cables, motors, and gear motors. The document indicates these maintenance kits and schedules are designed to ensure proper operation and maximize machine longevity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Schedule of Services.xlsx | XLSX spreadsheet | |
| Attachment 13 - VLM Service Schedule.xlsx | XLSX spreadsheet | |
| C-6 SF30 Amendment 0002.pdf | ||
| Amendment P00001_SF30_SP330025Q0088P00001.pdf | ||
| Attachment 7 - DL0584 Visitor Register Form.pdf | ||
| Attachment 6 - DD2875 System Authorization Access Request.pdf | ||
| Attachment 12 - QASP_VLM Mntc Svcs_Modula-NV.docx | DOCX document | |
| Tab 11 - CSS SP3300-25-Q-0088.pdf | ||
| Attachment 8 - DL1591 Supervisor Mishap Report.pdf | ||
| Attachment 3 - Eqpmt List-VLM Mntc Svcs_Modula-NV.pdf | ||
| Attachment 9 - DL1818 Visitor Notification Form.pdf | ||
| Attachment 2 - PWS-VLM Mntc Svcs_Modula-DDNV.docx | DOCX document | |
| Attachment 1 - Schedule of Services.xlsx | XLSX spreadsheet | |
| Attachment 11 - TE_1.2_CAC_Procedures.pdf | ||
| Attachment 5 - Wage Determination No 2015-4341.pdf | ||
| Attachment 10 - TE 1.1 Contractor Personnel Sec.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREVENTIVE MAINTENANCE LEVELS
Annual LVL 1 PM Maintenance The Scheduled LVL 1 Maintenance recommended by MODULA INC must be performed at least ONE a YEAR and not beyond No. 15,000 Missions.
During the LVL 1 PM the Certified Technicians will perform all routine inspections, calibration, lubrication, and adjustment activities to ensure the proper operation and increase the longevity of the machines.
Level 2,3,4 - PM parts replacement
The Maintenance KIT replacement program is design to ensure to the machine the proper operation during the years and to max its longevity, replacing some consumable parts at certain time.
• PM LVL 2 Every 30,000 missions (Replace Sprocket, Chains, Pawls, Guides, and Door parts if it is present)
• PM LVL 3 Every 45,000 missions (Replace Wheel-tubes, and external bay slides if an EB is present)
• PM LVL 4 Every 150,000 missions (Replace Vertical Belt, Vertical Pulleys, Vertical E-Chain, Cradle Movement
Cables, Motors, Gear motors)