Attachment 4 - Pictures.docx

DOCX document 13 MB Posted

Attached to
TBRD Water Leak Repair Federal contract opportunity
Solicitation number
127EAX26Q0087
Issued by
Department of Agriculture Forest Service

About this file

This file is an attachment containing photographic documentation of water infrastructure components and installation locations for the Tonto Basin Ranger District water leak repair project. The images illustrate the physical scope of work including hydrant relocations at Cholla Campground with concrete ring casings, the Grapevine Group Site water tank and associated vault installations, priority valve and pressure reduction valve placements, cross-connections between Grapevine Group Site and Windy Hill administrative sites, and water line metering infrastructure positioned in concrete vault boxes. The photographs serve as visual reference materials for contractors bidding on Solicitation Number 127EAX26Q0087, providing site-specific details regarding the locations where hydrants must be relocated to main water lines, where valves require installation to reduce future leak potential, and existing infrastructure that may be affected during the repair work.

The photographic attachment supports the primary project objective of eliminating known leaks and preventing future leaks in the Tonto National Forest drinking water network. These images enable prospective contractors to assess physical conditions, understand the spatial relationships between components, and plan equipment placement and work sequencing for hydrant relocations, valve installations, trench work including potential asphalt replacement in the campground loop, and backfilling operations that will be required to complete the water system repairs in accordance with applicable codes and contract requirements.

View the file

Other files for this federal contract opportunity

Other files attached to TBRD Water Leak Repair, newest first.
File Type Posted
Site Visit Report- TBRD Water Leak Repair Project.docx DOCX document
127EAX26Q0087 Amendment 0001.pdf PDF
Attachment 5 - Updated Schedule of Items.xlsx XLSX spreadsheet
Attachment 7 - Drawings.pdf PDF
127EAX26Q0087 TBRD Water Leak Repair.pdf PDF
Attachment 1 - Statement of Work.docx DOCX document
Attachment 5 - Schedule of Items.xlsx XLSX spreadsheet
Attachment 2 - Industrial Fire Plan.pdf PDF
Attachment 3 - Directional Maps.pdf PDF
Attachment 6 - Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Southwest Region 3 Tonto National Forest TBRD WATER LEAK REPAIR PHASE 2- Pictures Relocation of Hydrants at Cholla Campground:

Concrete rings encasing hydrant:

Grapevine Group Site Priority Valve and Pressure Reduction Valve Installation

Cross connection between Grapevine Group Site and Windy Hill (rest of administrative sites)

Grapevine Water Tank:

Grapevine Group Site Vault near Tank:

Grapevine Group Site Vault where pressure reduction valve will be installed downstream of:

Cholla Campground Pressure Reduction Value Installation:

Water line coming into campground and meter (in concrete vault box) image5.jpeg image6.png image7.png image8.jpeg image9.jpeg image10.jpeg image11.jpeg image1.jpeg image2.jpeg image3.jpeg image4.jpeg