Site Visit Report- TBRD Water Leak Repair Project.docx
DOCX document 17 KB Posted
- Attached to
- TBRD Water Leak Repair Federal contract opportunity
- Solicitation number
- 127EAX26Q0087
- Issued by
- Department of Agriculture Forest Service
About this file
This is a Site Visit Report documenting a pre-award inspection for the TBRD Water Leak Repair Project (Solicitation Number 127EAX26Q0087) under the Department of Agriculture Forest Service. The report captures observations and findings from an on-site evaluation of the Tonto National Forest's Tonto Basin Ranger District facility where water infrastructure repairs are planned.
The project scope includes repairing leaks in the forest's drinking water network, with primary objectives of eliminating known leaks and reducing future leak potential. Key deliverables include as-built drawings upon project completion. The work involves relocating 1- or 2-inch recreation hydrants from secondary pipes to main distribution lines, abandoning existing leaking secondary pipes in place, and installing one priority valve and two pressure reduction valves at COR-designated locations. One identified leak may require excavation under asphalt campground loop pavement, necessitating trench backfilling and new asphalt placement to restore the loop to original condition. The contractor must provide all personnel, equipment, tools, and materials required to complete the work in compliance with applicable codes and contract requirements. This site visit report supports the solicitation process by documenting existing conditions and project logistics prior to quote submission.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 127EAX26Q0087 Amendment 0001.pdf | ||
| Attachment 5 - Updated Schedule of Items.xlsx | XLSX spreadsheet | |
| Attachment 7 - Drawings.pdf | ||
| Attachment 2 - Industrial Fire Plan.pdf | ||
| Attachment 3 - Directional Maps.pdf | ||
| Attachment 6 - Wage Determination.pdf | ||
| Attachment 4 - Pictures.docx | DOCX document | |
| 127EAX26Q0087 TBRD Water Leak Repair.pdf | ||
| Attachment 1 - Statement of Work.docx | DOCX document | |
| Attachment 5 - Schedule of Items.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 19, 2026 Tonto Basin Ranger District Water Leak Repair Project Site Visit Report Five bidders were present and signed the attendance sheet:
| - | Sterling Thomas, representing Quality Pumping, 602 525 0324, qualitypumping@yahoo.com |
| - | Rony Lambghare, Oddoneta Construction, 929 200 3833, estimating@oddonetta.net |
| - | Michael Woodbory, Oddoneta Construction, 929 200 3608, mwoodbuny@oddonetto.net |
| - | Logan Smith, Sharp Creek Contracting Inc., 602 550 2874, logan@sharpcreck.com |
| - | Austin Libby, MJH United LLC, 928 951 6012, James.H@MH.united.ocm |
| - | Tim Entrekin, Westen Grade LLC, 928 358 7693, time@westerngc.com |
Four Forest Service employees were present:
| - | Kossigan Apedjinou |
| - | Sylvia Qi |
| - | Brett Anderson |
| - | Sean Fleetham |
The meeting began at 10:15 AM at the Tonto Basin Ranger District office.
| 1. | At the Grapevine Group Campground, the location where the priority valve is to be installed was identified. Forest Service personnel explained the need for this valve. The few questions asked by the bidders received answers deemed satisfactory by the contractors. |
| 2. | At the same campground (Grapevine site), the group visited the vault where the pressure-reducing valve will be installed. |
| 3. | At the "Teddy Bear" and "Christmas" loops, Forest Service personnel explained the goal and indicated the planned relocation of the two hydrants. |
| 4. | The next stop was the location were the concrete rings that the contractor must move along with the fire hydrants are located. |
| 5. | The site visit concluded at 12:15 PM at the Cholla site, where the second pressure valve will be installed. |
Site visit summary:
| - | Attachment No. 5 (Schedule of Item) will be updated and sent to the five bidders present at the visit. |
| - | The selected contractor will not be required to replace asphalt in areas where leaks located beneath the roadway will be repaired; concrete may be used instead. |