Attachment 4_photos Paddy Flat Garage Warehouse Barn Site.pdf

PDF 12 MB Posted

Attached to
GAOA Paddy Flat Guard Station Deferred Maintenance, Payette NF
Solicitation number
1240LT24R0002
Issued by

About this file

This government file provides details on a federal contract opportunity from the Department of Agriculture Forest Service. The solicitation number is 1240LT24R0002 for deferred maintenance services at the GAOA Paddy Flat Guard Station on the Payette National Forest. The file includes a 12MB photo attachment of the guard station site. Services required under this contract include general repairs and upgrades to address deferred maintenance needs at the Paddy Flat facility. The solicitation opening date has passed and contract award is anticipated by the end of the current fiscal year.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair broken door.

Pour new concrete landing for this door and door next to it.

GARAGE

Install lens guard or replace with fixture that has lens guard.

Extra flooring, siding, etc. Government supplies may be used. Contractor to supply materials beyond existing supply.

Repair/replace siding where damaged and repaint all siding.

Window maintenance.

LBP Abatement.

Lead-based paint removal or abatement.

Metal roof replacement.

Install metal sheeting inside on gable ends.

Garage sliding door maintenance for smoother operation.

LBP Abatement Sliding garage doors

Repaint siding

Paint door to match photo

Remove/abate lead based paint on trim.

Replace chinking and daubing on exterior of warehouse

WAREHOUSE

Wood is called chinking.

Mortar is called daubing.

Replace existing windows with wood windows in the style of rental cabin windows. Remove lead-based paint, replace trim in kind and paint white.

Posts can be used for fence repair.

Add lens guard or replace fixture with one that has lens guard.

Replace chinking and daubing where light is coming through.

Replace trim pieces where missing in kind and paint white.

Replace metal roof

Check logs for rotting and replace where necessary.

Replace section of bottom log where rotted.

Clean up things leaning against warehouse and fence. Fix fence.

Install gate

Window maintenance like on the other buildings.

Repair/repair damaged siding and repaint all siding.

Replace metal roof.

BARN

Lead based paint removal/abatement.

Repair door, very difficult to open currently.

Install sheet metal on gable ends.

Maintain doors so they open and close properly.

LBP abatement Siding repair

Lead based paint on trim. Remove and replace in kind and paint white

Door too thick for slider.

Trim tree branches up to 8’.

Pour new concrete pad for propane, move propane to new pad, redo lines after moving.

SITE WORK

Repaint picnic table.

Move fire ring to location specified by COR and install concrete pad per details.

Fence repair.

Maintain entrance gate for smooth opening.

Fence repair.

Remove this fire ring.