Attachment 4 - NLAE 1989 AS-BUILT Division 11 Electrical.pdf

PDF 25 MB Posted

Attached to
Rewire Fire Alarm Voice Notification System
Solicitation number
1232SA25Q0324
Issued by

About this file

The file is an electrical as-built drawing set for a multi-level facility, specifically Attachment 4 - NLAE 1989 AS-BUILT Division 11 Electrical. The comprehensive drawing set includes 26 electrical plans and diagrams covering site electrical layouts, power plans, lighting plans, and detailed schedules for multiple building levels (Level B, Levels 1-3, Penthouse, and Roof). Specific drawings include site electrical plans, power and lighting plans for each level, enlarged laboratory power plans, riser diagrams, electrical details, lighting schedules, panelboard schedules, and equipment schedules.

The related federal contract opportunity is a Small Business set-aside solicitation (Number 1232SA25Q0324) issued by the USDA Agricultural Research Service for rewiring a fire alarm voice notification system in Ames, Iowa. The contract is a Firm Fixed Price procurement with a 180-day performance period, using a Lowest Price Technically Acceptable (LPTA) evaluation method. Potential contractors must be SAM-registered, attend a mandatory site visit (July 29 or 31, 2025), and submit technical and price quotes electronically by the specified deadline. The NAICS code is 238210 with a small business size standard of $19M.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

176 NLAE 11.00 Site Electrical Plan

177 NLAE 11.01 Power Plan - Level B
178 NLAE 11.01A Lighting Plan - Level B
179 NLAE 11.02 Power Plan - Level 1
180 NLAE 11.02A Lighting Plan - Level 1
181 NLAE 11.03 Power Plan - Level 2
182 NLAE 11.03A Lighting Plan - Level 2
183 NLAE 11.04 Power Plan - Level 3
184 NLAE 11.04A Lighting Plan - Level 3
185 NLAE 11.05 Power Plan - Penthouse & Roof
186 NLAE 11.05A Lighting Plan - Penthouse & Roof
187 NLAE 11.07 Enlarged Lab Plan - Power West - Level B
188 NLAE 11.08 Enlarged Lab Plan - Power East - Level B
189 NLAE 11.09 Enlarged Lab Plan - Power West - Level 1
190 NLAE 11.10 Enlarged Lab Plan - Power East - Level 1
191 NLAE 11.11 Enlarged Lab Plan - Power West - Level 2
192 NLAE 11.12 Enlarged Lab Plan - Power East - Level 2
193 NLAE 11.13 Enlarged Lab Plan - Power West - Level 3
194 NLAE 11.14 Enlarged Lab Plan - Power East - Level 3
195 NLAE 11.18 Riser Diagrams
196 NLAE 11.21 Details
197 NLAE 11.22 Details and Lighting Schedule
198 NLAE 11.23 Details
199 NLAE 11.24 Schedules
200 NLAE 11.25 Panelboard Schedules
201 NLAE 11.26 Equipment Schedule

File details come from the government source that posted it. Updated .