Attachment 4 - MAHG241006 Replace Magnolia DFAC AHUs B7409 - MSS.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Replace Magnolia DFAC AHUs
Solicitation number
FA301026R0008
Issued by

About this file

This is a Material Submittals Schedule (MSS) for the Replace Magnolia DFAC AHUs project (Project Number 241006), associated with Air Force solicitation FA301026R0008. The document serves as a template for tracking and managing contractor submissions throughout the construction project, establishing required submittal types, quantities, submission timelines, and approval workflows. The schedule outlines submission requirements for hazardous materials documentation (questionnaires, Material Safety Data Sheets, and reporting forms) due five days prior to the project start date, with final hazmat and recycling reports due at contract end. Warranty documentation from both manufacturers and the contractor is required at project completion.

The MSS specifies technical submittals for 25 line items covering HVAC systems (Sections 23 05 93, 23 09 00, 23 30 00), electrical distribution systems (Section 26 20 00), and various building components including carpentry, doors, frames, sealants, tile work, and paint finishes. Most technical submittals require three copies and are due ten days following Notice to Proceed (NTP), with submission to Civil Engineering for review and approval. The document includes fields for tracking submittal numbers, submission and receipt dates, review suspense dates, approval or disapproval notifications, and resubmittal requirements. This template is designed to be completed by the Project Engineer and Contract Administrator to ensure systematic documentation and timely processing of all required contractor submittals throughout the project lifecycle.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
241006Project Title:
MAHG241006 Replace Magnolia DFAC AHU'S B7409Solicitation / Contract Number:

FA301026R0008

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies Required (if not electronically submitted)Remarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationWarranty-Manufacturer and/or WorkmanshipCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission Date

fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

Submittal Numbers fergusog: Enter the Submittal Number

Date Contractor
NotifiedContractor Resubmittal

fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date

(MM/DD/YY)

Approved fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

1HazMat Questionnaire335 Days Prior to Start Date
2HazMat MSDS335 Days Prior to Start Date
3HazMat Reporting Entry Form335 Days Prior to Start DateSubmit Final Quantities
4HazMat Reporting entry Form33End of Contract
5Recycling and Landfill Report33End of Contract
6Warranty (Manufacture's)33End of Contract
71-Year Warranty (Contractor's)33End of Contract
21Section 23 05 93 TAB33310 Days Following HVAC complete
22Section 23 09 00 Control3333310 Days Following EMS Control complete
23Section 23 30 00 Air Distribution System33310 Days Following NTP
24SECTION 26 20 00
INTERIOR DISTRIBUTION SYSTEM1110 Days Following NTP
8Section 061000-Rough Carpentry11110 Days Following NTP
9Section 062000-Finish Carpentry General111110 Days Following NTP
10Section 064020-Interior Architectural Woodwork111110 Days Following NTP
10Section 082000-Wood Doors111110 Days Following NTP
11Section 081113-Steel Frames1111110 Days Following NTP
12Section 082000-Wood Doors1111110 Days Following NTP
13Section 084010-Aluminum Doors and Frames1111110 Days Following NTP
11Section 079200-Joint Sealants111110 Days Following NTP
15Section 093013-Tile and Grout1111110 Days Following NTP
16Section 093050-Tile Setting Materials and Accessories1111110 Days Following NTP
1210 Days Following NTP
12111110 Days Following NTP
131111110 Days Following NTP
14Section 099100-Paint111110 Days Following NTP
15111110 Days Following NTP
20Section 099323-Stains and Transparent Finishes1111110 Days Following NTP
14
15
16
17
18
19
20
21
22
23
24
25

&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).

&P of &N

File details come from the government source that posted it. Updated .