Attachment 4 - M1-102 EXISTING RESIDENTIAL COMPOUND ENLARGED SITE PLAN.pdf

PDF 1 MB Posted

Attached to
USAID/South Sudan Juba Compound Electrical Upgrade Federal contract opportunity
Solicitation number
72066821R00014
Issued by
US Agency for International Development South Sudan

About this file

This attachment is an existing residential compound enlarged site plan related to a federal contract solicitation. The USAID/South Sudan Juba Compound Electrical Upgrade solicitation seeks Phase One proposals to provide electrical upgrade services at the USAID Mission in South Sudan compound in Juba. Proposals are due by a specified date to upgrade the electrical infrastructure and systems at the residential compound to address safety and capacity issues. The selected contractor will be responsible for evaluating the existing electrical systems, developing design plans, obtaining necessary permits and approvals, and performing the upgrade work. The award is expected to be a firm-fixed-price contract with a one-year period of performance.

View the file

Other files for this federal contract opportunity

Other files attached to USAID/South Sudan Juba Compound Electrical Upgrade, newest first.
File Type Posted
J.3.8_E1-704_Residential Compound Single Line Diagram_AMD003.pdf PDF
J.3.8_E1-701_Existing Office Single Diagram. AMD003.pdf PDF
J.3.7_E1-102_Existing Residential Site Plan_AMD003.pdf PDF
J.3.7_E1-101_Existing Office Compound Site Plan_AMD003.pdf PDF
Amendment 03 RFP 72066821R00014 Juba Elec. Upgrade..pdf PDF
J.3.7_E1-103_Office Compound Site Plan_AMD003.pdf PDF
J.3.7_E1-001_General Notes, Legend and Abbreviations_AMD003.pdf PDF
J.3.3.2_Design Intent Report_AMD003.pdf PDF
RFP 72066821R00014 Juba Compound Electrical Upgrade Amendment 0002.pdf PDF
72066821R00014 Amendment 01 - Electrical Retrofit.pdf PDF
Attachment 1 -013550 ConSec Juba Electrical Upgrade Project Final.pdf PDF
Attachment 1 - 011005 Exec and Coord Juba Electrical Upgrades Final.pdf PDF
Attachment 3 - 230905 INSTRUMENTATION AND CONTROLS FOR HVAC OBO.pdf PDF
Attachment 3 - 260508 COMMON WORK ELEC-COMM.pdf PDF
Attachment 3 - 260518 LOW-VOLT POWER CONDUCTORS JAN19.pdf PDF
Attachment 3 - 261214 MEDIUM-VOLTAGE TRANSFORMERS.pdf PDF
Attachment 3 - 262725 WIRING DEVICES JAN19.pdf PDF
Attachment 3 - 262417 PANELBOARDS JAN19.pdf PDF
Attachment 3 - 262913 ENCLOSED CONTROLLERS JAN12.pdf PDF
Attachment 4 - E1-102 EXISTING RESIDENTIAL COMPOUND SITE PLAN.pdf PDF
Attachment 4 - E1-101 EXISTING OFFICE COMPOUND SITE PLAN.pdf PDF
Attachment 4 - M1-705 GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf PDF
Attachment 4 - M1-104 RESIDENTIAL COMPOUND ENLARGED SITE PLAN.pdf PDF
Attachment 4 - E1-701 EXISTING OFFICE COMPOUND SINGLE LINE DIAGRAM.pdf PDF
Attachment 6 - Design Intent Report.pdf PDF
Attachment 8-Past Performance Information Sheet.xlsx XLSX spreadsheet
SF1442-14b Juba Compound Electrical Upgrade.pdf PDF
Attachment 3 - 262500 ENCLOSED BUS ASSEMBLIES.pdf PDF
Attachment 1 -ToC SM DB wo CW Juba Electrical Upgrades Final.pdf PDF
Attachment 1 -014010 Quality Juba Electrical Upgrades Final.pdf PDF
Attachment 1 -ds1663.PDF PDF
Attachment 3 - 62816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS FL.pdf PDF
Attachment 3 - 260525 GROUNDING-BONDING-ELEC-SYSTEMS JAN19.pdf PDF
Attachment 3 - 262214 LOW-VOLTAGE TRANSFORMERS.pdf PDF
Attachment 3 - 262413 SWITCHBOARDS FL.pdf PDF
Attachment 3 - 262923 VARIABLE-FREQUENCY MOTOR CONTROLLERS FL.pdf PDF
Attachment 3 - 263535 POWER-FACTOR CORRECTION JAN18.pdf PDF
Attachment 3 - 263214 ENGINE GENERATORS JAN18R FOR JUBA.pdf PDF
Attachment 4 - E1-001 GENERAL NOTES LEGEND AND ABBREVIATIONS.pdf PDF
Attachment 4 - M1-706 GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf PDF
Attachment 4 - M1-703 EXISTING GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf PDF
Attachment 4 - E1-704 RESIDENTIAL COMPOUND SINGLE LINE DIAGRAM.pdf PDF
Attachment 7 - Juba USAID Geotechnical Report dated Feb 2008.pdf PDF
RFP 72066821R00014 Juba Compound Electrical Upgrade Final.pdf PDF
Attachment 1 -017825A CMMS Template v2-00-02.xlsx XLSX spreadsheet
Attachment 1 -017705 Closeout Juba Electrical Upgrades Final.pdf PDF
Attachment 1 -015005 TempFa Juba Electrical Upgrades Final.pdf PDF
Attachment 1 -013525 Safety Juba Electrical Upgrades Final.pdf PDF
Attachment 1 -013205 Scheduling Juba Electrical Upgrades Final.pdf PDF
Attachment 3 - 000000 TABLE OF CONTENTS.pdf PDF
Show all 50

USAID/South Sudan Juba Compound Electrical Upgrade has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .