Attachment 4 Lofton Fishing Pier Boring Report.pdf

PDF 1 MB Posted

Attached to
Lofton Reservoir Fishing Pier Construction Project
Solicitation number
1240BH24Q0007
Issued by

About this file

The attached documents include boring logs and a federal contract opportunity solicitation for the Lofton Reservoir Fishing Pier Construction Project. The boring logs provide subsurface geotechnical data from drill borings taken at the project site, indicating dense to very dense silty sand with cobbles and gravels was encountered to depths of 9 to 11 feet below ground surface. The related federal contract opportunity solicitation seeks quotes for construction of the Lofton Reservoir Fishing Pier, with a response due date of 4 April 2024. The solicitation is issued by the USDA Forest Service Pacific Northwest Region for building a new fishing pier at Lofton Reservoir.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SM Loose to M. Dense SILTY SAND, SM, with trace to some subrounded F-C gravels, Brown, Moist to Wet, trace organics, low to non plastic

SM M. Dense to Dense SILTY SAND, SM, with some cobbles to fine gravels, Brown, Wet, non plastic

SM Dense to V. Dense SILTY SAND, SM, with some cobbles to fine gravels, Brown, Wet, non plastic

4-3-4 780 80

1-1-3 450 100

4-6-10 1680 100

20-23-11 34100 100

20-16-12 28100 100

9-3-8 1180 100

12-16-18 34100 100

16-19-23 42100 100

11-34-46 8060 100

G W

T n ot e nc ou nt er ed

SREO Geo Group

S u pe rL og C iv il

T ec h S of tw ar e, U S

A w w .c iv il te ch

.c om

F il e:

C

U se rs

\c h ri st op h er m ar ti n \B ox \0

1.

c h ri st op h er

.m .m ar ti n W or ks pa ce

\D ri ll L og s\

L of to n

.lo g

D at e:

0/

/2

Lofton Fishing Pier Fremont-Winema NF Bly Ranger District

Driler: C.Martin

Lat./Long. 42.26336, -120.81964

Date Completed 26 SEPT 2022

Boring No. DH-1

Elev.: SWL:

Drilling Method: 6" HSA

Logged By: C. Martin

Drilling Equipment: FS Truck Mounted Big Beaver

Site Map

S am pl e

N o.

S am pl e

T yp e

R ec ov er y

R Q

D

B lo w C ou nt pe r in ch es

B lo w s/

F oo t ( N

D ep th ft B

G S

G ra ph ic

L og

Materials Description

M oi st ur e

Remarks

PLATE

W at er T ab le

SM Dense to V. Dense SILTY SAND, SM, with some cobbles to fine gravels, Brown, Wet, non plastic

End of Boring at (feet BGS): 21

47-23-18 41100 100

21-66-32 9880 100

24-32-40 72100 100

25-24-22 46100 100

39-36-45 81100 100

SREO Geo Group

S u pe rL og C iv il

T ec h S of tw ar e, U w .c iv il te ch e:

C

U se rs

\c h ri st op h er m ar ti n \B ox \0

1.

c h ri st op h er

.m .m ar ti n W or ks pa ce

\D ri ll L og s\

L of to n e:

0/

/2

Lofton Fishing Pier Fremont-Winema NF Bly Ranger District

Driler: C.Martin

Lat./Long. 42.26336, -120.81964

Date Completed 26 SEPT 2022

Boring No. DH-1

Elev.: SWL:

Drilling Method: 6" HSA

Logged By: C. Martin

Drilling Equipment: FS Truck Mounted Big Beaver

Site Map

S am pl e

N o.

S am pl e

T yp e

R ec ov er y

R Q

D

B lo w C ou nt pe r in ch es

B lo w s/

F oo t ( N

D ep th ft B

G S

G ra ph ic

L og

Materials Description

M oi st ur e

Remarks

PLATE

W at er T ab le

SM Boulders with infilling of loose matrix of Silty Sand, trace organics, low plastic

SM Dense SILTY SAND, SM, with some cobbles to fine gravels, Brown, Wet, non-plastic

End of Boring at (feet BGS): 9

1-20-3 2350 80 Surface boulders present at pile locations

5-4-5 980 100

40-30-12 42100 100 *SPT values derived from correlation to Drive Probe

21-20-15 3550 100

22-15-16 3160 100

18-23-25 4840 100

50/4" 50/4 Refusal @ 9 ft bgs

G W

T n ot e nc ou nt er ed

SREO Geo Group

S u pe rL og C iv il

T ec h S of tw ar e, U w .c iv il te ch e:

C

U se rs

\c h ri st op h er m ar ti n \B ox \0

1.

c h ri st op h er

.m .m ar ti n W or ks pa ce

\D ri ll L og s\

L of to n e:

0/

/2

Lofton Fishing Pier Fremont-Winema NF Bly Ranger District

Driler: C.Martin

Lat./Long. 42.26336, -120.81964

Date Completed 26 SEPT 2022

Boring No. DP-1

Elev.: SWL:

Drilling Method: Drive Probe

Logged By: C. Martin

Drilling Equipment: Drive Probe

Site Map

S am pl e

N o.

S am pl e

T yp e

R ec ov er y

R Q

D

B lo w C ou nt pe r in ch es

B lo w s/

F oo t ( N

D ep th ft B

G S

G ra ph ic

L og

Materials Description

M oi st ur e

Remarks

PLATE

W at er T ab le

SM Boulders with infilling of loose matrix of Silty Sand, trace organics, low plastic

SM Loose SILTY SAND, SM, with some fine to coarse gravels, Brown, Wet, non-plastic

SM M. Dense to Dense SILTY SAND, SM, with some cobbles to fine gravels, Briwn, Wet, non-plastic

End of Boring at (feet BGS): 11

4-1-0 10 Surface boulders present at pile locations

1-0-0 10

1-2-1 350 100 *SPT values derived from correlation to Drive Probe

2-3-4 750 100

4-4-5 970 100

10-12-14 2680 100

18-19-23 4280 100

50/3" 50/30 Refusal @ 11 ft bgs

G W

T n ot e nc ou nt er ed

SREO Geo Group

S u pe rL og C iv il

T ec h S of tw ar e, U w .c iv il te ch e:

C

U se rs

\c h ri st op h er m ar ti n \B ox \0

1.

c h ri st op h er

.m .m ar ti n W or ks pa ce

\D ri ll L og s\

L of to n e:

0/

/2

Lofton Fishing Pier Fremont-Winema NF Bly Ranger District

Driler: C.Martin

Lat./Long. 42.26336, -120.81964

Date Completed 26 SEPT 2022

Boring No. DP-2

Elev.: SWL:

Drilling Method: Drive Probe

Logged By: C. Martin

Drilling Equipment: Drive Probe

Site Map

S am pl e

N o.

S am pl e

T yp e

R ec ov er y

R Q

D

B lo w C ou nt pe r in ch es

B lo w s/

F oo t ( N

D ep th ft B

G S

G ra ph ic

L og

Materials Description

M oi st ur e

Remarks

PLATE

W at er T ab le

Lofton_BoringLogs
DP-1
DP-2

File details come from the government source that posted it. Updated .