This solicitation requests quotes for the Lofton Reservoir Fishing Pier Construction Project. Quotes are due by April 4, 2024 at 5:00 PM for the construction of a new fishing pier at Lofton Reservoir. The project is located approximately 21 miles east of Bly, Oregon on the Paisley Ranger District. The scope of work includes installing scour countermeasures at an existing abutment, rock armoring, approach path modifications with crushed aggregate and asphalt surfacing, erosion control, traffic control, a timber superstructure for the pier, drilled in piles, and all other items necessary to complete the project according to the plans and specifications. The awarding agency is the US Department of Agriculture Forest Service Pacific Northwest Region.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents Preface
103 - Scope of Work
104 - Control of Work
105 - Control of Material
106 - Acceptance of Work
107 - Legal Relations and Responsibility to the Public
108 - Prosecution and Progress
109 - Measurement and Payment
152 - Construction Survey and Staking
153 - Contractor Quality Control
156 - Public Traffic
157 - Soil Erosion and Sediment Control
170 - Develop Water Supply and Watering
171 - Weed and Disease Prevention
252 – Rockery, Special Rock Embankment, and Rock Buttress
322 - Minor Aggregate Courses
404 - Minor Hot Asphalt Concrete
551 – Drilled In Piles
648 - Stream Simulation
Preface Preface_wo_03_22_2022
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.
103 - Scope of Work
Delete all of this section and replace with the following:
103.01 Intent of Contract.
103.00_National_11_9_2016
This project is for the construction of a new fishing pier at the Lofton Reservoir. The new pier is comprised of untreated sawn and glued‐laminated timbers beams, supported by drilled in piles.
The Lofton Fishing Pier site lies south of the Quartz Mountain Sno‐Park on the Paisley Ranger District approximately 21 miles east of Bly, Oregon. The site is located off Forest Development Road 3715, T.38S., R.16E., Sec. 13, Willamette Meridian.
The work includes but is not limited to installing scour countermeasures at existing abutment (lean concrete), rock armoring at abutment, approach path modifications with crushed aggregate and asphalt surfacing, erosion control, traffic control, pier timber superstructure, drilled in piles, and all other items necessary to complete the work in accordance with the plans and specifications.
104 - Control of Work
Delete Subsections 104.01, 104.02, and 104.04.
104.00_National_11_9_2016
104.03 Specifications and Drawings.
(c) As‐built drawings. Modify the first sentence to read as follows: Use one set of Contractor‐provided plans exclusively for as‐built drawings.
(d) Submittals. Add this section:
Shop Drawings and Submittals. The following submittals shall be submitted for approval within 10 calendar days after Notice to Proceed as required by the clause or specification unless noted elsewhere:
Brief Title Section To Submit Submittal
Material Data and Certifications 105.02 (multiple sections)
14 days
Qualifications/ Quality Control Plan
153.02 , 03 2 14 days
Sampling & Testing Results 154.01 1 N/A
Traffic Control Plan 156.04 2 14 days
Soil Erosion & Sediment Control Plan
157.04 2 14 days
Aggregate Courses 301.03 2 14 days
Asphalt Concrete 403.02 2 14 days
Drilled Steel Pipe Shells 551.10 2 14 days
Untreated Structural Timber and Lumber
557.20
Untreated Structural Timber, Glued‐laminated
557.20
Certified Payroll Record WH‐347 (submit weekly)
FAR 52.222‐8 1 N/A
Initial Construction Schedule 155.05 1 At Prework
Construction Schedule Update 155.06 1 Monthly
104.06_National_11_9_2016
Add the following to Subsection 104.06:
104.06 Use of Roads by Contractor.
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105.02 Material Sources.
105 - Control of Material
105.05_National_6_29_2020
105.02(a) Government provided sources.
Add the following:
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
Special Embankment Rock Source – There is material on site in the vicinity of the construction site available for Special Rock Embankment.
Structural Backfill - There is no available Government source for Crushed Aggregate for this project.
Crushed Aggregate - There is no available Government source for Crushed Aggregate for this project.
Waste Site – Government Furnished – There is no available Government waste site for this project.
All materials designated for removal and disposal must be disposed of away from Forest Land as per SPS Section 204.14.
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.
106 - Acceptance of Work
Delete Subsection 106.01 and replace with the following:
106.01 Conformity with Contract Requirements.
106.01 _National_7_18_2017
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project.
When the Government tests work, copies of test reports are furnished to the Contractor upon request.
Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work; providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
1. Sampling method;
2. Number of samples;
3. Sample transport;
4. Test procedures;
5. Testing laboratories;
6. Reporting;
7. Estimated time and costs; and
8. Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
1. Have the work accepted at a reduced price; or
2. Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
Delete Subsection 106.02 and replace with the following:
106.02 Visual Inspection.
Acceptance is based on visual inspection of the work for compliance with the specific contract requirements.
Use prevailing industry standards in the absence of specific contract requirements or tolerances.
107 - Legal Relations and Responsibility to the Public 107.05_National_7_18_2017
Add the following to Subsection 107.02:
107.02 Protection and Restoration of Property and Landscape.
Work adjacent to or within the reservoir will not be allowed to begin prior to July 31, 2024 and must be completed prior to December 31, 2024 unless otherwise approved by the Contracting Officer (C.O.).
Delete Subsection 107.05.
108 - Prosecution and Progress
Delete Section 108 in its entirety.
108.00_National_11_9_2016
109 - Measurement and Payment
Delete Subsections 109.06, 109.07, 109.08, and 109.09:
109.00_National_11_9_2016
Delete Subsections 109.06, 109.07, 109.08, 109.09.
109.01 _National_2_22_2019
Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:
109.01 Measurement of Work.
Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement
Subsection of the section controlling the work being performed. Table 109‐1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.
Table 109‐1
Decimal Accuracy of Quantities for Final Payment
Pay Item Level of Precision Linear Foot 1
Exception--Timber, Steel, and concrete Piles 0.1 Station 0.1 Mile 0.01 Square Foot 0.1 Square Yard 0.1 Each 1 Acre 0.01 Gallon 1 M-Gals. 0.1 Cubic Yard 1
Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;
0.1
Exception--Concrete; Masonry 0.01 Pound 1 Ton 0.1
Exception--Calcium Chloride;
Sodium Chloride; Hydrated Lime;
Bituminous Materials; Pavements;
Bed Course Materials
0.01
Hour 0.1
MFBM 0.01
Station Yard 1 Cubic Yard Mile 1 Ton Mile 1
109.02 _National_11_9_2016
Add the following sentence to Subsection 109.02(b):
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
152 - Construction Survey and Staking
Add the following to Subsection 152.04(c):
152.04 General.
152.00_National_12_12_2016
(c) Material.
Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath, or mark them with plastic flagging. Use designated colors for paint or flagging. Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.
Do not use aerosol spray paints.
Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence.
Make the following changes to Subsection 152.05:
152.05 Survey and Staking Requirements.
Delete Subsection 152.05(d)(2) and replace with the following:
(d) Slope and reference stakes.
(2) Conventional survey methods. When required, locate slope stakes on designated portions of the road. Locate the slope stake catch points and use them to establish clearing limits and slope stake references.
Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.
Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake. Place sight stakes when required.
Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.
Use the designated method to establish the slope stake catchpoint.
Method I—Computed Method. Use the template information shown in the plans or other Government-provided data to calculate the actual location of the catchpoint. The slope stake “catchpoint distance” provided may be used as a trial location to initiate slope staking. Recatch slope stakes on any section that does not match the staking report within the tolerances established in Table 152-2.
Method II—Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other Government-provided data.
Add the following to Subsection 152.05(e):
(e) Clearing and grubbing limits.
Mark the clearing limits with flagging or tags on trees to be left standing, or on lath. Make markings intervisible, and no more than 90 feet apart.
After establishing clearing limits, move the location line stake outside the clearing limits for station identification purposes, and mark it with horizontal distance to location line.
Replace Table 152-1 with the following:
Table 152‐1 Construction Survey and Staking Tolerances.
Table 152-1 Construction Survey and Staking Tolerances (1)
Staking Phase Horizontal Vertical
Control points set from existing
Government control points‐ Tolerance Class
A
±0.03 feet
(±10 millimeters)
±0.01 feet × N
(±3 millimeters × N )(2)
Mapping, topography, and cross‐section
Points‐ Tolerance Class A
±0.16 feet
(±50 millimeters)
±0.16 feet
(±50 millimeters)
Centerline points (3) including (PC), (PT), (POT),(POC), and references‐ Tolerance Class
A
±0.06 feet
(±20 millimeters)
±0.06 feet
(±20 millimeters)
Slope‐stake and slope‐stake references‐
Tolerance Class A (4)
±0.16 feet
(±50 millimeters)
±0.16 feet
±50 millimeters)
Culverts, ditches, and minor drainage structures stakes‐ Tolerance Class A
±0.16 feet
(±50 millimeters)
±0.06 feet
(±20 millimeters)
Retaining walls stakes ±0.06 feet
(±20 millimeters)
±0.03 feet
(±10 millimeters)
Curb and gutter stakes ±0.06 feet
(±20 millimeters)
±0.03 feet
(±10 millimeters)
Bridge substructures stakes ±0.03 feet
(±10 millimeters)(5)
±0.03 feet
(±10 millimeters)
Bridge superstructures stakes ±0.03 feet
(±10 millimeters)(5)
±0.03 feet
(±10 millimeters)
Clearing and grubbing limit stakes‐ Tolerance
Class A
±1.00 feet
(±300 millimeters)
Roadway subgrade finish stakes‐ Tolerance
Class A (6)
±0.16 feet
(±50 millimeters)
±0.03 feet
(±10 millimeters)
Roadway finish grade stakes (6) ±0.16 feet
(±50 millimeters)
±0.03 feet
(±10 millimeters)
Table 152-1
Construction Survey and Staking Tolerances (continued) (1)
Staking Phase Horizontal Vertical
Control points set from existing Government control points –Tolerance Class B (7)
±0.16 feet
(±20 millimeters) ±0.16 feet × N
(±20 millimeters × N )(2)
Mapping, topography, and cross‐section points–Tolerance Class B (7)
±1.00 feet
(±300 millimeters)
±0.50 feet
(±150 millimeters)
Centerline points including (PC), (PT), (POT),(POC), and references–Tolerance Class
B (7)
±0.16 feet
(±20 millimeters)
±0.16 feet
(±20 millimeters)
Slope‐stake and slope‐stake references–
Tolerance Class B (7)
±0.50 feet
(±50 millimeters)
±0.16 feet
±50 millimeters)
Culverts, ditches, and minor drainage structures stakes–Tolerance Class B (7)
±0.50 feet
(±150 millimeters)
±0.16 feet
(±20 millimeters)
Clearing and grubbing limit stakes–Tolerance
Class B (7)
±2.00 feet
(±600 millimeters)
Roadway subgrade finish stakes–Tolerance
Class B (7)
±0.50 feet
(±50 millimeters)
±0.16 feet
(±10 millimeters)
Roadway finish grade stakes–Tolerance Class
B (7) ±0.50 feet
(±50 millimeters)
±0.16 feet
(±10 millimeters)
(1) At statistical 95 percent confidence level. Tolerances are relative to existing Government control points.
(2) N is the number of instrument setups.
(3) Centerline points: PC ‐ point of curve, PT ‐ point of tangent, POT ‐ point on tangent, POC ‐ point on curve.
(4) Take the cross‐sections normal to the centerline ±1 degree.
(5) Bridge control is established as a local network and the tolerances are relative to that network.
(6) Includes paved ditches.
(7) Tolerance Class B for Very Low Volume Roads with an aggregate or native finished surface.
153 - Contractor Quality Control
Delete Subsection 153.02 and replace with the following:
153.02 Qualifications.
153.02_National_11_1_2016
Submit the following for approval with the quality control plan:
(a) Quality control manager (QCM). Furnish a QCM who has at least 2 years’ experience in construction, inspector, quality control and material testing on construction projects of similar type and scope.
(b) Testers. Provide testers with at least one year experience in the type of sampling and testing required, and with one of the following for the type of sampling and testing performed:
(1) NICET Level II certification in highway material or equivalent state or industry certification;
(2) Certification by a regional certification program (such as Western Alliance for Quality Transportation Construction (WAQTC), Northeast Transportation Technician Certification Program (NETTCP), Southeast Task Force for Technician Training and Qualification (STFTTQ), or Multi Regional Training and Certification (M-TRAC)); or
(3) At least one year employment by an AASHTO accredited laboratory performing equivalent sampling and testing.
153.03_National_11_1_2016
Add the following paragraph to the end of Subsection 153.03(b):
153.03 Quality Control Plan.
(b) Quality Control Procedures.
Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.
153.07_National_11_1_2016
Delete Subsection 153.07 and replace with the following:
153.07 Records and control charts.
Maintain complete testing and inspection records by pay item number and make them accessible to the CO.
156 - Public Traffic
Delete Section 156 in its entirety and replace with the following:
Description
156.00_National_2_5_2019
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Permanent Traffic Control 633
Traffic Signing and Marking Material 718
Concrete Barriers and Precast Guardwalls 618
Temporary plastic fence 710.11
Construction Requirements
156.03 General. Accommodate traffic according to MUTCD, approved traffic control plan and this section.
Perform work in a manner that ensures safety and convenience of the public. Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to Subsection 106.07(b).
Submit traffic control plan at least 30 days prior to intended use. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.
Post construction signs and traffic control devices in conformance with MUTCD and Forest Service EM 7100-15.
All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown.
Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.
Table 156-1 Temporary Road Closures
Road Number
From Terminus
To Terminus
Maximum Consecutive Days of Closure
Minimum Consecutive Days Open
Park Roadway
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Payment for contract work is provided indirectly. See Subsection 109.05.
157 - Soil Erosion and Sediment Control
Delete Subsection 157.04 and replace with the following:
157.04_National_11_1_2016
157.04 General.
Thirty (30) days prior to the start of construction, submit a written plan according to subsection 104.03 with all necessary permits that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control without approval.
When erosion control measures are not functioning as intended, take corrective action to eliminate or minimize pollutants in storm water discharges from the project.
170 - Develop Water Supply and Watering
170.01 This work consists of developing an acceptable water supply, furnishing, hauling, and applying water.
Materials
170.02 Conform to the following subsection.
Water 725.01.
Construction Requirements
170.03 Development of Supply & Access. Develop water supplies and access to the water supplies as required. Use designated water sources or other approved water sources. Before using non-designated water sources, obtain all necessary permissions, water rights, and permits.
170.04 Equipment. Provide mobile watering equipment with watertight tanks of known capacity.
Provide for positive control of water application from the driver’s position.
170.05 Application. Apply water uniformly without ponding or washing.
170.06 Acceptance. Developing water supplies and watering will be evaluated under Subsections
106.02 and 106.04.
Measurement
170.07 Measure the Section 170 items listed in the bid schedule according to Subsection 109.02.
Payment
170.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 170 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
171 - Weed and Disease Prevention
171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest System lands.
171.02 Conform to the following Subsection:
Water 725.01
Construction Requirements
171.03 General . Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest System lands.
Perform all work at a location designated on the plans or other locations approved in writing. Provide the CO with an opportunity to monitor the washing and inspection.
171.04 Equipment. Use a high pressure washing system.
For work on National Forest System lands, use a washing system that traps all wash water and either stores it for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds in an approved manner. Do not mix soaps, detergents, or other chemicals with the wash water.
For work at a commercial washing facility, use an approved facility.
171.05 Washing. Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.
171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment. Rewash the construction equipment as necessary or as directed.
171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02.
Measurement
171.08 Do not measure weed prevention for payment.
Payment
171.09 Include all costs associated with the Section 171-Weed Prevention in the unit price for Section 151- Mobilization.
252 – Rockery, Special Rock Embankment, and Rock Buttress
252.01 This work consists of constructing special rock embankment (rock armor) at the pier abutment as shown on the plans.
252.02 Rock material to be used for special rock embankment shall be gathered on site in the vicinity of the proposed pier. Geotextile Type IV to be placed under rock armor shall conform to Section 714.01
322 - Minor Aggregate Courses
02.01 This work consists of constructing one or more courses of aggregate on a prepared surface.
Work includes producing aggregate by grid rolling, screening, or crushing methods, or placing pit-run or Government-furnished aggregate.
Surface aggregate grading is designated as shown in Table 703-3.
Subbase and base aggregate grading is designated as shown in Table 703-2.
02.02 Conform to the following Subsections:
Aggregate 703.05 Water 725.01 c
02.03 General. Prepare the surface on which the aggregate course is placed according to Section 204 or 303 as applicable.
Request approval of the roadbed in writing before placing aggregate.
Develop, haul, and apply water in accordance with Section 170.
Submit target values within the gradation ranges shown in Table 703-2 or 703-3 for the required grading. After reviewing the proposed target values the CO will determine the final values for the gradation and notify the Contractor in writing.
No quality requirements or gradation other than maximum size will be required for pit run and grid-rolled material. For grid rolling, use all suitable material that can be reduced to maximum size.
After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.
If the aggregate is produced and stockpiled before placement, handle and stockpiled according to Section 320. Establish stockpile sites at approved locations.
02.04 Mixing and Spreading. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content suitable for the specified compaction method. Spread and shape the mixture on the prepared surface in a uniform layer with no segregation of size, and to a loose depth that will provide the required compacted thickness.
Do not place in layers exceeding 6 inches in compacted thickness for aggregate base and surface courses or twice the maximum particle size for screened aggregate. When more than one layer is necessary, compact each layer according to Subsection 322.05 before placing the next layer. Route hauling and leveling equipment uniformly over the full width.
When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.
02.05 Compacting. Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
Compaction A. Operating spreading and hauling equipment over the full width of the travelway.
Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).
Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).
Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.
Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures.
02.06 Construction Tolerance. If grade finishing stakes are required, finish the surface to within ±0.10 feet from staked line and grade elevation.
If grade finishing stakes are not required, shape the surface to the required template and check the surface with a 10-foot straightedge. Defective areas are surface deviations in excess of 1/2 inch in 10 feet between any two contacts of the straightedge with the surface.
Correct all defective areas by loosening the material, adding or removing material, reshaping, and compacting.
Ensure that the compacted thickness is not consistently above or below the specified thickness.
The maximum variation from the compacted specified thickness is ½ inch.
Ensure that the compacted width is not consistently above the specified width. The maximum variation from the specified width will not exceed +12 inches at any point.
02.07 Maintenance. Maintain the aggregate course to the correct line, grade, and cross-section by blading, watering, rolling, or any combination thereof until placement of the next course. Correct all defects according to Subsection 322.06.
02.08 Acceptance. See Table 322-1 or Table 322-2 as applicable, for sampling and testing requirements.
Aggregate gradation and surface course plasticity index will be evaluated under Subsection 106.04.
If the aggregate is obtained from a government stockpile, then the above characteristics will be evaluated under Subsection 106.02. Other aggregate quality properties will be evaluated under Subsections 106.02 and 106.04. Placement of aggregate courses will be evaluated under Subsections
106.02 and 106.04.
The allowable upper and lower aggregate gradation limits are the Target Value plus or minus the allowable deviations shown in Tables 703-2 and 703-3.
The allowable upper and lower Plasticity index limits for surface courses are stated in 703.05(b).
Preparation of the surface on which the aggregate course is placed will be evaluated under Section 204 or 302 as applicable.
02.09 Measure the Section 322 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.
Measure square yard width horizontally to include the top of aggregate width including designed widening. Measure the square yard length horizontally along the centerline of the roadway.
If the measurement for aggregate is by cubic yard using contract quantities, then measure aggregate by the cubic yard in-place once compacted, otherwise measurement for aggregate by the cubic yard is measured by the cubic yard in the hauling vehicle.
Measure thickness perpendicular to the grade of the travel way.
Measure width perpendicular to the centerline.
322.10 The accepted quantities will be paid at the contract price per unit of measurement for the Section 322 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Table 322-1
Sampling and Testing Requirements
Material or Product
Type of Acceptance (Subsection)
Characteristic
Category
Test Methods Specifications
Sampling Frequency
Point of
Split
Sample
Reporting
Time
Aggregate source quality 703.05
Measured and tested for conformance (106.04 & 105)
LA abrasion
(coarse)
AASHTO T 96
1 per type & source of material
Source of
Yes, when requested
Before using in work
Sodium sulfate soundness loss (coarse & fine)
AASHTO T 104
Durability index (coarse & fine)
AASHTO T 210
Fractured faces
ASTM D 5821
Subbase, Base, and Surface courses
Measured and tested
(106.04)
AASHTO T 2
2 per day
From windrow or roadbed after processing or from approved crusher sampling device
Yes
48 hours
Table 322-1 (continued)
Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Subbase, Base, and Surface Measured and tested for conformance
Moisture-density Method D
AASHTO T 99 (1)
1 per type and source of
Source of material
Yes, when requested
Before using in work
(106.04) Moisture-density
Method E R-1 Marshall “ “ “ “
Moisture-density Method F
AASHTO T
180(1) “ “ “ “
Moisture-density
Method G
R-1 Marshall
In-place density & moisture content
AASHTO T 310
or other approved procedures
3 per day
In-place
Before placing next layer
(1) Minimum of 5 points per proctor.
Table 322-2
Specifications
Frequency
Point of
Split
Reporting
Time
Screened Aggregate Measured and tested
(106.04 )
AASHTO T 2
2 per day
From windrow or roadbed after processing or from approved crusher sampling device
Yes
48 hours
404 - Minor Hot Asphalt Concrete
404.02 Composition of Mix (Job‐Mix Formula).
Delete the second paragraph and replace with the following:
Submit a job-mix formula and supporting documentation, test results, and calculations for the material to be incorporated into the work. Include copies of laboratory test results and mix design data that demonstrate that the properties of the aggregate, additives, and mixture meet the current requirements and criteria of Federal or state agencies. Ensure that the job-mix formula was performed no more than one year prior to placing the hot asphalt concrete. After reviewing the Contractor’s proposed job-mix formula, the CO will determine the final values for the job-mix formula to be used and notify the Contractor in writing.
404.04_nat_us_03_02_2005
404.04 Weather Limitations.
Change 35o F to 45o F:
404.06_nat_us_03_02_2005
404.06 Placing.
Add the following:
Do not place asphalt until the CO has approved in writing the area where it will be placed.
Delete the last sentence and replace with the following:
Offset the longitudinal joint of one layer at least 6 inches from the joint in the layer immediately below. Make the longitudinal joint in the top layer along the centerline of two-lane roadways or at the lane lines of roadways with more than two lanes. Offset transverse joints in succeeding layers and in adjacent lanes at least 10 feet, where possible.
404.07_nat_us_03_02_2005
404.07 Compacting (a).
Delete and replace with the following:
(a) Roadway paving. Thoroughly and uniformly compact the surface a minimum of three passes with rollers that meet one of the following requirements:
(1) Steel-wheeled rollers, other than vibratory type, capable of exerting a force of not less than
1.5 ton/feet of width of the compression roll or rolls.
(2) Vibratory steel-wheel rollers with a minimum mass of 5 ton, equipped with amplitude and frequency controls, and designed to compact asphalt concrete.
(3) Pneumatic-tire rollers with smooth tread tires of equal size that provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 lbf/in2.
Perform initial compaction while the mixture is above 250 °F. Perform finish rolling with steel-wheel rollers and continue until no roller tracks remain.
404.09 Acceptance.
Add the following to the second paragraph:
See Table 404-1 for sampling and testing requirements.
Table 404-1. Delete and replace with the following:
Table 404‐1 Sampling and Testing Requirements.
Material or Product Type of
(Subsection)
Characteristic Category Sampling Methods
Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Asphalt Mixture (404.09)
- - - AASHTO T 168 Three minimum per project and at least one per 500 Cubic yards
Roadway prior to compaction yes As soon as sampled
551 – Drilled In Piles
This work includes furnishing all labor, equipment, materials, and supplies for drilling and advancing pipe for steel pipe piles. Drill holes for placement of pipe piles as shown on plans using standard well drilling equipment with an under-reamer bit style for advancing well casing pipe.
Complete all work associated with the installation of the pile in the presence of the CO. Work not completed under the direct observation of the CO will be rejected. Provide a schedule for all pile installation work in writing to the CO a minimum of 3 working days in advance of the work to ensure the CO is present for all pile installation work.
Conform to the following Sections and Subsections:
Steel pipes 715.05
Qualifications. Perform drilling operations with the specified equipment by or under the direct supervision of an equipment operator with a minimum of five (5) years of demonstrated successful past performance in similar work.
Submit information regarding the manufacturer and model of the well-drilling equipment to be used in drilling operations and the qualifications and experience of the operator a minimum of 7 calendar days in advance of operations
Pile drilling equipment. Furnish well-drilling equipment with an under-reamer style bit capable of advancing 10 inch diameter well casing (10 inch ID), 0.365-inch wall thickness, conforming to ASTM A53 type E or S, Grade B or ASTM A252, Grade 2, into the soils shown in drill logs. Material shown in drill logs is representative of the site, but natural obstructions not shown in the drill logs may be encountered. Drill logs are available for viewing at the Fremont- Winema National Forest Supervisor’s Office located in Lakeview, Oregon.
Pile Lengths. Furnish pile pipe in accordance with the itemized order list shown on the plans. All pipe furnished and paid for is the property of the Government.
551.08 Drilled-in pile capacity. Drill holes for piles to the minimum tip elevations and the required embedment in bedrock shown in the plans. Advance well casing pipe to be used as a pipe pile shell to the bottom of the hole as shown in the plans.
551.10 Preparation and drilling. Load, transport, unload, store, and handle steel pipes for piles so the metal is kept clean and free from damage. Do not use pipes that exceed the camber and sweep permitted by allowable mill tolerance.
Perform the work under Section 208. Make the heads of all piles plane and perpendicular to the longitudinal axis of the pile. Coordinate pile installation to prevent damage to other parts of the completed work.
Install piles and pipes so that the axial alignment is within 1/4 inch per foot, along the longitudinal axis, of the required alignment. The CO may stop drilling operation to check the pile alignment.
Check alignment of piles that cannot be internally inspected after installation before the last 5 feet are drilled. Do not pull laterally on piles or splice to correct misalignment. Do not splice a properly aligned section on a misaligned pipe.
Remove and replace pipes that are determined to be unacceptable for use due to breaks, bends, or kinks.
Install a permeable, Type 1 Turbidity Curtain around piles during the installation process to contain sediments.
551.14 Pile cutoffs. Cut off the tops of all permanent piles and pile casings at the required elevation.
Cut off the piles clean and straight parallel to the bottom face of the structural member in which they are embedded. Dispose of cutoff lengths according to Subsection 203.05(a).
551.15 Unsatisfactory Piles. Correct unsatisfactory piles by an approved method. Methods of correcting unsatisfactory piles may include one or more of the following:
(a) Use of the pile at a reduced capacity;
(b) Install additional piles;
(c) Repair damaged piles; and
(d) Replace damaged piles.
(e)
551.17 Acceptance. Pile material will be evaluated under Subsections 106.02 and 106.03. Furnish production certifications with each shipment of the pipes for the pile. Drilling piles, placement of pipes and related work will be evaluated under Subsections 106.02 and 106.04.
551.18 Measure the Section 551 items listed in the bid schedule according to Subsection 109.05 When measurement is by the linear foot, measure the length of pile from the cutoff elevation to the tip.
Measure furnished pipes by the linear foot as given in the pipe order list.
551.19 The accepted quantities will be paid at the contract price per unit of measurement for the Section 551 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
648 - Stream Simulation
648.00_National_4_8_2022
648.04 Equipment Operations. An oil spill containment kit is required on each job site when working in and around open water. Composition of the kit is dependent on the job; determine contents of the kit as needed for each job. At a minimum, include tarps and oil-absorbent pads. Provide a floating oil boom downstream of the work site when specified in the contract.