This document is an amendment to Solicitation No. 1240BH24Q0007 for the Lofton Reservoir Fishing Pier Construction Project. The amendment provides an update to the original solicitation's Section C.2 regarding the project location. The project is located in the Bly Ranger District of the Fremont-Winema National Forest, Lake County, Oregon, approximately 21 miles east of Bly, Oregon. The work includes constructing a new fishing pier using untreated sawn and glued-laminated timber beams supported by drilled-in piles, as well as installing scour countermeasures, rock armoring, approach path modifications, erosion control, and traffic control. The Government's estimate for the project is between $25,000 and $100,000. Quotes are due by April 11, 2024, and the period of performance is August 1, 2024, to December 31, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240BH24Q0007
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40BH
PORTLAND OR 97204-2829
STE 310
1220 SW 3RD AVE
USDA-FS CSA NORTHWEST 6
67101203/20/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/12/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Lofton Fishing Pier
The purpose of this amendment is to provide an update to the original solicitation Section
C.2 (Project Location) applicable to this project (see attached page 6 from Section C).
Please ensure to sign the amendment and include with your quotes.
Solicitation due date remains the same. Quotes should be submitted no later than April
11th, 2024 by COB.
Period of Performance: 08/01/2024 to 12/31/2024
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
DARCY J. RAPOZA
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation No: 1240BH24Q0007 Project Name: Lofton Fishing Pier Construction Project
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
This project is for the construction of a new fishing pier at the Lofton Reservoir. The new pier is comprised of untreated sawn and glued-laminated timbers beams, supported by drilled in piles.
The work includes but is not limited to installing scour countermeasures at existing abutment (lean concrete), rock armoring at abutment, approach path modifications with crushed aggregate and asphalt surfacing, erosion control, traffic control, pier timber superstructure, drilled in piles, and all other items necessary to complete the work in accordance with the plans and specifications.
C.2 PROJECT LOCATION
The project is located in the Bly Ranger District of the Fremont-Winema National Forest, Lake County, Oregon. The Lofton Fishing Pier site lies south of the Quartz Mountain Sno-Park approximately 21 miles east of Bly, Oregon. The site is located off Forest Development Road 3715, T.38S., R.16E., Sec. 22, Willamette Meridian.
Latitude: 42.263342° Longitude: -120.819665°
C.3 MAGNITUDE OF CONSTRUCTION PROJECT
The Government’s estimate is between $25,000 and $100,000.
C.4 TECHNICAL SPECIFICATIONS
[ X ] FHWA Standard Specification 2014 U.S. Customary applies.
Applicable Specifications References to Standard Specifications in the contract refer to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14 U.S. Customary Units. The Forest Service Supplemental Specifications to the FP-14 are given on the Specification List and are physically attached in Section J. Applicable work shall also be in conformance with the current edition of the AASHTO criteria, either LRFD, LFD, or ASD. Specifications not on the list but referenced by other Standard Specifications, shall also be applicable to this document. All requirements contained on the Specification List are hereby made a part of this solicitation and any resultant contract.
452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
sfelton Highlight sfelton Highlight
File details come from the government source that posted it. Updated .