This document is an attachment detailing the insurance requirements for a construction contract. The key insurance requirements are:
Performance Insurance: 30% of contract value, valid for contract duration plus 2 months.
Payment Insurance: 20% of contract value, valid for contract duration plus 3 years for worker salaries and benefits.
Liability Insurance: 30% of contract value, valid for contract duration plus 2 months, covering contractual and third-party liability.
Stability Insurance: 30% of contract value, valid for 3 years after work completion.
Elements Quality Insurance: 30% of contract value, valid for 1 year after work completion.
Correct Equipment Functioning Insurance: 30% of contract value, valid for 1 year after work completion.
This attachment is related to the INL Colombia Construction IDIQ solicitation issued by the Department of State Office of Acquisition Management, with a proposal due date of August 16, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19AQMM24R0102 0006.pdf | ||
| 19AQMM25R0102 0005.pdf | ||
| Attachment 7 - 19AQMM24R0102 QA Second Round.pdf | ||
| 19AQMM24R0102 00004.pdf | ||
| 19AQMM24R0102 0003.pdf | ||
| 19AQMM24R0102 QA - Answers and AQM Comments.xlsx | XLSX spreadsheet | |
| Attachment 3 - IDIQ Drawings 0003.zip | ZIP file | |
| 19AQMM24R0102 00002.pdf | ||
| 19AQMM24R0102 Pre-Proposal Conference.pptx | PPTX presentation | |
| Attachment 6 - Past Performance Questionnaire (PPQ).docx | DOCX document | |
| 19AQMM24R0102 00001.pdf | ||
| 19AQMM24R0102.pdf | ||
| Attachment 5 - Firm and Project Information.pdf | ||
| Attachment 3 - IDIQ Drawings.zip | ZIP file | |
| Attachment 1 - SOW and TECHNICAL SPECIFICATIONS.zip | ZIP file | |
| Attachment 2 - BIDDING CHARTS.zip | ZIP file |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 4 ‐ INSURANCE FOR CONSTRUCTION CONTRACTS
Performance Insurance (Póliza de Cumplimiento): Submitted after the contractor is signed and prior to the notice to proceed in a sum equal to 30% of the value of the contract and valid for the duration of the contract and a further two months, Payment Insurance (Póliza de Pago de Salarios y Prestaciones Sociales): Submitted after the contract is signed and prior to the notice to proceed in a sum equal to 20% of the value of the contract, and valid for the duration of the contract and a further three years for the salaries and social benefits of the workers.
Liability Insurance ( Póliza de Responsabilidad Civil Contractual): submitted after the contract is signed and prior to the notice to proceed in a sum equal to 30% of the value of the contract, and valid for the duration of the contract and a further two months covering contractual and Third Party Civil Liability, Stability Insurance (Póliza de Estabilidad): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for three years from the date of the handover of the work/ substantial completion.
Elements Quality Insurance ( Póliza de Calidad de Elementos): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for one year from the date of the handover of the work/ substantial completion.
Correct Equipment Functioning Insurance (Póliza de correcto funcionamiento de los equipos):
Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for one year from the date of the handover of the work/ substantial completion