Attachment 4 - Evaluation Criteria - Barrier Mx.docx
DOCX document 42 KB Posted
- Attached to
- Barrier Maintenance Federal contract opportunity
- Solicitation number
- FA441725Q0029
About this file
This is an evaluation criteria document for solicitation FA441725Q0029 for barrier maintenance services at Hurlburt Field AFB. The evaluation will use a Performance Price Trade-off methodology where Past Performance and Technical factors combined are more important than price.
The evaluation includes three main factors: Price, Technical, and Past Performance. Technical evaluation uses pass/fail ratings across three subfactors: 1) Customer Service Hotline availability 24/7/365, 2) Lead Technician qualifications requiring 3+ years of barrier maintenance experience and manufacturer certifications, with Barrier Technicians needing 1+ year experience, and 3) Operations & Maintenance Plans for each Access Control Point. Past Performance evaluation examines work within the past 3 years, with relevancy ratings based on years of barrier maintenance experience (Very Relevant: 5+ years, Relevant: 3-4 years, Somewhat Relevant: 1-2 years). Total Evaluated Price includes base period, four option periods, and potential 6-month extension under FAR 52.217-8. Award will be made to the lowest-priced technically acceptable offeror with Substantial Confidence past performance rating.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 6 - Questions and Answers Sheet.pdf | ||
| Attachment 1 - PWS Barriers - 16 Oct 2024.docx | DOCX document | |
| Attachment 5 - Past Performance Questionnaire.pdf | ||
| Attachment 2 - Wage Det. Rev 29, Dec 23, 2024.pdf | ||
| Attachment 3 - Instructions To Offerors - Barrier Mx.docx | DOCX document | |
| Solicitation - FA441725Q0029 Barrier Mx.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA441725Q0029
212Addendum to 52.212-2 Evaluation-Commercial Items
1. EVALUATION FACTORS FOR AWARD
Award will be made based on the evaluation of Price, Past Performance, and Technical where Past Performance and Technical, when combined, are more important than price. Simplified Procedures for Certain Commercial Items in accordance with FAR 13.5 and the procedures outlined in this addendum will be used to make a Best Value decision. The Government will utilize the Performance Price-Trade-off methodology as described below to determine the quote that represents the best value to the government.
2. SYNOPSIS OF EVALUATION
Step 1: Rank each quoter based on Total Evaluated Price (TEP) from lowest to highest.
Step 2: The lowest-priced quoter will then be evaluated to ensure they adhered to all submission requirements IAW Addendum to 52.212-1.
Step 3: If the lowest-priced quoter adhered to all submission requirements, evaluate quoter’s technical acceptability based on the evaluation factors. If deemed technically acceptable, move to the next step.
Step 4: Evaluate past performance. If the lowest-priced quoter’s past performance confidence rating is deemed to be a ‘Substantial Confidence’, the quoter is determined responsible, and the price is determined fair and reasonable, then the Government will proceed to award to this vendor and no further evaluations will be conducted.
If the lowest priced quoter did not adhere to submission requirements of instruction to offerors, receives an “Unacceptable” rating for the Technical factor, or receives a past performance rating other than “Substantial Confidence”, the Government will follow the same evaluation method for the next lowest quoter.
The process will continue until a quote is found that adheres to the instruction to offerors, has an acceptable rating for the Technical Factor and has a past performance confidence rating of ‘Substantial Confidence’. The Contracting officer will then make an integrated assessment to render the best value award decision. The Government reserves the right to award to other than the lowest priced quoter if determined to be in the best interest of the Government but is not required to do so.
During all stages of the evaluation, the government reserves the right to enter into exchanges with one or multiple quoters, but is not required to do so. Therefore, respondents should provide their best available pricing in their initial quote. While we strive for maximum objectivity, the evaluation process is inherently subjective.
3. PRICE EVALUATION
To receive an acceptable rating for the Price Factor, the quoter’s price must:
1) adhere to all requirements of 52.212-1 and accompanying addendum and
2) be determined fair and reasonable in accordance with FAR 13.106-3.
Total Evaluated Price (TEP) will be calculated as follows: TEP = Base Period (CLIN 0001-0004) + Option Period 1 (CLIN 1001-1004) + Option Period 2 (CLIN 2001-2004) + Option Period 3 (CLIN 3001-3004) + Option Period 4 (CLINS 4001-4004) + Option to Extend Services IAW FAR 52.217-8. Quantities identified will be multiplied by the unit price to confirm the extended price and then the extended price for all CLINS will be added together for a total for that specific period. Unit prices shall be used in the event Total price will be calculated by totaling all CLINs inclusive of all option years and the option to extend services IAW FAR 52.217-8.
FAR 52.217-8 will be included in the price evaluation by adding 50% of the value of each CLIN in option year four (CLIN 4001-4004) to the total price. This amount is for evaluation purposes only and will not be included in the awarded contract value. Prices will be rounded off to two decimal points. Total price will be evaluated for price reasonableness.
FAR clause 52.217-8, Option to Extend Services six-month extension is included in the TEP for evaluation purposes only. The Option to Extend Services price totals will not be included in the awarded contract value. If the Government exercises FAR 52.217-8, Option to Extend Services, the extension will not exceed six (6) months total and CLINS will be added to the contract at the time FAR 52.217-8 is exercised at a monthly price equal to the preceding period of performance's monthly price in accordance with FAR 52.217-8. The CO may exercise this clause during the life of the contract at any option period to extend services for up to 6-months.
Prices will be evaluated for completeness, fair and reasonableness, and unbalanced pricing. Offers whose price is determined to be incomplete or unreasonable will not be considered for award. Additionally, an offer may be rejected if the Contracting Officer determines the pricing to be unbalanced.
Completeness: The Government will review pricing submissions for completeness and compliance with the solicitation.
Reasonableness: The Government may use the following various price analysis techniques established in FAR 13.106-3 to ensure a fair and reasonable price to include: comparison of proposed prices received (adequate price competition), comparison of previously proposed prices and previous Government contract prices, use of parametric estimating/rough yardsticks, comparison with competitive published price lists or market prices, comparison with Independent Government estimates, comparison with market research, and/or analysis of pricing information provided by the offeror.
Unbalanced Pricing: The Government will analyze each offer to determine whether they are unbalanced with respect to prices proposed on different CLINs for the same or similar services in the same or similar quantities with respect to option pricing. An offer may be rejected if the Contracting Officer determines that the prices are significantly unbalanced or if the unbalanced pricing poses an unacceptable risk to the Government.
Offerors are cautioned against submitting an unbalanced offer. Unbalanced pricing exists when, despite a reasonable TEP, the price of one or more contract line items is significantly over or understated as indicated by the application of price analysis techniques. The Government will analyze offers to determine whether they are unbalanced with respect to price. An example of an unbalanced offer would be proposed contract line items that are significantly less than or significantly overstated in relation to the other proposed contracted line items (either of the offeror's offer or the same contract line items as proposed by other offerors). The Government may also consider an offer unbalanced if there is a significant difference between proposed contract line items in the same contract line items category between option periods or the proposed prices from year to year or above what would be considered a reasonable adjustment for inflation. An offer may be rejected if the CO determines that the lack of balance poses an unacceptable risk to the Government.
If the Government cannot determine the proposed pricing to be fair and reasonable, other than certified cost and pricing data may be obtained from the offerors.
4. TECHNICAL EVALUATION
The technical rating reflects the degree to which the offeror's offer meets or does not meet the minimum performance or capability requirements. The focus is on the ability of the offeror to meet the minimum requirements of the PWS.
The government will evaluate technical offers and the below listed sub-factors on a pass/fail-basis, assigning an overall rating of Acceptable, or Unacceptable. An unacceptable rating for any of the below sub-factors will result in an unacceptable rating for the Technical Capability primary factor.
Definitions: Evaluators shall assign a rating which falls within one of the following definitions according to the degree which the offeror's technical offer meets the minimum requirement described below:
Acceptable: Offer meets the requirements of the solicitation.
Unacceptable: Offer does not meet the requirements of the solicitation.
Technical Acceptability shall be evaluated against the following sub-factors where all sub-factors are considered equal:
Subfactor 1 - Customer Service Hotline Phone Number ---- The Contractor must provide a single customer service hotline phone number that can be accessed 24 hours a day, 365 days a year by contract award to be responsive to Government requests. The Contractor’s customer service function must be managed to ensure responsiveness. To be responsive, Contractor personnel must be available during all hours to respond to Government requests. The Contractor must log all calls received and the response calls made by the Contractor. A Telephone Call Log must include the date, time, caller, brief description of the issue, response time for the Lead Technician, and resolution for each telephone call. The Contractor must have a process for resolving Air Force installation concerns and following up on unresolved requests. (CDRL A001)
Subfactor 2 - Qualifications of Lead Technician, Barrier Technician(s), and Crew ----
| Lead Technician: The Lead Technician performing the work must be trained on the specific barrier(s) at the military base and have no less than three (3) years minimum of experience inspecting and maintaining barriers, barrier control systems, and military safety barrier control systems. The lead technician must have documented certification from each of the AVB manufactures that are included in the scope of the contract. The Lead Technician’s experience in barrier control systems and safety control systems must include documented experience in troubleshooting, modification, maintenance, and repair of barrier and traffic control systems. The Contractor is required to submit to the CO or COR a list of employees certifying proof of qualifications within five (5) calendar days prior to contract performance. A Lead Technician possessing the required qualifications will oversee all the work including the work of Barrier Technicians on the site. The Lead Technician must be present when work is being performed for PM, Routine and Emergency Service Calls, and Additional In-Scope Work. |
| Barrier Technician: The Barrier Technicians performing the work must be trained on the specific barrier(s) at the military base and have no less than one (1) year minimum of experience inspecting and maintaining barriers, barrier control systems, and traffic control systems. The Contractor is required to submit to the CO or COR a list of employees certifying proof of qualifications within five (5) calendar days prior to contract performance. |
Non-Qualified Barrier Technician, Welding, and Electrical: The Lead Technician must oversee the work of non-qualified barrier technicians. Non-qualified barrier technicians may perform traffic control, cleaning, corrosion control duties, and assist qualified Barrier Technicians with inspecting and maintaining barriers, barrier control systems, and traffic control systems. If a Contractor or Subcontractor employee performs welding, they must be certified in the Shielded Metallic Arc Welding process utilizing the American Welding Society (AWS) Code of AWS D.1.1 in the 3G and 4G positions for 1” thick A-36 structural steel. The Contractor must produce a current welding certification to the CO or COR for each employee performing welding prior to the commencement of any work involving welding. The Contractor must coordinate with and obtain an installation-specific welding and cutting permit issued by the local Base Civil Engineer office via coordination with the CO or COR prior to any cutting or welding. Each Contractor or Subcontractor employee performing electrical work on barrier systems must meet fitness/license requirements per the National Electric Code (NFPA 70) and any local State regulations. The Contractor must ensure a person who possesses a current Cardiopulmonary Resuscitation certification be present at all times when electrical work is being conducted.
Subfactor 3 - Operations & Maintenance (O&M) Plan ---- The Contractor must develop an Operations and Maintenance (O&M) Plans for each individual ACP. The O&M Plans must be part of the Contractor’s proposal submission to be evaluated by the Government prior to the award of the contract. Each ACP O&M Plan will include, at a minimum, the following:
· PM Checklist tailored specifically for each ACP based on site-specific equipment and the manufacturer’s service manual. (For an example of items that are expected to be on the PM Checklist, see Appendix E)
· Specific ACP test procedures for barrier operations and safety system. (For an example of items that are expected to be on the testing procedure checklist, see Appendix E within PWS)
· Reports to be prepared and submitted, and records to be maintained.
· Recommend list of long lead time parts for consideration for storage on-base.
The rating assigned to this factor will be based on the offeror's technical offer. The validity and thoroughness of the offeror's technical offer will be evaluated as specific evidence of the offeror's understanding and capability to perform this requirement. An overall rating will be assigned; failure to be assigned an acceptable rating in any element will render the offer unacceptable:
To be determined technically acceptable at the factor level, the offeror must be rated acceptable in each subfactor. A subfactor will be rated acceptable when all the corresponding elements of the subfactor are met.
Procedures at FAR 15.306, Exchanges with Offerors After Receipt of Quotations/Offers, may be implemented to determine technical acceptability in accordance with the solicitation requirements. Only those offers determined to be technically acceptable will be considered for further evaluation.
5. PAST PERFORMANCE EVALUATION
Using the Past and Present Performance questionnaires (PPQ), the contracting officer shall seek performance information for only those offerors rated technically acceptable. Each offer shall provide recent and relevant information regarding an offerors actions under previously awarded contracts. The Government will evaluate the offerors previous performance and may evaluate information on problems identified/ encountered on previous contracts and corrective actions taken by the offeror.
Past performance will be evaluated on recency, relevancy, and quality of performance and be used as a measure of the Government’s confidence in the quoter’s ability to successfully perform based on previous and current contract efforts.
Performance confidence ratings assess the probability of the quoter successfully accomplishing the proposed effort based on the quoters past performance. The government will use past performance information submitted by the quoter’s references, other sources such as other Federal Government offices, Past Performance Information Retrieval System (PPIRS)/Contractor Performance Assessment Reports (CPARS), and private and commercial sources.
Recency. Past Performance will first be evaluated for recency. For the purpose of this evaluation, "recent" is defined as performance occurring within three (3) years from the date of issuance of the solicitation. All performance prior to three years from the date of the issuance of solicitation or not yet performed on the date of this solicitation will not be evaluated.
Relevancy. Past Performance will then be evaluated for relevancy and shall be assigned one of the relevancy definition ratings as described below when the offeror has identified and demonstrated what elements of each contract are deemed relevant to this solicitation and indicate what percentage of service was performed by the offeror (prime), subcontractor (if applicable) and teaming contractor (if applicable). The final determination of the identified and demonstrated relevancy elements of each contract will be the decision of the government.
Relevancy Assessment. The Government will conduct an in-depth evaluation of all recent performance information obtained to determine how closely the Barrier Maintenance performed under those contracts relate to the scope, magnitude/complexity, contract environment and the cost/price factors of the Hurlburt Field AFB requirement. For each recent past performance citation reviewed, the relevance of the work performed will generally be assessed for the scope, magnitude/complexity and contract environment aspects (however, all aspects of performance that relate to this acquisition may be considered). Consideration will be given to efforts that are considered to be of the type that are similar in scope, magnitude/complexity, and contract environment when compared to the services described in this solicitation. A relevancy determination of the offeror's past performance will be made based upon the afore mentioned considerations, including joint venture partner(s). In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the offeror or teaming partner whose contract is being reviewed and evaluated. The past performance questionnaires and information obtained from other sources will be used to establish the degree of relevancy of past performance. A relevancy determination of the offeror's past performance will be made based upon the aforementioned considerations, including joint venture partner(s). In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the offeror or teaming partner whose contract is being reviewed and evaluated. The past performance questionnaires and information obtained from other sources will be used to establish the degree of relevancy of past performance.
The Government will use the following relevancy definitions when assessing recent contracts:
VERY RELEVANT. Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires. To be defined as Very Relevant, the effort shall have included the below services:
(1) Five (5) or more years’ experience with Barrier Maintenance (to include, but not limited to: actuators, control systems (including software), control wiring, circuitry, structural framework, lighting, spring assembly, hydraulic-related equipment, safety loops and other vehicle detection systems)
RELEVANT. Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires. To be defined as Relevant, the effort shall have included the below services:
(2) Three (3) to four (4) years’ experience with Barrier Maintenance (to include, but not limited to: actuators, control systems (including software), control wiring, circuitry, structural framework, lighting, spring assembly, hydraulic-related equipment, safety loops and other vehicle detection systems)
SOMEWHAT RELEVANT. Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires. To be defined as Relevant, the effort shall have included the below services:
(3) One (1) to two (2) years’ experience with Barrier Maintenance (to include, but not limited to: actuators, control systems (including software), control wiring, circuitry, structural framework, lighting, spring assembly, hydraulic-related equipment, safety loops and other vehicle detection systems)
NOT RELEVANT. Present/past performance effort involved little or none of the scope and magnitude of effort and complexities that this solicitation requires.
(4) Twelve (12) months, or less, experience with Barrier Maintenance (to include, but not limited to: actuators, control systems (including software), control wiring, circuitry, structural framework, lighting, spring assembly, hydraulic-related equipment, safety loops and other vehicle detection systems)
Quality of Performance. All past performance that is recent and determined to be very relevant, relevant, or somewhat relevant, will be reviewed to determine the quality of the offeror's performance. This information will be used by the evaluation team in determining the overall performance confidence assessment rating.
Assigning Performance Assessment Confidence Ratings. As a result of the relevancy and quality of the performance of the recent contracts, evaluated offerors will receive an integrated performance confidence assessment rating. The past performance evaluation focuses on performance that is relevant to the technical factors. The resulting performance confidence assessment rating is made at the factor level and represents an overall evaluation of contractor performance. Offerors without a record of recent/relevant past performance or for whom information on past performance is so sparse that no meaningful confidence assessment rating can be reasonably assigned will not be evaluated favorably or unfavorably on past performance and, as a result will receive an "Unknown Confidence" rating for the Past Performance factor. More recent performance will have a greater impact on the Performance Confidence Assessment than less recent effort. A strong record of relevant past performance may be considered more advantageous to the Government than an "Unknown Confidence" rating. Likewise, a more relevant past performance record may receive a higher confidence rating and be considered more favorably than a less relevant record of favorable performance.
Past performance regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement will not be considered as highly as past performance information for the principal offeror.
If a Teaming Agreement is submitted as part of the proposal, each teaming offeror's past performance will be evaluated separately using the same evaluation methods described above. The Prime Contractor's past performance will be weighted slightly more than equal based on their overall responsibility for contract management. The separate ratings of each party in the Teaming Agreement will be combined to determine an aggregate PERFORMANCE ASSESSMENT CONFIDENCE RATING.
One of the following performance confidence assessment confidence ratings will be assigned to the evaluated quote:
a) Substantial Confidence: Based on the quoter’s recent/relevant performance record, the Government has a high expectation that the quoter will successfully perform the required effort.
b) Satisfactory Confidence: Based on the quoter’s recent/relevant performance record, the Government has a reasonable expectation that the quoter will successfully perform the required effort.
c) Neutral (Unknown) Confidence: No recent/relevant performance record is available, the quoter’s performance record is not recent or relevant, or the quoter’s record of past performance is so sparse that a meaningful confidence rating cannot be reasonably determined.
d) Limited Confidence: Based on the quoter’s recent/relevant performance record, the Government has a low expectation that the quoter will successfully perform the required effort.
e) No Confidence: Based on the quoter’s recent/relevant performance record, the Government has no expectation that the quoter will successfully perform the required effort.
Confidence that the quoter can or cannot successfully perform all required services within the PWS will be based upon the past performance information submitted by the quoter as well as the Government’s independent investigation of the quoter’s past performance. It is recommended that the quoter submit any and all documentation addressing adverse past performance ratings for recent and relevant contracts. Failure to do so may result in the Government assigning an unfavorable rating for this factor. Quoters that do not have a record of recent and relevant past performance will receive a neutral rating for this factor and will not be evaluated favorably or unfavorably.
(End of Addendum to FAR 52.212-2)