Attachment 4 - Evaluation Criteria (15Mar24).pdf
PDF 117 KB Posted
- Attached to
- Orbital Services Program-4 (OSP-4) On-Ramp #2 Federal contract opportunity
- Solicitation number
- FA8818-24-R-B003
About this file
This document provides the evaluation criteria for the Orbital Services Program-4 (OSP-4) On-Ramp #2 solicitation. The Space Systems Command Launch Enterprise at Kirtland Air Force Base is seeking proposals for multiple award indefinite delivery/indefinite quantity contracts to expand the current vendor pool for orbital launch services. The solicitation includes a capability questionnaire that will evaluate offerors' mass-to-orbit capabilities, experience with previous launches, and ability to provide mission assurance and launch range support. Proposals will be reviewed to ensure all required documentation is provided and determine responsibility and eligibility for award, including any potential organizational conflicts of interest. All qualifying offerors awarded a basic contract will receive a $50,000 task order to study the Launch Service User Guide. The North American Industry Classification System code is 481212 and the small business size standard is 1,500 employees, though responses from small and small disadvantaged businesses are encouraged.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Minimum Award LSUG SOW- On-Ramp 2 05 Aug 2021.pdf | ||
| OSP-4 B CDRL - On-Ramp 2.pdf | ||
| OSP-4 C CDRL - On-Ramp 2.pdf | ||
| OSP-4 F CDRL - On-Ramp 2.pdf | ||
| Attachment 3 - Instructions to Offerors (15Mar24).pdf | ||
| OSP-4 E CDRL - On-Ramp 2.pdf | ||
| OSP-4 A CDRL - On-Ramp 2.pdf | ||
| Attachment 1 - Performance Work Statement (PWS) - Rev3.pdf | ||
| Attachment 2 - OSP-4 RFP DD-254.pdf | ||
| Attachment 5 Ordering Guide Rev3.pdf | ||
| OSP-4 D CDRL - On-Ramp 2.pdf | ||
| Min Award LSUG Model Contract_Solicitation - FA881824RB004.pdf | ||
| Minimum Award LSUG SOW.pdf | ||
| OSP-4 Model Contract_Solicitation - FA881824RB003.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EVALUATION CRITERIA
Attachment 4
Orbital Services Program-4 (OSP-4)
ON-RAMP #2
Evaluation Criteria
Basic: 15 March 2024
EVALUATION FACTORS FOR AWARD
1.0 Basis for Contract Award: This source selection is conducted In Accordance With
(IAW) Federal Acquisition Regulation (FAR) 15.3, Source Selection, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Department of the Air Force Federal Acquisition Regulation Supplement (DAFFARS). These regulations are available electronically at https://acquisition.gov/. Contract(s) may be awarded to
Offerors deemed responsible in accordance with the FAR, as supplemented, whose proposals conform to the solicitation’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by
Attachment 3, Instructions to Offerors, of this solicitation) and are judged, based on the evaluation factors, to be capable of meeting the requirements of the Government.
1.1 Number of Contracts to be Awarded: The Government intends to award the basic contract to all Offerors capable of meeting Orbital Services Program-4 (OSP-4) requirements, however, the Government reserves the right to make no award at all.
The Offerors will need to be deemed responsible in accordance with FAR 9.1, as supplemented by DFARS and DAFFARS, and proposals that do not conform to the solicitation’s requirements may be determined to be ineligible for award.
1.2 Rejection of Offers: The Government may reject any proposal that is evaluated to be non-compliant in terms of program commitments, contract terms and conditions, or technically unacceptable such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.
1.3 Correction Potential of Proposals: The Government will consider, throughout the evaluation, the "correction potential" of any deficiency or uncertainty. The judgment of such "correction potential" is within the sole discretion of the Government. If an aspect of an offeror's proposal does not meet the Government's requirements and is not considered correctable, the offeror may be eliminated from the competitive range.
1.4 Discussions: The Government intends to award without discussions. However, if during the evaluation period, it is determined to be in the best interest of the
Government to establish a competitive range and hold discussions, Offeror responses to Evaluation Notices (ENs) and the Final Proposal Revision (FPR) will be considered in making the source selection decision. Any changes or exceptions in the FPR are subject to evaluation and may introduce risk that the Offeror’s proposal be determined unacceptable and ineligible for award.
2.0 Evaluation Factors: The evaluation factors will be used to evaluate each proposal based upon an integrated assessment. The applicable factor(s) will be evaluated as either
“Acceptable” or “Unacceptable” as defined by the DoD Source Selection Procedures, Table
C-1, below. A failure to meet any requirement will result in an “Unacceptable” rating.
Technical (Factor 1)
Capability Questionnaire http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/15.htm https://acquisition.gov/ https://www.acq.osd.mil/dpap/policy/policyvault/USA004370-14-DPAP.pdf
Table C-1. Technical Acceptable/Unacceptable Rating Method
Adjectival Rating Description
Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
3.0 Volume II - Technical (Factor 1)
3.1 Capability Questionnaire: Per Attachment 3 – Instructions to Offerors, Appendix
A, the requirement is met and determined acceptable when:
i. The Offeror completed the mass-to-orbit table on question one and the evidence narrative substantiates the Offeror’s response.
ii. The Offeror selected A or B on question two and the evidence narrative substantiates the Offeror’s response.
iii. The Offeror selected A or B on question three and the evidence narrative substantiates the Offeror’s response.
iv. The Offeror selected A or B on question four and the evidence narrative substantiates the Offeror’s response.
4.0 Volume III – Contract Documentation: The proposal documentation contained in
Volume III will be reviewed to ensure all required documentation was provided in response to the solicitation, and the provided documentation will be relied upon to facilitate the
Contracting Officer’s determination of contractor responsibility and to determine eligibility for award. This will include the evaluation of potential Organizational Conflicts of Interest
(OCIs).
File details come from the government source that posted it. Updated .