Attachment 4 - E. EHRM Infrastructure Upgrades Part 3 of 3.pdf

PDF 15 MB Posted

Attached to
36C77623B0063 - EHRM Infrastructure System Upgrades, Chicago, IL - Solicitation Federal contract opportunity
Solicitation number
36C77623B0063
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This is a summary of an attachment to a federal contract solicitation. The attachment is for EHRM infrastructure upgrades for the Department of Veterans Affairs Technology Acquisition Center in Chicago, Illinois. The related solicitation, number 36C77623B0063, seeks proposals for upgrades to the EHRM infrastructure system. Offerors should respond by the specified deadline to upgrade and maintain the EHRM system, including necessary hardware, software, and support services. Pricing is to be provided for a one year base period and four one-year options. The solicitation is set aside for small businesses. The incumbent contractor was not specified. Responses are due by the date listed on the federal contracting website for this opportunity from the Department of Veterans Affairs Technology Acquisition Center.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNOLOGY SYMBOL LIST

SYMBOL: DESCRIPTION: NOTE:

EQUIPMENT

LIST ABBREV.:

#D

W

#D#V 1.

WALL INFORMATION OUTLET, COMBINATION

TELEPHONE/DATA COMMUNICATION

SC-IO-W

1.WALL INFORMATION OUTLET, WALL TELEPHONESC-IO-W

1.

FLOOR INFORMATION OUTLET, DATA COMMUNICATION

ONLY

SC-IO-F

WAP

1.

CEILING INFORMATION OUTLET, DATA

COMMUNICATION ONLY, WIRELESS ACCESS POINT

SC-IO-C

#D#V 1.

FLOOR INFORMATION OUTLET, COMBINATION

TELEPHONE/DATA COMMUNICATION

SC-IO-F

#D 1.

CEILING INFORMATION OUTLET, DATA

COMMUNICATION ONLY

SC-IO-C

#D 1.

WALL INFORMATION OUTLET, DATA COMMUNICATION

ONLY

SC-IO-W

M

T

2.CARD READER (ROUGH-IN ONLY)N/A

CSS 2.CONTROLLED SECURITY SCHEME SCHEDULE

IDENTIFIER

N/A

TECHNOLOGY GENERAL NOTES:

1. ###-### INDICATES TECHNOLOGY EQUIPMENT SCHEDULE ITEM LABELED AS "EQUIPMENT

LIST ABBREVIATION"

2. REFER TO TECHNOLOGY EQUIPMENT SCHEDULE AND SPECIFICATIONS FOR FULL

DESCRIPTIONS AND MANUFACTURERS OF ALL DEVICES.

TECHNOLOGY MOUNTING SUBSCRIPT KEY:

A MOUNT AT +6" TO CENTERLINE ABOVE COUNTER OR BACKSPLASH

H MOUNT ORIENTED HORIZONTALLY

L MOUNT IN CASEWORK

M MOUNT IN MODULAR FURNITURE

S MOUNT IN SURFACE RACEWAY

A SLASH IS USED BETWEEN TWO SUBSCRIPTS, E.G., A/H.

1. THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE WITH THE ADA STANDARDS FOR

ACCESSIBLE DESIGN. REFER TO THE ADA GUIDELINES FOR ALL CONFIGURATION DETAILS

ON THIS PAGE FOR ADDITIONAL INFORMATION.

2. CONCEAL ALL CONDUIT IN WALLS, PARTITIONS, ABOVE CEILING, IN FLOOR SLAB, ETC.

UNLESS OTHERWISE INDICATED ON THE PLANS OR IN THE SPECIFICATIONS. CONDUIT IN

MECHANICAL ROOMS AND STORAGE ROOMS WITHOUT CEILINGS MAY BE EXPOSED ON

BUILDING STRUCTURE.

3. BOXES LOCATED ON OPPOSITE SIDES OF NON-RATED WALLS SHALL BE OFFSET A MINIMUM

OF 6" HORIZONTALLY. BOXES ON OPPOSITE SIDES OF FIRE RATED WALLS SHALL BE

OFFSET A MINIMUM OF 24" HORIZONTALLY. "THRU-THE-WALL" BOXES SHALL NOT BE

ALLOWED WITHOUT PRIOR WRITTEN APPROVAL OF THE ARCHITECT/ENGINEER.

4. VERIFY ALL FURNITURE, MODULAR FURNITURE, AND EQUIPMENT LOCATIONS WITH

ARCHITECTURAL PLANS, ELEVATIONS, AND REVIEWED SHOP DRAWINGS. PRIOR TO MAKING

THE ACTUAL TELECOMMUNICATIONS INSTALLATION, ADJUST OUTLETS OR CONNECTION

LOCATIONS TO ACCOMMODATE FURNITURE AND/OR EQUIPMENT.

5. TELECOMMUNICATIONS EQUIPMENT SHALL BE MOUNTED TO ALLOW ACCESS TO

ELECTRICAL AND MECHANICAL EQUIPMENT. ALL MOUNTING OF TELECOMMUNICATION

DEVICES ON EQUIPMENT SUPPLIED BY ANOTHER CONTRACTOR SHALL BE APPROVED IN

ADVANCE BY THE OTHER CONTRACTOR.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALL

OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED CONTRACTOR AT THE

EXPENSE OF THIS CONTRACTOR. ALL CONDUITS THROUGH WALLS SHALL BE GROUTED OR

SEALED INTO OPENINGS.

7. ALL MATERIALS USED TO SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS SHALL

BE TESTED AND CERTIFIED AS A SYSTEM PER ASTM E814 STANDARDS FOR FIRE TESTS OF

THROUGH-PENETRATION FIRESTOPS. REFER TO DIVISION 7 FOR ADDITIONAL INFORMATION

AND REQUIREMENTS SPECIFIC TO FIRESTOPPING.

8. THE TECHNOLOGY CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

THE CEILINGS, CEILING TILES, AND CEILING GRID ASSOCIATED WITH THE AREAS OF WORK

BY ALL CONTRACTORS.

9. ALL LADDER RACK AND CABLE TRAY SIZES ARE AS DEFINED ON THE DRAWINGS. REFER TO

SPECIFICATION SECTION 27 05 36 FOR APPROVED MANUFACTURERS AND INSTALLATION

REQUIREMENTS. PROTECT BEND RADIUS OF CABLE BY ADDING WATERFALL FOR

TRANSITIONING OF CABLE TRAY TO RACK.

10. FLUSH MOUNT ALL TELECOMMUNICATION OUTLETS AT +18" FROM FLOOR (CENTERLINE

DIMENSION), EXCEPT WHERE OTHERWISE NOTED. OUTLETS MAY BE SURFACE MOUNTED

WHEN CONDUIT IS SPECIFIED EXPOSED.

11. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO THE

WALLS, FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES

DAMAGE IS RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE

RATING, AND FINISH.

12. ALL ADDITIONAL FLOOR SLEEVES SHALL REQUIRE THE CONTRACTOR TO SCAN THE FLOOR

PRIOR TO CORING. NO WORK SHALL PROCEED WITHOUT VERIFICATION THE CORE

LOCATION IS CLEAR OF CONDUIT WITHIN THE DECK.

13. TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHALL BE INSTALLED IN ALL

WALL AND FLOOR PENETRATIONS AT THE END OF EVERY WORK SHIFT WHILE WORK IS IN

PROGRESS. UN-SEALED OPENINGS ARE NOT ALLOWED TO PROVIDE PROTECTION AGAINST

FIRE/SMOKE SPREAD THROUGH UN-SEALED PENETRATIONS.

14. RE-INSTALL CEILING TILES AT THE END OF EVERY WORK SHIFT DURING CABLE

INSTALLATION.

15. ALL BACKBOX INSTALLED IN A FIRE-RATED WALL SHALL BE INSTALLED WITH FIRE PUTTY

PADS.

TECHNOLOGY INSTALLATION NOTES:

1. THE EXISTING DATA NETWORK IS TO REMAIN OPERATIONAL DURING THE INSTALLATION OF

THE NEW TELECOM ROOM EQUIPMENT. THE SYSTEM SHALL NOT BE DISRUPTED UNLESS

COORDINATED IN ADVANCE WITH THE OWNER AND ENGINEER AND AT THEIR DISCRETION

ON DATE AND TIME.

2. REFER TO THE DRAWINGS FOR THE LOCATIONS OF THE NEW TELECOM ROOM HEADEND

EQUIPMENT AND THE EXISTING TELECOM ROOM EQUIPMENT LOCATIONS.

3. CONSTRUCT NEW TELECOMMUNICATIONS ROOMS AND/OR EXPAND EXISTING TO REMAIN

TELECOMMUNICATIONS ROOMS. RENOVATION AND CONSTRUCTION OF NEW

TELECOMMUNICATION ROOMS SHALL BE COMPLETED AT THE START OF THE PROJECT.

4. FUSION SPLICE THE EXISTING FIBER FROM THE EXISTING INCOMING LOCATION AS

IDENTIFIED IN THE FIBER DIAGRAM. MAINTAIN THE EXISTING FIBER AND FEEDS TO THE

EXISTING TELECOMMUNICATIONS ROOM AS CURRENTLY CONSTRUCTED UNTIL THE END OF

THE PROJECT.

5. ROUTE NEW FIBER TO THE NEW TELECOMMUNICATIONS ROOMS. IN EXISTING TO REMAIN

TELECOMMUNICATIONS ROOMS, ROUTE A NEW FIBER BACKBONE TO THE NEW CLOSET

LOCATIONS. MAINTAIN THE EXISTING ROOMS AND FIBER BACKBONE CABLING UNTIL THE

AREA BEING SERVED BY EACH RESPECTIVE TELECOMMUNICATIONS ROOM HAS BEEN RE-

FED.

6. PROVIDE NEW A/B POWER PANELS, HVAC, AND GROUNDING IN NEW AND EXISTING TO

REMAIN ROOMS. POWER ALL TELECOMMUNICATIONS ROOM LOADS FROM THE NEW PANELS.

7. FOR NEW OR EXPANDED TELECOMMUNICATIONS ROOMS, PROVIDE NEW CABLES FROM THE

EXISTING OUTLETS TO THE NEW ROOMS. REMOVE ALL EXISTING CABLING AFTER NEW

CABLES HAVE BEEN PULLED TO THE OUTLETS TO MAINTAIN OPERATIONAL CAPABILITY OF

THE SPACES TO THE GREATEST EXTENT POSSIBLE.

8. AFTER NEW CABLING HAS BEEN INSTALLED, REMOVE EXISTING BACKBONE CABLING IN

TELECOMMUNICATIONS ROOMS BEING ABANDONED.

9. REFER TO THE TECHNOLOGY DEMOLITION NOTES FOR ADDITIONAL REQUIREMENTS.

TECHNOLOGY PHASING NOTES

GENERAL NOTES:

1. ALL SYMBOLS AND ABBREVIATIONS LISTED MAY NOT BE APPLICABLE TO THIS PROJECT.

REFER TO THE GENERAL TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE COMPLETE

DESCRIPTION AND ITEMS.

2. ALL SYMBOLS AND ABBREVIATIONS REFER TO TECHNOLOGY SHEETS ONLY AS DEFINED ON

THE SHEET INDEX. REFER TO THE TECHNOLOGY NOTES FOR ADDITIONAL INFORMATION.

3. ALL SYMBOLS LISTED ABOVE ARE FOR REFERENCE ONLY. REFER TO PLANS AND LINE TYPE

KEY FOR NEW, EXISTING TO REMAIN AND TO BE REMOVED ITEMS FOR ADDITIONAL

INFORMATION.

4. REFER TO RISERS ON SHEET(S): TN601.

TECHNOLOGY SYMBOL NOTES:

1. "#V/#D" INDICATES INFORMATION OUTLET FACEPLATE CONFIGURATION. REFER TO

INFORMATION OUTLET SCHEDULE ON TN701 AND F1/TN502 FOR ADDITIONAL INFORMATION.

2. ROUGH-IN ONLY. REFER TO DETAIL E8/TN501 FOR ROUGH-IN REQUIREMENTS OF ACCESS

CONTROLLED DOORS.

CABLE TRAY, CHANNEL TRAY, BASKET

TRAY

LADDER RACK

WIDTH X HEIGHT

WIDTH X HEIGHT

DIAMETERø C CONDUIT

CONDUIT DOWN

CONDUIT UP

CONDUIT SLEEVE

CONTINUATION

SC-GND-1

SC-ER-1

SC-VWM-1

SC-MPP-1

PA-CPW-1 FIRE RATED PATHWAY

GROUND BAR WALL MOUNTED

EQUIPMENT RACK

VERTICAL WIRE MANGER

PATCH PANEL

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED

ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10'-0" HEIGHT ABOVE

PROJECT 0'-0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

SECURITY CONTRACTORS.C.

ASBESTOS ABATEMENT CONTRACTOR

FIRE PROTECTION CONTRACTORF.P.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

ELECTRICAL CONTRACTORE.C.

A.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

M

A X

20" MAX.

M

A X

20"-25" MAX.

M

A X

M

IN

. 4

M

A X

M

A X

10" MAX. 10"-24" MAX.

ADA GUIDELINES - FRONT ACCESS

ADA STANDARDS FOR ACCESSIBLE DESIGN

INSTALL ABOVE COUNTER

DEVICE AT 44" ABOVE

FINISHED FLOOR.

INSTALL ABOVE COUNTER

DEVICE AT 40" ABOVE

FINISHED FLOOR.

INSTALL DEVICE AT 18"

ABOVE FINISHED FLOOR.

ADA GUIDELINES - SIDE ACCESS

INSTALL DEVICE AT 44"

ABOVE FINISHED FLOOR.

INSTALL DEVICE AT 42"

ABOVE FINISHED FLOOR.

1. THE DRAWINGS INDICATE EXISTING ITEMS TO BE REMOVED. THE DRAWINGS ARE

INTENDED TO INDICATE THE SCOPE OF WORK REQUIRED AND DO NOT INDICATE EVERY

BOX, CONDUIT, OR WIRE THAT MUST BE REMOVED.

2. ITEMS (i.e. SPEAKERS, SWITCHES, ETC.) REMOVED AND NOT RELOCATED REMAIN THE

PROPERTY OF THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE

DISPOSAL OF MATERIAL THE OWNER DOES NOT WANT TO REUSE OR RETAIN. (i.e., FOR

MAINTENANCE PURPOSES).

3. EXISTING TO REMAIN DEVICES WITHIN OR ADJACENT TO THE PATH OF CONSTRUCTION

SHALL BE PROTECTED IN PLACE. DEVICES THAT MUST BE REMOVED SHALL BE TESTED

PRIOR TO REMOVAL, PROTECTED FROM DAMAGE, AND RE-INSTALLED IN ITS ORIGINAL

LOCATION DURING THE NEW CONSTRUCTION PHASE OF THE PROJECT.

4. OBTAIN APPROVAL FROM THE OWNER BEFORE TURNING OFF THE POWER TO EQUIPMENT,

SYSTEMS, PANELS, ETC. COORDINATE ALL OUTAGES WITH OWNER. CONDUIT CONCEALED

IN WALL CONSTRUCTION MAY BE ABANDONED IN PLACE IF NOT AFFECTED BY OTHER

CONSTRUCTION.

5. ALL CONDUIT SHALL BE REMOVED WHERE WALLS ARE BEING REMOVED. WHERE CONDUIT

IS IN THE CONCRETE SLAB, CUT OFF FLUSH, PULL OUT WIRE, AND PLUG. WHERE CONDUIT

IS RUN EXPOSED, ALL ASSOCIATED CLAMPS, SUPPORTS, HANGERS, ETC., SHALL ALSO BE

REMOVED.

6. COORDINATE ALL WORK WITH OTHER CONTRACTORS AT THE JOB SITE BEFORE REMOVING

EXISTING EQUIPMENT AND INSTALLING NEW ITEMS.

7. EXISTING CONDUIT IN GOOD CONDITION, MAY BE REUSED IN PLACE. RELOCATING EXISTING

CONDUIT SHALL NOT BE ALLOWED. BONDING CONDUCTORS SHALL BE INSTALLED IN ALL

REUSED CONDUIT TO ASSURE PROPER GROUND PATH.

8. EQUIPMENT REMOVAL IN CERTAIN LOCATIONS MAY REQUIRE THE INSTALLATION OF A

JUNCTION BOX TO RECONNECT CIRCUITS THAT REMAIN IN OPERATION. EXTEND CONDUIT

AND WIRING AS REQUIRED TO MAINTAIN POWER TO REMAINING EQUIPMENT.

9. DEVICES TO BE REMOVED SHALL HAVE ALL CONNECTED WIRING REMOVED TO THE

SOURCE.

10. DEVICES NOT TO BE REMOVED SHALL BE PROTECTED FROM THE ENVIRONMENT, AND ALL

ASSOCIATED CABLE/RACEWAYS ARE TO REMAIN AND BE PROTECTED. T.C. SHALL BE

RESPONSIBLE FOR REPAIR OF ANY INTERRUPTIONS TO PROTECTED DEVICES.

11. REFER TO SPECIFICATIONS SECTION 27 05 00 AND 27 05 05 FOR ADDITIONAL

12. ALL ABANDONED EQUIPMENT IN THE TELECOMMUNICATION ROOMS BEING ABANDONED OR

TURNED OVER TO THE NAVY SHALL BE REMOVED AS PART OF THE CONTRACTORS SCOPE.

THIS INCLUDES BUT NOT LIMITED TO RACKS, CABINETS, PATCH PANEL, VOICE WALLFIELDS

AND BONDING SYSTEMS. COORDINATE WITH OWNER PRIOR TO REMOVAL.

13. CONTRACTOR IS TO REMOVE ALL REPLACED CABLING IN ITS ENTIRETLY TO THE TR. NO

CABLING SHALL BE ABANDONED IN PLACE.

TECHNOLOGY DEMOLITION NOTES

TECHNOLOGY ABBREVIATION KEY

ENTRANCE FACILITYEF-#

MAIN CROSS-CONNECTMC-#

TELECOMMUNICATIONS ROOMTR-#

ABOVE FINISHED FLOORAFF

BELOW FINISHED CEILINGBFC

CONDUITC

SIMILARSIM

TYPICALTYP

MOUNTING HEIGHT ABOVE FINISHED FLOOR+#

JUNCTION BOXJ-BOX

ABBR: DESCRIPTION:

UNLESS OTHERWISE NOTEDUON

FIELD OF VIEWFOV

DOUBLE POLE DOUBLE THROWDPDT

PAN TILT ZOOMPTZ

POWER OVER ETHERNETPOE

ABOVE FINISHED GRADEAFG

DELAYED EGRESSDE

1. ALL CABLING IS TO BE INSTALL PER THE LATEST STANDARDS.

2. ALL TESTING EITHER REQUIRED BY RULE, SPEC OR CODE OR AT THE REQUEST OF THE

COR, ARE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR FOR BOTH TIME AND

DOLLARS.

3. ALL CABLES ARE TO BE END TO END REEL TESTED PRIOR TO UNSPOOLING AND AT

LEAST 10 DAYS PRIOR TO INSTALLATION.

4. PASSING TEST RESULTS FOR EACH REEL, CLEARING IDENTIFYING CABLE TYPE AND

REEL#, TO BE SUBMITTED TO COR NOT LESS THAN 72 HOURS PRIOR TO INSTALLATION

5. INSTALLATION OF CABLE TO BE IN ACCORDANCE WITH SECTION 27 15 00.

6. ALL CABLES, TRAYS, AND CONDUITS ARE TO BE LABELED AT INITIAL INSTALL PER THE

TIA-568-C.1 AND TIA-606 STANDARDS.

7. ALL CABLE TRAYS, CONDUITS AND PATHWAYS INSTALLATIONS SHALL BE PER THE

TIA-569-B STANDARD.

8. ALL INSTALLATIONS ARE TO ADHERE TO THE MANUFACTURES BEND RADIUS

RECOMMENDATIONS. ANY CABLE FOUND TO BE IN A RADIUS TIGHTER THAT

RECOMMENDED WITH BE, AT THE SOLE DISCRETION OF THE COR, EITHER TESTED FOR

FITNESS, FITNESS BEING AS DETERMINED BY THE COR, OR BE REPLACED, IN FULL, AT

THE CONTRACTORS SOLE EXPENSE IN BOTH TIME AND DOLLARS.

9. ANY CABLE FOUND TO SHOW DAMAGE OF ANY KIND SHALL, AT THE SOLE DISCRETION OF

THE COR, BE EITHER, TESTED FOR FITNESS, FITNESS BEING DETERMINED SOLELY BY

THE COR, OR BE REPLACED AT THE CONTRACTORS SOLE EXPENSE IN BOTH TIME AND

DOLLARS.

10. ANY TERMINATION SHOWING SIGNS OF DAMAGE, OF POOR INSTALLATION QUALITY, OR

NOT PASSING TESTING, SHALL BE REPLACED AT THE CONTRACTOR'S SOLE EXPENSE IN

BOTH TIME AND DOLLARS.

11. ALL CABLING IS TO BE INSTALLED IN SUCH A MANOR AS TO HAVE SMOOTH FLOWING

CABLE RUNS WITHOUT CABLES WRAPPING, THRU OR AROUND OTHER CABLES. THIS IS

TO INCLUDE EXISTING CABLES WITHIN A RUN.

12. ALL CABLES UPON ENTERING THE TR OR MC SHALL TAKE A MINIMUM OF ONE RUN, A

MINIMUM OF 20', TO ATTAIN SERVICE LOOP, AROUND THE RACETRACK PRIOR TO

WATERFALLING DOWN TO THE RACK FOR TERMINATION.

13. ALL CABLES SHALL BE LABELED, IN ACCORDANCE WITH THE TIA-606 STANDARD, AT BOTH

TERMINATION POINTS AND PRIOR TO ENTERING OR EXITING A THRUWAY, CABLE WAY, OR

CONDUIT.

14. ONLY RIGID METAL CAN SUPPORT CABLE. USE OF PLASTICS, ZIP TIES OR OTHER

MATERIALS IS NOT PERMITTED TO SUPPORT CABLES.

15. BUNDLING OF CABLES CAN ONLY BE ACCOMPLISHED UTILIZING A VELCRO TYPE CABLE

WRAP. USE OF ZIP TIES TO BUNDLE CABLE IS NOT PERMISSIBLE.

16. CABLES TRANSITIONING INTO OR OUT OF A CABLE TRAY SHOULD CLEANLY TRANSITION

WITHOUT WRAPPING THRU OR AROUND OTHER CABLES.

17. SMALL CABLE COUNTS CANNOT PASS THRU WALLS, FLOORS OR CEILINGS WITHOUT

BEING IN RIGID CONDUIT AND MUST BE FIRE STOPPED ON BOTH SIDES UTILIZING

APPROVED FIRESTOPPING METHODS.

18. J-HOOKS ARE PERMISSIBLE FOR UP TO 6 CIRCUITS.

19. CABLE CANNOT BE UNSUPPORTED FOR DISTANCES GREATER THAN 4'.

20. CABLE CAN ONLY BE SUPPORTED BY COMPONENTS OR SYSTEMS SPECIFICALLY

DESIGNED FOR THAT PURPOSE. UTILIZATION OF PIPING, CONDUIT OR OTHER CABLE IS

NOT PERMISSIBLE.

21. ALL CABLING NO LONGER ACTIVE AFTER A TR CUTOVER SHOULD BE COMPLETELY

DEMOED FROM SOURCE TO POINT OF SERVICE.

GENERAL CABLING NOTES:

1. CUTOVERS SHALL BE PER SINGLE, INDIVIDUAL, TR.

2. WHERE PERMITTED THE CONTRACTOR IS SOLELY RESPONSIBLE FOR PROVIDING ALL

APPROPRIATELY BADGED RESOURCES TO PROVIDE ALL REQUIRED ESCORTS WITHOUT

RELIANCE ON ANY VA OR GOVERNMENT STAFF.

3. EACH CUTOVER SHALL BE SCHEDULED NOT LESS THAN 10 DAYS FROM THE COMPLETED

INSTALL OF THE NETWORK SWITCHES.

4. THE DURATION OF THE CUTOVER SHALL BE COORDINATED WITH THE COR PRIOR TO

SUBMISSION OF THE SCHEDULING REQUEST.

5. A CUTOVER SHALL NOT BE SCHEDULED UNTIL ANY AND ALL DEFICIENCIES FROM EITHER

THE INSPECTIONS, TESTING OR RECORDS ARE MITIGATED AND ACCEPTED BY THE COR IN

WRITING.

6. THE CONTRACTOR SHALL SUBMIT THE REQUEST FOR NETWORK CUTOVER, TO THE COR,

TAKING INTO ACCOUNT THE REQUIREMENT FOR THE PRE-NETWORK SWITCH

INSTALLATION INSPECTION TIMELINES.

7. THE REQUEST FOR CUTOVER SHALL CONTAIN A FULLY DEVELOPED, STEP BY STEP,

TIMELINE PLAN TAKING INTO ACCOUNT ANY AND ALL TASK, COORDINATION, OUTAGES,

LOGISTICAL REQUIREMENTS, AND ANY OTHER REQUIREMENTS NECESSARY FOR A

SUCCESSFUL EVOLUTION, IN TIMELINE, IN AN EDITABLE ELECTRONIC FORMAT, FOR COR

APPROVAL.

8. THE COR SHALL USE BEST EFFORTS TO SCHEDULE THE REQUESTED DATES BUT THE

ULTIMATE TIMELINE SHALL BE BASED UPON THE AVAILABILITY AND LOGISTICS OF ALL

PARTIES.

9. UPON FINAL TERMINATION AND TESTING OF EACH SERVICE PANEL EACH CIRCUIT A

COMPLETE END TO END TEST SHALL BE PERFORMED.

10. UPON THE PASSING TEST THE OWNER SHALL CONNECT EACH CERTIFIED CIRCUIT FROM

THE ASSIGNED PATCH PORT, UTILIZING THE CONTRACTOR PROVIDED 6A PATCH CABLE,

TO THE NETWORK PORT.

11. A FINAL THRU PUT FROM THE DATA CENTER TO THE SERVICE PORT SHOULD BE LOGGED

AND ADDED TO THE RECORD.

12. ANY AND ALL DEFICIENCIES ENCOUNTERED DURING THE CUTOVER ARE TO BE

CORRECTED PRIOR TO THE CONTRACTOR DEMOBILIZING FROM THE CUTOVER

EVOLUTION.

GENERAL CUTOVER NOTES:

1. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING, WITH THE COR, A

CONSTRUCTION WALK THRU AT LEAST 10 DAYS PRIOR TO CONSTRUCTION START OF A

TR LOCATION. THE WALKTHROUGH SHOULD HAVE IN ATTENDANCE THE SUPERVISOR

FOR THE GENERAL CONTRACTOR AS WELL AS EACH SUBCONTRACTOR PERFORMING

WORK WITHIN THE TR.

2. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING, WITH THE COR, AN INTERIM

INSPECTION OF EACH TR LOCATION NOT LESS THAN 10 DAYS PRIOR TO THE MID POINT

OF COMPLETION FOR THE TR LOCATION. THE PROGRESS AT THIS POINT SHALL BE

UTILIZED TO ADJUST PROJECT SCHEDULE PER SECTION 01 32 16.15.

3. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING, WITH THE COR, A PRE-NETWORK

SWITCH INSTALLATION INSPECTION, NOT LESS THAN 10 DAYS PRIOR TO THE SCHEDULED

NETWORK SWITCH INSTALL DATE, AT WHICH TIME ALL SCOPE, EXCEPT FINAL

TERMINATION OF THE SERVICE END AND FINAL CIRCUIT TESTING FROM PATCH THRU

SERVICE RECEPTACLE, SHALL BE COMPLETE.

4. ANY DEFICIENCIES FOUND SHALL BE CORRECTED IN A MANOR AS TO NOT IMPEDE

SCHEDULED EVENTS INCLUDING, BUT NOT LIMIT TO, THE CUTOVER.

5. A FINAL INSPECTION IS TO BE SCHEDULED AFTER A MINIMUM 10 DAYS OF FULL

OPERATIONAL RUN TIME.

6. ANY DEFICIENCIES SHALL BE CORRECTED WITHIN 72 HOURS AND, UPON THE COR'S

SOLE DISCRETION, CAN RESULT IN ADDITIONAL INSPECTIONS UNTIL THE TR MEETS ALL

REQUIREMENTS.

7. A LESSONS LEARNED DOCUMENT, COVERING THE COMPLETE BUILD AND ACCEPTANCE

OF THE INDIVIDUAL TR IS DUE NOT MORE THAN 10 DAYS AFTER FINAL ACCEPTANCE.

GENERAL TR ACCEPTANCE NOTES:

SUGGESTED MATRIX OF RESPONSIBILITY

ITEM: SHOWN ON:

FURNISHED

BY:

INSTALLED

BY: NOTES:

TECHNOLOGY ROUGH-IN, REFER TO

TECHNOLOGY EQUIPMENT SCHEDULE

AND SPECIFICATIONS FOR DEFINITION

T-SERIES E.C. E.C. 3. 4.

INFORMATION OUTLET FACEPLATES,

JACKS, AND TERMINATIONS

T-SERIES T.C. T.C.

CONDUIT SLEEVES (WHEN SHOWN ON

DRAWINGS)

T-SERIES E.C. E.C.

CONDUIT SLEEVES (NOT SHOWN BUT

REQUIRED FOR PROPER INSTALLATION

OF SYSTEM)

N/A T.C. T.C. 2. 4.

TELECOMMUNICATION SYSTEMS

ROUGH-IN

T-SERIES E.C. E.C. 1.

TELECOMMUNICATION EQUIPMENT,

CABLING, AND TERMINATIONS

T-SERIES T.C. T.C.

CABLE TRAY (INCLUDING WIRE BASKET

TRAY) REFER TO SPECIFICATION

SECTION 27 05 28 FOR DEFINITION

T-SERIES E.C. E.C.

LADDER RACK T-SERIES T.C. T.C. 5.

GROUNDING LUGS ON TECHNOLOGY

EQUIPMENT

T-SERIES T.C. E.C. 6.

BONDING SYSTEM FOR TECHNOLOGY

SYSTEM, REFER TO SPECIFICATION

SECTION 27 05 26 FOR DEFINITION

T-SERIES E.C. E.C. 7. 8.

CONNECTION OF TECHNOLOGY

BONDING SYSTEM TO THE ELECTRICAL

GROUND SYSTEM

T-SERIES E.C. E.C.

LINE VOLTAGE POWER (+120V OR

GREATER)

E-SERIES E.C. E.C.

LINE VOLTAGE POWER (NOT SHOWN

BUT REQUIRED FOR PROPER

INSTALLATION OF SYSTEM)

N/A T.C. E.C. 2. 4.

LINE VOLTAGE POWER FOR DOOR

HARDWARE POWER SUPPLIES

ARCH SPEC E.C. E.C.

LOW VOLTAGE CABLING FOR

TECHNOLOGY SYSTEMS

T-SERIES T.C. T.C.

CABLE HANGERS AND SUPPORTS OR

OTHER CABLE ROUTING METHODS

(OTHER THAN CONDUIT AND CABLE

TRAY)

T-SERIES T.C. T.C. 5.

FLOOR BOX (ROUGH-IN) T & E SERIES E.C. E.C.

SUGGESTED MATRIX OF RESPONSIBILITY NOTES

1. LOCATIONS OF TELECOMMUNICATIONS ROUGH-INS SHALL BE INDICATED BY THE INFORMATION

OUTLET SYMBOLS ON THE DRAWINGS. REFER TO THE TECHNOLOGY SYMBOL LIST FOR

ADDITIONAL INFORMATION.

2. BASED ON THE INHERENT DIFFERENCES IN PRODUCTS FROM VARIOUS MANUFACTURERS, ALL

REQUIRED EQUIPMENT MAY NOT BE SHOWN ON THE DRAWINGS FOR ALL ACCEPTABLE

MANUFACTURERS.

3. INCLUDES BACKBOXES AND CONDUIT REQUIRED FOR THE TECHNOLOGY SYSTEMS

INSTALLATION. THE E.C. SHALL BASE THE BID ON THE BASIS OF DESIGN SHOWN ON THE

CONTRACT DOCUMENTS.

4. ALL CHANGES TO THE SLEEVES, BACKBOXES, CONDUITS, AND POWER REQUIRED BECAUSE OF

THE T.C.'S SELECTION OF AN ALTERNATE ACCEPTABLE MANUFACTURER OR FROM SYSTEM

CONFIGURATIONS THAT ARE LEFT TO THE CHOICE OF THE CONTRACTOR SHALL BE INCLUDED

IN THE T.C.'S BID. THIS BID SHALL INCLUDE INSTALLATION BY A LICENSED ELECTRICIAN.

5. UNLESS TRADE RULES DICTATE OTHERWISE.

6. FURNISHED AS PART OF THE EQUIPMENT WHEN POSSIBLE, OR FURNISHED TO THE E.C. FOR

INSTALLATION IN THE FIELD.

7. INCLUDES ALL CONDUCTORS, GROUND BARS, AND TERMINATIONS FOR THE COMPLETE

BONDING SYSTEM REQUIRED BY THE SPECIFICATIONS.

8. REFER TO ELECTRICAL DRAWINGS FOR LOCATIONS OF PANELS AND SWITCHBOARDS SHOWN

IN THE TECHNOLOGY BONDING RISER DIAGRAM AND TYPICAL TELECOM ROOM BONDING FLOW

DIAGRAM.

TELECOM ROOM REFERENCES

TELECOM ROOM

DETAIL / SHEET

REFERENCE

FLOOR PLAN

REFERENCE ARCH ROOM NUMBER

MC-1 B1/1017.TN401 F6/1017.TN102 1012

TR-1 B1/43H.TN401 43H.TN101 G50

TR-2 B1/81H.TN401 81H.TN102 133B

TR-3 B1/152.TN401 152.TN101 101

TR-4 C1/237.TN401 237.TN101A D131

TR-5 D1/237.TN401 237.TN101B M119

TR-6 B1/1007.TN401 1007.TN101 1125

TR-7 E1/1007.TN401 1007.TN102 2163

TR-8 B6/1017.TN401 1017.TN103 2123

TR-9 E1/1017.TN401 1017.TN104 3036

TR-10 B1/1523.TN401 1523.TN101N 1030

TR-11 E1/1523.TN401 1523.TN101S 1064

VCI

Project Management

Construction Management

Engineering Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

VETERANS

HEALTH

ADMINISTRATION

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT EHRM INFRASTRUCTURE UPGRADES

CAPTAIN JAMES A. LOVELL FHCC

EAST CAMPUS - NORTH CHICAGO

Project Director

Revisions: Date:

VA FORM 08 - 6231

A

CD (100%) SUBMITTAL

(ISSUED FOR BID AND

CONSTRUCTION)

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

57 LOUIS PRIMA DR., SUITE B, COVINGTON, LA 70433

504.676.8337; John Vollman

556-21-700

Name: David Simon Department of Veterans Affairs

Phone: 224.610.3561 Email: david.simon@va.gov

CD (100%) SUBMITTAL

B

IM

/2

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M u p g ra d e s /T

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M C

.r v t

/8

/2

:5

:0

P M

TN001

TECHNOLOGY COVERSHEET

ALL

ACA SKM

North Chicago, IL

03/08/2023

TECHNOLOGY SHEET INDEX

TN001 TECHNOLOGY COVERSHEET

43H.TD101 FIRST FLOOR DEMOLITION - TECHNOLOGY - BLDG 43H

43H.TD102 SECOND FLOOR DEMOLITION - TECHNOLOGY - 43H

43H.TN101 FIRST FLOOR - TECHNOLOGY - BLDG 43H

43H.TN102 SECOND FLOOR - TECHNOLOGY - BLDG 43H

43H.TN401 TECHNOLOGY ROOM ENLARGEMENTS - BLDG 43H

81H.TD101 BASEMENT DEMOLITION - TECHNOLOGY - BLDG 81H

81H.TD102 FIRST FLOOR DEMOLITION - TECHNOLOGY - BLDG 81H

81H.TD103 SECOND FLOOR DEMOLITION - TECHNOLOGY - BLDG 81H

81H.TN101 BASEMENT - TECHNOLOGY - BLDG 81H

81H.TN102 FIRST FLOOR - TECHNOLOGY - BLDG 81H

81H.TN103 SECOND FLOOR - TECHNOLOGY -BLDG 81H

81H.TN401 TECHNOLOGY ROOM ENLARGEMENTS - BLDG 81H

152.TD101 FIRST FLOOR DEMOLITION - TECHNOLOGY - BLDG 152

152.TN101 FIRST FLOOR - TECHNOLOGY -BLDG 152

152.TN401 TECHNOLOGY ROOM ENLARGEMENTS - BLDG 152

237.TD101A FIRST FLOOR DEMOLITION - TECHNOLOGY - AREA A - BLDG 237

237.TD101B FIRST FLOOR DEMOLITION - TECHNOLOGY - AREA B - BLDG 237

237.TN101A FIRST FLOOR - TECHNOLOGY - AREA A -BLDG 237

237.TN101B FIRST FLOOR - TECHNOLOGY - AREA B - BLDG 237

237.TN401 TECHNOLOGY ROOM ENLARGEMENTS - BLDG 237

1007.TD101 FIRST FLOOR DEMOLITION - TECHNOLOGY - BLDG 1007

1007.TD102 SECOND FLOOR DEMOLITION - TECHNOLOGY - BLDG 1007

1007.TN101 FIRST FLOOR - TECHNOLOGY - BLDG 1007

1007.TN102 SECOND FLOOR - TECHNOLOGY - BLDG 1007

1007.TN401 TECHNOLOGY ROOM ENLARGEMENTS - BLDG 1007

1017.TD101 BASEMENT DEMOLITION - TECHNOLOGY - BLDG 1017

1017.TD102 FIRST FLOOR DEMOLITION - TECHNOLOGY - BLDG 1017

1017.TD103 SECOND FLOOR DEMOLITION - TECHNOLOGY - BLDG 1017

1017.TD104 THIRD FLOOR DEMOLITION - TECHNOLOGY - BLDG 1017

1017.TN101 BASEMENT - TECHNOLOGY - BLDG 1017

1017.TN102 FIRST FLOOR - TECHNOLOGY - BLDG 1017

1017.TN103 SECOND FLOOR - TECHNOLOGY - BLDG 1017

1017.TN104 THIRD FLOOR - TECHNOLOGY - BLDG 1017

1017.TN401 TECHNOLOGY ROOM ENLARGMENTS - BLDG 1017

1523.TD101N FIRST FLOOR DEMOLITION - TECHNOLOGY - NORTH - BLDG 1523

1523.TD101S FIRST FLOOR DEMOLITION - TECHNOLOGY - SOUTH - BLDG 1523

1523.TN101N FIRST FLOOR - TECHNOLOGY - NORTH - BLDG 1523

1523.TN101S FIRST FLOOR - TECHNOLOGY - SOUTH - BLDG 1523

1523.TN401 TECHNOLOGY ROOM ENLARGEMENTS - BLDG 1523

TN501 TECHNOLOGY DETAILS

TN503 TECHNOLOGY DETAILS

TN601 TECHNOLOGY DIAGRAMS

TN701 TECHNOLOGY SCHEDULES

GRAND TOTAL: 44

COMM

G80

TR

G50

LARGE WAITING

G67

LARGE EXAM

G69

LARGE EXAM

G71

SMALL EXAM

G73

SMALL KENNEL

G75

CORR

G74

STORAGE

G48 LARGE KENNEL

G76

CONFERENCE/ STAFF LOUNGE

G77

COURTYARD

STORAGE

G48A

CORRIDOR

G78

RECEPTION

G68

PHARM

G70

DOCTOR OFFICE

G72

OFFICE

G79

OFFICE

G79A

QUARANTINE

G83

QUARANTINE

G84

DECONTAMINATION

G86

VESTIBULE

G82

CORRIDOR

G81

CORRIDOR

G88

JAN

G85

DRY

STO

G90

FEED COOLER

G90A

CLEANED WASTE HOLDING

G91

FEED PREP

G89

CLEAN STORAGE

G87

RECEIVING/ EXAM/ WASH AREA

G92

CORR

G96

F TLT

G93

F SHOWER

G94

M TLT/ SHOWER

G95

CORR

G65

VEST

G64

TOILET

G63PROCEDURE

G61

STORAGE

G62

SUB-

STERILE

G58

SCRUB

G59

OR

G60X-RAY/ PRE-OP/ POST-OP

G56

CORRIDOR

G51

LAUNDRY/ STORAGE

G52

JAN

G55

DARK ROOM

G57TLT

G53

NECROPSY

G54

GAS MAINFOLD

G97

MED/LAB AIR

G98

STAIR

G64A SMALL WAITING

G66

CORRIDOR

G46

PIT

3D

1D-WAP

1D-WAP

1D-WAP

1D-WAP

D

D

D

4D

D

2D

D

D

3D 2D 1V

D

D

V

D

D

V

2D

D

D

V

D

V

2V2D 2 D

D

V

V

2D

D

D

1D-WAP

1D

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

D

EXISTING LOCATION OF VOICE

CABLING (#V) TERMINATIONS

EXISTING LOCATION OF DATA

AND WAP CABLING (#D)

TERMINATIONS

VCI

Project Management

Construction Management

Engineering Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

VETERANS

HEALTH

ADMINISTRATION

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT EHRM INFRASTRUCTURE UPGRADES

CAPTAIN JAMES A. LOVELL FHCC

EAST CAMPUS - NORTH CHICAGO

Project Director

Revisions: Date:

VA FORM 08 - 6231

A

CD (100%) SUBMITTAL

(ISSUED FOR BID AND

CONSTRUCTION)

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

57 LOUIS PRIMA DR., SUITE B, COVINGTON, LA 70433

504.676.8337; John Vollman

556-21-700

Name: David Simon Department of Veterans Affairs

Phone: 224.610.3561 Email: david.simon@va.gov

CD (100%) SUBMITTAL

B

IM

/2

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M u p g ra d e s /T

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M C

.r v t

/8

/2

:5

:3

P M

43H.TD101

FIRST FLOOR DEMOLITION -

TECHNOLOGY - BLDG 43H

43H

ACA SKM

North Chicago, IL

03/08/2023

FULLY SPRINKLERED

1/8" = 1'-0"

FIRST FLOOR DEMOLITION - TECHNOLOGY - BLDG 43H

D1

SCALE: 1/8" = 1' - 0"

8 0 8 16246

N

GENERAL NOTES:

1. REFER TO TN001 TECHNOLOGY COVERSHEET

FOR TECHNOLOGY SYMBOL LIST.

2. ALL INFORMATION OUTLETS ON THIS SHEET

SERVED FROM EXISTING TELECOMMUNICATION

ROOMS (AS INDICATED).

3. ALL EXISTING CABLING SHOWN TO BE DEMO'D

SHALL BE REMOVED FROM END TO END AND

REPLACED WITH NEW DATA CABLES.

4. ALL VOICE (#V) LOCATIONS SHOWN HAVE THE

NUMBER OF CABLES INDICATED TERMINATED AT

THE FACEPLATE, PLUS AN ADDITIONAL

CATEGORY 3 CABLE COILED IN THE CEILING. THE

CONTRACTOR SHALL INCLUDE REMOVAL OF THE

COILED CABLE IN ADDITION TO THE #V LOCATION

NOTED TO BE DEMO'D AT EACH OUTLET

LOCATION IN ITS ENTIRETY TO SOURCE.

5. ALL WAP LOCATIONS SHOWN TO BE DEMO'D

REPRESENT REPLACEMENT OF DATA CABLING

ONLY. THE EXISTING ACCESS POINT DEVICE

SHALL BE PROTECTED IN PLACE WITH DATA

CABLING INSTALLED NEW WITH TERMINATION

WITHIN 5'-0" OF DEVICE. INSTALL PATCH CORD TO

COMPLETE INSTALLATION.

STORAGE

G48A

STAIR

G64A

TOILET

OPEN

OFFICE

OFFICE

OFFICE

MECH

STORAGE

OPEN

SPACE

1D-WAP

1D-WAP

1D-WAP

D

V

2D 1V 3D

2D2V 2D2V 2D2V

2D 1V 2V

VCI

Project Management

Construction Management

Engineering Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

VETERANS

HEALTH

ADMINISTRATION

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT EHRM INFRASTRUCTURE UPGRADES

CAPTAIN JAMES A. LOVELL FHCC

EAST CAMPUS - NORTH CHICAGO

Project Director

Revisions: Date:

VA FORM 08 - 6231

A

CD (100%) SUBMITTAL

(ISSUED FOR BID AND

CONSTRUCTION)

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

57 LOUIS PRIMA DR., SUITE B, COVINGTON, LA 70433

504.676.8337; John Vollman

556-21-700

Name: David Simon Department of Veterans Affairs

Phone: 224.610.3561 Email: david.simon@va.gov

CD (100%) SUBMITTAL

B

IM

/2

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M u p g ra d e s /T

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M C

.r v t

/8

/2

:5

:3

P M

43H.TD102

SECOND FLOOR DEMOLITION -

TECHNOLOGY - 43H

43H

ACA SKM

North Chicago, IL

03/08/2023

FULLY SPRINKLERED

1/8" = 1'-0"

SECOND FLOOR DEMOLITION - TECHNOLOGY - 43H

D1

SCALE: 1/8" = 1' - 0"

8 0 8 16246

N

GENERAL NOTES:

1. REFER TO TN001 TECHNOLOGY COVERSHEET

FOR TECHNOLOGY SYMBOL LIST.

2. ALL INFORMATION OUTLETS ON THIS SHEET

SERVED FROM EXISTING TELECOMMUNICATION

ROOMS (AS INDICATED).

3. ALL EXISTING CABLING SHOWN TO BE DEMO'D

SHALL BE REMOVED FROM END TO END AND

REPLACED WITH NEW DATA CABLES.

4. ALL VOICE (#V) LOCATIONS SHOWN HAVE THE

NUMBER OF CABLES INDICATED TERMINATED AT

THE FACEPLATE, PLUS AN ADDITIONAL

CATEGORY 3 CABLE COILED IN THE CEILING. THE

CONTRACTOR SHALL INCLUDE REMOVAL OF THE

COILED CABLE IN ADDITION TO THE #V LOCATION

NOTED TO BE DEMO'D AT EACH OUTLET

LOCATION IN ITS ENTIRETY TO SOURCE.

5. ALL WAP LOCATIONS SHOWN TO BE DEMO'D

REPRESENT REPLACEMENT OF DATA CABLING

ONLY. THE EXISTING ACCESS POINT DEVICE

SHALL BE PROTECTED IN PLACE WITH DATA

CABLING INSTALLED NEW WITH TERMINATION

G80

TR

LARGE WAITING LARGE EXAM LARGE EXAM

SMALL EXAM

SMALL KENNEL

CORR

STORAGE

LARGE KENNEL

CONFERENCE/ STAFF LOUNGE

COURTYARD

STORAGE

CORRIDOR

RECEPTION PHARM DOCTOR OFFICE OFFICE OFFICE QUARANTINE QUARANTINE

DECONTAMINATION

VESTIBULE

CORRIDOR

CORRIDOR

JAN

DRY

STO FEED COOLER CLEANED WASTE HOLDING

FEED PREP

CLEAN STORAGE

RECEIVING/ EXAM/ WASH AREA

CORR

F TLT

F SHOWER

M TLT/ SHOWER

CORR

VEST

TOILET

PROCEDURE

STORAGE

SUB-

STERILE

SCRUB

OR

X-RAY/ PRE-OP/ POST-OP

CORRIDOR

LAUNDRY/ STORAGE

JAN

DARK ROOM

TLT

NECROPSY

GAS MAINFOLD MED/LAB AIR

STAIR

SMALL WAITING

CORRIDOR

TR

G50

G67 G69 G71

G73

G75 G74

G48

G76

G77

G48A

G78

G68 G70 G72 G79 G79A G83 G84

G86

G82

G81

G88

G85

G90 G90A G91

G89

G87

G92

G96

G93

G94

G95

G65

G64

G63

G61

G62

G58

G59

G60

G56

G51

G52

G55

G57

G53

G54

G97 G98

G64A

G66

G46

G80

M E D

G A S

S H U T

O F F

M E D

G A S

S H U T

O F F

M E D

G A S

S H U T

O F F

M E D

G A S

S H U T

O F F

M E D

G A S

C O N T

P N L

MED

GASCONT

PNL

M E D

G A S

S H U T

O F F

MED

GASCONT

PNL

P R E S S U R E

R E

B U

IL

D

IN

G

S T A T

IO

N

P R E S S U R E

R E

B U

IL

D

IN

G

S T A T

IO

N

PRESSURE

RE-BUILDING

STATION

PIT

P

P

P

P

FEC

N

NO

NO

V V

V

V A A

E

NE

NO

V

V

V

A

3D

D

D

D

3D

D

3D

D

D

3D 3D

D

D

D

D

3D

D

D

D

D

3D 3 D

D

3D

D

D

2D-WAP-NV

2D-WAP-NV

2D-WAP-NV

2D-WAP-NV

2D-WAP-NV

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

3D

3D

D

D

D

3D

D

D 3 D

D 2D-WAP-NV2D-WAP-NV

D

D

43H.TN401

B1

TR-1

43H.TN401

D1

VCI

Project Management

Construction Management

Engineering Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

VETERANS

HEALTH

ADMINISTRATION

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT EHRM INFRASTRUCTURE UPGRADES

CAPTAIN JAMES A. LOVELL FHCC

EAST CAMPUS - NORTH CHICAGO

Project Director

Revisions: Date:

VA FORM 08 - 6231

A

CD (100%) SUBMITTAL

(ISSUED FOR BID AND

CONSTRUCTION)

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

57 LOUIS PRIMA DR., SUITE B, COVINGTON, LA 70433

504.676.8337; John Vollman

556-21-700

Name: David Simon Department of Veterans Affairs

Phone: 224.610.3561 Email: david.simon@va.gov

CD (100%) SUBMITTAL

B

IM

/2

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M u p g ra d e s /T

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M C

.r v t

/8

/2

:5

:4

P M

43H.TN101

FIRST FLOOR - TECHNOLOGY - BLDG

43H

43H

ACA SKM

North Chicago, IL

03/08/2023

FULLY SPRINKLERED

1/8" = 1'-0"

FIRST FLOOR - TECHNOLOGY - BLDG B43H

D1

SCALE: 1/8" = 1' - 0"

8 0 8 16246

N

GENERAL NOTES:

1. REFER TO TN001 TECHNOLOGY COVERSHEET

FOR TECHNOLOGY GENERAL NOTES,

2. TECHNOLOGY INSTALLATION NOTES AND

SYMBOL LIST.

3. REFER TO TN701 FOR GENERAL TECHNOLOGY

EQUIPMENT SCHEDULE.

4. ALL INFORMATION OUTLETS ON THIS SHEET

TO BE CABLED ON A SCHEDULED BASIS WITH

OWNER WHILE OCCUPIED. COORDINATE

DEMO AND CABLE REPLACEMENT WITH

OWNER. REFER TO THE PHASING NOTES IN

THE COVER SHEET FOR MORE INFORMATION.

5. CONTRACTOR TO PROVIDE NEW J-HOOK

ROUTES FOR ALL NEW CABLING. J-HOOK SIZE

AND QUANTITY TO BE PER MANUFACTURER

RECOMMENDATIONS.

6. ALL CABLES ON THIS FLOOR WILL BE SERVED

FROM THE COMM ROOM G50.

KEYNOTES;

1. PROVIDE 24 STRAND OS2 FIBER OPTIC CABLE FROM

EXISTING COMM CLOSET M105 TO TR-5.

G48A

STAIR

G64A

TOILET

OPEN

OFFICE

OFFICE

OFFICE

MECH

STORAGE

OPEN

SPACE

D

3D 3D 3D

3D 3D 3D

2D-WAP-NV 2D-WAP-NV

3D 3D

3D3D3D

VCI

Project Management

Construction Management

Engineering Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

VETERANS

HEALTH

ADMINISTRATION

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT EHRM INFRASTRUCTURE UPGRADES

CAPTAIN JAMES A. LOVELL FHCC

EAST CAMPUS - NORTH CHICAGO

Project Director

Revisions: Date:

VA FORM 08 - 6231

A

CD (100%) SUBMITTAL

(ISSUED FOR BID AND

CONSTRUCTION)

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

57 LOUIS PRIMA DR., SUITE B, COVINGTON, LA 70433

504.676.8337; John Vollman

556-21-700

Name: David Simon Department of Veterans Affairs

Phone: 224.610.3561 Email: david.simon@va.gov

CD (100%) SUBMITTAL

B

IM

/2

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M u p g ra d e s /T

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M C

.r v t

/8

/2

:5

:4

P M

43H.TN102

SECOND FLOOR - TECHNOLOGY -

BLDG 43H

43H

ACA SKM

North Chicago, IL

03/08/2023

FULLY SPRINKLERED

1/8" = 1'-0"

SECOND FLOOR - TECHNOLOGY - 43H

D1

SCALE: 1/8" = 1' - 0"

8 0 8 16246

N

GENERAL NOTES:

1. REFER TO TN001 TECHNOLOGY COVERSHEET

FOR TECHNOLOGY GENERAL NOTES,

2. TECHNOLOGY INSTALLATION NOTES AND

SYMBOL LIST.

3. REFER TO TN701 FOR GENERAL TECHNOLOGY

EQUIPMENT SCHEDULE.

4. ALL INFORMATION OUTLETS ON THIS SHEET

TO BE CABLED ON A SCHEDULED BASIS WITH

OWNER WHILE OCCUPIED. COORDINATE

DEMO AND CABLE REPLACEMENT WITH

OWNER. REFER TO THE PHASING NOTES IN

THE COVER SHEET FOR MORE INFORMATION.

5. CONTRACTOR TO PROVIDE NEW J-HOOK

ROUTES FOR ALL NEW CABLING. J-HOOK SIZE

AND QUANTITY TO BE PER MANUFACTURER

RECOMMENDATIONS.

6. ALL CABLES ON THIS FLOOR WILL BE SERVED

FROM THE COMM ROOM G50.

CORR

G50

W

W R I

2D-ACP

2D-CAM-VA

CSS

CORR

G50

3D

43H.TN401

C3

SC-CAB-1

KEY NOTES:

1. TWO COMPARTMENT COLLOCATION CABINET WITH TWO LOCKABLE DOORS. ONE

COMPARTMENT FOR VA, ONE COMPARTMENT FOR NAVY. EACH 3D WORK AREA

OUTLET SHALL HAVE TWO DATA CABLES RAN TO THE NAVY COMPARTMENT AND

ONE RAN TO THE VA COMPARTMENT.

2. PROVIDE MUD RING AT OUTLETS ON WALLS WITH 3/4" BACKBOARD.

3. VERIFY FINAL MOUNTING LOCATION WITH VA IS PRIOR TO ROUGH-IN.

SC-GND-1

SPACE RESERVED FOR

ACCESS CONTROL

42 12

SC-CAB-1

(TYP.)

SC-HWM-1

SC-PDU-H

NETWORK SWITCH

SC-HWM-1

SC-BLK-1

SC-FDC-1

SC-BLK-1

SC-MPP-1

SC-MPP-1

SC-BLK-1

SC-BLK-1

SC-BLK-1

SC-MPP-1

SC-MPP-1

SC-MPP-1

SC-BLK-1

SC-HWM-1

NETWORK SWITCH

SC-HWM-1

NETWORK SWITCH

SC-HWM-1

SC-PDU-H

SC-PDU-H

NETWORK SWITCH

SC-HWM-1

SC-MPP-1

SC-UPS-1

SC-UPS-1 VA RACK

NAVY RACK

KEY NOTES:

1. PROVIDE RACK MOUNTED GROUND BAR SC-GND-2 AT TOP REAR OF RACK.

2. ALL FIBER OPTIC CABLE SHALL BE TERMINATED INTO THE NAVY RACK.

3. ALL UTP CABLING WILL ENTER THE TOP RIGHT SIDE AND ROUTE TO THE BAYS CAT6A

STRAIGHT PATCH PANELS. PATCH CABLES FROM THE LOWER BAYS WILL USE THE

LEFT SIDE VERTICAL CABLE CHANNELS TO ROUTE TO THE TOP BAY.

SC-BLK-1

SC-PDU-H

FRONT

SC-BLK-1

NETWORK SWITCH

NETWORK SWITCH

18"x6"

SC-CT-1

(TYP.)

PW-CPW-1

(TYP.)

VCI

Project Management

Construction Management

Engineering Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

VETERANS

HEALTH

ADMINISTRATION

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT EHRM INFRASTRUCTURE UPGRADES

CAPTAIN JAMES A. LOVELL FHCC

EAST CAMPUS - NORTH CHICAGO

Project Director

Revisions: Date:

VA FORM 08 - 6231

A

CD (100%) SUBMITTAL

(ISSUED FOR BID AND

CONSTRUCTION)

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

57 LOUIS PRIMA DR., SUITE B, COVINGTON, LA 70433

504.676.8337; John Vollman

556-21-700

Name: David Simon Department of Veterans Affairs

Phone: 224.610.3561 Email: david.simon@va.gov

CD (100%) SUBMITTAL

B

IM

/2

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M u p g ra d e s /T

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M C

.r v t

/8

/2

:5

:4

P M

43H.TN401

TECHNOLOGY ROOM

ENLARGEMENTS - BLDG 43H

43H

ACA SKM

North Chicago, IL

03/08/2023

FULLY SPRINKLERED

1/4" = 1'-0"

DATA ROOM ENLARGEMENT TR-1

B1

SCALE: 1/4" = 1' - 0"

4 0 4 8123

1" = 1'-0"

EQUIPMENT RACK ELEVATION TR-1

C3

1/4" = 1'-0"

DATA ROOM PATHWAY TR-1

D1

MECH ROOM

B03

STORAGE

B02

STO

B06

MECH ROOM

B04

STORAGE

B10

STORAGE

B05

STORAGE

B07

STORAGE

B08A

STORAGE

B08B

STORAGE

B08C

STORAGE

B09

VESTIBULE

B08

ELEV

BELEV2

STAIR

BST2

STAIR

BST1

STORAGE

B01

ELEC ROOM

B13

ELECTRICAL ROOM

B14

FREIGHT ELEV

BELEV3

MECHANICAL ROOM

B11 BOILER ROOM

ENTRY

UP

UP

2D

2D

D

D

V

D

V

D

V

D

V

2D

2D

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

VCI

Project Management

Construction Management

Engineering Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

VETERANS

HEALTH

ADMINISTRATION

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT EHRM INFRASTRUCTURE UPGRADES

CAPTAIN JAMES A. LOVELL FHCC

EAST CAMPUS - NORTH CHICAGO

Project Director

Revisions: Date:

VA FORM 08 - 6231

A

CD (100%) SUBMITTAL

(ISSUED FOR BID AND

CONSTRUCTION)

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

57 LOUIS PRIMA DR., SUITE B, COVINGTON, LA 70433

504.676.8337; John Vollman

556-21-700

Name: David Simon Department of Veterans Affairs

Phone: 224.610.3561 Email: david.simon@va.gov

CD (100%) SUBMITTAL

B

IM

/2

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M u p g ra d e s /T

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M C

.r v t

/8

/2

:5

:4

P M

81H.TD101

BASEMENT DEMOLITION -

TECHNOLOGY - BLDG 81H

81H

ACA SKM

North Chicago, IL

03/08/2023

FULLY SPRINKLERED

1/8" = 1'-0"

BASEMENT DEMOLITION - TECHNOLOGY - B81H

D3

SCALE: 1/8" = 1' - 0"

8 0 8 16246

N

GENERAL NOTES:

1. REFER TO TN001 TECHNOLOGY COVERSHEET

FOR TECHNOLOGY SYMBOL LIST.

2. ALL INFORMATION OUTLETS ON THIS SHEET

SERVED FROM EXISTING TELECOMMUNICATION

ROOMS (AS INDICATED).

3. ALL EXISTING CABLING SHOWN TO BE DEMO'D

SHALL BE REMOVED FROM END TO END AND

REPLACED WITH NEW DATA CABLES.

4. ALL VOICE (#V) LOCATIONS SHOWN HAVE THE

NUMBER OF CABLES INDICATED TERMINATED AT

THE FACEPLATE, PLUS AN ADDITIONAL

CATEGORY 3 CABLE COILED IN THE CEILING. THE

CONTRACTOR SHALL INCLUDE REMOVAL OF THE

COILED CABLE IN ADDITION TO THE #V LOCATION

NOTED TO BE DEMO'D AT EACH OUTLET

LOCATION IN ITS ENTIRETY TO SOURCE.

5. ALL WAP LOCATIONS SHOWN TO BE DEMO'D

REPRESENT REPLACEMENT OF DATA CABLING

ONLY. THE EXISTING ACCESS POINT DEVICE

SHALL BE PROTECTED IN PLACE WITH DATA

CABLING INSTALLED NEW WITH TERMINATION

133B

STORAGE

133C

COMM

STORAGE AREA

TR

ADMINISTRATIVE SPACE

ENTRY

ADMINISTRATIVE OFFICE

MECH ROOM

REFRIGERATOR

133A

WAREHOUSE

OFFICE

STAIR

1ST4

MECH ROOM

OFFICE

136A

FREIGHT ELEV

1ELEV3

ELEV

1ELEV2

STORAGE

133D

STAIR

1ST3

STORAGE

130A

STORAGE AREA

CORRIDOR

ADMINISTRATIVE OFFICE

COOLER

129A

COOLER

ADMINISTRATIVE OFFICE

ADMINISTRATIVE OFFICE

RECEIVING

LOADING AREA

M/F TLT

125A

SHWR RM

RECEIVING

STAIR

1ST1

CLO

113A

VESTIBULE

ELEVATOR

1ELEV1

OFFICE

CORR

STAIR

1ST2

CORR

VAULT

MAIL RM

LOUNGE

M TLT

JAN

107A

F TLT

104A

FOYER

MECH CLO

OFFICE

OFFICE

ELEC

ROOM

133-A

DN

DN

UP

UP

UP

AED

2D

2D

2D

D

D

D

V

D

V

D

V

D

V

1D 1V

1D1V

1D 1V

2D2V

D

V

D

V

D

V

D

V

D

V

D

V

1D 2V1D 2V

1D1V 1D1V

D

V

2D

D

V

D

V

D

V

1D1V

1D1V

2D

1D 1V 1D 1V

D2 D

D

1D2V 2D 1V

D

V

1D 1V

2D

D

D

V

V

D

V

D

V

D

V

1D1V

1D 1V

D

V

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

REMOVE EXISTING

TELEPHONE PUNCH

BLOCKS

PULL BACK THE EXISTING FIBER

AND RE-ROUTE TO THE NEW

TELECOM ROOM SHOWN ON SHEET

81H.TN101

EXISTING LOCATION DATA CABLING

(#D) TERMINATIONS

EXISTING LOCATION DATA CABLING

(#D) TERMINATIONS

VCI

Project Management

Construction Management

Engineering Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

VETERANS

HEALTH

ADMINISTRATION

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT EHRM INFRASTRUCTURE UPGRADES

CAPTAIN JAMES A. LOVELL FHCC

EAST CAMPUS - NORTH CHICAGO

Project Director

Revisions: Date:

VA FORM 08 - 6231

A

CD (100%) SUBMITTAL

(ISSUED FOR BID AND

CONSTRUCTION)

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

57 LOUIS PRIMA DR., SUITE B, COVINGTON, LA 70433

504.676.8337; John Vollman

556-21-700

Name: David Simon Department of Veterans Affairs

Phone: 224.610.3561 Email: david.simon@va.gov

CD (100%) SUBMITTAL

B

IM

/2

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M u p g ra d e s /T

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M C

.r v t

/8

/2

:5

:4

P M

81H.TD102

FIRST FLOOR DEMOLITION -

TECHNOLOGY - BLDG 81H

81H

ACA SKM

North Chicago, IL

03/08/2023

FULLY SPRINKLERED

1/8" = 1'-0"

FIRST FLOOR DEMOLITION - TECHNOLOGY - B81H

F3

SCALE: 1/8" = 1' - 0"

8 0 8 16246

N

GENERAL NOTES:

1. REFER TO TN001 TECHNOLOGY COVERSHEET

FOR TECHNOLOGY SYMBOL LIST.

2. ALL INFORMATION OUTLETS ON THIS SHEET

SERVED FROM EXISTING TELECOMMUNICATION

ROOMS (AS INDICATED).

3. ALL EXISTING CABLING SHOWN TO BE DEMO'D

SHALL BE REMOVED FROM END TO END AND

REPLACED WITH NEW DATA CABLES.

4. ALL VOICE (#V) LOCATIONS SHOWN HAVE THE

NUMBER OF CABLES INDICATED TERMINATED AT

THE FACEPLATE, PLUS AN ADDITIONAL

CATEGORY 3 CABLE COILED IN THE CEILING. THE

CONTRACTOR SHALL INCLUDE REMOVAL OF THE

COILED CABLE IN ADDITION TO THE #V LOCATION

NOTED TO BE DEMO'D AT EACH OUTLET

LOCATION IN ITS ENTIRETY TO SOURCE.

5. ALL WAP LOCATIONS SHOWN TO BE DEMO'D

REPRESENT REPLACEMENT OF DATA CABLING

ONLY. THE EXISTING ACCESS POINT DEVICE

SHALL BE PROTECTED IN PLACE WITH DATA

CABLING INSTALLED NEW WITH TERMINATION

WAREHOUSE

LABORATORY

203A

ADMINISTRATIVE OFFICE

STORAGE

VESTIBULE

STAIRS

2ST1

STORAGE

ADMINISTRATIVE OFFICE

WAREHOUSE

OFFICE

202B

OFFICE

202A

MECH ROOM

ELEV

2ELEV1 STAIRS

2ST2

STORAGE

MEN

WOMEN

HALL

HALL

OFFICE

CONF

OFFICE

OFFICE

OFFICE

OFFICE

OPEN

OFFICE

COPY

BREAK

DN

DN

1D-WAP

1D-WAP

1D-WAP

1D 1D

1D-WAP

1D-WAP

2D

1D-WAP

2D

1D-WAP

1D-WAP

D

D

D

D

D

2D

D

D

D2D 2D

D 2

D D

2D 2D

D

D

D

D

D

D

2D

D

D

D

D

D

D

2D 2D

4D

4D

1D-WAP

1D

D

D

-W A

P

D

V

1D1V

1D 1V1D 1V

1D1V

D

V

1D 1V 1D 1V 1D 1V

1D1V 1D1V

D

V

D

V

D

V

D

V

D

V

D

V

D

V

1D1V

D

2D D

1D-WAP 1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D

2D

VCI

Project Management

Construction Management

Engineering Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

VETERANS

HEALTH

ADMINISTRATION

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT EHRM INFRASTRUCTURE UPGRADES

CAPTAIN JAMES A. LOVELL FHCC

EAST CAMPUS - NORTH CHICAGO

Project Director

Revisions: Date:

VA FORM 08 - 6231

A

CD (100%) SUBMITTAL

(ISSUED FOR BID AND

CONSTRUCTION)

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

57 LOUIS PRIMA DR., SUITE B, COVINGTON, LA 70433

504.676.8337; John Vollman

556-21-700

Name: David Simon Department of Veterans Affairs

Phone: 224.610.3561 Email: david.simon@va.gov

CD (100%) SUBMITTAL

B

IM

/2

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M u p g ra d e s /T

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M C

.r v t

/8

/2

:5

:4

P M

81H.TD103

SECOND FLOOR DEMOLITION -

TECHNOLOGY - BLDG 81H

81H

ACA SKM

North Chicago, IL

03/08/2023

FULLY SPRINKLERED

1/8" = 1'-0"

SECOND FLOOR DEMOLITION - TECHNOLOGY - B81H

F3

SCALE: 1/8" = 1' - 0"

8 0 8 16246

N

GENERAL NOTES:

1. REFER TO TN001 TECHNOLOGY COVERSHEET

FOR TECHNOLOGY SYMBOL LIST.

2. ALL INFORMATION OUTLETS ON THIS SHEET

SERVED FROM EXISTING TELECOMMUNICATION

ROOMS (AS INDICATED).

3. ALL EXISTING CABLING SHOWN TO BE DEMO'D

SHALL BE REMOVED FROM END TO END AND

REPLACED WITH NEW DATA CABLES.

4. ALL VOICE (#V) LOCATIONS SHOWN HAVE THE

NUMBER OF CABLES INDICATED TERMINATED AT

THE FACEPLATE, PLUS AN ADDITIONAL

CATEGORY 3 CABLE COILED IN THE CEILING. THE

CONTRACTOR SHALL INCLUDE REMOVAL OF THE

COILED CABLE IN ADDITION TO THE #V LOCATION

NOTED TO BE DEMO'D AT EACH OUTLET

LOCATION IN ITS ENTIRETY TO SOURCE.

5. ALL WAP LOCATIONS SHOWN TO BE DEMO'D

REPRESENT REPLACEMENT OF DATA CABLING

ONLY. THE EXISTING ACCESS POINT DEVICE

SHALL BE PROTECTED IN PLACE WITH DATA

CABLING INSTALLED NEW WITH TERMINATION

MECH ROOM

B03

STORAGE

B02

STO

B06

MECH ROOM

B04

STORAGE

B10

STORAGE

B05

STORAGE

B07

STORAGE

B08A

STORAGE

B08B

STORAGE

B08C

STORAGE

B09

VESTIBULE

B08

ELEV

BELEV2

STAIR

BST2

STAIR

BST1

STORAGE

B01

ELEC ROOM

B13

ELECTRICAL ROOM

B14

FREIGHT ELEV

BELEV3

MECHANICAL ROOM

B11 BOILER ROOM

ENTRY

UP

UP

UNEXCAVATED

SPACE

3D

3D

D

D

D 3

D D

3D

3D

2D-WAP-NV

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-NV

D

D

D

3D

D

-A C

P

2D-WAP-NV

2D-WAP-NV

2D-WAP-NV

2D-WAP-NV

2D-WAP-NV

2D-CAM-VA

VCI

Project Management

Construction Management

Engineering Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

VETERANS

HEALTH

ADMINISTRATION

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT EHRM INFRASTRUCTURE UPGRADES

CAPTAIN JAMES A. LOVELL FHCC

EAST CAMPUS - NORTH CHICAGO

Project Director

Revisions: Date:

VA FORM 08 - 6231

A

CD (100%) SUBMITTAL

(ISSUED FOR BID AND

CONSTRUCTION)

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

57 LOUIS PRIMA DR., SUITE B, COVINGTON, LA 70433

504.676.8337; John Vollman

556-21-700

Name: David Simon Department of Veterans Affairs

Phone: 224.610.3561 Email: david.simon@va.gov

CD (100%) SUBMITTAL

B

IM

/2

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M u p g ra d e s /T

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M C

.r v t

/8

/2

:5

:4

P M

81H.TN101

BASEMENT - TECHNOLOGY - BLDG

81H

81H

ACA SKM

North Chicago, IL

03/08/2023

FULLY SPRINKLERED

SCALE: 1/8" = 1' - 0"

8 0 8 16246

N

1/8" = 1'-0"

BASEMENT - TECHNOLOGY - BLDG B81H

D3

GENERAL NOTES:

1. REFER TO TN001 TECHNOLOGY COVERSHEET

FOR TECHNOLOGY GENERAL NOTES,

2. TECHNOLOGY INSTALLATION NOTES AND

SYMBOL LIST.

3. REFER TO TN701 FOR GENERAL TECHNOLOGY

EQUIPMENT SCHEDULE.

4. ALL INFORMATION OUTLETS ON THIS SHEET

TO BE CABLED ON A SCHEDULED BASIS WITH

OWNER WHILE OCCUPIED. COORDINATE

DEMO AND CABLE REPLACEMENT WITH

OWNER. REFER TO THE PHASING NOTES IN

THE COVER SHEET FOR MORE INFORMATION.

5. CONTRACTOR TO PROVIDE NEW J-HOOK

ROUTES FOR ALL NEW CABLING. J-HOOK SIZE

AND QUANTITY TO BE PER MANUFACTURER

RECOMMENDATIONS.

6. ALL CABLES ON THIS FLOOR WILL BE SERVED

FROM THE NEW TELECOM ROOM. REFER TO

SHEET 81H.TN101 FOR LOCATION.

133-B

STORAGE AREA

TR

ADMINISTRATIVE SPACE

ENTRY

ADMINISTRATIVE OFFICE

MECH ROOM

REFRIGERATOR

WAREHOUSE

OFFICE

STAIR

MECH ROOM

OFFICE

FREIGHT ELEV

ELEV

STORAGESTAIR

STORAGE

STORAGE AREA

CORRIDOR

ADMINISTRATIVE OFFICE

COOLER

COOLER

ADMINISTRATIVE OFFICE

ADMINISTRATIVE OFFICE

RECEIVING

LOADING AREA

M/F TLT SHWR RM

RECEIVING

STAIRCLO

VESTIBULE

ELEVATOR

OFFICE

CORR

STAIR

CORR

VAULT

MAIL RM

LOUNGE

M TLTJAN F TLT

FOYER

MECH CLO

OFFICE

OFFICE

ELEC

ROOM

133A

1ST4

136A

1ELEV3

1ELEV2

133D1ST3

130A

129A

125A 125

1ST1113A

1ELEV1

1ST2

105107A 104A

133-A

DN

DN

UP

UP

UP

LOADING

DOCK

LOADING

DOCK

AED

3D

3D

3D

D

3D 3D

D

D

D

D

D

D

D

D

D

D

D

3D

D

D

3D

3D3D

3D 3D

3D

3D

3D

D

3D

3D

D

D

D

3D

3D

D

D

D

2D-WAP-NV

2D-WAP-VA

2D-WAP-NV

2D-WAP-NV

2D-WAP-NV

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

D

D

D

W

2D-WAP-NV

2D-WAP-NV

2D-WAP-NV

2D-WAP-NV

2D-WAP-NV

2D-WAP-NV

81H.TN401

B1

TR-2

81H.TN401

D1

SC-MPP-24

SC-MPP-24

VCI

Project Management

Construction Management

Engineering Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

VETERANS

HEALTH

ADMINISTRATION

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT EHRM INFRASTRUCTURE UPGRADES

CAPTAIN JAMES A. LOVELL FHCC

EAST CAMPUS - NORTH CHICAGO

Project Director

Revisions: Date:

VA FORM 08 - 6231

A

CD (100%) SUBMITTAL

(ISSUED FOR BID AND

CONSTRUCTION)

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

57 LOUIS PRIMA DR., SUITE B, COVINGTON, LA 70433

504.676.8337; John Vollman

556-21-700

Name: David Simon Department of Veterans Affairs

Phone: 224.610.3561 Email: david.simon@va.gov

CD (100%) SUBMITTAL

B

IM

/2

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M u p g ra d e s /T

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M C

.r v t

/8

/2

:5

:4

P M

81H.TN102

FIRST FLOOR - TECHNOLOGY - BLDG

81H

81H

ACA SKM

North Chicago, IL

03/08/2023

FULLY SPRINKLERED

1/8" = 1'-0"

FIRST FLOOR - TECHNOLOGY - B81H

F3

SCALE: 1/8" = 1' - 0"

8 0 8 16246

N

KEYNOTES;

1. THE NEW TELECOM ROOM BACKBONE SHALL BE

SERVED WITH THE EXISTING FIBER PULLED BACK

FROM THE EXISTING CLOSET. REFER TO SHEET

81H.TD101 FOR EXISTING LOCATION.

2. INSTALL (24) CATEGORY 6A CABLE TO NAVY RACK.

GENERAL NOTES:

1. REFER TO TN001 TECHNOLOGY COVERSHEET

FOR TECHNOLOGY GENERAL NOTES,

2. TECHNOLOGY INSTALLATION NOTES AND

SYMBOL LIST.

3. REFER TO TN701 FOR GENERAL TECHNOLOGY

EQUIPMENT SCHEDULE.

4. ALL INFORMATION OUTLETS ON THIS SHEET

TO BE CABLED ON A SCHEDULED BASIS WITH

OWNER WHILE OCCUPIED. COORDINATE

DEMO AND CABLE REPLACEMENT WITH

OWNER. REFER TO THE PHASING NOTES IN

THE COVER SHEET FOR MORE INFORMATION.

5. CONTRACTOR TO PROVIDE NEW J-HOOK

ROUTES FOR ALL NEW CABLING. J-HOOK SIZE

AND QUANTITY TO BE PER MANUFACTURER

RECOMMENDATIONS.

FROM THE NEW TELECOM ROOM.

WAREHOUSE

LABORATORY

203A

ADMINISTRATIVE OFFICE

STORAGE

VESTIBULE

STAIRS

2ST1

STORAGE

ADMINISTRATIVE OFFICE

WAREHOUSE

OFFICE

202B

OFFICE

202A

MECH ROOM

ELEV

2ELEV1 STAIRS

2ST2

STORAGE

MEN

WOMEN

HALL

HALL

OFFICE

CONF

OFFICE

OFFICE

OFFICE

OFFICE

OPEN

OFFICE

COPY

BREAK

DN

DN

P

P

3D

2D-WAP-NV

2D-WAP-NV

2D-WAP-NV

3D 3D

2D-WAP-NV

2D-WAP-NV

3D

2D-WAP-NV

3D

2D-WAP-NV

2D-WAP-NV

D

D

D

3D

D

D

3D

D

3D

D

D

3D 3D

3D

3D

2D-WAP-NV

3D

D

D

3D

3D3D

3D

D3D 3D 3D

3D 3D

D

D

D

D

D

D

D

3D

D

3D D

2D-WAP-VA 2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-VA

2D-WAP-NV

VCI

Project Management

Construction Management

Engineering Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

VETERANS

HEALTH

ADMINISTRATION

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT EHRM INFRASTRUCTURE UPGRADES

CAPTAIN JAMES A. LOVELL FHCC

EAST CAMPUS - NORTH CHICAGO

Project Director

Revisions: Date:

VA FORM 08 - 6231

A

CD (100%) SUBMITTAL

(ISSUED FOR BID AND

CONSTRUCTION)

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

57 LOUIS PRIMA DR., SUITE B, COVINGTON, LA 70433

504.676.8337; John Vollman

556-21-700

Name: David Simon Department of Veterans Affairs

Phone: 224.610.3561 Email: david.simon@va.gov

CD (100%) SUBMITTAL

B

IM

/2

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M u p g ra d e s /T

.0

V A

-N o rt h

C h ic a g o

IL

-E

H R

M C

.r v t

/8

/2

:5

:4

P M

81H.TN103

SECOND FLOOR - TECHNOLOGY

-BLDG 81H

81H

ACA SKM

North Chicago, IL

03/08/2023

FULLY SPRINKLERED

1/8" = 1'-0"

SECOND FLOOR - TECHNOLOGY - B81H

F3

SCALE: 1/8" = 1' - 0"

8 0 8 16246

N

GENERAL NOTES:

1. REFER TO TN001 TECHNOLOGY COVERSHEET

FOR TECHNOLOGY GENERAL NOTES,

2. TECHNOLOGY INSTALLATION NOTES AND

SYMBOL LIST.

3. REFER TO TN701 FOR GENERAL TECHNOLOGY

EQUIPMENT SCHEDULE.

4. ALL INFORMATION OUTLETS ON THIS SHEET

TO BE CABLED ON A SCHEDULED BASIS WITH

OWNER WHILE OCCUPIED. COORDINATE

DEMO AND CABLE REPLACEMENT WITH

OWNER. REFER TO THE PHASING NOTES IN

THE COVER SHEET FOR MORE INFORMATION.

5. CONTRACTOR TO PROVIDE NEW J-HOOK

ROUTES FOR ALL NEW CABLING. J-HOOK SIZE

AND QUANTITY TO BE PER MANUFACTURER

RECOMMENDATIONS.

6. ALL CABLES ON THIS FLOOR WILL BE SERVED

FROM THE NEW TELECOM ROOM. REFER TO

SHEET 81H.TN101 FOR LOCATION.

133-B

W

CSS

W R I

D

-A C

P2D-CAM-VA

TR

81H.TN401

C3

SC-ER-1

SC-VWM-1

(TYP.)

(TYP.)

SC-TTB

(TYP.)

SC-GND-1

KEY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .