ATTACHMENT 4 - Drawings.pdf
PDF 15 MB Posted
- Attached to
- Y1AZ--EHRM Infrastructure Upgrades Construction - Pine Ridge Federal contract opportunity
- Solicitation number
- 36C77622B0041
About this file
This document provides details for a federal construction contract opportunity with the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation involves infrastructure upgrades to the EHRM facility in Pine Ridge, South Dakota, including electrical panel and HVAC upgrades, communications infrastructure improvements, physical security enhancements, and expansion/renovation of existing space. Work will also include bonding, UPS installation, exterior and interior wall renovations for waterproofing, and adding new data outlets, patch panels, and CAT6A cabling. The technical complexity of the project is low but the contractor must comply with Tribal Employment Rights Office requirements in the remote area and only work during restricted daytime hours.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA OF WORK
C om m od ity R d
Hospital Housing
PINE RIDGE
HOSPITAL
AREA OF WORK
PINE RIDGE, SD
PINE RIDGE VA CLINIC-PTSD BLDG
SD
ND
NE
MN
IA
KS
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
PROJECT LOCATION:
PROJECT TITLE:
BUILDING NUMBER:
ARCHITECTS + ENGINEERS:
BANCROFT ARCHITECTS +
ENGINEERS
CONTRACT NUMBER:
STATION PROJECT NUMBER:
BANCROFT-AE PROJECT NUMBER:
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
PROJECT NUMBERS:
03/31/2022
100% CONSTRUCTION DOCUMENTS
03/31/2022
GENERAL - COVER SHEET EHRM INFRASTRUCTURE
UPGRADES
PINE RIDGE VA CLINIC
CZ LD
568A4-21-703
G001
EHRM INFRASTRUCTURE UPGRADES
568A4-21-703
36C26319D0044
18-121
Pine Ridge Clinic
Pine Ridge Clinic
HIGHWAY 18, P.O. BOX 5016
PINE RIDGE, SD 57770
100% CONSTRUCTION
DOCUMENTS
PINE RIDGE VA CLINIC
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007 T:847.952.9362 F:847.952.9403 www.bancroft-ae.com
18-12136C26319D0044
NOT TO
SCALE
VICINITY MAP
NOT TO
SCALE
CAMPUS MAP
Revisions: Date:
35% SCHEMATIC DESIGN 6/24/2021
65% DESIGN DEVELOPMENT 7/29/2021
95% CONSTRUCTION DOCUMENTS 09/02/2021
95% CONSTRUCTION DOCUMENTS 09/09/2021
100% CONSTRUCTION DOCUMENTS 09/16/2021
100% CONSTRUCTION DOCUMENTS REVISED COMMENTS 12/09/2021
100% CONSTRUCTION DOCUMENTS 01/14/2022
100% CONSTRUCTION DOCUMENTS 02/17/2022
100% CONSTRUCTION DOCUMENTS 03/31/2022
NOT TO
SCALE
STATE MAP
NN
N
NOT TO
SCALE
NEW 400A SERVICE ENTRANCE LOCATION
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER
GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
(HTTP://WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE 2018 (IBC) (ONLY WHEN SPECIFICALLY
REFERENCED IN VA DESIGN DOCUMENTS).
• NFPA 101 LIFE SAFETY CODE 2020.
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND
NFPA 900.
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA)
STANDARDS.
• VA EHRM SITE INFRASTRUCTURE AND END USER DEVICE
REQUIREMENTS v2.0, APRIL 15, 2021VA SEISMIC DESIGN
REQUIREMENTS, H-18-8 .
• NATIONAL ELECTRICAL CODE (NEC).
• INTERNATIONAL PLUMBING CODE (IPC).
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13).
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR
DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS,
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR
NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE
RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS,
10 CFR PARTS 433, 434 AND 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE
BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION MANAGEMENT.
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN
THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER
CONSTRUCTION SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE
STANDARD 62.1- 2004.
• ASHRAE-110 F VELOCITY MEASUREMENT PROCEDURES
• SHEET METAL AND AIR CONDITIONING CONTRACTORS ASSOCIATION
(SMACNA)
• INTERNATIONAL MECHANICAL CODE (IMC)
• UNDERWRITER'S LABORATORIES (UL)
BUILDING CODE DATA
GROSS FLOOR AREA / SF CBOC BUILDING 4,130
GROSS FLOOR AREA / SF
CBOC BUILDING
BUSINESS
OCCUPANCY
1,595
GROSS FLOOR AREA / SF
CBOC BUILDING
OCCUPANCY R-4
2,535
NOTE MAIN APPLICABLE CODES FOR REFERENCE ONLY, ADDITIONAL APPLICABLE CODES REFERENCED AS NEEDED.
APPLICABLE CODE
NFPA 101 (2020) IBC 2018 PROVIDED/ ACTUAL
SECTION REQUIREMENT SECTION REQUIREMENT
OCCUPANCY TYPE
101 6.1.11 BUSINESS/R-4 304 BUSINESS/R-4
OCCUPANT LOAD FACTOR
CBOC BUSINESS OCCUPANCY
TABLE 7.3.1.2
TABLE 1004.5
OCCUPANT LOAD/PERSONS
CBOC BUSINESS OCCUPANCY
11 11
BUILDING CONSTRUCTION TYPE
NFPA 220 V (000) TABLE 601 V-B
MAX ALLOWABLE HEIGHT ABOVE GRADE TABLE 504.3
MAX ALLOWABLE NUMBER OF STORIES ABOVE GRADE TABLE 504.4
MAX ALLOWABLE BUILDING AREA TABLE 506.2
AUTOMATIC SPRINKLER SYSTEM FULLY SPRINKLERED TABLE 506.2 FULLY SPRINKLERED
NOTE BUILDING CBOC IS A SINGLE STORY STRUCTURE WITH MIXED-USE OCCUPANCY OF GROUP-B AND R-4.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
03/31/2022
GENERAL - DRAWING INDEX, BUILDING CODE
INFORMATION
EHRM INFRASTRUCTURE
UPGRADES
PINE RIDGE VA CLINIC
CZ LD
568A4-21-703
G002
Pine Ridge Clinic
100% CONSTRUCTION
DOCUMENTS
18-12136C26319D0044
DRAWING INDEX
SHEET NUMBER SHEET TITLE 35% 65% 95% 100%
00-GENERAL
G001 GENERAL - COVER SHEET • • • •
G002 GENERAL - DRAWING INDEX, BUILDING CODE INFORMATION • • • •
GI001 GENERAL - GENERAL PROJECT NOTES • • • •
GI002 GENERAL - GENERAL DEMOLITION NOTES • • • •
GI101 GENERAL - LIFE SAFETY AND INFECTION CONTROL PLANS - FIRST FLOOR • • • •
GI102 GENERAL - INFECTION CONTROL NOTES AND DETAILS • • • •
01-ARCHITECTURAL
A001 ARCHITECTURAL - SYMBOLS, ABBREVIATIONS AND TYPICAL MOUNTING HEIGHTS • • • •
A100 ARCHITECTURAL - CBOC SITE PLAN • • • •
A101 ARCHITECTURAL - DEMOLITION AND CONSTRUCTION PLANS - FIRST FLOOR • • • •
A102 ARCHITECTURAL - DEMOLITION AND CONSTRUCTION CEILING PLANS - FIRST
FLOOR
A103 ARCHITECTURAL - DEMOLITION AND NEW WORK ELEVATIONS - MECH.ROOM 112 • • •
A104 ARCHITECTURAL - MISC.DETAILS AND SCHEDULES • • •
06 - PLUMBING
P001 PLUMBING - GENERAL NOTES, SYMBOLS AND ABBREVIATIONS • • •
P101 PLUMBING ENLARGED PLAN DEMOLITION / NEW CONSTRUCTION • • •
P501 PLUMBING - DETAILS • • •
07-MECHANICAL
M001 MECHANICAL - GENERAL NOTES, SYMBOLS, & ABBREVIATIONS • • •
M101 MECHANICAL ENLARGED PLAN • • •
M501 MECHANICAL DETAILS • • •
M601 MECHANICAL SCHEDULES • • •
08-ELECTRICAL
E001 ELECTRICAL - GENERAL NOTES • • • •
E002 ELECTRICAL - SYMBOLS AND ABBREVIATIONS • • • •
EP101 ELECTRICAL - FIRST FLOOR POWER PLAN AND SERVICE ENTRANCE, 400A SERVICE
EP102 ELECTRICAL - SITE PLAN, 400A SERVICE UNDERGROUND • •
EPD102 ELECTRICAL - SITE PLAN, 400A SERVICE UNDERGROUND •
ET101 ELECTRICAL - ENLARGED MECHANICAL ROOM TECHNOLOGY PLAN • • • •
ET102 ELECTRICAL - FIRST FLOOR NETWORK AND PHONE CABLING PLAN • • • •
ET103 ELECTRICAL - NETWORK DIAGRAM • • •
ET104 ELECTRICAL - GOLDEN WEST COMMUNICATION FIBER • • •
EF100 ELECTRICAL - RELOCATE FIRE ALARM CONTROL PANEL • • •
E500 ELECTRICAL - ARC FLASH, CURRENT IN AMPERES, ELECTRICAL EQUIPMENT
SCHEDULE AND SINGLE LINE DIAGRAM
E501 ELECTRICAL - PHASING AND UTILITIES CONTACT DATA • • • •
E600 ELECTRICAL - PANEL SCHEDULES • • • •
E601 ELECTRICAL - EQUIPMENT SCHEDULES • • • •
E700 ELECTRICAL - SIGNAGE • •
Grand total: 34
Revisions: Date:
35% SCHEMATIC DESIGN 6/24/2021
65% DESIGN DEVELOPMENT 7/29/2021
95% CONSTRUCTION DOCUMENTS 09/02/2021
95% CONSTRUCTION DOCUMENTS 09/09/2021
100% CONSTRUCTION DOCUMENTS 09/16/2021
100% CONSTRUCTION DOCUMENTS REVISED COMMENTS 12/09/2021
100% CONSTRUCTION DOCUMENTS 01/14/2022
100% CONSTRUCTION DOCUMENTS 02/17/2022
100% CONSTRUCTION DOCUMENTS 03/31/2022
APPLICABLE CODES
ADDITIONAL REQUIREMENTS
All contracting employees providing work on Native American Nation land shall fully comply with TERO (Tribal Employment Rights Office) requirements. TERO Ordinances require that all employers who are engaged in operating a business on reservations give preference to qualified Native Americans in all aspects of employment, contracting and other business activities.
CONTACT INFORMATION:
TRIBAL EMPLOYMENT RIGHTS OFFICE
(TERO)
Buffy D.M.Redfish Office Manager P.O. Box 379 Pine Ridge, SD 57770 605-867-5167 605-867-5892 fax 605-407-2977 cell
ADDITIONAL REQUIREMENTS Contractor to provide staff that will undergo training and certification to allow un-escorted access to IT closets. The contractor shall certify sufficient number of staff to accommodate proposed schedule without relying on VA staff to accompany as escorts. This will require PIV badging requirement including background investigations, see "Contractor Background Investigations Request" form.
1. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH ALL PUBLISHED APPLICABLE
LOCAL / STATE / FEDERAL / NATIONAL CODES, ORDINANCES AND REGULATIONS ALONG
WITH ALL RELATED VA DIRECTIVES, DESIGN GUIDES AND MANUALS, SPECIFICATIONS AND
STANDARDS PLUS ALL VA REQUIREMENTS (FEDERAL AND LOCAL) THAT ARE PROJECT
SPECIFIC TO THE DOCUMENTED SCOPE OF WORK ON THIS SITE.
2. EACH CONTRACTOR SHALL HAVE PUBLIC LIABILITY, PROPERTY DAMAGE AND WORKMAN'S
COMPENSATION INSURANCE AS REQUIRED BY THE VA IN THE BIDDING DOCUMENTATION.
CONTACT THE VA/CO DURING THE BIDDING PHASE WITH ANY QUESTIONS, VERIFICATIONS,
AND DOCUMENTATION NECESSARY CONCERNING ALL REQUIREMENTS FOR PROJECT
INSURANCE COVERAGE.
3. BEFORE SUBMITTING A BID, ALL CONTRACTORS WILL CAREFULLY EXAMINE THE
DRAWINGS AND SPECIFICATIONS SO AS TO BE THOROUGHLY FAMILIAR WITH ALL THE
CONTRACT REQUIREMENTS. EACH BIDDER SHOULD THEN VISIT THE SITE OF THE WORK
TO BECOME ACQUAINTED WITH ALL VISIBLE FIELD CONDITIONS AFFECTING THE
CONTRACT, SUCH AS OBSTACLES WHICH MAY BE ENCOUNTERED AND ALL OTHER
CONDITIONS RELATIVE TO WHAT COULD AFFECT/IMPACT THE WORK OR BE AFFECTED BY
THE PERFORMANCE OF THE WORK.
4. IF AWARDED THE CONTRACT, THE CONTRACTORS SHALL NOT BE ALLOWED ANY EXTRA
COMPENSATION BY REASON OF ANY UNFORESEEN DIFFICULTIES OR OBSTACLES WHICH
THE BIDDER COULD HAVE REASONABLY ANTICIPATED PRIOR TO BIDDING. SHOULD ANY
DISCREPANCIES, ERRORS, CONFLICT OR ITEMS NEEDING CLARIFICATION BE DISCOVERED
IN THE PLANS AND/OR SPECIFICATIONS, THE CONTRACTOR SHALL NOTIFY THE VA/CO
PRIOR TO SUBMITTING A BID AND THE VA/COR BEFORE STARTING ANY OF THE WORK.
5. CONTRACTORS SHALL REFERENCE ALL DRAWINGS IN ALL SECTIONS OF WORK FOR FULLY
DEFINING THEIR SCOPE OF WORK RESPONSIBILITIES AND COORDINATE SAME WITH THE
GENERAL/PRIME CONTRACTOR. SUBCONTRACTORS AND SUPPLIERS FOR EACH TRADE
ARE ADVISED THAT INFORMATION PERTINENT TO THEIR SCOPE OF WORK ALSO OCCURS
IN OTHER SECTIONS OF THE DRAWINGS AND THE COMPLETE SET OF CONTRACT
DOCUMENTS.
6. ALL ENGINEERING SYSTEMS WORK INCLUDED IN THE CONTRACT DRAWINGS SHALL BE
TAKEN IN A SENSE AS A DIAGRAMMATIC REPRESENTATION OF ITS INTENDED PLACEMENT
AND DISTRIBUTION WITHIN THE GENERAL PROXIMITY WHERE SHOWN. THE SIZE AND THE
MEANS OF RUNNING DISTRIBUTION SYSTEMS ARE SHOWN BUT IT IS NOT INTENDED TO
SHOW EVERY CONNECTION, FITTING, OFFSET, SUPPORT ELEMENT, OR EVERY
STRUCTURAL DIFFICULTY THAT CAN BE ENCOUNTERED DURING THE INSTALLATION OF
THE WORK.
7. PROJECT LIMIT LINES ARE SHOWN ON THE DRAWINGS FOR ORIENTATION PURPOSES
ONLY AND SHOULD NOT BE CONSTRUED TO INDICATE THE FULL EXTENT OR LIMITS OF
THE AREA(S) OF WORK.
8. EACH CONTRACTOR PRIOR TO THE COMMENCEMENT OF WORK SHALL FULLY
COORDINATE AND VERIFY WITH ALL OTHER CONTRACTORS, OTHER TRADES AND THE
VA/COR CONCERNING ALL SPACE REQUIREMENTS FOR THIS PROJECT. THE
GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR COMMUNICATING,
DOCUMENTING AND COORDINATING ALL SPACE REQUIREMENTS WITH THE VA/COR TO
AVOID CONFLICTS AND MISCOMMUNICATION.
9. ALL EXISTING BUILDING UTILITIES AND INFRASTRUCTURE SERVICES SYSTEMS THAT FEED
OTHER SPACES OUTSIDE THE DEMISED PROJECT AREA AND THAT ARE LOCATED WITHIN
THE AREA OF WORK, THEREBY INTERFERING WITH THE NEW CONSTRUCTION, SHALL BE
REROUTED AND RELOCATED AS REQUIRED TO MAINTAIN FULL SERVICE TO THE AFFECTED
AREAS.
10. ALL FINISHED AREAS ADJACENT TO OR INCLUDED WITHIN THE AREA(S) OF CONSTRUCTION
ALONG WITH ALL PUBLIC PROJECT ACCESS ROUTES SHALL BE PROTECTED FROM DUST
AND DIRT THROUGH THE USE OF VA/COR APPROVED DUSTPROOF PROTECTION. SEE THE
OCCUPIED AREA PROTECTION PROTOCOLS PROVIDED IN THE "GENERAL" DRAWINGS
SECTION AND COORDINATE ALL SITE SPECIFIC CONDITIONS IMPACTS ENCOUNTERED
WITH THE VA/COR.
11. DO NOT SCALE THE DRAWINGS. USE THE GIVEN DIMENSIONS.
12. THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL
SHOP DRAWING REQUIREMENTS WITH ALL OF THE AFFECTED TRADES, THE VA/COR AND
WITH THE AE.
13. OBTAIN ALL REQUIRED VA/COR AUTHORIZATIONS BEFORE BEGINNING ANY DEMOLITION
WORK OR NEW CONSTRUCTION, INCLUDING TEMPORARY BARRICADES AND PROTECTION
WORK.
14. EACH CONTRACTOR SHALL MAINTAIN A COMPETENT OSHA-30 FOREMAN OR EQUALLY
QUALIFIED DIRECT REPRESENTATIVE ON THE JOB SITE AT ALL TIMES.
15. EACH CONTRACTOR SHALL COOPERATE AND COORDINATE WITH THE GENERAL/PRIME
CONTRACTOR’S SUPERINTENDENT AND WITH THE FOREMAN OF ALL OTHER TRADES IN
ORDER THAT THERE BE NO DELAYS IN THE EXECUTION AND COMPLETION OF THE WORK.
16. DURING CONSTRUCTION EACH CONTRACTOR SHALL KEEP ON SITE ACCURATE FIELD
RECORDS OF ALL CONCEALED AND VISUALLY ACCESSIBLE WORK THAT DIFFERS FROM
THE CONTRACT DRAWINGS/DOCUMENTS. THESE AS-BUILT MARKED-UP RECORD
DRAWINGS/DOCUMENTS WILL BE KEPT UP TO DATE BY THE GENERAL/PRIME
CONTRACTOR AND PROVIDED TO THE VA/COR FOR DISTRIBUTION AT THE COMPLETION OF
THE PROJECT.
17. IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO ADEQUATELY PROTECT
EXISTING CONSTRUCTION AND FINISHES TO REMAIN IN PLACE DURING BOTH THE
DEMOLITION AND CONSTRUCTION SEQUENCES OF WORK. ANY DAMAGE TO SUCH AREAS
SHALL BE RESTORED AND REFINISHED TO A "LIKE-NEW" CONDITION PRIOR TO THE
VA/COR'S ACCEPTANCE OF THAT WORK.
18. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE FOR THE PATCH, REPAIR,
REFINISHING AND/OR REPLACEMENT OF ALL CONSTRUCTION, MATERIALS, ASSEMBLIES,
EQUIPMENT, SIGNAGE AND FINISHES DAMAGED BY THE PROJECT DEMOLITION,
TEMPORARY CONSTRUCTION, NEW CONSTRUCTION OR THE MOVEMENT OF PERSONNEL,
TOOLS, EQUIPMENT, MATERIALS, ETC. BOTH INSIDE AND OUTSIDE OF THE DESIGNATED
AREAS OF WORK.
19. PROVIDE THE CUTTING AND PATCHING FOR ALL DEMOLITION WORK AND ALL NEW
CONSTRUCTION WORK BEING PERFORMED OUTSIDE OF THE PROJECT LIMIT LINES AS
REQUIRED TO PROPERLY COMPLETE THE PROJECT SCOPE OF WORK.
20. ALL CUTTING, CORING AND DRILLING OF EXISTING CONCRETE AND MASONRY
CONSTRUCTION SHALL NOT DAMAGE EXISTING REINFORCING STEEL, PIPING, CONDUITS
OR OTHER CONCEALED CONSTRUCTION WITHIN. PRIOR TO CORING, DRILLING, CUTTING
OR PERFORMING ANY BREAKING EFFORTS, PROVIDE PENETRATING FIELD X-RAYING OF
THE INTENDED AREAS AND DOCUMENT THE EXACT SIZE AND LOCATIONS OF ALL SUCH
INTERFERENCES. COORDINATE WITH AND OBTAIN VA/COR APPROVAL BEFORE PROCEED
WITH ANY SUCH REQUIRED PENETRATIONS WORK.
21. RELOCATIONS OF ANY INFRASTRUCTURE DISTRIBUTION SYSTEMS OR EQUIPMENT, WHICH
MAY ALTER THE ARCHITECTURAL OR STRUCTURAL CONSTRUCTION, MUST BE APPROVED
FIRST BY THE VA/COR PRIOR TO STARTING ITS RELOCATION.
22. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE TO PROVIDE THE REMOVAL OF ALL
CONSTRUCTION DEMOLITION DEBRIS, SPOIL AND MATERIALS FROM THE PROJECT SITE ON
A DAILY BASIS UNLESS SPECIFICALLY REFERENCED OTHERWISE IN THE PROJECT
SPECIFIC LOGISTICAL SEQUENCING REQUIREMENTS.
23. CONTRACTORS TO ENSURE ALL FIRE RESISTIVE RATINGS ARE MAINTAINED PER
LOCATIONS SHOWN ON THE DRAWINGS AND AS DISCOVERED IN THE FIELD. ALL
PENETRATIONS ARE TO BE SEALED BY AN APPROVED UL FIRESTOPPING SYSTEM. SEAL
ALL EXISTING PENETRATIONS EXPOSED DURING CONSTRUCTION AS PER THE APPROVED
UL FIRESTOPPING SYSTEM INSTALLATION REQUIREMENTS. FOLLOW THE
MANUFACTURE'S DESIGN RECOMMENDATIONS FOR THE PROPER FIRE STOPPING
MATERIAL TO BE USED IN EACH SPECIFIC APPLICATION.
24. ALL FIRESTOPS SHALL MATCH THE FIRE RATING OF THE CONSTRUCTION BEING
PENETRATED, SUCH AS WALLS, FLOORS, CEILINGS, PARTITIONS ETC. AND SHALL COMPLY
WITH ALL CODE REQUIREMENTS. USE ONLY A SINGLE (FMRC) APPROVED
MANUFACTURERS LINE OF PRODUCTS FOR ALL PROJECT FIRESTOPPING.
25. THE BASIS OF DESIGN FOR ALL FIRE STOPPING WILL BE PRODUCTS AS MANUFACTURED
BY THE 3M COMPANY.
26. PROVIDE AN HOURLY RATED FIRESTOP AT ALL PENETRATIONS OF RATED CONSTRUCTION
AND/OR ASSEMBLIES, WHETHER NEW OR EXISTING, AND AS A DIRECT RESULT OF THE
PROJECT DEMOLITION WORK OR NEW CONSTRUCTION. WHERE COMBUSTIBLE
PENETRANTS OCCUR USE A FIRE RATED INTUMESCENT MATERIAL AND WHERE
NONCOMBUSTIBLE PENETRANTS OCCUR USE A FIRE RATED ENDOTHERMIC MATERIAL.
ALL FIRESTOPPING WORK MUST BE APPROVED BY THE VA/COR BEFORE CONCEALED BY
CONSTRUCTION.
1. ALL CONTRACTORS, SUBCONTRACTORS AND THEIR REPRESENTATIVES
WORKING ON THIS PROJECT SHALL AT ALL TIMES PRIOR TO AND DURING
THE COURSE OF THEIR ACTIVITY BE RESPONSIBLE FOR THE SAFETY OF
THEIR EMPLOYEES, ALL OTHERS AND ARE TO BE IN CARE OF THE
PROPERTY.
2. EACH CONTRACTOR OR SUBCONTRACTOR, AS REPRESENTATIVES OF THEIR
EMPLOYEES, SHALL ASCERTAIN THAT THE CONDITIONS UNDER WHICH THEY
WILL BE REQUIRED TO ACCOMPLISH THEIR WORK ARE SAFE AND MEET ALL
APPLICABLE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HAZARD
ACT, ALONG WITH ALL OTHER APPLICABLE GOVERNING REGULATIONS AND
VA REQUIREMENTS.
3. THE BEGINNING OF WORK ON SITE BY A CONTRACTOR OR
SUBCONTRACTOR SHALL INDICATE HIS/HER SATISFACTION AND FULL
ACCEPTANCE OF THE CURRENT SITE CONDITIONS REGARDING SAFETY AND
THE NECESSARY COMPLIANCE WITH ALL CONTRACT REQUIREMENTS
REGARDING SAME. THE CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR
ANY ACCIDENTS, INJURIES, AND/OR DAMAGES INCURRED AS A RESULT OF
ANY VISIBLE OR KNOWN UNSAFE CONDITIONS THAT EXIST.
4. IF UNSATISFIED WITH THE CURRENT SITE SAFETY CONDITIONS AND/OR THE
NECESSARY COMPLIANCE, THE CONTRACTOR OR SUBCONTRACTOR SHALL
INDICATE THE ACTIONS AND/OR DEVICES NECESSARY TO RENDER THE JOB-
SITE SAFE. IF THE WORK OF OTHER PARTIES, UPON INSPECTION, IS FOUND
AT ANY TIME TO BE UNSAFE THE CONTRACTOR OR SUBCONTRACTOR SHALL
IMMEDIATELY STOP ALL WORK AND NOTIFY THE GENERAL/PRIME
CONTRACTOR AND THE VA/COR. THE SUBMISSION OF A BID FOR ANY
PORTION OF WORK INCLUDED IN THIS CONTRACT SHALL ALSO INDICATE
ACKNOWLEDGMENT AND ACCEPTANCE OF THESE REQUIREMENTS.
SUMMARY DESCRIPTION:
1. THE BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS ARE TO BE
FOLLOWED FOR ALL CONTRACTOR PROPOSED EQUIVALENT
SUBSTITUTIONS OR DEVIATIONS FROM THE BASE
BID/CONSTRUCTION DOCUMENTS.
2. AN EQUIVALENT SUBSTITUTION REPRESENTS ANY DEVIATION
FROM THE CONTRACT DOCUMENTS ORIGINAL DESIGN INTENT,
SCOPE OF WORK REQUIREMENTS, THE DETAILING OR
SPECIFICATIONS.
3. NO SUCH EQUIVALENT SUBSTITUTION OR DEVIATION WILL BE
ALLOWED WITHOUT FIRST GOING THROUGH THE BOD COMPLIANCE
PROTOCOLS PROCESS AND OBTAINING VA APPROVAL.
4. ONCE VA APPROVAL OF THE EQUIVALENT SUBSTITUTION OR
DEVIATION REQUEST HAS BEEN OBTAINED, THE FORMAL SHOP
DRAWING PREPARATION AND SUBMITTAL PROCESS MAY BEGIN
FOR THAT WORK.
5. THE FOLLOWING BOD COMPLIANCE PROTOCOLS DEFINE IN DETAIL
THE RESPONSIBILITIES AND THE EVALUATION PROCESS ALONG
WITH THE REQUIREMENTS AND PROCEDURES TO BE FOLLOWED
WHEN REQUESTING VA CONSIDERATION OF ANY PROPOSED
EQUIVALENT SUBSTITUTION OR DEVIATION.
BOD COMPLIANCE PROTOCOLS:
1. THE BOD COMPLIANCE PROTOCOLS APPLY TO ALL MATERIALS,
EQUIPMENT, HARDWARE, FINISHES, CONTROLS, ENGINEERING
SYSTEMS AND THEIR INCLUSIVE PARTS, DETAILED ASSEMBLIES
PLUS ALL RELATED DESIGN ELEMENTS AND SPECIFIED
PARAMETERS THAT ARE CONTAINED WITHIN THE BID/ISSUED FOR
CONSTRUCTION DRAWINGS AND SPECIFICATIONS
DOCUMENTATION, OR AS SPECIFICALLY REFERENCED BY SAME.
2. SPECIFIC DESIGN CHARACTERISTICS REQUIRING BOD COMPLIANCE
ANALYSIS WILL VARY WITH EACH SPECIFIC ITEM BEING PROPOSED
AS AN EQUIVALENT SUBSTITUTION AND WILL NEED TO BE FULLY
COMPARED TO ESTABLISH BOD COMPLIANCE.
3. CRITICAL DESIGN CHARACTERISTICS AND ELEMENTS ARE SPECIFIC
TO EACH ITEM NEEDING CONSIDERATION AND COULD CONSIST OF,
BUT NOT LIMITED TO, CRITERIA SUCH AS DIMENSIONAL LOGISTICS,
PERFORMANCE CHARACTERISTICS, CAPACITY, DUTY
REQUIREMENTS, OPERATIONAL EFFICIENCIES, ACOUSTICAL
REQUIREMENTS, UTILITIES IMPACTS, CONNECTION VARIANCES,
DETAILING DEVIATIONS, FRAMING MODIFICATIONS, ROUGH IN
REQUIREMENTS, WEIGHT INCREASES AND/OR DISTRIBUTIONS,
STRUCTURAL IMPACTS, ATTACHMENTS, SUPPORTS, FINISHES,
AVAILABILITY, COMPATIBILITY, CONSTRUCTABILITY, WARRANTIES,
SERVICE LIFE, MAINTENANCE REQUIREMENTS, ENVIRONMENTAL
CONSIDERATIONS, LEED RELATED DESIGN CONSIDERATIONS, ETC.
4. A VERY CRITICALLY IMPORTANT DESIGN CHARACTERISTIC OF ALL
BOD ITEMS NEEDING TO BE FULLY EVALUATED AND PROPERLY
COORDINATED WOULD BE THE DESIGN AND LAYOUT DIMENSIONAL
LOGISTICS REQUIREMENTS. THOSE CRITICAL PARAMETERS COULD
CONSIST OF, BUT NOT LIMITED TO, ALL DIMENSIONAL ELEMENTS
THAT AFFECT SIZE, HEIGHT, WIDTH, DEPTH, THICKNESS,
PLACEMENT, SPACING, CLEARANCES, ACCESS, MOUNTING,
CONNECTION/LOCATION REQUIREMENTS, INSTALLATION
TOLERANCES, OPERABLE ELEMENT CLEARANCES, ETC., ALL OF
WHICH COULD IMPACT OTHER AREAS OR COMPONENTS OF WORK.
5. CONTRACTORS WILL BE RESPONSIBLE TO FULLY IDENTIFY ALL
PROPOSED EQUIVALENT SUBSTITUTIONS, DEVIATIONS, IMPACTS
AND MODIFICATIONS FROM THE "BASIS OF DESIGN" INTENT WITH
THE GENERAL/PRIME CONTRACTOR DURING THE BIDDING
PROCESS AND OBTAIN THEIR APPROVAL BEFORE COMPLETING
THEIR PRICING AND SUBMITTING A BID.
6. IF A PROPOSED EQUIVALENT SUBSTITUTION ITEM WILL REQUIRE
THAT MODIFICATIONS NEED TO BE MADE, TO THE WORK OF THE
PROVIDING CONTRACTOR, THE WORK OF OTHER CONTRACTORS
OR THE WORK OF THE VA, THE SUBMITTING CONTRACTOR SHALL
BE FULLY RESPONSIBLE TO INFORM AND ADVISE THE
GENERAL/PRIME CONTRACTOR OF ANY AND ALL SUCH NECESSARY
IMPACTS AND POSSIBLE MODIFICATIONS REQUIRED AS A PART OF
THEIR BIDDING AND BASE CONTRACTUAL SCOPE OF WORK
RESPONSIBILITIES.
7. THE CONTRACTOR PROPOSING THE EQUIVALENT SUBSTITUTION
SHALL BE RESPONSIBLE FOR ALL RELATED WORK AND SHALL
IDENTIFY, VERIFY, COORDINATE AND PROVIDE ENGINEERED
SOLUTIONS FOR ALL IMPACT ISSUES AFFECTING INFRASTRUCTURE
SYSTEMS, UTILITIES SERVICES, BUILDING STRUCTURE,
SURROUNDING ELEMENTS, AND SYSTEMS AFFECTED FROM
WEIGHT DIFFERENTIALS, REVISED LOADING CHARACTERISTICS,
CONNECTION/MOUNTING VARIANCES, INSTALLATION CONFLICTS
AND DETAILING MODIFICATIONS, ETC. CAUSED BY THE EQUIVALENT
SUBSTITUTION REQUIREMENTS.
8. SPECIAL ATTENTION NEEDS TO BE PAID TO ANY SYSTEMS
EQUIPMENT AND MATERIAL PERFORMANCE CHARACTERISTICS
INCLUDING ALL ASPECTS OF THEIR DIMENSIONAL LOGISTICS
FEATURES AND REQUIREMENTS ALONG WITH ANY STRUCTURAL
AND UTILITIES IMPACTS.
9. EACH EQUIVALENT SUBSTITUTION REQUEST ALONG WITH ANY/ALL
IMPACTS, DEVIATIONS/VARIANCES AND MODIFICATIONS WILL
REQUIRE VA/COR APPROVAL(S) BEFORE ANY SUCH REQUEST IS
DEEMED APPROPRIATE BY THE VA AND ALLOWED TO PROCEED
INTO THE NORMAL SHOP DRAWING PREPARATION, SUBMITTAL AND
REVIEW PROCESS.
10. NO REQUEST FOR AN EQUIVALENT SUBSTITUTION REVIEW CAN BE
MADE VIA A SHOP DRAWING SUBMISSION. ANY SUCH SUBMISSION
WILL NOT BE REVIEWED AND WILL BE REJECTED AS NON-
CONFORMING WITH THE DESIGN INTENT AND NOTED THAT THE
CONTRACTOR IS TO FOLLOW THE STANDARD BOD COMPLIANCE
PROTOCOLS.
11. ANY DEVIATIONS FROM THE BOD REQUIREMENTS THAT SURFACE
DURING THE CONSTRUCTION PHASE SHALL IMMEDIATELY BE MADE
KNOWN TO THE GENERAL/PRIME CONTRACTOR WHO WILL IN TURN
NOTIFY THE VA/COR. ALL SUCH DEVIATIONS, VARIANCES AND
IMPACTS WILL BE FULLY IDENTIFIED, DOCUMENTED AND
SUBMITTED TO THE VA/COR FOR REVIEW, EVALUATION AND
DIRECTION(S) ON HOW TO PROCEED.
12. ANY NON-COMPLIANT EQUIVALENT SUBSTITUTIONS WORK FOUND
TO BE IN PLACE DURING THE CONSTRUCTION PHASE THAT HAD
NOT GONE THROUGH THE BOD COMPLIANCE PROTOCOLS
APPROVAL PROCESS AND THAT DOESN'T HAVE THE VA/COR'S
APPROVAL WILL BE SUBJECT TO POSSIBLE REJECTION AND
REMOVAL.
13. THE FINAL INSTALLATION OF ANY EQUIVALENT SUBSTITUTION AND
ITS IMPACTS SHALL NOT COMPROMISE ANY OF THE BOD
PERFORMANCE CHARACTERISTICS NOR SHALL IT ENCUMBER ANY
OF THE ASSOCIATED DESIGN LAYOUT AND DIMENSIONAL
LOGISTICS REQUIREMENTS.
14. THE FINAL INSTALLATION OF ANY EQUIVALENT SUBSTITUTION AND
ITS IMPACTS SHALL COMPLY WITH ALL APPLICABLE BUILDING
CODES, REGULATIONS AND VA REQUIREMENTS, PLUS ALLOW ANY
SYSTEMS, EQUIPMENT AND/OR MATERIALS TO FUNCTION
PROPERLY AND SAFELY.
BOD EQUIVALENT SUBSTITUTIONS PROCESS SEQUENCE:
1. BIDDING PHASE
A. ALL BOD PROPOSED EQUIVALENT SUBSTITUTIONS, DEVIATIONS AND
ASSOCIATED IMPACTS SHALL BE FULLY IDENTIFIED AND COORDINATED WITH
THE GENERAL/PRIME CONTRACTOR(S) DURING THE BIDDING PROCESS SUCH
THAT THE COST OF ALL ASSOCIATED BOD SUBSTITUTION MODIFICATIONS,
REQUIRED DEVIATIONS AND SCOPE OF WORK IMPACTS DIRECTLY AFFECTING
OTHER TRADES SHALL BE INCLUDED IN THE BASE BIDS OF ALL AFFECTED
CONTRACTORS.
2. GENERAL/PRIME CONTRACTOR RESPONSIBLE FOR COORDINATION
A. THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE TO FULLY
IDENTIFY, DOCUMENT, MAKE SUBMISSIONS, TRACK, COORDINATE, OBTAIN
APPROVALS AND INCLUDE THE COST OF ALL SUCH EQUIVALENT
SUBSTITUTIONS, VARIANCE MODIFICATIONS AND ALL IMPACT SCOPE OF WORK
IN THEIR BASE BID COST OF CONSTRUCTION AS WELL AS ALLOWED FOR
WITHIN THEIR PROJECT SCHEDULE.
B. THE GENERAL/PRIME CONTRACTOR SHORTLY AFTER CONTRACT
AWARD/EXECUTION SHALL NOTIFY AND COORDINATE WITH THE VA/COR, ALL
SUCH KNOWN EQUIVALENT SUBSTITUTION DEVIATION REQUESTS AND
POSSIBLE IMPACTS FROM THE SPECIFIC BOD REQUIREMENTS PROVIDED IN
THE DRAWINGS AND SPECIFICATIONS.
C. ALL SUCH DEVIATIONS, VARIANCES AND IMPACTS WILL BE FULLY IDENTIFIED,
DOCUMENTED AND SUBMITTED TO THE VA/COR FOR REVIEW, EVALUATION AND
DIRECTION(S) ON HOW TO PROCEED.
D. DOCUMENTATION BEFORE STARTING THE WORK. THEY WILL ALSO BE
RESPONSIBLE TO FULLY IDENTIFY AND COORDINATE SAME WITH ALL
AFFECTED SUBCONTRACTORS TO BE SURE THAT ALL SUCH WORK IS
INCLUDED IN THEIR BASE BID SCOPE OF WORK.
3. CONTRACTORS IDENTIFY PROPOSED EQUIVALENT SUBSTITUTION(S)
A. ALL CONTRACTORS, BEFORE SUBMITTING THEIR REQUEST FOR EQUIVALENT
SUBSTITUTION SHALL BE RESPONSIBLE TO HAVE FULLY VERIFIED AND
CERTIFIED IN WRITING THAT THE DESIGN CHARACTERISTICS OF THE ITEMS
THEY WILL BE SUBMITTING FOR BOD COMPLIANCE REVIEW MEETS OR
EXCEEDS THE DESIGN INTENT AND PERFORMANCE REQUIREMENTS AS
DESIGNED, DETAILED AND SPECIFIED.
4. CONTRACTORS PREPARE DETAILED COMPARISONS
A. THE REQUESTING CONTRACTOR SHALL PREPARE AND PROVIDE TO THE
GENERAL/PRIME CONTRACTOR A FULL LINE ITEM, SIDE-BY-SIDE COMPARISON
LISTING OF ALL BOD DESIGN AND MANUFACTURED CHARACTERISTICS VERSUS
THE SAME FOR THE EQUIVALENT SUBSTITUTION BEING PROPOSED.
B. ALL EQUIPMENT, MATERIALS OR ASSEMBLY EQUIVALENT SUBSTITUTIONS
SHALL BE PROVIDED ON A CONTRACTOR PREPARED ITEMIZED LISTING PER
EACH REQUESTED SUBSTITUTION WITH A FULL AND DETAILED COMPARATIVE
DESCRIPTION OF ALL SPECIFICATIONS, PERFORMANCE CHARACTERISTICS,
CAPACITIES, WEIGHT, DIMENSIONAL LOGISTICS AND KNOWN DEVIATIONS
FROM THE ORIGINAL BOD.
5. CONTRACTORS IDENTIFY RELATED IMPACTS AND DEVIATIONS
A. THE REQUESTING CONTRACTOR SHALL BE RESPONSIBLE TO FULLY IDENTIFY
AND DOCUMENT ALL PROPOSED EQUIVALENT SUBSTITUTION CAUSED
IMPACTS, DEVIATIONS AND MODIFICATIONS FROM THE ORIGINAL BOD
REQUIREMENTS WITH THE GENERAL/PRIME CONTRACTOR AS WELL AS ALL
AFFECTED CONTRACTORS.
B. SEE THE DETAILED PROTOCOL REQUIREMENTS FOR THE EXTENT OF
RESPONSIBILITIES AND DOCUMENTATION REQUIRED FOR THIS CRITICAL ITEM.
6. CONTRACTOR'S DOCUMENTATION TO GENERAL/PRIME CONTRACTOR
A. CONTRACTORS SHALL COORDINATE WITH THE GENERAL/PRIME CONTRACTOR
AS TO THE SPECIFIC DATE THAT EACH IS REQUIRED FOR THE COMPLETION OF
THEIR EQUIVALENT SUBSTITUTION UBMISSION REQUEST DOCUMENTATION
AND DELIVERY OF THE COMPLETED PACKAGE(S) TO THEM.
B. THE GENERAL/PRIME CONTRACTOR HAVING BEEN MADE FULLY AWARE OF
THESE POTENTIAL EQUIVALENCY SUBSTITUTIONS AND IMPACTS DURING THE
BIDDING PROCESS SHALL INCLUDE AND DOCUMENT THIS BOD PROCESS IN
THEIR DETAILED PROJECT SCHEDULE ALLOWING A SEPARATE TASK ITEM
TIMELINE WITH CRITICAL DATES AND PERFORMANCE TARGETS IDENTIFIED AND
TRACKED.
7. TRACKING LIST OF PROPOSED EQUIVALENT SUBSTITUTIONS AND IMPACTS
A. THE SUCCESSFUL GENERAL/PRIME CONTRACTOR SHALL PREPARE A
COMPLETE MASTER LISTING, BY SPECIFICATION AND/OR DRAWING SECTIONS,
OF ALL PROPOSED EQUIVALENT SUBSTITUTION REQUESTS.
B. THIS MASTER LISTING WILL CONSIST OF A SUMMARY DESCRIPTION OF EACH
REQUEST ALONG WITH A BULLET POINT LISTING OF THE MAJOR IMPACTS AND
DEVIATIONS RESULTING FROM IT.
C. THIS DOCUMENT WILL BE PREPARED AS A SPREAD SHEET AND UTILIZED AS A
TRACKING TOOL FOR DOCUMENTING ALL SIGNIFICANT ASSOCIATED DATES,
ACTION ITEMS, CURRENT STATUS, REJECTIONS/APPROVALS AND ADDITIONAL
PERTINENT ISSUES AND ITEMS TO BE RECORDED AND TRACKED AS REQUIRED
BY THE VA/COR.
8. EQUIVALENCY REQUEST(S) SUBMITTED TO VA
A. THE SUCCESSFUL GENERAL/PRIME CONTRACTOR SHALL SUBMIT TO THE
VA/COR FOR PRELIMINARY REVIEW A MASTER SUMMARY LISTING OF ALL
EQUIVALENT SUBSTITUTION REQUESTS WITH ANY/ALL IMPACTS IDENTIFIED.
B. A SEPARATE FULLY DETAILED SUBMISSION DOCUMENTATION PACKAGE SHALL
BE PREPARED FOR EACH SUBSTITUTION REQUEST AND WILL CONSIST OF
SEQUENCE ITEMS NUMBER 3, 4, 5 & 6 ALONG WITH ANY ADDITIONAL PERTINENT
INFORMATION DEEMED NECESSARY SUCH AS SKETCHES, DETAILED
DRAWINGS, ENGINEERING DESIGN AND CALCULATIONS, MORE DETAILED
DESCRIPTIONS, ETC.
9. VA REVIEW AND ACTION NOTIFICATION
A. THE VA/COR SHALL REVIEW EACH SUBSTITUTION REQUEST PACKAGE AND
TAKE SUCH ACTION AS DEEMED NECESSARY ON EACH. SUCH ACTION COULD
CONSIST OF REJECTION, APPROVAL OR DIRECTION ON PROVIDING MORE
DETAILED INFORMATION AND/OR CLARIFICATION(S) ON EACH SUBMISSION
AND/OR EACH IMPACT.
B. AS PART OF THE VA'S REVIEW PROCESS THE AE WILL ALSO BE INCLUDED IN A
SIMILAR FASHION TO THE SHOP DRAWING REVIEW PROCESS AND SHALL
CONSULT WITH THE VA/COR AND PROVIDE A RECOMMENDATION FOR THE VA'S
CONSIDERATION.
C. THE AE WILL REJECT IMMEDIATELY WITHOUT REVIEWING ANY SUBMITTAL THAT
IS DEEMED INCOMPLETE AND NOT IN COMPLIANCE WITH THE BOD PROTOCOLS
COMPLIANCE REQUIREMENTS.
D. IT SHOULD BE NOTED THAT IT IS NOT THE AE'S RESPONSIBILITY TO RESEARCH,
DOCUMENT AND PROVE EQUIVALENCE, THAT IS THE REQUESTING/SUBMITTING
CONTRACTOR'S RESPONSIBILITY AS PER THESE PROTOCOLS. THE AE'S
RESPONSIBILITY IS TO REVIEW AND ANALYZE THE DETAILED COMPARATIVE
DOCUMENTATION PROVIDED AND ADVISE THE VA/COR ON WHAT WAS
SUBMITTED.
10. VA APPROVAL ALLOWS SHOP DRAWING PROCESS TO BEGIN
A. PRIOR TO THE CONTRACTOR(S) BEING ALLOWED TO PROCEED WITH SHOP
DRAWING PREPARATION AND THE OFFICIAL SHOP DRAWING SUBMISSION(S)
PROCESS, THEY WILL FIRST NEED TO OBTAIN THE VA/COR APPROVAL(S) ON
EACH EQUIVALENT SUBSTITUTION REQUEST THAT WILL AFFECT THE SHOP
DRAWING PROCESS FOR THAT.
11. IMPLEMENTATION OF SUBSTITUTION(S) AND IMPACT(S)
A. ONCE APPROVED BY THE VA/COR THE CONTRACTORS SHALL PERFORM THEIR
FINAL COORDINATION EFFORTS AND BEGIN THE NORMAL SHOP DRAWING
PREPARATION AND SUBMITTAL PROCESS INCLUDING PROVIDING ANY
ADDITIONAL ENGINEERING WORK NECESSITATED BY THE EQUIVALENT
SUBSTITUTION.
B. THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
ALL WORK ASSOCIATED WITH AND IMPACTED BY ANY EQUIVALENT
SUBSTITUTION ALONG WITH THE COMPLETE COORDINATION AND
MANAGEMENT OF THE WORK.
VERIFY AND COORDINATE ALL PROTECTION REQUIREMENTS TO BE PROVIDED FOR
EACH SPECIFIC AREA OR LOCATION OF SCHEDULED WORK WITH THE VA/COR,
BEFORE BEGINNING ANY WORK. WHEN PERFORMING CONSTRUCTION WORK
(DEMOLITION OR NEW) IN OCCUPIED SPACES, THE FOLLOWING PROTECTION
PROTOCOLS WILL BE FOLLOWED ON A DAILY BASIS UNLESS MODIFIED IN WRITING
BY THE VA/COR ON A CASE BY CASE BASIS:
1. CAREFULLY MOVE/RELOCATE ANY SIGNAGE, WALL HUNG ITEMS, BLINDS,
CURTAINS, ETC. THAT ARE WITHIN THE AREA/ZONE WHERE THE WORK IS TO
BE ACCOMPLISHED AND IN DANGER OF BEING DAMAGED BY THE
PERFORMANCE OF THE WORK, INCLUDING DAMAGE THAT CAN BE CAUSED BY
FALLING OBJECTS, DUST OR MOISTURE. NOTE: THIS ALSO APPLIES TO THE
DIRECT ACCESS ROUTE(S) THRU THE OCCUPIED AREA(S) TO AND FROM THE
ACTUAL WORK AREA/ZONE. NOTE: THE CONTRACTOR WILL BE RESPONSIBLE
TO MOVE/RELOCATE ANY FURNITURE, EQUIPMENT, BOXES, FILES, USER
BELONGINGS, ETC. THAT WOULD BE IN THE AREA OF WORK AND
OBSTRUCT/INTERFERE WITH THE PERFORMANCE OF THE CONTRACTOR'S
WORK. COORDINATE ALL REQUIRED VA RELOCATIONS WITH VA/COR.
2. CAREFULLY PROVIDE FULL PROTECTIVE DUST, MOISTURE AND DAMAGE
PREVENTION BARRIERS/COVERS FOR ALL SUCH ITEMS ADDRESSED ABOVE
INCLUDING THE ADDITIONAL PROTECTION OF ALL WALL SURFACES/FINISHES,
WINDOWS/GLAZING, DOORS, FRAMES, HARDWARE, CARPETING, FLOOR
COVERINGS, WALL BASE, ELECTRICAL DEVICES, WALL/CEILING MOUNTED
EQUIPMENT & CONTROLS, CEILING CONSTRUCTION, TILE, GRID, WALL
ANGLES, LIGHT FIXTURES, DIFFUSERS, GRILLES, LIFE SAFETY DEVICES, FIRE
SPRINKLER HEADS, ETC.
3. FLOOR FINISHES SHALL BE PROTECTED THROUGHOUT THE AREA WITH A 6
MIL HEAVY DUTY STRING REINFORCED FIRE RETARDANT POLYETHYLENE
SHEETING (VISQUEEN) AND/OR TEMPORARY TARPAULIN(S)/DROP CLOTH(S)
AS A MINIMUM FOR DUST, MOISTURE AND VERY LIGHT FOOT TRAFFIC
PROTECTION.
4. ALL MAIN TRAFFIC AREAS TO AND INSIDE THE WORK ZONE/AREAS SHALL
HAVE ADDITIONAL PROTECTION PROVIDED OVER THE 6 MIL HEAVY DUTY
STRING REINFORCED FIRE RETARDANT POLYETHYLENE SHEETING
(VISQUEEN), IN THE FORM OF FULL SHEETS OF 3/16” TEMPERED HARDBOARD
(MASONITE) 4'X8' PANELS. ALL MASONITE PANELS SHALL BE FIRMLY HELD
TOGETHER AND SECURED IN PLACE VIA THE USE OF AN INDUSTRY
APPROVED 2" HEAVY DUTY CONSTRUCTION ADHESIVE TAPE, INTENDED FOR
THIS APPLICATION. NOTE: ALL BOARD TO BOARD JOINTS WILL BE FULLY
TAPED THE LENGTH OF THE JOINT AND ALL BOARD TO VISQUEEN JOINTS
WILL BE TAPED AT 4' ON CENTER WITH A MINIMUM 8” LENGTH OF TAPE.
PAINTERS TAPE AND/OR MASKING TAPE ARE NOT CONSIDERED
EQUIVALENTS TO THE HEAVY DUTY CONSTRUCTION ADHESIVE TAPE BEING
SPECIFIED.
5. CONSTRUCT A TEMPORARY FULL HEIGHT, FULLY SEALED, CONTAINMENT
ENCLOSURE AROUND ALL CONSTRUCTION AREAS/ZONES IN ORDER TO
CONTAIN AS MUCH DUST AND DEBRIS AS POSSIBLE DURING THE
PERFORMANCE OF ANY DEMOLITION, CONSTRUCTION AND CLEAN-UP WORK.
6. THE TEMPORARY FULL HEIGHT CONTAINMENT ENCLOSURES SHOULD BE
CONSTRUCTED OF A MINIMUM 6 MIL HEAVY DUTY STRING REINFORCED FIRE
RETARDANT POLYETHYLENE SHEETING (VISQUEEN) WITH THE USE OF THE
APPROPRIATE TELESCOPICALLY ADJUSTABLE ALUMINUM OR METAL
VERTICAL SPRING LOADED SUPPORT STUDS/POLES. FULL HEIGHT FOAM
PADDED RAILS, PRESSURE FIT AT ALL PERIMETER WALL/PARTITION
CONNECTION CONDITIONS ARE TO BE UTILIZED IN ORDER TO MINIMIZE THE
USE OF TAPE SEALS ON ALL FINISHED WALL SURFACES.
7. WHEN ALL WORK IS COMPLETED FOR THE PREARRANGED SPECIFIC
LOCATION(S) AND DAY, SCHEDULED TASKING AND IDENTIFIED PERIOD OF
TIME THE ENTIRE AREA IS TO BE FULLY CLEANED-UP, ALL TEMPORARY
CONTAINMENT ENCLOSURES AND PROTECTION REMOVED WITH ALL ITEMS
IDENTIFIED IN NOTE #1 RETURNED TO THEIR PRIOR FUNCTIONING POSITIONS.
NOTE: FULLY CLEANED-UP MEANS COMMERCIALLY VACUUM CLEANED WITH
ALL SURFACES BEING FULLY WIPED DOWN AND DUST FREE AS THE
CONTRACTOR ACCEPTED THE AREA/SPACE PRIOR TO PERFORMING THE
WORK.
8. ALL SPACES WILL BE RETURNED TO THE USER, BY THE CONTRACTOR, AS A
COMMERCIALLY CLEAN ENVIRONMENT WITH ALL OPEN CONSTRUCTION
SURFACES SEALED WITH TEMPORARY CONSTRUCTION MATERIALS
INCLUDING THE USE OF 6 MIL HEAVY DUTY STRING REINFORCED FIRE
RETARDANT POLYETHYLENE SHEETING (VISQUEEN), IN ORDER TO AVOID
DUST PARTICLES FROM THE CONSTRUCTION AREA MIGRATING INTO THE
OCCUPIED USER’S AREA/SPACE/ROOM(S).
9. UNLESS DIRECTLY SPECIFIED AND CONFIRMED BY THE VA/COR OTHERWISE,
ALL TEMPORARY PROTECTION AND ENCLOSURES ARE TO BE SET-UP AND
KNOCKED-DOWN ON A DAILY BASIS SUCH THAT THE USERS OF THE
OCCUPIED AREAS ARE NOT TO BE INCONVENIENCED AND PREVENTED FROM
FUNCTIONING WITHIN THEIR SPACE/AREA/ROOM(S) DURING THEIR NORMAL
BUSINESS HOURS OF OPERATION.
10. THE BASIS OF DESIGN FOR ALL 6 MIL HEAVY DUTY STRING REINFORCED FIRE
RETARDANT POLYETHYLENE SHEETING WILL BE IN FULL COMPLIANCE WITH
NFPA 701-04, ASTM E84 AND CPAI 84 SECTION 6. IT SHALL BE
MANUFACTURED WITH 3 PLY CONSTRUCTION CONSISTING OF FIRE
RETARDANT VIRGIN POLYETHYLENE IN THE (2) OUTER LAYERS OF PLASTIC
WITH A DIAMOND SCRIM REINFORCING MESH PLACED BETWEEN.
11. MOBILE CONTAINMENT SYSTEMS MAY BE UTILIZED WHERE APPLICABLE, IF
APPROVED FOR USE BY THE VA/COR. MOBILE UNITS SHALL BE FULLY
EQUIPPED WITH A NEGATIVE AIR HEPA FILTRATION SYSTEM THAT IS IN
COMPLIANCE WITH THE INFECTION CONTROL REQUIREMENTS OF EACH
SPECIFIC AREA OF WORK AND TASK BEING PERFORMED.
GENERAL NOTES FOR CONTRACTORS SPECIAL SAFETY NOTES BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS
OCCUPIED AREAS PROTECTION
PROTOCOLS
GENERAL PAINTING NOTES CONSTRUCTION PERIOD STAGING OF WORK
MISCELLANEOUS GENERAL NOTES
WHEREVER THE WORK BEING PERFORMED BY THIS PROJECT REQUIRES
THE REMOVAL/DEMOLITION FROM, OR THE INSTALLATION OF NEW
MATERIALS, EQUIPMENT OR ASSEMBLIES TO FINISH PAINTED SURFACES,
THE CONTRACTOR SHALL PROVIDE ALL PAINTING TO THE EXISTING
WALL/CEILING SURFACES BEING AFFECTED BY THE WORK. ANY NEW
MATERIALS BEING INSTALLED ARE TO MATCH ALL OF THE EXISTING
FINISHED CONDITIONS SUCH THAT WHEN THE WORK PERFORMED IS
COMPLETED IT BLENDS WITH THE EXISTING FINISHED DECOR AND
DOESN'T STAND OUT AS BEING A REPAIR, UNFINISHED OR NEW WORK
THAT DOESN'T BLEND WITH THE EXISTING CONDITIONS. ANY
PAINTING/REPAINTING SHALL OCCUR IN ALL INSTANCES FROM FLOOR TO
CEILING AND FROM A FULL HEIGHT WALL CORNER TO A FULL HEIGHT
WALL CORNER CHANGE IN PLANE. ALL EXISTING PAINTED SURFACES ARE
TO BE RECEIVING A NEW FINISH COAT AS A MINIMUM, SEE BELOW:
P1 PROVIDE ALL PAINTING AND RELATED WORK AS SHOWN ON THE
DRAWINGS AND/OR AS REASONABLY IMPLIED BY THE SPECIFICATIONS
AND THE PROJECT REQUIREMENTS TO PROVIDE A COMPLETELY FINISHED
PROJECT.
P2 ALL SCRATCHES, DENTS, CRACKS AND/OR OPENINGS IN EXISTING
AND NEW WALL SURFACES ARE TO BE FILLED WITH PLASTER PATCH,
SPACKLING COMPOUND OR OTHER PRESCRIBED MATERIAL IN AN
INDUSTRY APPROVED MANNER AND SANDED SMOOTH TO PROVIDE A
"LIKE NEW" SURFACE CONDITION BEFORE PAINTING AND FINISHING.
P3 ALL SURFACES ARE TO BE CLEANED FREE OF LOOSE DIRT, DUST,
OIL, GREASE AND ALL FOREIGN MATTER JUST PRIOR TO FINISHING.
P4 PROVIDE ALL LABOR, MATERIALS, BRUSHES, TOOLS, LADDERS AND
ALL EQUIPMENT OF ANY KIND NECESSARY FOR THE PROPER EXECUTION
OF THE WORK.
P5 WORKMANSHIP EXECUTION SHALL BE PERFORMED IN AN
INDUSTRY RECOGNIZED MANOR DETERMINED TO BE RATED AS FIRST
CLASS IN EVERY RESPECT WITH ALL MATERIALS EVENLY SPREAD AND
SMOOTH WITHOUT DEFECTS, RUNS, SAGS, OR DEBRIS PRESENT IN THE
FINISHED SURFACE.
P6 THE PRIME COAT SHALL BE TINTED TO APPROXIMATE SHADE OF
THE FINAL COAT. ALL SECTIONS, SPOTS OR HOT SPOTS AFTER PRIMARY
APPLICATION SHALL BE TOUCHED-UP BEFORE APPLYING THE SECOND
COAT TO PRODUCE A SMOOTH AND LEVEL SURFACE. THE THIRD AND
FINAL COAT SHALL NOT BE APPLIED UNTIL AFTER ALL OTHER TRADES,
WHOSE OPERATIONS WOULD BE DETRIMENTAL TO FINISH PAINTING, HAVE
COMPLETED THEIR WORK IN THE AREAS TO BE PAINTED.
P7 WORK NOT INCLUDED: UNLESS OTHERWISE INDICATED, SHOP
PRIMING OF FERROUS METAL ITEMS AND FABRICATED COMPONENTS ARE
INCLUDED UNDER THEIR RESPECTIVE TRADES. PRE-FINISHED ITEMS ARE
NOT INCLUDED. FINISHED METALS SUCH AS ANODIZED ALUMINUM,
STAINLESS STEEL, BRONZE, AND SIMILAR METALS WILL NOT BE PAINTED,
UNLESS OTHERWISE SPECIFIED. DO NOT PAINT ANY MOVING PARTS OF
OPERATING UNITS, OR OVER ANY EQUIPMENT IDENTIFICATION,
PERFORMANCE RATINGS, NAMES OR NOMENCLATURE PLATES OR CODE-
REQUIRED LABELS.
P8 PROTECT ALL WORK OF OTHER TRADES. CORRECT ANY PAINTING
RELATED DAMAGES BY CLEANING, REPAIRING, REFINISHING OR
REPLACING AS NECESSARY TO ACHIEVE VA/COR APPROVAL.
P9 PROPERLY PREPARE ALL SURFACES TO RECEIVE FINISHES AND
APPLY PRIME COATS, PAINTING AND FINISHING MATERIALS IN
ACCORDANCE WITH EACH MANUFACTURER'S DIRECTIONS FOR AN
INDUSTRY RECOGNIZED QUALITY APPLICATION. USE APPLICATORS AND
TECHNIQUES BEST SUITED FOR THE MATERIALS AND SURFACES TO
WHICH THEY ARE TO BE APPLIED.
P10 WHEN UNDERCOATS, STAINS OR OTHER CONDITIONS SHOW
THROUGH THE FINAL PAINT OR FINISHED COAT, APPLY ADDITIONAL
COMPLETE COATS UNTIL THE SURFACE FILM IS OF A UNIFORM FINISHED
COLOR AND APPEARANCE.
P11 APPLY EACH MATERIAL AT NOT LESS THAN THE MANUFACTURER'S
RECOMMENDED SPREADING RATE, SO AS TO PROVIDE A TOTAL DRY FILM
THICKNESS OF NOT LESS THAN 2.5 MILS FOR THE ENTIRE COATING
SYSTEM OF (1) PRIME AND (2) FINISH COATS FOR ALL 3 COAT WORK
REQUIRED ON PAINTED SURFACES.
P12 PAINTED SURFACE PREPARATION: COMPLY WITH PAINT
MANUFACTURER'S RECOMMENDATIONS FOR EACH MATERIAL TYPE AND
SURFACE FINISH TO BE PROVIDED AS PER THEIR REFERENCE GUIDE AND
SPECIFICATIONS.
P13 METAL SURFACE PREPARATION: ALL METAL SURFACES TO BE
PAINTED MUST BE CLEAN AND FREE OF RUST, MILL SCALE, GREASE, OIL,
DIRT AND OTHER FOREIGN MATTER. ALL ALUMINUM SURFACES MUST BE
CLEANED WELL IN ORDER TO REMOVE ALL SURFACE FILM AND OILS, AND
SHALL BE PROPERLY PRIMED IN ACCORDANCE WITH THE PAINT
MANUFACTURER'S RECOMMENDATIONS.
P14 ALL PAINTING WORK SHALL BE COMPLETED WITHIN WHAT THE
INDUSTRY UNIVERSALLY RECOGNIZES AS TOP QUALITY WORKMANSHIP
FROM UTILIZING INDUSTRY RECOGNIZED BEST PRACTICES APPLICATION
PROCEDURES FOR ALL COATS/APPLICATIONS. ALL COMPLETED WORK
WILL REQUIRE VA/COR APPROVAL
NORMAL WORK SHIFT HOURS FOR THE PINE RIDGE COMMUNITY BASED
OUTPATIENT VA CLINIC ARE 8:00 AM UNTIL 4:30 PM DAILY, MONDAY
THROUGH FRIDAY, EXCLUDING FEDERAL HOLIDAYS. EVERY SECOND
MONDAY OF THE MONTH IS A WORKING DAY FOR THE CLINIC,
CONSTRUCTION ACTIVITIES SHOULD NOT BE PERFORMED DURING THIS
TIMES.
1 CERTAIN WORK ITEMS, CONSTRUCTION ACTIVITIES, AND WORK IN
CERTAIN AREAS MAY BE DEEMED BY THE VA AS NECESSARY TO BE
PERFORMED DURING PERIODS OF AFTERHOURS/OFF-HOURS
WORK. SELECTION OF SUCH WORK ITEMS, CONSTRUCTION
ACTIVITIES, AND WORK IN SUCH AREAS SHALL BE AT THE VA'S
DISCRETION.
2 CERTAIN WORK ITEMS AND CONSTRUCTION ACTIVITIES,
INCLUDING BUT NOT LIMITED TO THOSE THAT CREATE NOISE,
DUST, VIBRATIONS, AND THAT WOULD CREATE DISTURBANCES TO
THE MEDICAL CENTER AND/OR ANY OF THE ADJACENT OCCUPIED
AREAS, WILL NEED TO BE PERFORMED DURING PERIODS OF
AFTERHOURS/OFF-HOURS WORK. ITEMS THAT WILL REQUIRE
AFTER HOURS ACTIVITIES SHALL BE FULLY COORDINATED WITH VA
COR PRIOR TO START OF CONSTRUCTION.
1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS IN
THE FIELD PRIOR TO COMMENCING WORK.
2. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF
DIMENSIONS SHOWN ON THE DRAWINGS. NOTIFY THE VA/COR OF
ANY DISCREPANCY BEFORE STARTING WORK.
3. A SUCCESSFUL REVIEW OF SHOP DRAWINGS AND SUBMITTALS BY
THE ARCHITECT/ENGINEER DOES NOT RELIEVE CONTRACTOR OF
THE RESPONSIBILITY TO REVIEW AND CHECK SHOP DRAWINGS
BEFORE SUBMITTAL TO VA/COR. THE CONTRACTOR REMAINS
SOLELY RESPONSIBLE FOR ERRORS AND OMISSIONS ASSOCIATED
WITH THE PREPARATION OF SHOP DRAWINGS AS THEY PERTAIN TO
DETAILS AND GIVEN DIMENSIONS IN THE CONTRACT DOCUMENTS.
4. CONTRACTOR SHALL OBTAIN VA/COR WRITTEN APPROVAL PRIOR
TO PROCEEDING WITH ANY CHANGES FROM THE INFORMATION
PROVIDED HEREIN.
AREA OF SCOPE OF WORK(FOR
REFERENCE ONLY-SELECTIVE
DEMOLITION AND NEW WORK MAY
EXTEND BEYOND SHOWN LIMITS)
FOR A SYMBOL LEGEND OF FIRE-
RATED PARTITIONS, SEE SHEET GI001
TEMPORARY CONSTRUCTION
PROJECT SCOPE
PROJECT SCOPE IS TO UPDATE EXISTING IT INFRASTRUCTURE IN CBOC
TO CURRENT STANDARDS.
EXISTING IT EQUIPMENT IS LOCATED IN MECHANICAL ROOM #112 AT THE
CBOC.
VA DIRECTED A/E TO ACCOMMODATE NEW IT EQUIPMENT IN A LOCKABLE
SERVER CABINET WITHIN ROOM #112, INSTEAD OF A SEPARATE ENLOSED
TELECOMMUNICATIONS ROOM.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
03/31/2022
GENERAL - GENERAL PROJECT NOTES EHRM INFRASTRUCTURE
UPGRADES
PINE RIDGE VA CLINIC
CZ LD
568A4-21-703
GI001
Pine Ridge Clinic
100% CONSTRUCTION
DOCUMENTS
18-12136C26319D0044
Revisions: Date:
35% SCHEMATIC DESIGN 6/24/2021
65% DESIGN DEVELOPMENT 7/29/2021
95% CONSTRUCTION DOCUMENTS 09/02/2021
95% CONSTRUCTION DOCUMENTS 09/09/2021
100% CONSTRUCTION DOCUMENTS 09/16/2021
100% CONSTRUCTION DOCUMENTS REVISED COMMENTS 12/09/2021
100% CONSTRUCTION DOCUMENTS 01/14/2022
100% CONSTRUCTION DOCUMENTS 02/17/2022
100% CONSTRUCTION DOCUMENTS 03/31/2022
GENERAL DEMOLITION NOTES
GENERAL NOTES FOR CONTRACTORS: SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL WORK LOCATED WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT PART OF THIS SECTION AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED HEREIN.
PROTECTION PROTOCOLS: VERIFY AND COORDINATE ALL PROTECTION REQUIREMENTS TO BE PROVIDED FOR EACH SPECIFIC AREA OR LOCATION OF SCHEDULED WORK WITH THE VA/COR, BEFORE BEGINNING ANY WORK. WHEN PERFORMING DEMOLITION WORK IN ANY OCCUPIED SPACES FOLLOW THE “OCCUPIED AREAS PROTECTION PROTOCOLS” UNLESS MODIFIED IN WRITING BY THE VA/COR
ON A CASE BY CASE BASIS.
1. BEFORE BEGINNING ANY DEMOLITION WORK EACH CONTRACTOR AND DISCIPLINE SHALL PERFORM A FULL EXAMINATION OF ALL AREAS OF WORK AND FULLY VERIFY ALL EXISTING CONDITIONS ALONG WITH ALL OF THE AREAS OF WORK FOR ANY UNFORESEEN CONDITIONS OR DISCREPANCIES FROM THE DOCUMENTATION THAT WOULD AFFECT THEIR WORK AND/OR THE WORK OF OTHERS. ANY UNFORESEEN CONDITIONS OR DISCREPANCIES DISCOVERED ARE TO BE IMMEDIATELY IDENTIFIED AND COORDINATED WITH THE GENERAL/PRIME CONTRACTOR WHO SHALL IN TURN DOCUMENT AND PROMPTLY REPORT ANY SUCH CONDITIONS DIRECTLY TO THE VA/COR FOR DIRECTION ON HOW TO PROCEED BEFORE ALLOWING ANY WORK TO BEGIN.
2. ALL REQUIRED DEMOLITION WORK IS NOT NECESSARY LIMITED TO WHAT IS ONLY SPECIFICALLY SHOWN OR DIRECTLY CALLED OUT ON THE DEMOLITION PLANS OR THAT IS ONLY SPECIFICALLY IDENTIFIED WITHIN THE DEMOLITION NOTES DESCRIPTIONS. THE INTENT OF THE DOCUMENTATION IS TO GENERALLY IDENTIFY THE MORE SPECIFIC MAJOR ELEMENTS OF WORK IN PLACE THAT SHALL REQUIRE REMOVAL AND/OR REWORK IN ORDER TO ACCOMPLISH THE DESIGN INTENT OF THE DOCUMENTS. THE FULL EXTENT OF DEMOLITION WORK COULD INCLUDE BUT NOT NECESSARILY BE LIMITED TO ALL AFFECTED LESSER ELEMENTS OF ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, MEDICAL GASES, FIRE PROTECTION SPRINKLER SYSTEMS AND ALL ELECTRICAL SYSTEMS WORK INCLUDING HIGH AND LOW VOLTAGE POWER, COMMUNICATION SYSTEMS SUCH AS CCTV, SECURITY, IT DATA, LIFE SAFETY, FIRE PROTECTION, NURSE CALL, PA, BAS
CONTROLS SYSTEMS, TEMPERATURE AND OTHERWISE, ETC.
3. ALL REQUIRED DEMOLITION WORK IS NECESSARY TO FACILITATE THE EXTENT OF BOTH THE NEW CONSTRUCTION WORK AS WELL AS TO FACILITATE THE REPLACEMENT, RELOCATION AND/OR THE REWORKING OF THE EXISTING SYSTEMS. ANY REWORKING OF THE CURRENT ELEMENTS AND COMPONENTS CURRENTLY NEEDING TO BE MODIFIED IN ORDER TO PROPERLY SUPPORT THE COMPLETED PROJECT SHALL BE PROVIDED AS INTENDED TO CONFORM WITH THE ORIGINAL DESIGN INTENT WHETHER SPECIFICALLY CALLED FOR IN GREAT DETAIL WITH EVERY ANCILLARY ELEMENT FULLY NAMED AND IDENTIFIED OR AS CALLED OUT AS A GENERAL COMPONENT PORTION OF WORK THAT NEEDS TO BE PROPERLY REMOVED IN ORDER TO COMPLETE THE SCOPE OF
WORK AS INTENDED TO COMPLY WITH ALL BASES OF DESIGN REQUIREMENTS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE DEMOLITION AND REMOVAL OF ALL EXISTING WALLS, CEILINGS, SUSPENSION SYSTEMS, FLOORING, ELECTRICAL, TELEPHONE AND PLUMBING CONSTRUCTION AS WELL AS ALL MATERIALS, FINISHES AND EQUIPMENT THAT IS NOT SPECIFICALLY SHOWN OR CALLED FOR AS REQUIRED TO FACILITATE THE NEW CONSTRUCTION WORK INSIDE THE CONTRACT AREA, THE ADJACENT SPACES AND THE SPACES ABOVE AND BELOW. SOME ADDITIONAL ITEMS THAT MAY NOT BE SPECIFICALLY SHOWN IN GREAT DETAIL ON THE DEMOLITION PLAN THAT ARE A PART OF THE DEMOLITION WORK, BUT NOT LIMITED TO, ARE CASEWORK, SHELVING, BRACKETS, STANDARDS, DOOR HARDWARE, MISCELLANEOUS OTHER HARDWARE, SIGNAGE, FLOORING MATERIALS, WALL BASE, WOOD GROUNDS, WALL COVERING MATERIALS, BACKING LINERS OR BOARDS, ANY REMAINING MASTIC, GROUT, CAULKING AND SEALANTS, EXPOSED ANCHORS AND FASTENERS, FRAMING MATERIALS, BACKER BOARDS OR METAL PLATES, CHAIR RAILS, BRACKETS, HOOKS, SURFACE MOUNTED OR RECESSED
ACCESSORIES, PRIVACY CURTAINS AND TRACKS, ETC.
5. ALL DEMOLITION WORK SHALL BE PERFORMED IN A SYSTEMATICALLY SAFE FULLY SUPERVISED COORDINATED AND PROPERLY MANAGED SEQUENCE OF WORK UNDER THE DIRECT SUPERVISION OF THE GENERAL/PRIME CONTRACTOR’S SUPERINTENDENT AND/OR THEIR MANAGEMENT PERSONNEL INCLUDING THE PERFORMANCE OF ANY ANCILLARY ELEMENTS OF SELECTIVE DEMOLITION.
6. ALL DEMOLITION, THE HANDLING OF MATERIALS AND EQUIPMENT ALONG WITH THE MOVEMENT OF THESE ELEMENTS THROUGHOUT THE FACILITY SHALL BE PERFORMED SO AS TO PREVENT DAMAGE TO ADJACENT IMPROVEMENTS AND FACILITIES TO REMAIN AS WELL AS TO PROVIDE SAFETY FOR ALL TRADESPEOPLE, STAFF, RESIDENTS/PATIENTS, VISITORS AND SERVICE
PROVIDERS.
7. PROVIDE ALL PHYSICAL AND ENVIRONMENTAL PROTECTIVE MEASURES AS REQUIRED BY THE PROJECT DOCUMENTS, VA FEDERAL AND LOCAL REQUIREMENTS, APPLICABLE OSHA REGULATIONS, THE STATION AND ALL LOCAL INFECTION CONTROL AUTHORITIES, NFPA REQUIREMENTS, THE VA/COR AND ALL OTHER REGULATORY AGENCIES AND VA AUTHORITIES HAVING JURISDICTION OVER
THIS PROJECT.
8. PROVIDE ALL TEMPORARY PARTITIONS, PROTECTION, DOOR ACCESS UNITS, ENCLOSURES, WALKWAYS, FENCING, RAILINGS, CANOPIES, AIR FILTRATION DEVICES, VESTIBULES, AIRLOCKS, ETC., WHERE REQUIRED BY THE CONTRACT DOCUMENTS, THE VA/COR AND ALL AUTHORITIES HAVING JURISDICTION OVER THE PROJECT AND SHALL BE SURE TO MAINTAIN ADEQUATE AND SAFE EMERGENCY MEANS OF EGRESS FROM ALL AREAS. ALL SUCH WORK NEEDING TO BE PROVIDED WILL REQUIRE VA/COR REVIEW AND APPROVAL BEFORE BEGINNING ANY OF SUCH WORK.
9. GREAT CARE SHALL BE TAKEN WHEN PERFORMING SELECTIVE DEMOLITION IN THE UTILIZATION OF MORE SENSITIVE AND LESS INVASIVE METHODS OF DEMOLITION/REMOVAL, AS WELL AS PROVIDING THE APPROPRIATE ENHANCED PROTECTIVE BARRIERS IN ORDER TO PROVIDE FOR THE LEAST AMOUNT OF DAMAGE TO THE WORK THAT IS TO REMAIN IN PLACE. EXISTING FINISHED SURFACES, MATERIALS AND EXPOSED EQUIPMENT THAT WOULD RECEIVE SIGNIFICANT AMOUNTS OF SURFACE DAMAGE AND WOULD REQUIRE SIGNIFICANT AMOUNTS OF PATCHING, REPAIRS AND REFINISHING WORK SHALL BE DEEMED AS DAMAGED AND UNUSABLE AND WILL NEED TO BE REPLACED IN WHOLE BY THE RESPONSIBLE CONTRACTOR AND ITS REPLACEMENT ONCE
COMPLETED WILL NEED TO RECEIVE VA/COR APPROVAL.
10. WHERE EXISTING FLOOR FINISHES ARE TO BE FULLY REMOVED TO ALLOW FOR THE INSTALLATION OF NEW, PROVIDE FOR THE COMPLETE REMOVAL OF THE EXISTING FLOOR FINISHES ALONG WITH ALL ASSOCIATED ATTACHMENT SYSTEMS SUCH AS MASTICS, ADHESIVES, TACKLES STRIPS, STAPLES, SETTING BEDS OF GROUT, MORTAR OR CONCRETE, CARPET PADDING, ATTACHED SUBFLOORING MATERIALS, ETC. AS REQUIRED TO GET DOWN TO THE EXISTING STRUCTURAL FLOOR SUBSTRATE THAT CAN BE PROPERLY PATCHED, REPAIRED, LEVELED AND MADE READY TO
RECEIVE THE NEW FLOOR FINISHES.
11. ITEMS INDICATED TO BE REMOVED AND SALVAGED FOR THE VA SHALL REMAIN THE VA’S PROPERTY AND SHALL BE CAREFULLY REMOVED, CLEANED AND PROTECTED FROM DAMAGE BY THE CONTRACTOR RESPONSIBLE AT ALL TIMES. ALL SUCH ITEMS INDICATED TO BE SALVAGED WILL BE PACKAGED AND/OR CRATED AS REQUIRED BY THE VA/COR TO PROPERLY PROTECT THEM FROM DAMAGE CAUSED BY THE HANDLING, MOVING AND/OR THE STORAGE OF THESE ITEMS.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .