ATTACHMENT 1 - Specifications Vol 1.pdf

PDF 2 MB Posted

Attached to
Y1AZ--EHRM Infrastructure Upgrades Construction - Pine Ridge Federal contract opportunity
Solicitation number
36C77622B0041
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This is a solicitation for a construction project involving electrical, HVAC, plumbing, and communications infrastructure upgrades at a VA facility in Pine Ridge, South Dakota. Work includes electrical panel and power upgrades, UPS installation, HVAC expansion and renovation, plumbing system renovation, and communications infrastructure upgrades including new data outlets and cabling. The project requires compliance with Tribal Employment Rights Office requirements and has restricted daily construction hours. Responses are due by the date listed on the solicitation, which will then be evaluated for award.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications

Black Hills Veterans Affairs Health Care System

Pine Ridge VA Clinic

EHRM Infrastructure Upgrades

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

100% Construction Documents Submission

March 31, 2022

SPECIFICATIONS

VOL 01

DIVISIONS 00-14

DIVISION 00

Black Hills VAHCS Pine Ridge, SD 57770

EHRM Infrastructure Upgrades Bancroft Architects + Engineers

01-01-21

Contract No. 36C26319D0044 Station Project No. 568A4-21-703 Bancroft-AE Project No. 18-121 02/17/2022

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 01-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 07-20 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 57 19 Temporary Environmental Controls 01-21 01 74 19 Construction Waste Management 01-21 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY NOT USED

DIVISION 05 – METALS NOT USED

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES NOT USED

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 60 00 Flashing and Sheet Metal 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 10-17

EHRM Infrastructure Upgrades Bancroft Architects + Engineers

01-01-21

Contract No. 36C26319D0044 Station Project No. 568A4-21-703 Bancroft-AE Project No. 18-121 02/17/2022

00 01 10-2

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21 08 71 00 Door Hardware 01-21

DIVISION 09 – FINISHES

09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) 01-21 09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 13 00 Directories 01-21 10 14 00 Signage 01-21

DIVISION 11 – EQUIPMENT NOT USED

DIVISION 12 – FURNISHINGS NOT USED

DIVISION 13 - SPECIAL CONSTRUCTION NOT USED

DIVISION 14– CONVEYING EQUIPEMENT NOT USED

DIVISION 21- FIRE SUPPRESSION NOT USED

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-20 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 11-19 22 13 00 Facility Sanitary and Vent Piping 09-20 22 34 00 Fuel-Fired Domestic Water Heaters 09-20

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-20 23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment 02-20

23 11 23 Facility Natural-Gas Piping 04-20 23 23 00 Refrigerant Piping 02-20 23 81 00 Decentralized Unitary HVAC Equipment 03-20 23 82 00 Convection Heating and Cooling Units 03-20

DIVISION 25 – INTEGRATED AUTOMATION NOT USED

EHRM Infrastructure Upgrades Bancroft Architects + Engineers

01-01-21

Contract No. 36C26319D0044 Station Project No. 568A4-21-703 Bancroft-AE Project No. 18-121 02/17/2022

00 01 10-3

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 26 – ELECTRICAL

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 33 53 Static Uninterruptible Power Supply 01-17 26 43 13 Surge Protective Devices 01-17

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 08 00 Commissioning of Communications Systems 11-16 27 10 00 Control, Communication and Signal Wiring 06-15 27 15 00 Communications Structured Cabling 01-16

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 13 53 Security Access Detection 09-11 28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork (Short Form) 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS NOT USED

DIVISION 33 – UTILITIES NOT USED

DIVISION 34 – TRANSPORTATION NOT USED

DIVISION 48 – Electrical Power Generation NOT USED

EHRM Infrastructure Upgrades

Bancroft Architects + Engineers

05-01-20

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121 02/17/2022

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

DRAWING INDEX

SHEET NUMBER SHEET TITLE

00-GENERAL

G001 GENERAL - COVER SHEET

G002 GENERAL - DRAWING INDEX, BUILDING CODE INFORMATION

GI001 GENERAL - GENERAL PROJECT NOTES

GI002 GENERAL - GENERAL DEMOLITION NOTES

GI101 GENERAL - LIFE SAFETY AND INFECTION CONTROL PLANS - FIRST FLOOR

GI102 GENERAL - INFECTION CONTROL NOTES AND DETAILS

01-ARCHITECTURAL

A001 ARCHITECTURAL - SYMBOLS, ABBREVIATIONS AND TYPICAL MOUNTING HEIGHTS

A100 ARCHITECTURAL - CBOC SITE PLAN

A101 ARCHITECTURAL - DEMOLITION AND CONSTRUCTION PLANS - FIRST FLOOR

A102 ARCHITECTURAL - DEMOLITION AND CONSTRUCTION CEILING PLANS - FIRST FLOOR

A103 ARCHITECTURAL - DEMOLITION AND NEW WORK ELEVATIONS - MECH.ROOM 112

A104 ARCHITECTURAL - MISC.DETAILS AND SCHEDULES

06 - PLUMBING

P001 PLUMBING - GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

P101 PLUMBING ENLARGED PLAN DEMOLITION / NEW CONSTRUCTION

P501 PLUMBING - DETAILS

07-MECHANICAL

M001 MECHANICAL - GENERAL NOTES, SYMBOLS, & ABBREVIATIONS

M101 MECHANICAL ENLARGED PLAN

M501 MECHANICAL DETAILS

M601 MECHANICAL SCHEDULES

08-ELECTRICAL

E001 ELECTRICAL - GENERAL NOTES

E002 ELECTRICAL - SYMBOLS AND ABBREVIATIONS

EP101 ELECTRICAL - FIRST FLOOR POWER PLAN AND SERVICE ENTRANCE, 400A SERVICE

EP102 ELECTRICAL - SITE PLAN, 400A SERVICE UNDERGROUND

EPD102 ELECTRICAL - SITE PLAN, 400A SERVICE UNDERGROUND

ET101 ELECTRICAL - ENLARGED MECHANICAL ROOM TECHNOLOGY PLAN

ET102 ELECTRICAL - FIRST FLOOR NETWORK AND PHONE CABLING PLAN

ET103 ELECTRICAL - NETWORK DIAGRAM

ET104 ELECTRICAL - GOLDEN WEST COMMUNICATION FIBER

EF100 ELECTRICAL - RELOCATE FIRE ALARM CONTROL PANEL

E500 ELECTRICAL - ARC FLASH, CURRENT IN AMPERES, ELECTRICAL EQUIPMENT SCHEDULE AND SINGLE LINE DIAGRAM

E501 ELECTRICAL - PHASING AND UTILITIES CONTACT DATA

E600 ELECTRICAL - PANEL SCHEDULES

E601 ELECTRICAL - EQUIPMENT SCHEDULES

E700 ELECTRICAL - SIGNAGE

Grand total: 34

DIVISION 01

5-04-22

03/04/2022

01 00 00 -1

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for _568A4-21-703

EHRM Infrastructure Upgrades – Pine Ridge, SD as required by drawings and specifications.

B. Visits to the site by Bidders shall be made in accordance with the solicitation.

C. Offices of ________Bancroft Architects + Engineers as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Work subject to tests and/or testing laboratory shall be retained by General Contractor. Also see 014529 Quality Control, and

019100 General Commissioning Requirements.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

01 00 00 -2

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

F. Normal working hours for this contract will be from 8.00 am to

4.30 pm (local time) Monday/Tuesday through Friday except for weekends and established Federal Holidays. Every other week on Monday the clinic is operational and construction cannot occur. Performing on-site work outside normal working hours will require approval from the Contracting

Officer and COR. Requests shall be submitted via email at least

72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.

G. The Key Personnel assigned by the contractor for the performance of work on this contract shall be acceptable to VA in terms of personal and professional conduct and technical knowledge.

Should the assignment to this contract of any person by the contractor be deemed to conflict with the interests of VA, or in the event performance is deemed to be unsatisfactory at any time during the life of the contract, the Contracting Officer may notify the contractor and request the person be removed from the assignment. The reason for removal will be documented and a request to receive key personnel replacement within three (3) business days of the notification will be made. Replacement of key personnel qualifications shall be equal to or greater than those of the key personnel being replaced. Employment and staffing difficulties will not be justification for failure to meet established schedules. The contractor is required to submit a resume with qualifications for the proposed replacement which shall be approved by the COR and CO prior to the replacement starting work.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, General Construction:

01 00 00 -3

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

1. Work includes general construction, alterations, necessary removal and/or modifications of existing structures and construction, patching and finishing work, and certain other items.

B. ITEM II, Mechanical Work:

1. Work includes all labor, material, equipment and supervision to perform the required Mechanical construction work on this project including:

a. Installation of new split system air conditioning units.

b. Modifications to existing DDC controls.

c. Setup, programming, and adjustment of new & modified systems.

C. ITEM III, Electrical System Work:

1. Work includes all labor, material, equipment and supervision to perform the required electrical and telecommunications systems construction work on this project including:

a. Provide new power connections for new mechanical equipment.

b. Provide new power connections for MDF/IDF rack locations.

c. Provide new UPS units for MDF/IDF locations.

d. Provide registered RCDD supervision during construction.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at

Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

01 00 00 -4

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security escort and arrangements can be provided for the employees.

This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the

Contracting Officer.

C. Key Control:

1. Only a limited number of keys will be issued to the contractor. Key requests shall be made in writing to the COR.

2. If the Contractor loses a key, a charge of $30 will be billed for a replacement key.

3. Ensure all doors leading to and from construction are either monitored or locked to prevent access to the area from unauthorized persons.

D. Document Control:

01 00 00 -5

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

1. Before starting any work, the General Contractor/Sub

Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or

“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting

Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of

Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the

VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an

Engineering Document Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

01 00 00 -6

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Contractor may have designated areas pending campus activities, to be coordinated by the COR or COR representative.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the

Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the

Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the

Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or

01 00 00 -7

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121 regulation. When it is necessary to cross curbs or sidewalks, the

Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged to curbs, sidewalks, and roads.

D. *** Lay down area, conditioned storage area for material, working space and space available on campus for storing materials shall be the procured by the contractor unless identified on the drawings. ***

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. N/A

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by

Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to

Medical Center areas required to remain in operation.

01 00 00 -8

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR .

All such actions shall be coordinated with the COR or Utility

Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

I. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the

Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date

01 00 00 -9

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121 of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to COR.

3. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical

Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by

Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

4. N/A.

J. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m

(seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum

375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.

K. When a building and/or construction site is turned over to

Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

01 00 00 -10

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

1. Contractor shall maintain a minimum temperature of 4 degrees C

(40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company

(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

L. Utilities Services: Maintain existing utility services for

Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR.

Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan.

Refer to specification Sections 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS .

2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed

01 00 00 -11

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121 interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical

Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

N. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

01 00 00 -12

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

O. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways.

P. N/A

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply

Service, buildings and campus in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by COR and contractor. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of buildings.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

01 00 00 -13

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by

Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled

"DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by

Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

01 00 00 -14

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags and/or noted on drawings or in specifications. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by

COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. Room owner will not be occupying the space during construction, however the room office equipment will remain. **** It shall be the construction contractor responsibility to “gently move” office equipment locally (desks, chairs, cabinets, etc) to complete the construction work, 01 00 00 -15

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121 clean, and return office equipment to their original locations. Contractor shall understand the VA does not have labor to assist with this effort.****

4. If applicable PCB Transformers and Capacitors: The Contractor shall be responsible for disposal of the Polychlorinated

Biphenyl (PCB) transformers and capacitors. The transformers and capacitors shall be taken out of service and handled in accordance with the procedures of the Environmental Protection

Agency (EPA) and the Department of Transportation (DOT) as outlined in Code of Federal Regulation (CFR), Titled 40 and 49 respectively. The EPA's Toxic Substance Control Act (TSCA)

Compliance Program Policy Nos. 6-PCB-6 and 6-PCB-7 also apply.

Upon removal of PCB transformers and capacitors for disposal, the "originator" copy of the Uniform Hazardous Waste Manifest

(EPA Form 8700-22), along with the Uniform Hazardous Waste

Manifest Continuation Sheet (EPA Form 8700-22A) shall be returned to the Contracting Officer who will annotate the contract file and transmit the Manifest to the Medical

Center's Chief.

a) Copies of the following listed CFR titles may be obtained from the Government Printing Office:

40 CFR 261 ...... Identification and Listing of Hazardous

Waste

40 CFR 262 ...... Standards Applicable to Generators of

Hazardous Waste

40 CFR 263 ...... Standards Applicable to Transporters of

Hazardous Waste

40 CFR 761 ...... PCB Manufacturing, Processing, Distribution in Commerce, and use Prohibitions

01 00 00 -16

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

49 CFR 172 ...... Hazardous Material tables and Hazardous

Material Communications Regulations

49 CFR 173 ...... Shippers - General Requirements for

Shipments and Packaging

49 CRR 173 ...... Subpart A General

49 CFR 173 ...... Subpart B Preparation of Hazardous Material for Transportation

49 CFR 173 ...... Subpart J Other Regulated Material;

Definitions and Preparation

TSCA ............ Compliance Program Policy Nos. 6-PCB-6 and

6-PCB-7

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS (FAR 52.236-9)

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the COR.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The

Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from

01 00 00 -17

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121 failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant

Discharge Elimination System (NPDES) permit is required for this project. The Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements. Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the Contractor's method of operations and operations planning and the Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:

1. Designating areas for equipment maintenance and repair;

2. Providing waste receptacles at convenient locations and provide regular collection of wastes;

3. Locating equipment wash down areas on site, and provide appropriate control of wash-waters;

01 00 00 -18

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

4. Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials;

and

5. Providing adequately maintained sanitary facilities.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems

(including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause

01 00 00 -19

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121 entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS"

(FAR 52.236-2).

1.11 PHYSICAL DATA – SOIL CONDITIONS

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by

_______See SOW drawings and specifications__________________.

(FAR 52.236-4)

B. Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically on drawings.

C. A copy of the soil report will be made available for inspection by bidders upon request to the Engineering Officer at the VA

Medical Center, ____ See SOW drawings and specifications ________ and shall be considered part of the contract documents.

D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.

01 00 00 -20

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

1.12 (IF APPLICABLE) PROFESSIONAL SURVEYING SERVICES

A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the

Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.13 (IF APPLICABLE) LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work.

The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the

Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through

Contractor's negligence before their removal is authorized, the

Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the

Contractor.

(FAR 52.236-17)

B. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, lines for each gravesite control monument, and such other lines and grades that are reasonably necessary to properly assure that

01 00 00 -21

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121 location, orientation, and elevations established for each such structure and/or addition, roads, parking lots, gravesite control monuments, are in accordance with lines and elevations shown on contract drawings.

C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark

(through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:

1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.

D. During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings. Furnish such certification to the COR before any major items of concrete work are placed. In addition, Contractor shall also furnish to the COR certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.

1. Lines of each building and/or addition.

01 00 00 -22

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

2. Elevations of bottoms of footings and tops of floors of each building and/or addition.

3. Lines and elevations of sewers and of all outside distribution systems.

4. Lines of grave plot documentation.

5. Lines of elevations of all swales and interment areas.

6. Lines and elevations of roads, streets and parking lots.

E. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.

F. Upon completion of the work, the Contractor shall furnish the COR one electronic copy and reproducible drawings at the scale of the contract drawings, showing the finished grade on the grid developed for constructing the work, including burial monuments and fifty foot stationing along new road centerlines. These drawings shall bear the seal of the registered land surveyor or registered civil engineer.

G. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of Article "Professional Surveying Services".

1.14 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings

01 00 00 -23

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121 shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.15 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of

Construction in at least 30 days before the planned pre-warranty conference, submit two sets of the warranty management plan.

Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved.

Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:

01 00 00 -24

Black Hills VAHCS

Pine Ridge, SD 57770

EHRM Infrastructure UpgradesEHRM Infrastructure Upgrades

PART 1 - Bancroft Architects + Engineers

Contract No. 36C26319D0044

Station Project No. 568A4-21-703

Bancroft-AE Project No. 18-121

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

e. Name and phone numbers of manufacturers or suppliers.

f. Names, addresses and phone numbers of sources of spare parts.

g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

h. Starting point and duration of warranty period.

i. Summary of maintenance procedures required to continue the warranty…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .