Attachment 4 Drawings.pdf
PDF 3 MB Posted
- Attached to
- GAOA Council Bluff Beach Access Bridges
- Solicitation number
- 127EAX26Q0113
About this file
This is a technical design and construction document for bridge replacements at Council Bluff Beach Access within the Mark Twain National Forest, Potosi-Fredericktown Ranger District, Missouri (R09 Eastern Region, Iron County). The project involves the removal of two existing bridges and the installation of two new prefabricated steel truss bridges with associated concrete work.
Project scope includes removal of existing bridges, columns, and footings; installation of two new bridges (one 105 feet long with 8-foot clear width, one 36 feet long with 8-foot clear width); repair and replacement of concrete approaches and a walkway connecting the bridges; and ancillary work as specified. Both bridges must be H5 truck load or 90 PSF pedestrian load rated, whichever governs. The construction window is restricted to between Labor Day and Memorial Day when the beach is closed for the season, with exceptions requiring Contracting Officer approval and appropriate public safety measures. Construction shall not occur on weekends or federal holidays without advance approval. The contractor must submit fabrication shop drawings and calculations 14 days in advance of ordering fabricated structures and an erection plan 14 days before erection begins. Design must comply with AASHTO LRFD Guide Specifications for Pedestrian Bridges (2nd Edition) and AASHTO LRFD Bridge Design Specifications (10th Edition). All concrete must be Class A(AE) with f'c = 4500 PSI at 28 days with 5% air entrainment. The contractor is responsible for erosion control planning, equipment cleaning, utility locating via 811, tree removal coordination, and any damage repair to access routes. Structure numbers are 090905-056126-0.010 and 090905-056126-0.032.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION MAP
PROJECT LOCATION MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture Forest Service
COUNCIL BLUFF BEACH ACCESS
FROM THE POTOSI-FREDRICKTOWN RANGER DISTRICT OFFICE, HEAD SOUTHEAST ON MO-8 FOR 1.4 MILES. TURN RIGHT ONTO STATE HWY P. GO 14 MILES AND TAKE A SLIGHT RIGHT ONTO OLD RTE C, THEN TURN LEFT ONTO STATE HWY DD. GO 6.8 MILES AND TURN LEFT INTO THE REC AREA. FOLLOW
SIGNS TO THE BEACH AND PICNIC AREA.
LATITUDE 37.733562, LONGITUDE -90.918167.
BRIDGE REPLACEMENTS
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER DATE
DATE
DIRECTOR OF ENGINEERING DATE
FOREST SUPERVISOR DATE
RO BRIDGE PROGRAM MANAGER DATE
2/4 /26
5:
JR
YP
KA
C :\U
SE
RS
\JR
YP
KA
\B
OX
\R
E
NG
P
RO
JE
CT
S\
R0 9 M
T\
TR
AI
L
BR
ID
GE
\C
OU
NC
IL
B
LU
FF
B
EA
CH
A
CC
ES
S\
CO
UN
CI
L
BL
UF
F
BE
AC
H
AC
CE
SS
.D W
G;
MISSOURI
IRON COUNTY
R09 EASTERN REGION
MARK TWAIN NATIONAL FOREST
POTOSI-FREDERICKTOWN RANGER DISTRICT
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 COVERSHEET 12/04/2025
C-01 GENERAL NOTES AND QUANTITIES 12/04/2025
C-02 SITE MAP 12/04/2025
C-03 SITE PLAN 12/04/2025
C-04 SITE PROFILE 12/04/2025
C--05 PLAN PROFILE BRIDGE 1 12/04/2025
C-06 PLAN PROFILE BRIDGE 2 AND SIDEWALK 12/04/2025
C-07 ABUTMENT DETAILS 12/04/2025
STRUCTURE NUMBERS:
090905-056126-0.010 090905-056126-0.032
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/4 /26
:5
1 J
RY
PK
A
C:
\U
SE
RS
\JR
YP
KA
\B
OX
\R
E
NG
P
RO
JE
CT
S\
R0 9 M
T\
TR
AI
L
BR
ID
GE
\C
OU
NC
IL
B
LU
FF
B
EA
CH
A
CC
ES
S\
CO
UN
CI
L
BL
UF
F
BE
AC
H
AC
CE
SS
.D W
G;
(R09)
EASTERN REGION
COUNCIL BLUFF
BEACH ACCESS
BRIDGE
REPLACEMENTS
MARK TWAIN NATIONAL
FOREST
POTOSI RANGER DISTRICT
GENERAL NOTES AND
QUANTITIES
12/04/2025
J. RYPKA
J. RYPKA
J. DULKA
C-01 002 008
GENERAL NOTES:
THIS PROJECT CONSISTS OF REMOVAL OF EXISTING BRIDGES, COLUMNS, AND FOOTINGS, INSTALLATION OF TWO NEW BRIDGES, REPAIRING THE APPROACHES AND THE WALKWAY BETWEEN THE BRIDGES WITH CONCRETE, AND ANCILLARY WORK AS SHOWN ON THESE DRAWINGS OR REQUIRED
BY THE SPECIFICATIONS.
THE CONTRACTOR SHALL FIELD VERIFY THE SITE CONDITIONS AND DIMENSIONS, AND VERIFY PROJECT SPECIFICS PRIOR TO BEGINNING WORK. ANY CONDITIONS REQUIRING A MODIFICATION IN THE WORK SHALL BE REPORTED TO THE CONTRACTING OFFICER WITHIN 24 HOURS OF DETERMINATION.
UNLESS OTHERWISE NOTED, ALL WORK SHALL CONFORM TO THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS FP-24 AND THE FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS).
THE PROPOSED WORK IN THESE PLANS ARE IN ACCORDANCE WITH:
AASHTO LRFD GUIDE SPECIFICATIONS FOR DESIGN OF PEDESTRIAN BRIDGES, 2ND EDITION
FSH 7709.56B TRANSPORTATION STRUCTURES HANDBOOK, USDA FOREST SERVICE
AASHTO LRFD BRIDGE DESIGN SPECIFICATION, 10TH EDITION.
THE CONSTRUCTION WINDOW IS BETWEEN LABOR DAY AND MEMORIAL DAY WHILE THE BEACH IS CLOSED FOR THE SEASON. EXCEPTIONS CAN BE APPROVED IF REQUESTED IN ADVANCE AND APPROPRIATE PUBLIC SAFETY MEASURES ARE IMPLEMENTED. NO WORK SHALL BE PERFORMED ON WEEKENDS OR FEDERAL HOLIDAYS UNLESS APPROVED IN ADVANCE BY THE CONTRACTING OFFICER (CO).
THE CONTRACTOR SHALL SUBMIT FABRICATION SHOP DRAWINGS AND CALCULATIONS TO THE CO FOR APPROVAL 14 DAYS IN ADVANCE OF ORDERING
THE FABRICATED STRUCTURES.
THE CONTRACTOR MAY PROVIDE A DESIGN TO CONSTRUCT A STYLE OF BRIDGE OTHER THAN A TRUSS BRIDGE OF THE SAME LOAD CAPACITY AND CLEAR WIDTH IF PRICING IS BENEFICIAL TO THE GOVERNMENT. BOTH BRIDGES MUST BE AESTHETICALLY SIMILAR. CO MUST APPROVE DEVIATIONS TO
THE CURRENT DESIGN PRIOR TO CONTRACT AWARD.
PRIOR TO REMOVING TREES, INDIVIDUAL TREES SHALL BE FLAGGED AND APPROVED BY THE CO PRIOR TO REMOVAL. TREE REMOVAL SHALL BE THE MINIMUM REQUIRED FOR CRANE ACCESS. THE CUT TIMBER SHALL BE DISPOSED OF OFFSITE BY THE CONTRACTOR.
THE CONTRACTOR IS RESPONSIBLE FOR CALLING 811 FOR THE LOCATING OF UTILITIES IN ACCORDANCE WITH LAW. THE CONTRACTOR SHALL ALSO NOTIFY UTILITY OWNERS NOT PART OF THE DIG SAFE ALERT SYSTEM. IF UTILITY RELOCATION WORK IS REQUIRED, THE CONTRACTOR SHALL WORK
WITH UTILITY COMPANIES TO PERFORM THE WORK AT NO COST TO THIS PROJECT.
THE CONTRACTOR SHALL STOP WORK IMMEDIATELY AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY IF HUMAN REMAINS ARE FOUND.
THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO THE ACCESS ROUTE, PARKING AREA, OR OTHER ANCILLARY AREAS.
NO SPECIFIC EROSION CONTROL MEASURES HAVE BEEN DEVELOPED. THE CONTRACTOR IS RESPONSIBLE FOR THEIR EROSION CONTROL PLAN AND
PREVENTING LOSS OF SEDIMENT FROM THE SITE.
ALL EQUIPMENT SHALL BE CLEANED ACCORDING TO THE SPECIFICATIONS PRIOR TO USE. THE CONTRACTOR SHALL MAKE EQUIPMENT AVAILABLE TO THE CONTRACTING OFFICER PRIOR TO ENTRANCE TO THE JOB SITE. THE CONTRACTOR SHALL ABIDE ALL CONDITIONS OF THEIR SPILL PREVENTION
PLAN AND APPLICABLE LAW.
DESIGN DATA:
LIVE LOAD:
90 PSF PEDESTRIAN
H5 TRUCK
USE DESIGN LOAD FACTORS FOR STRUCTURAL DESIGN CALCULATIONS.
USE LEGAL LOAD FACTORS FOR COMPLETING A LOAD RATING, AND SUBMIT THE LOAD RATING AND SAFE LOAD CAPACITY DOCUMENTATION WITH THE
SHOP DRAWINGS.
SOILS:
ALLOWABLE BEARING CAPACITY 4,350 PSF FOR USCS GC SOILS
HYDROLOGY
NONE. BRIDGES ARE OVER DRY VALLEYS THAT CARRY SMALL AMOUNTS OF RUNOFF DURING RAIN EVENTS. NO PERENNIAL OR INTERMITTENT FLOW.
CONSTRUCTION NOTES:
ALL PRACTICAL FRAMING, CUTTING, AND DRILLING SHALL BE DONE PRIOR TO TREATMENT WHERE POSSIBLE.
ALL TIMBER CUT OR DRILLED ON-SITE SHALL BE FIELD TREATED WITH COPPER NAPTHENATE.
ALL HOLES DRILLED IN THE FIELD WHERE SPIKES ARE TO BE USED SHALL BE 1/16" SMALLER THAN SPIKE SIZE.
ALL HOLES DRILLED IN THE FIELD WHERE BOLTS ARE TO BE USED SHALL BE 1/16" LARGER THAN BOLT SIZE.
ALL HOLES DRILLED FOR LAG BOLTS SHALL HAVE THE LEAD AND AND SHANK HOLES PRE-DRILLED BASED ON THE LAG BOLT SIZE.
ANY NUT OR MACHINE BOLT HEAD IN CONTACT WITH TIMBER SHALL HAVE ONE PLATE WASHER BETWEEN THE NUT AND TIMBER AND BETWEEN BOLT HEAD
AND TIMBER.
ANY NUT OR MACHINE BOLT HEAD IN CONTACT WITH STEEL SHALL HAVE ONE CUT WASHER BETWEEN NUT AND STEEL.
SET ALL THREADS WITH A PUNCH AFTER TIGHTENING.
CONTRACTOR SHALL ONLY USE RUBBER TRACKED EQUIPMENT, OR OTHER PROTECTION FOR THE ASPHALT. ANY DAMAGE TO EXISTING ASPHALT SHALL BE
REPAIRED BY THE CONTRACTOR AT THEIR EXPENSE.
MATERIAL NOTES:
CONCRETE
CONCRETE FOR ABUTMENT CONSTRUCTION SHALL BE PER FP-24 SECTION 552, CLASS A(AE), f'c = 4500 PSI AT 28 DAYS WITH AN ENTRAINED AIR CONTENT OF 5%± 1%.
CONCRETE FOR BRIDGE DECK SHALL BE PER BRIDGE DESIGNER.
CONCRETE FOR SIDEWALK SHALL BE 3,000 PSI WITH 5% AIR ENTRAINMENT AND W/C RATIO 0.50 OR LESS.
SUBMIT MIX DESIGN FOR ALL CONCRETE 7 DAYS PRIOR TO PLACEMENT
CONTRACTOR SHALL NOT PLACE CONCRETE WITHOUT A GOVERNMENT REPRESENTATIVE PRESENT. PROVIDE A MINIMUM 24 HOUR NOTICE PRIOR TO
PLACING CONCRETE.
STEEL
STRUCTURAL STEEL SHAPES AND PLATES SHALL CONFORM TO ASTM A709 OR AASHTO M270, GRADE 50W.
STEEL CONNECTION HARDWARE SHALL MEET ASTM A325 TYPE 3 GALVANIZED TO ASTM F2329.
ALL FABRICATION SHALL BE DONE BY AN AISC CERTFIED FABRICATOR.
ESTIMATED QUANTITIES:
PREFABRICATED STEEL SUPERSTRUCTURE DESIGN MUST BE A TRUSS CONFIGURATION SIMILAR TO THAT SHOWN ON THE DRAWINGS. THE BRIDGE SHALL MAINTAIN THE LINES AND GRADES INDICATED ON THE BRIDGE PROFILE AND ELEVATION VIEWS.
THE BRIDGE CROSS-SECTION SHALL BE DETERMINED BY THE CONTRACTOR BUT SHALL PROVIDE THE WIDTH AND RAILING DETAILS INDICATED ON THE BRIDGE TYPICAL SECTION. THE CONTRACTOR SHALL DETERMINE TRUSS HEIGHT AND THE LOCATION OF THE DECK WITH RESPECT TO THE TOP AND BOTTOM
CHORDS (U FRAME VS. H FRAME). OVERHEAD LATERAL BRACING IS UNACCEPTABLE.
DESIGN:
THE PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE AND ASSOCIATED DETAILS SHALL BE DESIGNED UNDER THE DIRECTION OF A REGISTERED PROFESSIONAL ENGINEER. THE COMPLETED DESIGN, DRAWINGS, AND SPECIFICATION PACKAGE SHALL BE SUBMITTED TO THE CONTRACTING OFFICER FOR
REVIEW AND APPROVAL.
THE DESIGN OF ALL PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE ELEMENTS SHALL COMPLY WITH THE AASHTO LRFD GUIDE SPECIFICATION FOR DESIGN OF PEDESTRIAN BRIDGES, CURRENT EDITION AND AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, CURRENT EDITION.
PROVIDE CAMBER FOR 100% OF THE FULL DEAD LOAD DEFLECTION.
DEFLECTION SHALL NOT EXCEED L/500 AND SHOULD NOT INDUCE FORCES THAT EXCEED CONCRETE COMPRESSIVE STRENGTH.
SUBMIT SHOP DRAWINGS AND CALCULATIONS FOR APPROVAL. ALL SUBMITTALS MUST BE APPROVED BEFORE FABRICATION.
THE ENGINEER SHALL DESIGN THE BRIDGE FOR EITHER H5 TRUCK LOAD OR PEDESTRIAN LOADING (90PSF), WHICHEVER GOVERNS, AND SNOW AND WIND
LOADING APPROPRIATE FOR THE LOCATION THE BRIDGE WILL BE INSTALLED.
ALL DETAILS OF THE CONCRETE DECK AND REINFORCEMENT ARE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE INCLUDED IN THE SHOP
DRAWINGS. DECK CONCRETE AND REINFORCEMENT IS INCIDENTAL TO PAY ITEM 55504-0000.
STEEL FABRICATION:
THE PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE SHALL BE FABRICATED BY AN AISC CERTIFIED PLANT. WHEN STRUCTURAL STEEL IS TO BE WELDED, THE WELDING PROCEDURE SHALL BE IN ACCORDANCE WITH AWS D1.5 AND SHALL BE SUITABLE FOR THE GRADE OF STEEL AND INTENDED USE OR SERVICE.
PAINT ALL STEEL MEMBERS BELOW THE DECK ELEVATION WITHIN 3 FEET OF EACH END OF THE BRIDGE WITH A STANDARD 3-COAT PAINT SYSTEM.
REMAINING TRUSS MEMBERS TO BE WEATHERING STEEL. COLOR SHALL BE SIMILAR TO THE WEATHERING STEEL.
ERECTION PLAN:
THE CONTRACTOR SHALL SUBMIT AN ERECTION PLAN FOR THE PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE TO THE C.O. FOR APPROVAL 14 DAYS
BEFORE ERECTION IS SCHEDULED.
TEMPORARY SUPPORT BENTS MAY BE USED FOR THE ERECTION OF THE PREFABRICATED STEEL TRUSS BRIDGE. THE BENTS SHALL BE CRIBBING, SILLS, CONCRETE BLOCKS OR OTHER SUPPORTS AND SHALL BE PLACED WITH MINIMAL DISTURBANCE.ALL MATERIALS TO CONSTRUCT THE TEMPORARY BENTS SHALL BE REMOVED. THE SUBMITTALS SHALL INCLUDE DRAWINGS INDICATING TEMPORARY BENT LOCATIONS AND DETAILS ALSO INCLUDED, THE CONTRACTOR SHALL INDICATE THE EQUIPMENT AND METHODS PROPOSED TO INSTALL AND REMOVE THE TEMPORARY BENTS AND ERECT THE NEW PREFABRICATED STEEL TRUSS SUPERSTRUCTURE. TEMPORARY SUPPORTS ARE INCIDENTAL TO PAY ITEM 55504-0000.
PREFABRICATED STEEL TRUSSES:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/4 /26
:5
1 J
RY
PK
A
C:
\U
SE
RS
\JR
YP
KA
\B
OX
\R
E
NG
P
RO
JE
CT
S\
R0 9 M
T\
TR
AI
L
BR
ID
GE
\C
OU
NC
IL
B
LU
FF
B
EA
CH
A
CC
ES
S\
CO
UN
CI
L
BL
UF
F
BE
AC
H
AC
CE
SS
.D W
G;
(R09)
EASTERN REGION
COUNCIL BLUFF
BEACH ACCESS
BRIDGE
REPLACEMENTS
MARK TWAIN NATIONAL
FOREST
POTOSI RANGER DISTRICT
SITE MAP
12/04/2025
J. RYPKA
J. RYPKA
J. DULKA
C-02 003 008
NOTES:
1. THE CYAN COLORED OUTLINE IS THE CLEARING LIMIT OPENING IN THE TREE CANOPY
FOR ACCESS FOR THE BRIDGE AND CRANE.
2. CLEARING LIMITS EXTEND 20 FEET EACH WAY OF CENTERLINE OF THE BRIDGE AND
TRAIL ALIGNMENT.
3. CLEARING LIMITS EXTEND 12 FEET EACH WAY OF CENTERLINE OF THE ACCESS ROAD
CENTERLINE.
4. ADDITIONAL CLEARING WIDTH THAT IS NECESSARY FOR SETTING THE BRIDGES MUST
BE APPROVED BY THE CO PRIOR TO CUTTING TREES.
5. THE YELLOW AREA CAN BE USED FOR CONSTRUCTION STAGING.
6. PUBLIC ACCESS TO THE AREA MUST BE PREVENTED BY FENCING OR OTHER MEANS.
7. THE INTENT IS FOR THE CONSTRUCTION WINDOW TO BE DURING THE SEASON THE
BEACH IS CLOSED. IF CONSTRUCTION IS OCCURING DURING THE BEACH OPEN
SEASON, NOTES 8 AND 9 BELOW APPLY.
8. THE ACCESS ROAD SHALL BE DESIGNATED WITH SIGNS AS THE PUBLIC ACCESS TO
THE BEACH.
9. THE ACCESS ROAD CAN ONLY BE CLOSED TO PUBLIC TRAFFIC WHEN APPROVED BY
THE CO AND WHEN ITS NEEDED FOR SETTING THE SECOND BRIDGE.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PK-NAIL
1112.46
105'-0"
36.00'
9+ 27 9+
+0
+5
+0
+5
+5
PROPOSED BRIDGE
105' LONG
8' CLEAR WIDTH
EXISTING BRIDGE
PROPOSED SIDEWALK
PROPOSED BRIDGE
36' LONG
8' CLEAR WIDTH
EXISTING BRIDGE
ACCESS ROAD
BEACH ACCESS
ROAD AND PARKING
AREA
32'
9.1'
118 FT TO CP1
PICNIC AREA
PICNIC AREA
PICNIC AREA
REF PT "A"
REF PT "B"
REF PT "C"
REF PT "D"
PI: 10+60.58
GEOCELL PAD
CIP ABUTMENT
APPROXIMATE
CLEARING LIMIT
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/4 /26
:5
1 J
RY
PK
A
C:
\U
SE
RS
\JR
YP
KA
\B
OX
\R
E
NG
P
RO
JE
CT
S\
R0 9 M
T\
TR
AI
L
BR
ID
GE
\C
OU
NC
IL
B
LU
FF
B
EA
CH
A
CC
ES
S\
CO
UN
CI
L
BL
UF
F
BE
AC
H
AC
CE
SS
.D W
G;
(R09)
EASTERN REGION
COUNCIL BLUFF
BEACH ACCESS
BRIDGE
REPLACEMENTS
MARK TWAIN NATIONAL
FOREST
POTOSI RANGER DISTRICT
SITE PLAN
12/04/2025
J. RYPKA
J. RYPKA
J. DULKA
C-03 004 008Feet
0 10 20
CONTROL POINT TABLE
POINT #
NORTHING
692098.64
692071.89
EASTING
699136.10
699251.37
ELEVATION
1115.16
1112.46
DESCRIPTION
COTTON GIN SPIKE
PK-NAIL
NOTE: CONTROL ESTABLISHED VIA GPS RTK USING VRS IN 2022.
SITE CONTROL MAY NEED TO BE VERIFIED AND REESTABLISHED
BY CONTRACTOR PRIOR TO BEGINNING WORK.
REFERENCE POINTS
POINT STA NORTHING EASTING ELEVATION
A 9+47.50 692071.90 699297.88 1111.85 B 10+52.50 692083.22 699402.27 1110.85 C 11+00.35 692065.08 699445.24 1109.00 D 11+36.35 692047.88 699476.86 1107.70
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
EL
EV
AT
IO
N (F
EE
T)
STATION (FEET)
ALIGNMENT - TRAIL CL PROFILE
5x VERTICAL EXAGGERATION
9+27 9+50 10+00 10+50 11+00 11+50 11+56
STA: 9+46.70
ELEV: 1111.85
STA: 10+52.50
ELEV: 1110.85
STA: 11+37.14
ELEV: 1107.70
-0.95%
0.00% -4.00%
0.00%
-3.61%
0.00%
0.00%
STA 10+53.29
ELEV 1110.85
STA 9+47.50
ELEV 1111.85
STA 10+99.55
ELEV 1109.00
STA 11+00.35
ELEV 1109.00
STA 11+36.35
ELEV 1107.70
SIDEWALK
FINISHED GRADE
REF PT "A"
REF PT "B"
REF PT "C"
REF PT "D"
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/4 /26
:5
1 J
RY
PK
A
C:
\U
SE
RS
\JR
YP
KA
\B
OX
\R
E
NG
P
RO
JE
CT
S\
R0 9 M
T\
TR
AI
L
BR
ID
GE
\C
OU
NC
IL
B
LU
FF
B
EA
CH
A
CC
ES
S\
CO
UN
CI
L
BL
UF
F
BE
AC
H
AC
CE
SS
.D W
G;
(R09)
EASTERN REGION
COUNCIL BLUFF
BEACH ACCESS
BRIDGE
REPLACEMENTS
MARK TWAIN NATIONAL
FOREST
POTOSI RANGER DISTRICT
SITE PROFILE
12/04/2025
J. RYPKA
J. RYPKA
J. DULKA
C-04 005 008
Feet 0 10 20
Feet 0 10 20
(HOR.)
(VERT.)
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
105'-0"
9+
+0
+5
PI: 10+60.58
REF PT "B"
REF PT "A"
8'-0"
GEOCELL
SUBGRADE
CIP ABUTMENT
EXISTING BRIDGE
REMOVE PER PAY ITEM 20304
PROPOSED
CONCRETE
SIDEWALK
PATCH ASPHALT
AFTER BACKFILL
5' -0
BOLLARD
(TYP.)
'-3
1 2
12'-0"
2'-0"
REF PT "A"
REF PT "B"
105.00'
CONCRETE BRIDGE DECK 5" REINFORCED
CONCRETE SIDEWALK
4" COMPACTED BASE
6" GEOCELL BASE PER SPEC 629.
BACKFILL WITH BASE
AGGREGATE GRADATION D
PER TABLE 703-1.
CIP CONCRETE
ABUTMENT
PER SPEC 552
105' X 8'
H5 TRUSS
(DESIGN BY OTHERS)
EXISTING
ASPHALT
DRIVE
ASPHALT REPAIR
AFTER BACKFILLING
(INCIDENTAL)
4'-6" 1.5
6" BOLLARD,
REMOVABLE
STRUCTURE
EXCAVATION
AND BACKFILL
PER SPEC 208
EXISTING BRIDGE AND
PIERS TO BE REMOVED
(SOME DETAILS OMITTED
FOR CLARITY)
GRADE TO DRAIN
STRUCTURAL
BACKFILL
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/4 /26
:5
1 J
RY
PK
A
C:
\U
SE
RS
\JR
YP
KA
\B
OX
\R
E
NG
P
RO
JE
CT
S\
R0 9 M
T\
TR
AI
L
BR
ID
GE
\C
OU
NC
IL
B
LU
FF
B
EA
CH
A
CC
ES
S\
CO
UN
CI
L
BL
UF
F
BE
AC
H
AC
CE
SS
.D W
G;
(R09)
EASTERN REGION
COUNCIL BLUFF
BEACH ACCESS
BRIDGE
REPLACEMENTS
MARK TWAIN NATIONAL
FOREST
POTOSI RANGER DISTRICT
PLAN PROFILE
BRIDGE 1
12/04/2025
J. RYPKA
J. RYPKA
J. DULKA
C-05 006 008
BRIDGE 1 PLAN
BRIDGE 1 ELEVATION
NOTES:
· CONCRETE BRIDGE DECK FINISH SHALL BE NON-SKID
TEXTURED FINISH WITH A TRANSVERSE BROOM FINISH TO
PROVIDE SUFFICIENT FRICTION FOR FOOT TRAFFIC.
· REMOVE AND DISPOSE OF EXISTING BRIDGES PER SPEC
203. FILLING AND GRADING OF HOLES FROM REMOVED
PIER FOUNDATIONS INCIDENTAL TO PAY ITEM 20304-1000.
· COORDINATE REMOVAL, STORAGE, AND REINSTALLATION
OF EXISTING BOLLARDS WITH THE COR.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
10+50
+0
+5
1110PI: 10+60.58
'-3
1 2"
36'-0"
8'-0"
2'-6"
12'-6"
27'-21 2"
38'-111 2"
7'-3
4'-0"
4'-0"
8'-0"
REF PT "C"
REF PT "D"
36'-0"36'x8'
H5 TRUSS
(DESIGN BY OTHERS)
5" CONCRETE SIDEWALK
WITH WELDED WIRE
MESH REINFORCEMENT
6x6 W1.4/W1.4
46'-3"
6" GEOCELL BASE PER SPEC 629.
BACKFILL WITH BASE
AGGREGATE GRADATION D
PER TABLE 703-1.
EXISITNG CONCRETE.
POUR REPLACEMENT
CONCRETE AFTER
BACKFILL. (INCIDENTAL)
CIP CONCRETE
ABUTMENT
PER SPEC 552
STRUCTURE EXCAVATION
AND BACKFILL
PER SPEC 208
4" COMPACTED BASE
AGGREGATE GRADATION D
PER TABLE 703-1
EXISTING BRIDGE AND
PIERS TO BE REMOVED
(SOME DETAILS OMITTED
FOR CLARITY)
4" DRAIN TILE.
OUTLET AT DOWNHILL
SIDE OF ABUTMENT
(INCIDENTAL TO 20803)
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/4 /26
:5
1 J
RY
PK
A
C:
\U
SE
RS
\JR
YP
KA
\B
OX
\R
E
NG
P
RO
JE
CT
S\
R0 9 M
T\
TR
AI
L
BR
ID
GE
\C
OU
NC
IL
B
LU
FF
B
EA
CH
A
CC
ES
S\
CO
UN
CI
L
BL
UF
F
BE
AC
H
AC
CE
SS
.D W
G;
(R09)
EASTERN REGION
COUNCIL BLUFF
BEACH ACCESS
BRIDGE
REPLACEMENTS
MARK TWAIN NATIONAL
FOREST
POTOSI RANGER DISTRICT
PLAN PROFILE
BRIDGE 2 AND
SIDEWALK
12/04/2025
J. RYPKA
J. RYPKA
J. DULKA
C-06 007 008
6" BOLLARD
REMOVEABLE
NOTES:
· CONCRETE BRIDGE DECK FINISH SHALL BE NON-SKID
TEXTURED FINISH WITH A TRANSVERSE BROOM FINISH TO
PROVIDE SUFFICIENT FRICTION FOR FOOT TRAFFIC.
· REMOVE AND DISPOSE OF EXISTING BRIDGES PER SPEC
203. FILLING AND GRADING OF HOLES FROM REMOVED
PIER FOUNDATIONS INCIDENTAL TO PAY ITEM 20304-1000.
· COORDINATE REMOVAL, STORAGE, AND REINSTALLATION
OF EXISTING BOLLARDS WITH THE COR.
· SIDEWALK GRADING, COMPACTED BASE MATERIAL, AND
REINFORCEMENT MESH INCIDENTAL TO PAY ITEM
61001-0100.
· REMOVAL OF EXISTING ASPHALT WALKWAY PAID UNDER
PAY ITEM 20304-1000.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
12'-6"
2' -0
VA
R
IE
S
BA
SE
D O
N
SH
O P
D R
AW
IN
G S
2' -6
0' -8
12'-6"
2'-6"
2' -0
VA
R
IE
S
BA
SE
D O
N
SH
O P
D R
AW
IN
G S
0'-8"
(5) - 1
EVEN SPACING
TOP AND BTM
(2) - 2
MID-HEIGHT
EA. FACE
(15) - 3
(15) - 4
(3 O
R
" M
AX
C -C
(13) - 3 11" C-C
3 (5) - 1
(5) - 1
(2) - 2
(13) - 4 11" C-C4 4
(5
EV
EN
S
PA
C
IN
G
TO
P
AN
D B
TM
(13) - 3 11" C-C
3 0'-6"
0'-6"
(15) - 4
(3 O
R
" M
AX
C -C
REINFORCEMENT BAR SCHEDULE
BAR MARK SIZE QTY LENGTH WEIGHT SHAPE
1 6 20 12'-2" 364.8
2 4 4 12'-2" 32.6
3 4 30 7'-10" 157.4
4 4 30 VARIES (APPROX 8'-3") 165.8
5 4 12 - 16 12'-2" 97.8-130.4
12'-2"
12'-2"
2'-2"
1'-7"
12'-2"
VARIES ~4'-0"
4"
18" MIN.
EMBEDMENT
0' -3
CONCRETE AND STEEL NOTES:
1. USE CLASS A(AE) FOR CONCRETE, f'c = 4500 PSI AT 28 DAYS
WITH AN ENTRAINED AIR CONTENT OF 5%± 1%. PROVIDE ALL
CONCRETE IN ACCORDANCE WITH AN APPROVED MIX DESIGN.
CHAMFER ALL EXPOSED EDGES AT 3/4-INCH.
2. REINFORCING STEEL: USE REINFORCING STEEL OF THE
DEFORMED TYPE CONFORMING TO AASHTO M31 (ASTM A615),
GRADE 60. CUT AND BEND STEEL IN ACCORDANCE WITH ACI
315.
3. IF PRECASTING THE ABUTMENTS, THE SUPPLIER SHALL
PREPARE AND SUBMIT COMPLETE CONCRETE SHOP
DRAWINGS.
4. THE HEIGHT OF THE BACKWALL SHALL BE CUSTOMIZED TO
MATCH THE SUPERSTRUCTURE PROVIDED. ENSURE THE
BACKWALL HEIGHT IS SUCH THAT WHEN THE
SUPERSTRUCTURE IS SET, THE FINISHED GRADE OF THE DECK
MATCHES FINISHED HEIGHT OF BACKWALL. PAY QUANTITES
SHALL NOT BE ADJUSTED TO THIS CUSTOMIZATION, BUT
RATHER PAID AT PLAN QUANTITY.
5. MINIMUM CONCRETE COVER FOR FORMED SURFACES IS 2".
MINIMUM CONCRETE COVER FOR CONCRETE CAST AGAINST
EARTH IS 3"
6. REBAR AND WELDED WIRE SHALL BE PROPERLY SUPPORTED
TO ENSURE PROPER PLACEMENT AND COVERAGE OF
REINFORCING STEEL FROM THE SUBGRADE AND FORMED
SURFACES.
7. CONTRACTOR SHALL NOTIFY CO 24 HOURS PRIOR TO PLACING
CONCRETE. NO CONCRETE SHALL BE PLACED WITHOUT
INSPECTION OF REINFORCING STEEL AND FORMWORK.
8. CO SHALL APPROVE SUBGRADE PRIOR TO PLACING GEOCELL
1'-0"
0'-5"
0' -5
0' -4
6x6 W1.4/W1.4
WELDED WIRE MESH 0'
-2
EXPANSION
JOINT
1" x 12" ANCHOR BOLTS
LAYOUT PER SHOP DRAWINGS
4" COMPACTED BASE
AGGREGATE
GRADATION D
PER TABLE 703-1
0' -1
0"
BRIDGE EXPANSION GAP
PER SHOP DRAWINGS
STRUCTURE EXCAVATION
AND BACKFILL
PER SPEC 208
BEARINGS TO BE PROVIDED AND
DESIGNED IN ACCORDANCE WITH
BRIDGE REQUIREMENTS
2"
11 2"
1.5" GALV STEEL
HANDRAIL, BOTH
SIDES. (INCIDENTAL
TO 55504)
3' -0
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/4 /26
:5
1 J
RY
PK
A
C:
\U
SE
RS
\JR
YP
KA
\B
OX
\R
E
NG
P
RO
JE
CT
S\
R0 9 M
T\
TR
AI
L
BR
ID
GE
\C
OU
NC
IL
B
LU
FF
B
EA
CH
A
CC
ES
S\
CO
UN
CI
L
BL
UF
F
BE
AC
H
AC
CE
SS
.D W
G;
(R09)
EASTERN REGION
COUNCIL BLUFF
BEACH ACCESS
BRIDGE
REPLACEMENTS
MARK TWAIN NATIONAL
FOREST
POTOSI RANGER DISTRICT
ABUTMENT DETAILS
12/04/2025
J. RYPKA
J. RYPKA
J. DULKA
C-07 008 008
ABUTMENT REINFORCEMENT PLAN VIEW
ABUTMENT REINFORCEMENT ELEVATION VIEW ABUTMENT REINFORCEMENT SECTION VIEW
HANDRAIL DETAIL
SAFETY RAIL: A 6 INCH SPHERE MUST NOT PASS
THROUGH THE LOWER 27 INCHES OF THE RAIL AND AN 8
INCH SPHERE MUST NOT PASS THROUGH THE UPPER
AREA OF THE RAIL.PROVIDE A 4 INCH HIGH TOE KICK
SET 1/2 INCH ABOVE THE DECK.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Council Bluff Beach Access-COVERSHEET |
| Sheets and Views |
| COVERSHEET |
| OLE1 |
| Council Bluff Beach Access-NOTES |
| Sheets and Views |
| Council Bluff Beach Access-NOTES |
| OLE1 |
| Council Bluff Beach Access-SITE MAP |
| Sheets and Views |
| Council Bluff Beach Access-SITE MAP |
| OLE1 |
| Council Bluff Beach Access-SITE PLAN |
| Sheets and Views |
| Council Bluff Beach Access-SITE PLAN |
| OLE1 |
| Council Bluff Beach Access-PROFILE |
| Sheets and Views |
| Council Bluff Beach Access-PROFILE |
| OLE1 |
| Council Bluff Beach Access-P-P (1) |
| Sheets and Views |
| Council Bluff Beach Access-P-P (1) |
| OLE1 |
| Council Bluff Beach Access-P-P (2) |
| Sheets and Views |
| Council Bluff Beach Access-P-P (2) |
| OLE1 |
| Council Bluff Beach Access-DETAILS |
| Sheets and Views |
| Council Bluff Beach Access-DETAILS |
| OLE1 |
| 2026-03-11T09:53:11-0500 | |
| AMBROSIA WILSON |
| 2026-03-11T13:07:14-0500 | |
| Vinci Keeler |
| 2026-03-16T10:01:29-0500 | |
| CHRISTOPHER OLDS |
| Regional Bridge Program Mgr R09 | |
| 2026-03-16T11:38:48-0500 | |
| R09 Regional Office | |
| Jeffrey W. Dulka | |
| I have reviewed this document |
| 2026-03-25T11:57:48-0500 | |
| JONATHAN HEYL |
File details come from the government source that posted it. Updated .