Attachment 4 Drawings.pdf

PDF 3 MB Posted

Attached to
GAOA Council Bluff Beach Access Bridges
Solicitation number
127EAX26Q0113
Issued by

About this file

This is a technical design and construction document for bridge replacements at Council Bluff Beach Access within the Mark Twain National Forest, Potosi-Fredericktown Ranger District, Missouri (R09 Eastern Region, Iron County). The project involves the removal of two existing bridges and the installation of two new prefabricated steel truss bridges with associated concrete work.

Project scope includes removal of existing bridges, columns, and footings; installation of two new bridges (one 105 feet long with 8-foot clear width, one 36 feet long with 8-foot clear width); repair and replacement of concrete approaches and a walkway connecting the bridges; and ancillary work as specified. Both bridges must be H5 truck load or 90 PSF pedestrian load rated, whichever governs. The construction window is restricted to between Labor Day and Memorial Day when the beach is closed for the season, with exceptions requiring Contracting Officer approval and appropriate public safety measures. Construction shall not occur on weekends or federal holidays without advance approval. The contractor must submit fabrication shop drawings and calculations 14 days in advance of ordering fabricated structures and an erection plan 14 days before erection begins. Design must comply with AASHTO LRFD Guide Specifications for Pedestrian Bridges (2nd Edition) and AASHTO LRFD Bridge Design Specifications (10th Edition). All concrete must be Class A(AE) with f'c = 4500 PSI at 28 days with 5% air entrainment. The contractor is responsible for erosion control planning, equipment cleaning, utility locating via 811, tree removal coordination, and any damage repair to access routes. Structure numbers are 090905-056126-0.010 and 090905-056126-0.032.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION MAP

PROJECT LOCATION MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture Forest Service

COUNCIL BLUFF BEACH ACCESS

FROM THE POTOSI-FREDRICKTOWN RANGER DISTRICT OFFICE, HEAD SOUTHEAST ON MO-8 FOR 1.4 MILES. TURN RIGHT ONTO STATE HWY P. GO 14 MILES AND TAKE A SLIGHT RIGHT ONTO OLD RTE C, THEN TURN LEFT ONTO STATE HWY DD. GO 6.8 MILES AND TURN LEFT INTO THE REC AREA. FOLLOW

SIGNS TO THE BEACH AND PICNIC AREA.

LATITUDE 37.733562, LONGITUDE -90.918167.

BRIDGE REPLACEMENTS

RECOMMENDED BY:

APPROVED:

FOREST ENGINEER

DISTRICT RANGER DATE

DATE

DIRECTOR OF ENGINEERING DATE

FOREST SUPERVISOR DATE

RO BRIDGE PROGRAM MANAGER DATE

2/4 /26

5:

JR

YP

KA

C :\U

SE

RS

\JR

YP

KA

\B

OX

\R

E

NG

P

RO

JE

CT

S\

R0 9 M

T\

TR

AI

L

BR

ID

GE

\C

OU

NC

IL

B

LU

FF

B

EA

CH

A

CC

ES

S\

CO

UN

CI

L

BL

UF

F

BE

AC

H

AC

CE

SS

.D W

G;

MISSOURI

IRON COUNTY

R09 EASTERN REGION

MARK TWAIN NATIONAL FOREST

POTOSI-FREDERICKTOWN RANGER DISTRICT

INDEX OF SHEETS

SHEET SHEET TITLE DATE

G-01 COVERSHEET 12/04/2025

C-01 GENERAL NOTES AND QUANTITIES 12/04/2025

C-02 SITE MAP 12/04/2025

C-03 SITE PLAN 12/04/2025

C-04 SITE PROFILE 12/04/2025

C--05 PLAN PROFILE BRIDGE 1 12/04/2025

C-06 PLAN PROFILE BRIDGE 2 AND SIDEWALK 12/04/2025

C-07 ABUTMENT DETAILS 12/04/2025

STRUCTURE NUMBERS:

090905-056126-0.010 090905-056126-0.032

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/4 /26

:5

1 J

RY

PK

A

C:

\U

SE

RS

\JR

YP

KA

\B

OX

\R

E

NG

P

RO

JE

CT

S\

R0 9 M

T\

TR

AI

L

BR

ID

GE

\C

OU

NC

IL

B

LU

FF

B

EA

CH

A

CC

ES

S\

CO

UN

CI

L

BL

UF

F

BE

AC

H

AC

CE

SS

.D W

G;

(R09)

EASTERN REGION

COUNCIL BLUFF

BEACH ACCESS

BRIDGE

REPLACEMENTS

MARK TWAIN NATIONAL

FOREST

POTOSI RANGER DISTRICT

GENERAL NOTES AND

QUANTITIES

12/04/2025

J. RYPKA

J. RYPKA

J. DULKA

C-01 002 008

GENERAL NOTES:

THIS PROJECT CONSISTS OF REMOVAL OF EXISTING BRIDGES, COLUMNS, AND FOOTINGS, INSTALLATION OF TWO NEW BRIDGES, REPAIRING THE APPROACHES AND THE WALKWAY BETWEEN THE BRIDGES WITH CONCRETE, AND ANCILLARY WORK AS SHOWN ON THESE DRAWINGS OR REQUIRED

BY THE SPECIFICATIONS.

THE CONTRACTOR SHALL FIELD VERIFY THE SITE CONDITIONS AND DIMENSIONS, AND VERIFY PROJECT SPECIFICS PRIOR TO BEGINNING WORK. ANY CONDITIONS REQUIRING A MODIFICATION IN THE WORK SHALL BE REPORTED TO THE CONTRACTING OFFICER WITHIN 24 HOURS OF DETERMINATION.

UNLESS OTHERWISE NOTED, ALL WORK SHALL CONFORM TO THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS FP-24 AND THE FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS).

THE PROPOSED WORK IN THESE PLANS ARE IN ACCORDANCE WITH:

AASHTO LRFD GUIDE SPECIFICATIONS FOR DESIGN OF PEDESTRIAN BRIDGES, 2ND EDITION

FSH 7709.56B TRANSPORTATION STRUCTURES HANDBOOK, USDA FOREST SERVICE

AASHTO LRFD BRIDGE DESIGN SPECIFICATION, 10TH EDITION.

THE CONSTRUCTION WINDOW IS BETWEEN LABOR DAY AND MEMORIAL DAY WHILE THE BEACH IS CLOSED FOR THE SEASON. EXCEPTIONS CAN BE APPROVED IF REQUESTED IN ADVANCE AND APPROPRIATE PUBLIC SAFETY MEASURES ARE IMPLEMENTED. NO WORK SHALL BE PERFORMED ON WEEKENDS OR FEDERAL HOLIDAYS UNLESS APPROVED IN ADVANCE BY THE CONTRACTING OFFICER (CO).

THE CONTRACTOR SHALL SUBMIT FABRICATION SHOP DRAWINGS AND CALCULATIONS TO THE CO FOR APPROVAL 14 DAYS IN ADVANCE OF ORDERING

THE FABRICATED STRUCTURES.

THE CONTRACTOR MAY PROVIDE A DESIGN TO CONSTRUCT A STYLE OF BRIDGE OTHER THAN A TRUSS BRIDGE OF THE SAME LOAD CAPACITY AND CLEAR WIDTH IF PRICING IS BENEFICIAL TO THE GOVERNMENT. BOTH BRIDGES MUST BE AESTHETICALLY SIMILAR. CO MUST APPROVE DEVIATIONS TO

THE CURRENT DESIGN PRIOR TO CONTRACT AWARD.

PRIOR TO REMOVING TREES, INDIVIDUAL TREES SHALL BE FLAGGED AND APPROVED BY THE CO PRIOR TO REMOVAL. TREE REMOVAL SHALL BE THE MINIMUM REQUIRED FOR CRANE ACCESS. THE CUT TIMBER SHALL BE DISPOSED OF OFFSITE BY THE CONTRACTOR.

THE CONTRACTOR IS RESPONSIBLE FOR CALLING 811 FOR THE LOCATING OF UTILITIES IN ACCORDANCE WITH LAW. THE CONTRACTOR SHALL ALSO NOTIFY UTILITY OWNERS NOT PART OF THE DIG SAFE ALERT SYSTEM. IF UTILITY RELOCATION WORK IS REQUIRED, THE CONTRACTOR SHALL WORK

WITH UTILITY COMPANIES TO PERFORM THE WORK AT NO COST TO THIS PROJECT.

THE CONTRACTOR SHALL STOP WORK IMMEDIATELY AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY IF HUMAN REMAINS ARE FOUND.

THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO THE ACCESS ROUTE, PARKING AREA, OR OTHER ANCILLARY AREAS.

NO SPECIFIC EROSION CONTROL MEASURES HAVE BEEN DEVELOPED. THE CONTRACTOR IS RESPONSIBLE FOR THEIR EROSION CONTROL PLAN AND

PREVENTING LOSS OF SEDIMENT FROM THE SITE.

ALL EQUIPMENT SHALL BE CLEANED ACCORDING TO THE SPECIFICATIONS PRIOR TO USE. THE CONTRACTOR SHALL MAKE EQUIPMENT AVAILABLE TO THE CONTRACTING OFFICER PRIOR TO ENTRANCE TO THE JOB SITE. THE CONTRACTOR SHALL ABIDE ALL CONDITIONS OF THEIR SPILL PREVENTION

PLAN AND APPLICABLE LAW.

DESIGN DATA:

LIVE LOAD:

90 PSF PEDESTRIAN

H5 TRUCK

USE DESIGN LOAD FACTORS FOR STRUCTURAL DESIGN CALCULATIONS.

USE LEGAL LOAD FACTORS FOR COMPLETING A LOAD RATING, AND SUBMIT THE LOAD RATING AND SAFE LOAD CAPACITY DOCUMENTATION WITH THE

SHOP DRAWINGS.

SOILS:

ALLOWABLE BEARING CAPACITY 4,350 PSF FOR USCS GC SOILS

HYDROLOGY

NONE. BRIDGES ARE OVER DRY VALLEYS THAT CARRY SMALL AMOUNTS OF RUNOFF DURING RAIN EVENTS. NO PERENNIAL OR INTERMITTENT FLOW.

CONSTRUCTION NOTES:

ALL PRACTICAL FRAMING, CUTTING, AND DRILLING SHALL BE DONE PRIOR TO TREATMENT WHERE POSSIBLE.

ALL TIMBER CUT OR DRILLED ON-SITE SHALL BE FIELD TREATED WITH COPPER NAPTHENATE.

ALL HOLES DRILLED IN THE FIELD WHERE SPIKES ARE TO BE USED SHALL BE 1/16" SMALLER THAN SPIKE SIZE.

ALL HOLES DRILLED IN THE FIELD WHERE BOLTS ARE TO BE USED SHALL BE 1/16" LARGER THAN BOLT SIZE.

ALL HOLES DRILLED FOR LAG BOLTS SHALL HAVE THE LEAD AND AND SHANK HOLES PRE-DRILLED BASED ON THE LAG BOLT SIZE.

ANY NUT OR MACHINE BOLT HEAD IN CONTACT WITH TIMBER SHALL HAVE ONE PLATE WASHER BETWEEN THE NUT AND TIMBER AND BETWEEN BOLT HEAD

AND TIMBER.

ANY NUT OR MACHINE BOLT HEAD IN CONTACT WITH STEEL SHALL HAVE ONE CUT WASHER BETWEEN NUT AND STEEL.

SET ALL THREADS WITH A PUNCH AFTER TIGHTENING.

CONTRACTOR SHALL ONLY USE RUBBER TRACKED EQUIPMENT, OR OTHER PROTECTION FOR THE ASPHALT. ANY DAMAGE TO EXISTING ASPHALT SHALL BE

REPAIRED BY THE CONTRACTOR AT THEIR EXPENSE.

MATERIAL NOTES:

CONCRETE

CONCRETE FOR ABUTMENT CONSTRUCTION SHALL BE PER FP-24 SECTION 552, CLASS A(AE), f'c = 4500 PSI AT 28 DAYS WITH AN ENTRAINED AIR CONTENT OF 5%± 1%.

CONCRETE FOR BRIDGE DECK SHALL BE PER BRIDGE DESIGNER.

CONCRETE FOR SIDEWALK SHALL BE 3,000 PSI WITH 5% AIR ENTRAINMENT AND W/C RATIO 0.50 OR LESS.

SUBMIT MIX DESIGN FOR ALL CONCRETE 7 DAYS PRIOR TO PLACEMENT

CONTRACTOR SHALL NOT PLACE CONCRETE WITHOUT A GOVERNMENT REPRESENTATIVE PRESENT. PROVIDE A MINIMUM 24 HOUR NOTICE PRIOR TO

PLACING CONCRETE.

STEEL

STRUCTURAL STEEL SHAPES AND PLATES SHALL CONFORM TO ASTM A709 OR AASHTO M270, GRADE 50W.

STEEL CONNECTION HARDWARE SHALL MEET ASTM A325 TYPE 3 GALVANIZED TO ASTM F2329.

ALL FABRICATION SHALL BE DONE BY AN AISC CERTFIED FABRICATOR.

ESTIMATED QUANTITIES:

PREFABRICATED STEEL SUPERSTRUCTURE DESIGN MUST BE A TRUSS CONFIGURATION SIMILAR TO THAT SHOWN ON THE DRAWINGS. THE BRIDGE SHALL MAINTAIN THE LINES AND GRADES INDICATED ON THE BRIDGE PROFILE AND ELEVATION VIEWS.

THE BRIDGE CROSS-SECTION SHALL BE DETERMINED BY THE CONTRACTOR BUT SHALL PROVIDE THE WIDTH AND RAILING DETAILS INDICATED ON THE BRIDGE TYPICAL SECTION. THE CONTRACTOR SHALL DETERMINE TRUSS HEIGHT AND THE LOCATION OF THE DECK WITH RESPECT TO THE TOP AND BOTTOM

CHORDS (U FRAME VS. H FRAME). OVERHEAD LATERAL BRACING IS UNACCEPTABLE.

DESIGN:

THE PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE AND ASSOCIATED DETAILS SHALL BE DESIGNED UNDER THE DIRECTION OF A REGISTERED PROFESSIONAL ENGINEER. THE COMPLETED DESIGN, DRAWINGS, AND SPECIFICATION PACKAGE SHALL BE SUBMITTED TO THE CONTRACTING OFFICER FOR

REVIEW AND APPROVAL.

THE DESIGN OF ALL PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE ELEMENTS SHALL COMPLY WITH THE AASHTO LRFD GUIDE SPECIFICATION FOR DESIGN OF PEDESTRIAN BRIDGES, CURRENT EDITION AND AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, CURRENT EDITION.

PROVIDE CAMBER FOR 100% OF THE FULL DEAD LOAD DEFLECTION.

DEFLECTION SHALL NOT EXCEED L/500 AND SHOULD NOT INDUCE FORCES THAT EXCEED CONCRETE COMPRESSIVE STRENGTH.

SUBMIT SHOP DRAWINGS AND CALCULATIONS FOR APPROVAL. ALL SUBMITTALS MUST BE APPROVED BEFORE FABRICATION.

THE ENGINEER SHALL DESIGN THE BRIDGE FOR EITHER H5 TRUCK LOAD OR PEDESTRIAN LOADING (90PSF), WHICHEVER GOVERNS, AND SNOW AND WIND

LOADING APPROPRIATE FOR THE LOCATION THE BRIDGE WILL BE INSTALLED.

ALL DETAILS OF THE CONCRETE DECK AND REINFORCEMENT ARE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE INCLUDED IN THE SHOP

DRAWINGS. DECK CONCRETE AND REINFORCEMENT IS INCIDENTAL TO PAY ITEM 55504-0000.

STEEL FABRICATION:

THE PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE SHALL BE FABRICATED BY AN AISC CERTIFIED PLANT. WHEN STRUCTURAL STEEL IS TO BE WELDED, THE WELDING PROCEDURE SHALL BE IN ACCORDANCE WITH AWS D1.5 AND SHALL BE SUITABLE FOR THE GRADE OF STEEL AND INTENDED USE OR SERVICE.

PAINT ALL STEEL MEMBERS BELOW THE DECK ELEVATION WITHIN 3 FEET OF EACH END OF THE BRIDGE WITH A STANDARD 3-COAT PAINT SYSTEM.

REMAINING TRUSS MEMBERS TO BE WEATHERING STEEL. COLOR SHALL BE SIMILAR TO THE WEATHERING STEEL.

ERECTION PLAN:

THE CONTRACTOR SHALL SUBMIT AN ERECTION PLAN FOR THE PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE TO THE C.O. FOR APPROVAL 14 DAYS

BEFORE ERECTION IS SCHEDULED.

TEMPORARY SUPPORT BENTS MAY BE USED FOR THE ERECTION OF THE PREFABRICATED STEEL TRUSS BRIDGE. THE BENTS SHALL BE CRIBBING, SILLS, CONCRETE BLOCKS OR OTHER SUPPORTS AND SHALL BE PLACED WITH MINIMAL DISTURBANCE.ALL MATERIALS TO CONSTRUCT THE TEMPORARY BENTS SHALL BE REMOVED. THE SUBMITTALS SHALL INCLUDE DRAWINGS INDICATING TEMPORARY BENT LOCATIONS AND DETAILS ALSO INCLUDED, THE CONTRACTOR SHALL INDICATE THE EQUIPMENT AND METHODS PROPOSED TO INSTALL AND REMOVE THE TEMPORARY BENTS AND ERECT THE NEW PREFABRICATED STEEL TRUSS SUPERSTRUCTURE. TEMPORARY SUPPORTS ARE INCIDENTAL TO PAY ITEM 55504-0000.

PREFABRICATED STEEL TRUSSES:

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/4 /26

:5

1 J

RY

PK

A

C:

\U

SE

RS

\JR

YP

KA

\B

OX

\R

E

NG

P

RO

JE

CT

S\

R0 9 M

T\

TR

AI

L

BR

ID

GE

\C

OU

NC

IL

B

LU

FF

B

EA

CH

A

CC

ES

S\

CO

UN

CI

L

BL

UF

F

BE

AC

H

AC

CE

SS

.D W

G;

(R09)

EASTERN REGION

COUNCIL BLUFF

BEACH ACCESS

BRIDGE

REPLACEMENTS

MARK TWAIN NATIONAL

FOREST

POTOSI RANGER DISTRICT

SITE MAP

12/04/2025

J. RYPKA

J. RYPKA

J. DULKA

C-02 003 008

NOTES:

1. THE CYAN COLORED OUTLINE IS THE CLEARING LIMIT OPENING IN THE TREE CANOPY

FOR ACCESS FOR THE BRIDGE AND CRANE.

2. CLEARING LIMITS EXTEND 20 FEET EACH WAY OF CENTERLINE OF THE BRIDGE AND

TRAIL ALIGNMENT.

3. CLEARING LIMITS EXTEND 12 FEET EACH WAY OF CENTERLINE OF THE ACCESS ROAD

CENTERLINE.

4. ADDITIONAL CLEARING WIDTH THAT IS NECESSARY FOR SETTING THE BRIDGES MUST

BE APPROVED BY THE CO PRIOR TO CUTTING TREES.

5. THE YELLOW AREA CAN BE USED FOR CONSTRUCTION STAGING.

6. PUBLIC ACCESS TO THE AREA MUST BE PREVENTED BY FENCING OR OTHER MEANS.

7. THE INTENT IS FOR THE CONSTRUCTION WINDOW TO BE DURING THE SEASON THE

BEACH IS CLOSED. IF CONSTRUCTION IS OCCURING DURING THE BEACH OPEN

SEASON, NOTES 8 AND 9 BELOW APPLY.

8. THE ACCESS ROAD SHALL BE DESIGNATED WITH SIGNS AS THE PUBLIC ACCESS TO

THE BEACH.

9. THE ACCESS ROAD CAN ONLY BE CLOSED TO PUBLIC TRAFFIC WHEN APPROVED BY

THE CO AND WHEN ITS NEEDED FOR SETTING THE SECOND BRIDGE.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

PK-NAIL

1112.46

105'-0"

36.00'

9+ 27 9+

+0

+5

+0

+5

+5

PROPOSED BRIDGE

105' LONG

8' CLEAR WIDTH

EXISTING BRIDGE

PROPOSED SIDEWALK

PROPOSED BRIDGE

36' LONG

8' CLEAR WIDTH

EXISTING BRIDGE

ACCESS ROAD

BEACH ACCESS

ROAD AND PARKING

AREA

32'

9.1'

118 FT TO CP1

PICNIC AREA

PICNIC AREA

PICNIC AREA

REF PT "A"

REF PT "B"

REF PT "C"

REF PT "D"

PI: 10+60.58

GEOCELL PAD

CIP ABUTMENT

APPROXIMATE

CLEARING LIMIT

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/4 /26

:5

1 J

RY

PK

A

C:

\U

SE

RS

\JR

YP

KA

\B

OX

\R

E

NG

P

RO

JE

CT

S\

R0 9 M

T\

TR

AI

L

BR

ID

GE

\C

OU

NC

IL

B

LU

FF

B

EA

CH

A

CC

ES

S\

CO

UN

CI

L

BL

UF

F

BE

AC

H

AC

CE

SS

.D W

G;

(R09)

EASTERN REGION

COUNCIL BLUFF

BEACH ACCESS

BRIDGE

REPLACEMENTS

MARK TWAIN NATIONAL

FOREST

POTOSI RANGER DISTRICT

SITE PLAN

12/04/2025

J. RYPKA

J. RYPKA

J. DULKA

C-03 004 008Feet

0 10 20

CONTROL POINT TABLE

POINT #

NORTHING

692098.64

692071.89

EASTING

699136.10

699251.37

ELEVATION

1115.16

1112.46

DESCRIPTION

COTTON GIN SPIKE

PK-NAIL

NOTE: CONTROL ESTABLISHED VIA GPS RTK USING VRS IN 2022.

SITE CONTROL MAY NEED TO BE VERIFIED AND REESTABLISHED

BY CONTRACTOR PRIOR TO BEGINNING WORK.

REFERENCE POINTS

POINT STA NORTHING EASTING ELEVATION

A 9+47.50 692071.90 699297.88 1111.85 B 10+52.50 692083.22 699402.27 1110.85 C 11+00.35 692065.08 699445.24 1109.00 D 11+36.35 692047.88 699476.86 1107.70

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

EL

EV

AT

IO

N (F

EE

T)

STATION (FEET)

ALIGNMENT - TRAIL CL PROFILE

5x VERTICAL EXAGGERATION

9+27 9+50 10+00 10+50 11+00 11+50 11+56

STA: 9+46.70

ELEV: 1111.85

STA: 10+52.50

ELEV: 1110.85

STA: 11+37.14

ELEV: 1107.70

-0.95%

0.00% -4.00%

0.00%

-3.61%

0.00%

0.00%

STA 10+53.29

ELEV 1110.85

STA 9+47.50

ELEV 1111.85

STA 10+99.55

ELEV 1109.00

STA 11+00.35

ELEV 1109.00

STA 11+36.35

ELEV 1107.70

SIDEWALK

FINISHED GRADE

REF PT "A"

REF PT "B"

REF PT "C"

REF PT "D"

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/4 /26

:5

1 J

RY

PK

A

C:

\U

SE

RS

\JR

YP

KA

\B

OX

\R

E

NG

P

RO

JE

CT

S\

R0 9 M

T\

TR

AI

L

BR

ID

GE

\C

OU

NC

IL

B

LU

FF

B

EA

CH

A

CC

ES

S\

CO

UN

CI

L

BL

UF

F

BE

AC

H

AC

CE

SS

.D W

G;

(R09)

EASTERN REGION

COUNCIL BLUFF

BEACH ACCESS

BRIDGE

REPLACEMENTS

MARK TWAIN NATIONAL

FOREST

POTOSI RANGER DISTRICT

SITE PROFILE

12/04/2025

J. RYPKA

J. RYPKA

J. DULKA

C-04 005 008

Feet 0 10 20

Feet 0 10 20

(HOR.)

(VERT.)

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

105'-0"

9+

+0

+5

PI: 10+60.58

REF PT "B"

REF PT "A"

8'-0"

GEOCELL

SUBGRADE

CIP ABUTMENT

EXISTING BRIDGE

REMOVE PER PAY ITEM 20304

PROPOSED

CONCRETE

SIDEWALK

PATCH ASPHALT

AFTER BACKFILL

5' -0

BOLLARD

(TYP.)

'-3

1 2

12'-0"

2'-0"

REF PT "A"

REF PT "B"

105.00'

CONCRETE BRIDGE DECK 5" REINFORCED

CONCRETE SIDEWALK

4" COMPACTED BASE

6" GEOCELL BASE PER SPEC 629.

BACKFILL WITH BASE

AGGREGATE GRADATION D

PER TABLE 703-1.

CIP CONCRETE

ABUTMENT

PER SPEC 552

105' X 8'

H5 TRUSS

(DESIGN BY OTHERS)

EXISTING

ASPHALT

DRIVE

ASPHALT REPAIR

AFTER BACKFILLING

(INCIDENTAL)

4'-6" 1.5

6" BOLLARD,

REMOVABLE

STRUCTURE

EXCAVATION

AND BACKFILL

PER SPEC 208

EXISTING BRIDGE AND

PIERS TO BE REMOVED

(SOME DETAILS OMITTED

FOR CLARITY)

GRADE TO DRAIN

STRUCTURAL

BACKFILL

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/4 /26

:5

1 J

RY

PK

A

C:

\U

SE

RS

\JR

YP

KA

\B

OX

\R

E

NG

P

RO

JE

CT

S\

R0 9 M

T\

TR

AI

L

BR

ID

GE

\C

OU

NC

IL

B

LU

FF

B

EA

CH

A

CC

ES

S\

CO

UN

CI

L

BL

UF

F

BE

AC

H

AC

CE

SS

.D W

G;

(R09)

EASTERN REGION

COUNCIL BLUFF

BEACH ACCESS

BRIDGE

REPLACEMENTS

MARK TWAIN NATIONAL

FOREST

POTOSI RANGER DISTRICT

PLAN PROFILE

BRIDGE 1

12/04/2025

J. RYPKA

J. RYPKA

J. DULKA

C-05 006 008

BRIDGE 1 PLAN

BRIDGE 1 ELEVATION

NOTES:

· CONCRETE BRIDGE DECK FINISH SHALL BE NON-SKID

TEXTURED FINISH WITH A TRANSVERSE BROOM FINISH TO

PROVIDE SUFFICIENT FRICTION FOR FOOT TRAFFIC.

· REMOVE AND DISPOSE OF EXISTING BRIDGES PER SPEC

203. FILLING AND GRADING OF HOLES FROM REMOVED

PIER FOUNDATIONS INCIDENTAL TO PAY ITEM 20304-1000.

· COORDINATE REMOVAL, STORAGE, AND REINSTALLATION

OF EXISTING BOLLARDS WITH THE COR.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

10+50

+0

+5

1110PI: 10+60.58

'-3

1 2"

36'-0"

8'-0"

2'-6"

12'-6"

27'-21 2"

38'-111 2"

7'-3

4'-0"

4'-0"

8'-0"

REF PT "C"

REF PT "D"

36'-0"36'x8'

H5 TRUSS

(DESIGN BY OTHERS)

5" CONCRETE SIDEWALK

WITH WELDED WIRE

MESH REINFORCEMENT

6x6 W1.4/W1.4

46'-3"

6" GEOCELL BASE PER SPEC 629.

BACKFILL WITH BASE

AGGREGATE GRADATION D

PER TABLE 703-1.

EXISITNG CONCRETE.

POUR REPLACEMENT

CONCRETE AFTER

BACKFILL. (INCIDENTAL)

CIP CONCRETE

ABUTMENT

PER SPEC 552

STRUCTURE EXCAVATION

AND BACKFILL

PER SPEC 208

4" COMPACTED BASE

AGGREGATE GRADATION D

PER TABLE 703-1

EXISTING BRIDGE AND

PIERS TO BE REMOVED

(SOME DETAILS OMITTED

FOR CLARITY)

4" DRAIN TILE.

OUTLET AT DOWNHILL

SIDE OF ABUTMENT

(INCIDENTAL TO 20803)

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/4 /26

:5

1 J

RY

PK

A

C:

\U

SE

RS

\JR

YP

KA

\B

OX

\R

E

NG

P

RO

JE

CT

S\

R0 9 M

T\

TR

AI

L

BR

ID

GE

\C

OU

NC

IL

B

LU

FF

B

EA

CH

A

CC

ES

S\

CO

UN

CI

L

BL

UF

F

BE

AC

H

AC

CE

SS

.D W

G;

(R09)

EASTERN REGION

COUNCIL BLUFF

BEACH ACCESS

BRIDGE

REPLACEMENTS

MARK TWAIN NATIONAL

FOREST

POTOSI RANGER DISTRICT

PLAN PROFILE

BRIDGE 2 AND

SIDEWALK

12/04/2025

J. RYPKA

J. RYPKA

J. DULKA

C-06 007 008

6" BOLLARD

REMOVEABLE

NOTES:

· CONCRETE BRIDGE DECK FINISH SHALL BE NON-SKID

TEXTURED FINISH WITH A TRANSVERSE BROOM FINISH TO

PROVIDE SUFFICIENT FRICTION FOR FOOT TRAFFIC.

· REMOVE AND DISPOSE OF EXISTING BRIDGES PER SPEC

203. FILLING AND GRADING OF HOLES FROM REMOVED

PIER FOUNDATIONS INCIDENTAL TO PAY ITEM 20304-1000.

· COORDINATE REMOVAL, STORAGE, AND REINSTALLATION

OF EXISTING BOLLARDS WITH THE COR.

· SIDEWALK GRADING, COMPACTED BASE MATERIAL, AND

REINFORCEMENT MESH INCIDENTAL TO PAY ITEM

61001-0100.

· REMOVAL OF EXISTING ASPHALT WALKWAY PAID UNDER

PAY ITEM 20304-1000.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

12'-6"

2' -0

VA

R

IE

S

BA

SE

D O

N

SH

O P

D R

AW

IN

G S

2' -6

0' -8

12'-6"

2'-6"

2' -0

VA

R

IE

S

BA

SE

D O

N

SH

O P

D R

AW

IN

G S

0'-8"

(5) - 1

EVEN SPACING

TOP AND BTM

(2) - 2

MID-HEIGHT

EA. FACE

(15) - 3

(15) - 4

(3 O

R

" M

AX

C -C

(13) - 3 11" C-C

3 (5) - 1

(5) - 1

(2) - 2

(13) - 4 11" C-C4 4

(5

EV

EN

S

PA

C

IN

G

TO

P

AN

D B

TM

(13) - 3 11" C-C

3 0'-6"

0'-6"

(15) - 4

(3 O

R

" M

AX

C -C

REINFORCEMENT BAR SCHEDULE

BAR MARK SIZE QTY LENGTH WEIGHT SHAPE

1 6 20 12'-2" 364.8

2 4 4 12'-2" 32.6

3 4 30 7'-10" 157.4

4 4 30 VARIES (APPROX 8'-3") 165.8

5 4 12 - 16 12'-2" 97.8-130.4

12'-2"

12'-2"

2'-2"

1'-7"

12'-2"

VARIES ~4'-0"

4"

18" MIN.

EMBEDMENT

0' -3

CONCRETE AND STEEL NOTES:

1. USE CLASS A(AE) FOR CONCRETE, f'c = 4500 PSI AT 28 DAYS

WITH AN ENTRAINED AIR CONTENT OF 5%± 1%. PROVIDE ALL

CONCRETE IN ACCORDANCE WITH AN APPROVED MIX DESIGN.

CHAMFER ALL EXPOSED EDGES AT 3/4-INCH.

2. REINFORCING STEEL: USE REINFORCING STEEL OF THE

DEFORMED TYPE CONFORMING TO AASHTO M31 (ASTM A615),

GRADE 60. CUT AND BEND STEEL IN ACCORDANCE WITH ACI

315.

3. IF PRECASTING THE ABUTMENTS, THE SUPPLIER SHALL

PREPARE AND SUBMIT COMPLETE CONCRETE SHOP

DRAWINGS.

4. THE HEIGHT OF THE BACKWALL SHALL BE CUSTOMIZED TO

MATCH THE SUPERSTRUCTURE PROVIDED. ENSURE THE

BACKWALL HEIGHT IS SUCH THAT WHEN THE

SUPERSTRUCTURE IS SET, THE FINISHED GRADE OF THE DECK

MATCHES FINISHED HEIGHT OF BACKWALL. PAY QUANTITES

SHALL NOT BE ADJUSTED TO THIS CUSTOMIZATION, BUT

RATHER PAID AT PLAN QUANTITY.

5. MINIMUM CONCRETE COVER FOR FORMED SURFACES IS 2".

MINIMUM CONCRETE COVER FOR CONCRETE CAST AGAINST

EARTH IS 3"

6. REBAR AND WELDED WIRE SHALL BE PROPERLY SUPPORTED

TO ENSURE PROPER PLACEMENT AND COVERAGE OF

REINFORCING STEEL FROM THE SUBGRADE AND FORMED

SURFACES.

7. CONTRACTOR SHALL NOTIFY CO 24 HOURS PRIOR TO PLACING

CONCRETE. NO CONCRETE SHALL BE PLACED WITHOUT

INSPECTION OF REINFORCING STEEL AND FORMWORK.

8. CO SHALL APPROVE SUBGRADE PRIOR TO PLACING GEOCELL

1'-0"

0'-5"

0' -5

0' -4

6x6 W1.4/W1.4

WELDED WIRE MESH 0'

-2

EXPANSION

JOINT

1" x 12" ANCHOR BOLTS

LAYOUT PER SHOP DRAWINGS

4" COMPACTED BASE

AGGREGATE

GRADATION D

PER TABLE 703-1

0' -1

0"

BRIDGE EXPANSION GAP

PER SHOP DRAWINGS

STRUCTURE EXCAVATION

AND BACKFILL

PER SPEC 208

BEARINGS TO BE PROVIDED AND

DESIGNED IN ACCORDANCE WITH

BRIDGE REQUIREMENTS

2"

11 2"

1.5" GALV STEEL

HANDRAIL, BOTH

SIDES. (INCIDENTAL

TO 55504)

3' -0

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

2/4 /26

:5

1 J

RY

PK

A

C:

\U

SE

RS

\JR

YP

KA

\B

OX

\R

E

NG

P

RO

JE

CT

S\

R0 9 M

T\

TR

AI

L

BR

ID

GE

\C

OU

NC

IL

B

LU

FF

B

EA

CH

A

CC

ES

S\

CO

UN

CI

L

BL

UF

F

BE

AC

H

AC

CE

SS

.D W

G;

(R09)

EASTERN REGION

COUNCIL BLUFF

BEACH ACCESS

BRIDGE

REPLACEMENTS

MARK TWAIN NATIONAL

FOREST

POTOSI RANGER DISTRICT

ABUTMENT DETAILS

12/04/2025

J. RYPKA

J. RYPKA

J. DULKA

C-07 008 008

ABUTMENT REINFORCEMENT PLAN VIEW

ABUTMENT REINFORCEMENT ELEVATION VIEW ABUTMENT REINFORCEMENT SECTION VIEW

HANDRAIL DETAIL

SAFETY RAIL: A 6 INCH SPHERE MUST NOT PASS

THROUGH THE LOWER 27 INCHES OF THE RAIL AND AN 8

INCH SPHERE MUST NOT PASS THROUGH THE UPPER

AREA OF THE RAIL.PROVIDE A 4 INCH HIGH TOE KICK

SET 1/2 INCH ABOVE THE DECK.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Council Bluff Beach Access-COVERSHEET
Sheets and Views
COVERSHEET
OLE1
Council Bluff Beach Access-NOTES
Sheets and Views
Council Bluff Beach Access-NOTES
OLE1
Council Bluff Beach Access-SITE MAP
Sheets and Views
Council Bluff Beach Access-SITE MAP
OLE1
Council Bluff Beach Access-SITE PLAN
Sheets and Views
Council Bluff Beach Access-SITE PLAN
OLE1
Council Bluff Beach Access-PROFILE
Sheets and Views
Council Bluff Beach Access-PROFILE
OLE1
Council Bluff Beach Access-P-P (1)
Sheets and Views
Council Bluff Beach Access-P-P (1)
OLE1
Council Bluff Beach Access-P-P (2)
Sheets and Views
Council Bluff Beach Access-P-P (2)
OLE1
Council Bluff Beach Access-DETAILS
Sheets and Views
Council Bluff Beach Access-DETAILS
OLE1
2026-03-11T09:53:11-0500
AMBROSIA WILSON
2026-03-11T13:07:14-0500
Vinci Keeler
2026-03-16T10:01:29-0500
CHRISTOPHER OLDS
Regional Bridge Program Mgr R09
2026-03-16T11:38:48-0500
R09 Regional Office
Jeffrey W. Dulka
I have reviewed this document
2026-03-25T11:57:48-0500
JONATHAN HEYL

File details come from the government source that posted it. Updated .