Attachment 2 Schedule of Items.pdf
PDF 106 KB Posted
- Attached to
- GAOA Council Bluff Beach Access Bridges
- Solicitation number
- 127EAX26Q0113
About this file
This document is a Schedule of Items and pricing form for a fixed-price construction contract for the Council Bluff Beach Access Bridge Replacements project located in the Potosi Ranger District of Mark Twain National Forest.
The contract encompasses 15 line items across multiple construction phases, including mobilization, construction survey and staking, clearing and grubbing, and removal of structures and obstructions. Primary work items include structure excavation (207 cubic yards), structural backfill (164 cubic yards), structural concrete Class A (12.5 cubic yards), reinforcing steel (851 pounds), and a prefabricated steel bridge structure (one lot sum). Additional items include bearing devices (8 units), concrete sidewalk (48.9 square yards), bollard removal and reset (4 units), seeding using dry method, cellular confinement system (21 square yards), and cellular confinement system backfill (4.5 cubic yards). Contractors must submit unit prices and total prices for all items; one award will be made from this solicitation. Quantities are estimated, and contractors are required to field verify all quantities to satisfy requirements of the drawings, statement of work, and specifications. Bond premiums are not to be added to the contract price in accordance with FAR Clause 52.232-5 for fixed-price construction contracts. The form requires contractor company name, point of contact with title, email, phone number, and UEI number.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART 1 - SCHEDULE OF ITEMS
SECTION B - SERVICES AND PRICES
COUNCIL BLUFF BEACH ACCESS BRIDGE REPLACEMENTS
MARK TWAIN NATIONAL FOREST - POTOSI RANGER DISTRICT
B-1 SCHEDULE OF ITEMS
LINE
ITEM
PAY ITEM ITEM DESCRIPTION UOI QTY UNIT PRICE TOTAL
PRICE
0001 15101-0000 MOBILIZATION LS 1
0002 15201-0000 CONSTRUCTION SURVEY AND STAKING LS 1
0003 20102-0000 CLEARING AND GRUBBING LS 1
0004 20304-1000 REMOVAL OF STRUCTURES AND
OBSTRUCTIONS
LS 1
0005 20801-0000 STRUCTURE EXCAVATION CY 207
0006 20803-0000 STRUCTURAL BACKFILL CY 164
0007 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CY 12.5
0008 55401-1000 REINFORCING STEEL LB 851
0009 55504-0000 PREFABRICATED STEEL BRIDGES LS 1
0010 56401-0000 BEARING DEVICE EA 8
0011 61001-0100 SIDEWALK, CONCRETE SY 48.9
0012 61920-1000 REMOVE AND RESET BOLLARD EA 4
0013 62510-1000 SEEDING, DRY METHOD LS 1
0014 62903-0000 CELLULAR CONFINEMENT SYSTEM SY 21
0015 62910-1000 CELLULAR CONFINEMENT SYSTEM BACKFILL CY 4.5
TOTAL
B.2 SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS
OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
* One award will be made from this solicitation, contractors must submit pricing for all items.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
Company Name: POC & Title:
Email: Phone Number:
UEI Number:
| B-1 SCHEDULE OF ITEMS |
| B.2 SCHEDULE NOTES |