This is a comprehensive set of construction design documents for a Sanitation Facilities Construction project at Grindstone Indian Rancheria in California, authorized under Public Law 86-121 and IHS Projects CA 17-N18 and CA 20-N65. The project, dated July 2025, involves water storage tank replacement and water treatment monitoring systems.
The scope includes removal of an existing 30,000-gallon water storage tank and installation of a new 135,000-gallon bolted steel tank with associated infrastructure. Key project components include: a 6-inch aggregate base foundation with seismic restraints, underground electrical conduit runs (approximately 2,300 linear feet of 2-inch conduit with junction boxes at 400-foot intervals), liquid level gauges and control systems, drain and overflow systems, yard hydrant installation, and water main connections. The project incorporates detailed civil, structural, mechanical, and electrical work with thrust block details, restraint fittings, protection posts, and exterior ladder and access systems. Electrical work includes fiber optic control conduits, installation of analyzers and monitoring equipment, and distributed control panels connected to existing treatment infrastructure. Site work involves benching, keyways, trench drains with geotextile filter fabric, and grading to accommodate the new tank installation. The design complies with 2022 CBC/ASCE 7-16 seismic standards for Site Class C with a Seismic Design Category of D. Construction notes address utility location verification, contractor responsibility for existing facility protection, and coordination with the existing water system and treatment building located on the reservation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B05 Amendment 3.pdf | ||
| B05 Amendment 2.pdf | ||
| B05 Amendment 1.pdf | ||
| Attachment 3 Specifications.pdf | ||
| Attachment 1 Wage Determination CA20250007.pdf | ||
| Attachment 10 Past Performance Questionnaire.docx | DOCX document | |
| B01 26R00008.pdf | ||
| Attachment 6 Self Performed Calculation Sheet.docx | DOCX document | |
| Attachment 9 Specialized Experience Form.docx | DOCX document | |
| Attachment 2 SOW.pdf | ||
| Attachment 7 Price Breakout.xlsx | XLSX spreadsheet | |
| Attachment 5 Project Area Map.pdf | ||
| Attachment 8 IHS IEE Representation Form.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IN
D
IA
N
H
EALTH SER
V
IC
E
W W W W
WSL WSL WSL WSL
D DD D
E E
D
IA
N
H
EALTH SER
V
IC
E
/1 4/
D
D
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
X
X
X
X
X
X X
X
X
X
X
X
X X X X X X X X X X X X X X X X X X X X X X
D
D
D
W W
W W
W W
W W
W
W
W W
IN
D
IA
N
H
EALTH SER
V
IC
E
W
SL
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W
W
W W
Elevation (feet)
Distance (feet)
SECTION A-A
0+00 0+25 0+50 0+75 1+00 1+25 1+50
50%
0% 2%2%
STA:0+22
ELEV:809.09
STA:0+52
ELEV:793.80
STA:1+03
ELEV:793.73
STA:0+62
ELEV:794.00
STA: 0+89
ELEV:794.00
MATCH <E> ELEV.
@ 3:1 SLOPE
IN
D
IA
N
H
EALTH SER
V
IC
E
A
A
/1 4/
D
IA
N
H
EALTH SER
V
IC
E
2022 CBC/ASCE 7-16 Seismic Design Parameters
Latitude: 39.6767° N Longitude: -122.5211° W
ASCE 7-16
Table/Figure
2022 CBC
Table/Figure
Factor/ Coefficient
Value
Short-Period MCE at 0.2s Figure 22-1 Figure 1613.2.1(1) SS 0.912g
1.0s Period MCE Figure 22-2 Figure 1613.2.1(3) S1 0.393g
Soil Class Table 20.3-1 Section 1613.2.2 Site Class C
Site Coefficient Table 11.4-1 Table 1613.2.3(1) Fa 1.200
Site Coefficient Table 11.4-2 Table 1613.2.3(2) Fv 1.500
Adjusted MCE Spectral Response Parameters
Equation 11.4-1 Equation 16-20 SMS 1.094g
Equation 11.4-2 Equation 16-21 SM1 0.589g
Design Spectral Acceleration Parameters
Equation 11.4-3 Equation 16-22 SDS 0.729g
Equation 11.4-4 Equation 16-23 SD1 0.393g
Seismic Design Category Table 11.6-1 Table 1613.2.5(1)
Risk Category I to IV
D
Table 11.6-2 Table 1613.2.5(2) Risk Category
I to IV D
MCE – Maximum Considered Earthquake g – Acceleration due to gravity
/1 4/
D
IA
N
H
EALTH SER
V
IC
E
/1 4/
D
IA
N
H
EALTH SER
V
IC
E
/1 4/
D
IA
N
H
EALTH SER
V
IC
E
T T
T
T
T
/1 4/
D
IA
N
H
EALTH SER
V
IC
E
/1 4/
D
IA
N
H
EALTH SER
V
IC
E
SECTION
PLAN
SECTION B-B
B B
/1 4/
A
A
IN
D
IA
N
H
EALTH SER
V
IC
E
/1 4/
D
IA
N
H
EALTH SER
V
IC
E
A A
B B
/1 4/
X X X X X X
X X X
X X
X
X X
X
IN
D
IA
N
H
EALTH SER
V
IC
E
/1 4/
D
IA
N
H
EALTH SER
V
IC
E
KEYING AND BENCHING DETAIL
GRINDSTONE INDIAN RESERVATION WATER STORAGE
TANK
Phils Way and Chris Crossing
Elk Creek, California
FIGURE 7
Date: 03/23 MPE No. 06268-01
EXISTING GROUND SURFACE
PRIOR TO GRADING
EXISTING GROUND SURFACE
ENGIPNREIOERRE TDO F GILRLA DING
FINISHED SLOPE
2(H): 1(V) TYPICAL
KEYWAY
EXCAVATION
EQUAL TO
KEYWAY
DEPTH
EXISTING GROUND SURFACE
TRENCH DRAIN
CONCRETE LINED V-DITCH
BENCHES
SEEPAGE FLOW
TOE DRAIN DETAIL
DRAIN ROCK
DRAIN ROCK
GEOTEXTILE FILTER
FABRIC
PERFORATED OR SLOTTED PIPE
NOT TO SCALE
TRENCH DRAIN DETAIL
GEOTEXTILE FILTER
FABRIC
TRENCH
PERFORATED
OR SLOTTED
PIPE
10 FEET
MIN.
4 FEET
MIN.
2 FEET MIN. 18 INCHES
MIN.
NOTES:
1. Excavation for benches and keyway should remove all loose, soft, and/or disturbed soil and/or rock as well and any organic material or vegetation.
2. Keyway depth indicated above is a minimum. Actual depth may vary depending on field conditions. Keyway depth may be reduced to less than 3 feet if hard rock is encountered.
3. In general, cut slopes between benches should be no steeper than 3(h):1(v) or flatter depending on the materials encountered and should meet all federal or state OSHA requirements. The maximum vertical offset between adjacent benches should be less than 5 feet. All benches should extend a minimum of 12 inches (horizontally) into the slope.
4. The bottom of the keyway should be sloped downward a minimum of 2 percent toward the toe drain and heel of the keyway, as indicated above.
5. A toe drain should be placed at the bottom of the keyway at the location indicated above. This drain should extend the entire length of the keyway and be constructed in accordance with the detail above requirements provided below.
6. If water, fractured rock, pervious soils, or other subsurface conditions are exposed during grading which would indicate the potential for future water seepage into the fill, trench drains should be constructed at these location in accordance with the detail above and requirements provided below.
a. Drain trench depth(s) will vary depending on the subsurface conditions encountered during construction. As a minimum, trench depth(s) should be equal to the height of the adjoining, downslope cut; actual depth(s) should be determined in the field by the project Geotechnical Engineer. The trench wall should be free of obstructions, sharp rocks, or other protuberances which could puncture or otherwise damage the geotextile filter fabric.
b. Geotextile filter fabric should consist of Mirafi 140 NC, AMACO 4546, or other equivalent fabric approved by the project Geotechnical Engineer.
c. Geotextile filter fabric should be stored, handled, and installed in accordance with the manufacture’s recommendations.
d. Perforated or slotted pipe should be a minimum of 4-inches in diameter (for drains less than 200 feet in length), or 6-inches in diameter for drains exceeding 200 feet in length. Pipe should consist of perforated or slotted, high strength plastic (or other similar material) capable of sustaining overburden pressures (as well as any induced loading due to surface loads, nearby foundations, etc.) without noticeable deformation. Pipe type, connection details, and installation methods should be determined and specified by the project Geotechnical Engineer or Architect.
e. The bottom of all perforated or slotted pipes should be placed within 1 to3 inches of the trench or excavation bottom. Perforated or slotted pipes placed within a trench excavation should be centered (horizontally) within the excavation, with perforations or slots placed down or to the side. Pipe perforations or slots should be no more than ¼-inch in diameter or width.
f. Water collected by the perforated or slotted pipes should be directed by solid conduit (of similar type to perforated or slotted) to a sump, ditch, storm drain, or other suitable location for disposal.
g. Drain rock should consist of poorly-graded, durable stone, sized such that 100 percent passes the 1-inch sieve and less than 5 percent passes the No.4 sieve.
h. Perforated pipe and any solid conduit collector pipes should be sloped a minimum of 2 percent (2%) to drain.
i. Depending on project related factors beyond the scope of this study, it may be advisable to install drain line cleanouts at regular intervals. The design and location of cleanouts should be determined by the project Geotechnical Engineer or Architect. All cleanouts should be secured to prevent vandalism, tampering, or damage.
TOE DRAIN
3 FEET MIN.
07/28/2025
/1 4/
D
IA
N
HEALTH
SE
R V
I C
E
ELECTRICAL NOTES:
SE
P3
D
IA
N
H
EALTH SE
R V
I C
E
H
LETTER
SHEET
SE
D
IA
N
H
EALTH SE
R V
I C
E
SE
D
IA
N
H
EALTH SE
R V
I C
E
E-
LEGEND:
UNDERGROUND CONDUIT DUCT BANK
E-2
E-3 E-4
E-1
E-5
SE
MAT
CH LI
NE
ML-1
MATCH LINE ML-1
MATCH LINE ML-1
IN
D
IA
N
H
EALTH SE
R V
I C
E
C0003
C0007
C0004
C0008
C0008 C0009 C0010
SE
MATCH LINE ML-4
MATCH LINE ML-4
IN
D
IA
N
H
EALTH SE
R V
I C
E
C0010 C0011
C0012
C0012 C0013 C0014
C0015
SE
M
AT
C H
L
IN
E M
L-
W
X
MATCH LINE ML-1
MATCH LINE ML-1
IN
D
IA
N
H
EALTH SE
R V
I C
E
C0014 C0015
C0002
C0003
C0007
SE
D
IA
N
H
EALTH SE
R V
I C
E
C0005
SE
D
IA
N
H
EALTH SE
R V
I C
E
C0002
C0001
SE
D
IA
N
H
EALTH SE
R V
I C
E
C0015
C0018
C0019
C0016
C0017
E
E
E
E
E
E
E
E
E
E E
E E
E
E
SE
D
IA
N
H
EALTH SE
R V
I C
E
CONTROL CONDUIT WIRE SCHEDULE
CONDUIT WIRE
FROM TO
NO. SIZE CONTROL
C0001 1" 1-#18 TSP, 1-FIBER OPTIC DISTRIBUTION PLC ADMIN JUNCTION BOX 1"ABJB-1"
C0002 2" 1-#18 TSP, 1-FIBER OPTIC ADMIN JUNCTION BOX 1"ABJB-1" FIELD PULLBOX 2 "FPB-2"
C0003 2" 1-#18 TSP FIELD PULLBOX 2 "FPB-2" FIELD PULLBOX 1 "FPB-1"
C0004 2" 1-#18 TSP FIELD PULLBOX 1 "FPB-1" TANK PULLBOX 1 "TPB-1"
C0005 2" 1-#18 TSP TANK PULLBOX 1 "TPB-1" TANK INSTRUMENTATION JUNCTION BOX 1 "TJB-1" C0006 2" 1-#18 TSP TANK INSTRUMENTATION JUNCTION BOX 1 "TJB-1" TANK LEVEL TRANDUCER
C0007 2" FIBER OPTIC FIELD PULLBOX 2 "FPB-2" FIELD PULLBOX 3 "FPB-3"
C0008 2" FIBER OPTIC FIELD PULLBOX 3 "FPB-3" FIELD PULLBOX 4 "FPB-4"
C0009 2" FIBER OPTIC FIELD PULLBOX 4 "FPB-4" FIELD PULLBOX 5 "FPB-5"
C0010 2" FIBER OPTIC FIELD PULLBOX 5 "FPB-5" FIELD PULLBOX 6 "FPB-6"
C0011 2" FIBER OPTIC FIELD PULLBOX 6 "FPB-6" FIELD PULLBOX 7 "FPB-7"
C0012 2" FIBER OPTIC FIELD PULLBOX 7 "FPB-7" FIELD PULLBOX 8 "FPB-8"
C0013 2" FIBER OPTIC FIELD PULLBOX 8 "FPB-8" FIELD PULLBOX 9 "FPB-9"
C0014 2" FIBER OPTIC FIELD PULLBOX 9 "FPB-9" FIELD PULLBOX 10 "FPB-10"
C0015 2" FIBER OPTIC FIELD PULLBOX 10 "FPB-10" EXISTING JUNCTION BOX
C0016 2" FIBER OPTIC EXISTING JUNCTION BOX EXISTING BOOSTER PUMP BUILDING
C0017 2" FIBER OPTIC EXISTING BOOSTER PUMP BUILDING TREATMENT BUILDING JUCTION BOX 1 "TBJB-1" C0018 1" FIBER OPTIC TREATMENT BUILDING JUCTION BOX 1 "TBJB-1" NEW TREATMENT FIBER OPTIC/ETHERNET SWITCH
C0019 1" ETHERNET NEW TREATMENT FIBER OPTIC/ETHERNET SWITCH EXISTING TREATMENT PLC
SE
D
IA
N
H
EALTH SE
R V
I C
E
SE
3" MI
N
3"
MIN
12"
MIN
CF001-A-1
CF002-D-1
CF002-D-2
CF002-E-1
IN
D
IA
N
H
EALTH SE
R V
I C
E
SE
D
IA
N
H
EALTH SE
R V
I C
E
SE
D
IA
N
H
EALTH SE
R V
I C
E
SE
D
IA
N
H
EALTH SE
R V
I C
E
SE
D
IA
N
H
EALTH SE
R V
I C
E
SE
P3
Type text here
| Sheets and Views |
| CA 17-N18 G100,G101,C200 May14_2025-G100 |
| CA 17-N18 G100,G101,C200 May14_2025-G101 |
| CA 17-N18 G100,G101,C200 May14_2025-C100 |
| CA 17-N18 G100,G101,C200 May14_2025-C101 |
| OLE1 |
| CA 17-N18 G100,G101,C200 May14_2025-C200 |
| CA 17-N18 C500-C508 May14_2025-C500 |
| CA 17-N18 C500-C508 May14_2025-C501 |
| CA 17-N18 C500-C508 May14_2025-C502 |
| CA 17-N18 C500-C508 May14_2025-C503 |
| CA 17-N18 C500-C508 May14_2025-C504 |
| CA 17-N18 C500-C508 May14_2025-C505 |
| CA 17-N18 C500-C508 May14_2025-C506 |
| CA 17-N18 C500-C508 May14_2025-C507 |
| CA 17-N18 C500-C508 May14_2025-C508 |
| CA 17-N18 C500-C508 May14_2025-C509 |
| 20250610 CA20-N65 Grindstone Water Treatment Monitoring.pdf |
| Sheets and Views |
| CA20-65 E10X Controls-E100 |
| CA20-65 E10X Controls-E101 |
| CA20-65 E10X Controls-E102 |
| CA20-65 E10X Controls-E103 |
| CA20-65 E10X Controls-E104 |
| CA20-65 E10X Controls-E105 |
| CA20-65 E10X Controls-E106 |
| CA20-65 E10X Controls-E107 |
| CA20-65 E10X Controls-E108 |
| CA20-65 E10X Controls-E109 |
| CA20-65 E10X Controls-E110 |
| CA20-65 E10X Controls-E111 |
| 20250610 v2 CA20-N65 Grindstone Water Treatment Monitoring.pdf |
| Sheets and Views |
| CA20-65 E10X Controls-E100 |
| CA20-65 E10X Controls-E101 |
| CA20-65 E10X Controls-E102 |
| CA20-65 E10X Controls-E103 |
| CA20-65 E10X Controls-E104 |
| CA20-65 E10X Controls-E105 |
| CA20-65 E10X Controls-E106 |
| CA20-65 E10X Controls-E107 |
| CA20-65 E10X Controls-E108 |
| CA20-65 E10X Controls-E109 |
| CA20-65 E10X Controls-E110 |
| CA20-65 E10X Controls-E111 |
| G101.pdf |
| Sheets and Views |
| G101 |
| C501.pdf |
| Sheets and Views |
| C501 |
| CA 17-N18 G100,G101,C200 May14_2025-C200.pdf |
| Sheets and Views |
| C200 |
| CA 17-N18 G100,G101,C200.pdf |
| Sheets and Views |
| CA 17-N18 G100,G101,C200 May14_2025-G100 |
| CA 17-N18 G100,G101,C200 May14_2025-G101 |
| CA 17-N18 G100,G101,C200 May14_2025-C100 |
| CA 17-N18 G100,G101,C200 May14_2025-C101 |
| OLE1 |
CA 17-N18 G100,G101,C200 May14_2025-C200
| CA 17-N18 G100,G101,C200 May14_2025-C200.pdf |
| Sheets and Views |
| C200 |
| CA20-65 E10X Controls-E100.pdf |
| Sheets and Views |
| E100 |
| CA20-N65 Grindstone Water Treatment Monitoring.pdf |
| Sheets and Views |
| 16 CA20-65 E10X Controls - E100 |
| 17 CA20-65 E10X Controls - E101 |
| 18 CA20-65 E10X Controls - E102 |
| 19 CA20-65 E10X Controls - E103 |
| 20 CA20-65 E10X Controls - E104 |
| 21 CA20-65 E10X Controls - E105 |
| 22 CA20-65 E10X Controls - E106 |
| 23 CA20-65 E10X Controls - E107 |
| 24 CA20-65 E10X Controls - E108 |
| 25 CA20-65 E10X Controls - E109 |
| 26 CA20-65 E10X Controls - E110 |
| 27 CA20-65 E10X Controls - E111 |
| 28 CA20-65 E200 Details - E200 ELECTRICAL DETAIL |
| 29 CA20-65 IXX P&ID - I100 P&ID TITLE SHEET |
| 30 CA20-65 IXX P&ID - I101 NETWORK DIAGRAM |
| 31 CA20-65 IXX P&ID - I102 WATER TREATMENT |
| 32 CA20-65 IXX P&ID - I103 DISTRIBUTION TANK |
File details come from the government source that posted it. Updated .