This document appears to be a set of drawings related to the renovation of the Upper San Juan Campground in the Cleveland National Forest, located in Riverside County, California. The drawings include the title sheet, general notes, layout, plans for the new CXT restroom building, construction details, culvert profiles and plans, and cross-section details.
The related federal contract opportunity is Solicitation Number 127EAW24R0011, for the "Upper San Juan Campground Renovation - GAOA" project. This is a small business set-aside opportunity with an estimated project value between $500,000 and $1,000,000. All requests for information must be submitted by April 19, 2024 at 11:00 AM PST. The Forest Service will not organize a site visit, and failure to inspect the site will not be grounds for a claim after contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
SHEET OF
United States Department of Agriculture Forest Service
INDEX OF SHEETS
SHEET SHEET TITLE DATE
T-01 TITLE SHEET 5/15/2022
G-01 NOTES 5/15/2022
G-02 LAYOUT 5/15/2022
C-01 CXT PLAN 5/15/2022
C-02 CXT SITE 1 (S) 3/30/2023
C-03 CXT SITE 2 (N) 3/20/2023
C-04 CONSTRUCTION DETAIL A-D 5/15/2022
C-05 CONSTRUCTION DETAIL E-F 12/9/2022
C-06 #2 & 3 CULVERTS PROFILE 5/15/2022
C-07 #2 & 3 CULVERTS PLAN 5/15/2022
C-08 CULVERT TYPICAL 5/15/2022
C-09 FLARE END TYPICAL 12/9/2022
O-01 XS TYPICAL 12/9/2022
O-02 XS TYPICAL 12/9/2022
O-03 #1 CULVERT PLAN/PROFILE 12/9/2022
DRIVING DIRECTION:
Coming from East side: from CA 74 intersection with Grand Ave, Lake Elsinore, head southwest on CA-74 for about 9.7 mi., destination is on the right.
Coming from West side: from ca 74 intersection with i-5 San Juan Capistrano, head east on ca-74 for about 18.7 mi., destination is on the left.
PREPARED BY:
APPROVED:
CIVIL ENGINEER DATE
FOREST ENGINEER DATE
DISTRICT RANGER DATE
2/2 8/2
3 1 6:
T
LE
C
:\U
SE
RS
\T
LE
\D
OC
UM
EN
TS
\C
LE
VE
LA
ND
\P
RO
JE
CT
S\
\G
AO
A\
UP
PE
R
SA
N
JU
AN
C
AM
PG
RO
UN
D\
DW
G\
US
J C
G_
_P
1.2 .3.
DW
G; R05 PACIFIC SOUTHWEST REGION
CLEVELAND NATIONAL FOREST
RIVERSIDE COUNTY
CALIFORNIA
GAOA UPPER SAN JUAN CAMPGROUND RENOVATION
INTERSTATE HIGHWAYS
U.S. HIGHWAYS
CLEVELAND NATIONAL FOREST
1000'
TO LAKE
ELSINORE
TO I-5,
SAN JUAN
CAPISTRANO
N
RECOMMENDED BY:1
4 mi.
Entrance
Project site
DARRELL VANCE Digitally signed by DARRELL VANCE Date: 2023.03.21 15:21:42 -07'00'
BRAD AUGHINBAUGH Digitally signed by BRAD AUGHINBAUGH Date: 2023.03.21 15:14:16 -07'00'
TRIEN LE Digitally signed by TRIEN LE Date: 2023.03.21 14:20:58 -07'00'
WORK NOTES:
1. PROVIDE COPIES OF WEIGHT TICKETS FOR MATERIAL DELIVERED TO THE SITE FROM
COMMERCIAL SOURCES.
2. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN WATER FROM OUTSIDE SOURCE, PRIVATE
OR MUNICIPAL WATER DISTRICT. NO ON-SITE WATER IS AVAILABLE FOR CONSTRUCTION.
3. ALL PROJECT GENERATED DEBRIS AND WASTE MATERIAL SHALL BE REMOVED FROM THE
FOREST LAND AND DISPOSED OF LEGALLY BY THE CONTRACTOR EXCEPT TOP SOIL AND
SLASH TO BE PRESERVED FOR POST CONSTRUCTION RESTORATION
4. UNLESS SPECIFIED OTHERWISE, STANDARD SPECIFICATIONS FOR ROADS AND BRIDGES ON
FEDERAL HIGHWAY PROJECTS APPLY; FP-14 IS AVAILABLE ON-LINE AT
https://flh.fhwa.dot.gov/resources/specs/fp-14/fp14.pdf
AND FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (attached in contract document)
5. WHEN STATE OF CALIFORNIA SPECIFICATIONS OR TYPICALS ARE REFERRED TO, THEY WILL
REPLACE RESPECTIVE FP-14 SPECIFICATIONS, DOWNLOAD IS AVAILABLE AT
https://dot.ca.gov/-/media/dot-media/programs/design/documents/ f00203402018stdspecs-a11y.pdff
AND
https://dot.ca.gov/-/media/dot-media/programs/design/documents/ 2018-std-plns-for-web-a11y.pdf
6. SOIL AND SEDIMENT CONTROL INFORMATION:
https://dot.ca.gov/-/media/dot-media/programs/construction/documents/ environmental-compliance/csbmp-may-2017-final.pdf
7. ALL CONSTRUCTION AND ASSOCIATED ACTIVITIES SHALL BE LIMITED WITHIN
CAMPGROUND BOUNDARY AND SHALL NOT INTERFERE PUBLIC TRAFFIC ON STATE
HIGHWAY. THE CONTRACTOR IS RESPONSIBLE FOR ANY PERMIT REQUIRED BY CALTRANS
AT INTERSECTION WITH STATE HIGHWAY CA-74. TEMPORARY TRAFFIC CONTROL SHALL BE
IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)
2009 VERSION, ELECTRONIC COPY IS AVAILABLE AT
http://mutcd.fhwa.dot.gov/pdfs/2009r1r2/mutcd2009r1r2edition.pdf
THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN TO THE C.O. FOR APPROVAL
PRIOR TO WORK STARTS.
8. ASPHALT AREAS FOR CUT AND REPAVE SHALL BE MARKED ON THE GROUND BY THE
CONTRACTOR AND VERIFIED BY THE FOREST SERVICE BEFORE REMOVAL. CARE SHOULD BE
TAKEN DURING SAW CUTTING OF EXISTING PAVEMENT TO AVOID BREAKOUT.
REPLACEMENT ASPHALT SHALL BE CALTRANS SPECS, THE CONTRACTOR TO PROVIDE COPY
OF CALTRANS JOB MIX FORMULA CERTIFICATE DATED WITHIN 12 MONTHS OF MATERIAL
DELIVERY IF THE CONTRACTOR DOESN'T WANT TO HAVE THE TESTS PERFORMED AT THEIR
OWN EXPENSE.
9. QUALITY CONTROL AND TESTING AS REQUIRED BY SPECIFICATIONS IS THE CONTRACTOR
RESPONSIBILITY, INSPECTIONS CONDUCTED BY FOREST SERVICE EMPLOYEES ARE FOR THE
GOVERNMENT REFERENCE PURPOSES ONLY.
GENERAL NOTES:
1. THIS IS A PUBLIC WORKS CONTRACT. DAVIS BACON PREVAILING WAGES APPLY.
2. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE TO THE C.O.
PRIOR TO THE START OF WORK AND PROVIDE UPDATE WHEN CHANGE TO
SCHEDULE OCCURS.
3. THE CONTRACTOR IS RESPONSIBLE FOR DAMAGES TO EXISTING UTILITIES
INCLUDING UNDERGROUND UTILITIES CAUSED BY CONTRACTOR'S ACTIVITIES.
4. WORK NOT SPECIFIED IN THE SCHEDULE OF ITEMS BUT IS NECESSARY FOR THE
PERFORMANCE OF A PAY ITEM SHALL BE CONSIDERED INCIDENTAL TO THAT PAY
ITEM.
5. BEFORE ANY EXCAVATION ACTIVITIES BEGIN, THE CONTRACTOR SHALL CONTACT
A SERVICE TO LOCATE ANY BURIED UTILITIES. USA=1-800-227-2600 , THE
NATIONAL 811 NUMBER, OR THE WEBSITE http:/www.call811.com
6. MINIMIZE EROSION AND POLLUTION- SET THE MINIMUM CONSTRUCTION LIMITS
NEEDED FOR THE PROJECT AND CONFINE DISTURBANCE WITHIN THIS AREA.
MONITOR & MAINTAIN EROSION CONTROLS (I.E. SILT FENCES, STRAW WATTLES,
ETC) AS NEEDED THROUGH CONSTRUCTION AND REMOVE THEM ONCE SOURCES
OF EROSION ARE ELIMINATED. SUBMIT EROSION AND EROSION CONTROL PLAN
TO THE CO FOR REVIEW AND SECURE APPROVAL BEFORE GROUND DISTURBANCE
BEGINS.
7. THE CONTRACTOR SHALL MEET THE REQUIREMENTS OF CHAPTERS 10, 11, & 12.2
IN THEIR ENTIRETY OF "WATER QUALITY MANAGEMENT FOR NATIONAL FOREST
SYSTEM LANDS IN CALIFORNIA BEST MANAGEMENT PRACTICES" DATED
SEPTEMBER 2000
https://www.fs.usda.gov/internet/fse_documents/stelprdb5362512.pdf
8. EQUIPMENT, FOR THIS PROJECT, IF DRIVEN ON STATE OR COUNTY ROADS SHALL
BE CURRENTLY LICENSED AND SHALL BE WEED FREE BEFORE MOBILIZED TO
PROJECT SITE.
9. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING CALTRANS ENCROACHMENT PERMIT
FOR WORK AT INTERSECTION TO CA-74.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
3 1 6:
T
LE
C
:\U
SE
RS
\T
LE
\D
OC
UM
EN
TS
\C
LE
VE
LA
ND
\P
RO
JE
CT
S\
\G
AO
A\
UP
PE
R
SA
N
JU
AN
C
AM
PG
RO
UN
D\
DW
G\
US
J C
G_
_P
1.2 .3.
DW
G;
R5
PACIFIC SOUTHWEST REGION
GAOA UPPER
SAN JUAN
CAMPGROUND
RENOVATION
CLEVELAND NATIONAL
FOREST
TRABUCO DISTRICT
NOTES
T.LE
T.LE
B.AUGHIINBAUGH
w w
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
3 1 6:
T
LE
C
:\U
SE
RS
\T
LE
\D
OC
UM
EN
TS
\C
LE
VE
LA
ND
\P
RO
JE
CT
S\
\G
AO
A\
UP
PE
R
SA
N
JU
AN
C
AM
PG
RO
UN
D\
DW
G\
US
J C
G_
_P
1.2 .3.
DW
G;
R5
PACIFIC SOUTHWEST REGION
GAOA UPPER
SAN JUAN
CAMPGROUND
RENOVATION
CLEVELAND NATIONAL
FOREST
TRABUCO DISTRICT
LAYOUT
T.LE
T.LE
B.AUGHIINBAUGH
EXISTING PAVED SURFACE
PROPOSED LOCATION OF NEW
TOILET
APPROX. LOCATION OF
DEMOLISHED TOILET
EXISTING WATER HAND PUMP
EXISTING CULVERT(S)
PICNIC TABLE
EXISTING ASPHALT CURB (DIKE)
EXISTING WOODEN BARRIER
Feet
N w
NOTE:
HWY CA-74 AND ITS RIGHT OF WAY
ARE NOT PART OF AND ARE
OUTSIDE PROJECT LIMITS. THE
CONTRACTOR IS RESPONSIBLE FOR
ENCROACHMENT PERMIT AS
REQUIRED BY CALTRANS DISTRICT
8, ENCROACHMENT PERMIT OFFICE
AT 464 W. 4TH. STREET, MS 619, SAN
BERNARDINO, CA 92401-1400
1747.8
1755.1
1735.9
1733.9
1739.61739.6
1750.9 1756.4
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
2/1 6/2
3 1 3:
T
LE
C
:\U
SE
RS
\T
LE
\D
OC
UM
EN
TS
\C
LE
VE
LA
ND
\P
RO
JE
CT
S\
\G
AO
A\
UP
PE
R
SA
N
JU
AN
C
AM
PG
RO
UN
D\
DW
G\
S1
_G
RA
DI
NG
_P 4.D
W G;
R5
PACIFIC SOUTHWEST REGION
GAOA UPPER
SAN JUAN
CAMPGROUND
RENOVATION
CLEVELAND NATIONAL
FOREST
TRABUCO DISTRICT
CXT PLAN
B.AUGHINBAUGH
N Feet
0 20 40
REBAR WITH ORANGE PLASTIC CAP CONTROL POINTS (PNEZD):
2,5046.6320,4828.6850,1735.8750,CP (BY RH GATE POST)
3,5016.4140,5067.0500,1733.9310,CP (BY WATER WELL)
232,4859.0010,5248.5290,1739.5990,BS (OFF PAVEMENT NEAR CAMP #11
2003,4658.9776,5231.5621,1750.9020,BS (BY EDGE OF PAVEMENT)
2004,4666.8779,5341.4264,1755.0980,BS (UPSLOPE)
3002,4575.8570,4977.4715,1767.8850,BS2 (SPUR #4 NEAR TABLE UPSLOPE)
3003,4666.2587,5014.7788,1756.3680,BS3 (BY TREE ACROSS SPUR #4)
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/2 1/2
3 1 0:
T
LE
C
:\U
SE
RS
\T
LE
\D
OC
UM
EN
TS
\C
LE
VE
LA
ND
\P
RO
JE
CT
S\
\G
AO
A\
UP
PE
R
SA
N
JU
AN
C
AM
PG
RO
UN
D\
DW
G\
S1
_G
RA
DI
NG
_C
XT
G
RA
DI
NG
_P 5.6
2H 1V
.D W
G;
R5
PACIFIC SOUTHWEST REGION
GAOA UPPER
SAN JUAN
CAMPGROUND
RENOVATION
CLEVELAND NATIONAL
FOREST
TRABUCO DISTRICT
CXT SITE 1 (S)
B.AUGHINBAUGH
N Feet
0 10 20
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/2 1/2
3 1 0:
T
LE
C
:\U
SE
RS
\T
LE
\D
OC
UM
EN
TS
\C
LE
VE
LA
ND
\P
RO
JE
CT
S\
\G
AO
A\
UP
PE
R
SA
N
JU
AN
C
AM
PG
RO
UN
D\
DW
G\
S1
_G
RA
DI
NG
_C
XT
G
RA
DI
NG
_P 5.6
2H 1V
.D W
G;
R5
PACIFIC SOUTHWEST REGION
GAOA UPPER
SAN JUAN
CAMPGROUND
RENOVATION
CLEVELAND NATIONAL
FOREST
TRABUCO DISTRICT
CXT SITE 2 (N)
B.AUGHINBAUGH
N
Feet 0 10 20
File details come from the government source that posted it. Updated .