PART I—THE SCHEDULE
SECTION B-- SCHEDULE OF ITEMS
B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)
| Item |
| Construction Items |
| UOI |
| Qty. |
| Unit Price |
| Total Price |
| 15201 |
| Construction survey and staking |
| LSQ |
| 1 |
| 15401 |
| Contractor testing |
| LSQ |
| 1 |
| 15701 |
| Soil and Erosion Control, Silt Fence, Fiber Rolls |
| LSQ |
| 1 |
| 15761 |
| Dewatering structure |
| LSQ |
| 1 |
| 20101 |
| Clearing and grubbing, disposal of scatter slash |
| LSQ |
| 1 |
| 20419 |
| Drainage Excavation |
| CY |
| 506 |
| 25107 |
| Grouted riprap, class 3 |
| CY |
| 90 |
| 30101 |
| Aggregate base, Caltrans Class 2 3/4 in. |
| CY |
| 10 |
| 30310 |
| (*) Roadbed reconditioning with asphalt pulverization, compaction method FSSS 204.11.(a) |
| LS |
| 1 |
| 40301 |
| (*)Asphalt Concrete, type Caltrans Type A 1/2 in max. PG 64-10 |
| T |
| 460 |
| 60901 |
| (*) Curb, HMA 6 in. high |
| Foot |
| 1425 |
| 60202 |
| <64> inch span, <43> inch rise, pipe culvert, <pipe- |
arch ga. 12 w/ Flare End both ends>
| 60202a |
| <83> inch span, <57> inch rise, pipe culvert, <pipe- |
arch ga. 8>
| 60302b |
| (*) <11-5> span, <7-3> rise, structural plate pipe-arch, <ga. 10> thickness |
| Foot |
| 60 |
| 60207 |
| End section for <64> inch x <43> inch pipe culvert |
| Each |
| 4 |
| 62552 |
| Mulching with biodegradable erosion control blanket RECP Netting (Type B) |
| LSQ |
| 1 |
| 63501 |
| Temporary traffic control |
| LSQ |
| 1 |
| 32 30 00 |
| Site Improvements |
(1 ADA Parking & Walkway Incidental) A- CXT Tioga Vault Toilet Building (w/Chase)
| 02 41 00 a |
| Demolition and Disposal of Existing Picnic Tables |
| EA |
| 4 |
| 02 41 00 b |
| Demolition and Disposal of Existing Fire Rings/BBQ |
| EA |
| 4 |
| 32 30 00 a |
| Furnish and install Concrete Picnic Table |
| EA |
| 4 |
| 32 30 00 b |
| Furnish and install Fire Rings/BBQ Pits |
| EA |
| 4 |
Attachment 2. Schedule Solicitation No: 127EAW24R0011 Project Name: Upper San Juan Campground Renovation - GAOA
B.1 SCHEDULE OF ITEMS – OPTION 1
Option Items
| Item |
| Construction Items |
| UOI |
| Qty. |
| Unit Price |
| Total Price |
| 32 30 00 |
| Site Improvements |
(1 ADA parking & walkway) B- CXT Tioga Vault Toilet Building
| 32 38 13 |
| Metal Bollards |
| EA |
| 5 |
| 02 41 00 a |
| Demolition and Disposal of Existing Picnic Tables |
| EA |
| 2 |
| 02 41 00 b |
| Demolition and Disposal of Existing Pits |
| EA |
| 2 |
| 32 30 00 a |
| Furnish and install Concrete Picnic Table |
| EA |
| 2 |
| 32 30 00 b |
| Furnish and install Fire Rings/BBQ Pits |
| EA |
| 2 |
| Option 1 Total |
| $___________ |
| Base + Option 1 Total |
| $___________ |
B.2 SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
* One award will be made from this solicitation, contractors must submit pricing for all items.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
| Company Name: |
| POC & Title: |