Attachment 4 - Contractor Schedule of Values~2.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 27-422DNR-REALT-B-53706
- Issued by
- Illinois
About this file
This is a Contractor Schedule of Values document prepared for the Illinois Department of Natural Resources (IDNR) for the Campground Electrical Panel Replacement project at Delabar State Park in Oquawka, Bureau County, Illinois (IDNR File #1-25-034). The project involves removal of existing electrical disconnects and meter cabinets at the campground, removal of the existing wood structure, installation of a new wood structure, installation of a new electrical panel, installation of a new electrical meter and CT cabinet, reconnection of six existing camp site circuits, and construction of four handholes. All items are specified as individual units with quantities identified for bidding purposes.
The schedule of values provides line items for each component of the work to be completed, with unit prices to be supplied by bidders. The document totals $0.00 as presented, indicating this is a blank form distributed to prospective contractors for completion and submission with their bids. Pricing terms and specific contract conditions are referenced in the plans and specifications documents accompanying this schedule. The form is to be returned with the bid submission as required by the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Prices
| Contractor's Schedule of Values |
| Project Name: Campground Electrical Panel Replacement |
| IDNR File #1-25-034 |
| Brief Description of Project: |
| Contract work for this project shall consist of removal of existing electrical disconnects at the campground serving the camp sites and installing a new electrical panel and new electrical meter for future expansion at Delabar State Park, Oquawka, IL. |
| RETURN WITH BID | |||||
| (For complete information covering these items, see plans and specifications) | |||||
| Route: | |||||
| County: | Bureau | ||||
| Local Agency: | |||||
| Section: | |||||
| Item No. | Items | Units | Quantity | Unit Price | Total |
| 1 | REMOVAL OF EXISTING DISCONNECTS AND METER CABINET | EACH | 1 | ||
| 2 | REMOVAL OF WOOD STRUCTURE | EACH | 1 | ||
| 3 | NEW WOOD STRUCTURE | EACH | 1 | ||
| 4 | NEW ELECTRICAL PANEL | EACH | 1 | ||
| 5 | NEW ELECTRICAL METER AND CT CABINET | EACH | 1 | ||
| 6 | RECONNECT EXISTING CAMP SITE CIRCUITS | EACH | 6 | ||
| 7 | HANDHOLE | EACH | 4 |
Total As read: $0.00
Sheet1
File details come from the government source that posted it. Updated .