Attachment 4 - CCE Blank.xlsx

XLSX spreadsheet 67 KB Posted

Attached to
EDI CNS MSA Barricades
Solicitation number
FA557525B0006
Issued by

About this file

The file is a Construction Cost Estimate (CCE) Breakdown spreadsheet for a multi-site berm construction project at Moron Air Base, Spain. The project is divided into four Contract Line Items (CLINs): Kennel Berm, Facility 3100 Berms, Facility 3997 Berm, and Building 1012 Berm. Each CLIN includes detailed cost estimates for civil works and electrical works, covering activities such as fill material transportation, excavation, rodent barriers, landscaping, structural concrete, drainage systems, and electrical line diversions.

The associated federal contract opportunity (Solicitation Number FA557525B0006) is for EDI CNS MSA Barricades, with a project value between $1-5 million. The solicitation is restricted to local sources in Spain, with a pre-proposal conference on 25 June 2025 and bid submission deadline of 16 July 2025. The project is issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa, with bids evaluated according to criteria in Section M. Contractors must comply with Spanish legislation for government works, and funds are not currently available, with the bid acceptance period valid through 31 December 2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
EDI CNS MSA BARRICADES / EDI CONSTRUIR BARRICADAS DE POLVORINES
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 25-1002MORÓN AIR BASE, SPAIN
TOTAL PROJECT INCLUDING OVERHEAD AND PROFIT

ITEM

(€)
SUMMARY
RESUMEN
CLIN 1: KENNEL BERM TOTAL
TOTAL CLIN #1: BERMA DE PERRERA
CLIN #2: FAC. 3100 BERMS TOTAL
TOTAL CLIN #2: BERMAS DE INSTALACION 3100
CLIN #3: FAC. 3997 BERM TOTAL
TOTAL CLIN #3: BERMA DE INSTALACION 3997
CLIN #4: BLDG 1012 BERM TOTAL
TOTAL CLIN #4: BERMA DE EDIFICIO 1012
GRAND TOTAL
GRAN TOTAL

PREPARED BY:

&"Times New Roman,Regular"Page &P of &N

CLIN #1

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
EDI CNS MSA BARRICADES / EDI CONSTRUIR BARRICADAS DE POLVORINES
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 25-1002MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTOTHERLINE
LINITEMOFDIRECTCOST
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN 1: KENNEL BERM
CLIN #1: BERMA DE PERRERA
Material & Transporation
Material y Transporte
1Fill, material only
Relleno, solo materialm3
2Transport fill, includes transportation and unloading at site
Transporte de relleno, incluso transporte y descarga en sitiom3
Material & Transporation Total
Total Material y Transporte
Moving & Installing Fill
Movimiento y Colocación de Relleno
3Excavating
Excavaciónm3
4Hauling, excavated or borrow material
Transporte de material excavado o de préstamom3
5Spread fill
Extendido de rellenom3
6Backfill, 150 mm to 300 mm lifts
Relleno, tongadas de 150 mm a 300 mmm3
7Soil testing, proctor compaction
Ensayo de suelo, compactaciónProctoru
Moving & Installing Fill Total
Total Movimiento y Colocación de Relleno
Rodent Barrier
Barrera de Roedores
8AISI 304 stainless steel mesh, 50x25x0.9 mm
Malla de acero inoxidable AISI 304 50x25x0,9 mmm2
Rodent Barrier Total
Total Barrera de Roedores
Landscaping
Jardinería
9Seeding, irrigation, mowing and maintenance.
Siembra, irrigación, corte y mantenimientom2
Landscaping Total
Total Jardinería
Footing
Cimentación
10Structural concrete HA30/B/20/XC2, including forms
Hormigon estructural HA30/B/20/XC2, incluso encofradom3
11Reinforcing steel B500SD
Armadura B500SDkg
12Concrete admixture, air entraining agent
Aditivo de hormigó, agente inclusor de aireg
Footing Total
Total Cimentación
Wall
Muro
13Structural concrete HA30/B/20/XC2, including forms
Hormigon estructural HA30/B/20/XC2, incluso encofradom3
14Reinforcing steel B500SD
Armadura B500SDkg
15Concrete admixture, air entraining agent
Aditivo de hormigó, agente inclusor de aireg
Wall Total
Total Muro
Drainage Pipe with Weepholes
Tubería de drenaje con orificios de desagüe
16PVC pipe 50 mm diameter, schedule 40, includes couplings 3 m OC and hangers 3 per 3 m
Tubería de PVC de 50 mm de diámetro, calibre 40, incluye acoplamientos 3 m entre centros y colgadores 3 por 3 mm
Drainage Pipe with Weepholes Total
Total Tubería de drenaje con orificios de desagüe
Drainage Stone
Piedra de Drenaje
17Geotextile Fabric 3.3 mm
Tejido geotextil 3.3 mmm2
18Borrow, select granular fill
Préstamo, relleno granular seleccionadom3
Drainage Stone Total
Total Piedra de Drenaje
SUMMARY
RESUMEN
Material & Transporation Total
Total Material y Transporte
Moving & Installing Fill Total
Total Movimiento y Colocación de Relleno
Rodent Barrier Total
Total Barrera de Roedores
Landscaping Total
Total Jardinería
Footing Total
Total Cimentación
Wall Total
Total Muro
Drainage Pipe with Weepholes Total
Total Tubería de drenaje con orificios de desagüe
Drainage Stone Total
Total Piedra de Drenaje
CLIN 1: KENNEL BERM TOTAL
TOTAL CLIN #1: BERMA DE PERRERA
TOTAL MATERIAL COST
TOTAL LABOR COST
TOTAL OTHER DIRECT COST
TOTAL LINE COST
OVERHEAD
PROFIT
TOTAL PROJECT EUROS

PREPARED BY:

These costs and overhead and profit percentages will be applied in any possible future modifications

CLIN #2

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
EDI CNS MSA BARRICADES / EDI CONSTRUIR BARRICADAS DE POLVORINES
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 25-1002MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTOTHERLINE
LINITEMOFDIRECTCOST
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #2: FAC. 3100 BERMS
CLIN #2: BERMAS DE INSTALACION 3100
Material & Transporation
Material y Transporte
1Fill, material only
Relleno, solo materialm3
2Transport fill, includes transportation and unloading at site
Transporte de relleno, incluso transporte y descarga en sitiom3
Material & Transporation Total
Total Material y Transporte
Moving & Installing Fill
Movimiento y Colocación de Relleno
3Excavating
Excavaciónm3
4Hauling, excavated or borrow material
Transporte de material excavado o de préstamom3
5Spread fill
Extendido de rellenom3
6Backfill, 150 mm to 300 mm lifts
Relleno, tongadas de 150 mm a 300 mmm3
7Soil testing, proctor compaction
Ensayo de suelo, compactación Proctoru
Moving & Installing Fill Total
Total Movimiento y Colocación de Relleno
Rodent Barrier
Barrera de Roedores
8AISI 304 stainless steel mesh, 50x25x0.9 mm
Malla de acero inoxidable AISI 304 50x25x0,9 mmm2
Rodent Barrier Total
Total Barrera de Roedores
Landscaping
Jardinería
9Seeding, irrigation, mowing and maintenance.
Siembra, irrigación, corte y mantenimientom2
Landscaping Total
Total Jardinería
SUMMARY
RESUMEN
Material & Transporation Total
Total Material y Transporte
Moving & Installing Fill Total
Total Movimiento y Colocación de Relleno
Rodent Barrier Total
Total Barrera de Roedores
Landscaping Total
Total Jardinería
CLIN #2: FAC. 3100 BERMS TOTAL
TOTAL CLIN #2: BERMAS DE INSTALACION 3100
TOTAL MATERIAL COST
TOTAL LABOR COST
TOTAL OTHER DIRECT COST
TOTAL LINE COST
OVERHEAD
PROFIT
TOTAL PROJECT EUROS

PREPARED BY:

These costs and overhead and profit percentages will be applied in any possible future modifications

CLIN #3

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
EDI CNS MSA BARRICADES / EDI CONSTRUIR BARRICADAS DE POLVORINES
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 25-1002MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTOTHERLINE
LINITEMOFDIRECTCOST
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #3: FAC. 3997 BERM
CLIN #3: BERMA DE INSTALACION 3997
Material & Transporation
Material y Transporte
1Fill, material only
Relleno, solo materialm3
2Transport fill, includes transportation and unloading at site
Transporte de relleno, incluso transporte y descarga en sitiom3
Material & Transporation Total
Total Material y Transporte
Moving & Installing Fill
Movimiento y Colocación de Relleno
3Excavating
Excavaciónm3
4Hauling, excavated or borrow material
Transporte de material excavado o de préstamom3
5Spread fill
Extendido de rellenom3
6Backfill, 150 mm to 300 mm lifts
Relleno, tongadas de 150 mm a 300 mmm3
7Soil testing, proctor compaction
Ensayo de suelo, compactación Proctoru
Moving & Installing Fill Total
Total Movimiento y Colocación de Relleno
Rodent Barrier
Barrera de Roedores
8AISI 304 stainless steel mesh, 50x25x0.9 mm
Malla de acero inoxidable AISI 304 50x25x0,9 mmm2
Rodent Barrier Total
Total Barrera de Roedores
Landscaping
Jardinería
9Seeding, irrigation, mowing and maintenance.
Siembra, irrigación, corte y mantenimientom2
Landscaping Total
Total Jardinería
SUMMARY
RESUMEN
Material & Transporation Total
Total Material y Transporte
Moving & Installing Fill Total
Total Movimiento y Colocación de Relleno
Rodent Barrier Total
Total Barrera de Roedores
Landscaping Total
Total Jardinería
CLIN #3: FAC. 3997 BERM TOTAL
TOTAL CLIN #3: BERMA DE INSTALACION 3997
TOTAL MATERIAL COST
TOTAL LABOR COST
TOTAL OTHER DIRECT COST
TOTAL LINE COST
OVERHEAD
PROFIT
TOTAL PROJECT EUROS

PREPARED BY:

These costs and overhead and profit percentages will be applied in any possible future modifications

CLIN #4

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
EDI CNS MSA BARRICADES / EDI CONSTRUIR BARRICADAS DE POLVORINES
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 25-1002MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTOTHERLINE
LINITEMOFDIRECTCOST
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CLIN #4: BLDG 1012 BERM
CLIN #4: BERMA DE EDIFICIO 1012
CIVIL WORKS
OBRA CIVIL
Material & Transporation
Material y Transporte
1Fill, material only
Relleno, solo materialm3
2Transport fill, includes transportation and unloading at site
Transporte de relleno, incluso transporte y descarga en sitiom3
Material & Transporation Total
Total Material y Transporte
Moving & Installing Fill
Movimiento y Colocación de Relleno
3Excavating
Excavaciónm3
4Hauling, excavated or borrow material
Transporte de material excavado o de préstamom3
5Spread fill
Extendido de rellenom3
6Backfill, 150 mm to 300 mm lifts
Relleno, tongadas de 150 mm a 300 mmm3
7Soil testing, proctor compaction
Ensayo de suelo, compactación Proctoru
Moving & Installing Fill Total
Total Movimiento y Colocación de Relleno
Cut - Excavate & Haul Away
Desmonte - Excavación y Retirada
8Excavating
Excavaciónm3
9Hauling, excavated or borrow material
Transporte de material excavado o de préstamom3
Cut - Excavate & Haul Away Total
Total Desmonte - Excavación y Retirada
Rodent Barrier
Barrera de Roedores
10AISI 304 stainless steel mesh, 50x25x0.9 mm
Malla de acero inoxidable AISI 304 50x25x0,9 mmm2
Rodent Barrier Total
Total Barrera de Roedores
Landscaping
Jardinería
11Seeding, irrigation, mowing and maintenance.
Siembra, irrigación, corte y mantenimientom2
Landscaping Total
Total Jardinería
Footing
Cimentación
12Structural concrete HA30/B/20/XC2, including forms
Hormigon estructural HA30/B/20/XC2, incluso encofradom3
13Reinforcing steel B500SD
Armadura B500SDkg
14Concrete admixture, air entraining agent
Aditivo de hormigó, agente inclusor de aireg
Footing Total
Total Cimentación
Wall
Muro
15Structural concrete HA30/B/20/XC2, including forms
Hormigon estructural HA30/B/20/XC2, incluso encofradom3
16Reinforcing steel B500SD
Armadura B500SDkg
17Concrete admixture, air entraining agent
Aditivo de hormigón, agente inclusor de aireg
Wall Total
Total Muro
Drainage Pipe with Weepholes
Tubería de drenaje con orificios de desagüe
18PVC pipe 50 mm diameter, schedule 40, includes couplings 3 m OC and hangers 3 per 3 m
Tubería de PVC de 50 mm de diámetro, calibre 40, incluye acoplamientos 3 m entre centros y colgadores 3 por 3 mm
Drainage Pipe with Weepholes Total
Total Tubería de drenaje con orificios de desagüe
Drainage Stone
Piedra de Drenaje
19Geotextile Fabric
Tejido geotextilm2
20Borrow, select granular fill
Préstamo, relleno granular seleccionadom3
Drainage Stone Total
Total Piedra de Drenaje
Civil Works Summary
Resumen de Obra Civil
Material & Transporation Total
Total Material y Transporte
Moving & Installing Fill Total
Total Movimiento y Colocación de Relleno
Cut - Excavate & Haul Away Total
Total Desmonte - Excavación y Retirada
Rodent Barrier Total
Total Barrera de Roedores
Landscaping Total
Total Jardinería
Footing Total
Total Cimentación
Wall Total
Total Muro
Drainage Pipe with Weepholes Total
Total Tubería de drenaje con orificios de desagüe
Drainage Stone Total
Total Piedra de Drenaje
Civil Works Total
Total Obra Civil
ELECTRICAL WORKS
TRABAJOS ELÉCTRICOS
Berm Electrical Line Diversion
Desvío Línea Eléctrica en Berma
21Demolition of existing UG line
Demolición de línea enterrada existenteJOB
22Low Voltage Cable Cold Shrink Rubber Splicing
Empalmes retráctiles en frío de baja tensiónEa
23High voltage A1 type prefabricated manhole with cover
Arqueta prefabricada tipo A1 alta tension con tapaEa
24New LV underground ductbank and accessorires
Nuevo banco conductos línea enterrada de BT y accesoriosLm
25Low voltage A1 type prefabricated manhole with cover
Arqueta prefabricada tipo A1 baka tension con tapaEa
26Copper cable 1x10 mm2 RV-K 0.6/1 kV
Cable de cobre 1x10 mm2 RV-K 0.6/1 kVLm
27Copper cable 1x16 mm2 RV-K 0.6/1 kV
Cable de cobre 1x16 mm2 RV-K 0.6/1 kVLm
28Copper cable 1x70 mm2 RV-K 0.6/1 kV
Cable de cobre 1x70 mm2 RV-K 0.6/1 kVLm
29Copper cable 2x(1x6 mm2) RV-K 1000V
Cable de cobre 2x(1x6 mm2) RV K 1000VLm
30Copper cable 3 G 6 mm2 RVFV 1000V
Cable de cobre 3 G 6 mm2 RVFV 1000VLm
Berm Electrical Line Diversion Total
Total Desvío Línea Eléctrica en Berma
Electrical Works Summary
Resumen de Trabajos Eléctricos
Berm Electrical Line Diversion Total
Total Desvío Línea Eléctrica en Berma
Electrical Works Total
Total Trabajos Eléctricos
CLIN #4: BLDG 1012 BERM SUMMARY
RESUMEN CLIN #4: BERMA DE EDIFICIO 1012
Civil Works Total
Total Obra Civil
Electrical Works Total
Total Trabajos Eléctricos
CLIN #4: BLDG 1012 BERM TOTAL
TOTAL CLIN #4: BERMA DE EDIFICIO 1012
TOTAL MATERIAL COST
TOTAL LABOR COST
TOTAL OTHER DIRECT COST
TOTAL LINE COST
OVERHEAD
PROFIT
TOTAL PROJECT EUROS

PREPARED BY:

These costs and overhead and profit percentages will be applied in any possible future modifications

File details come from the government source that posted it. Updated .