| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | | | PROPOSED TOTAL CONTRACT PRICE | |
| EDI CNS MSA BARRICADES / EDI CONSTRUIR BARRICADAS DE POLVORINES | | | | |
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | | WORK LOCATION | |
| | QUUG 25-1002 | MORÓN AIR BASE, SPAIN | |
| | | | TOTAL PROJECT INCLUDING OVERHEAD AND PROFIT |
ITEM
| (€) |
| SUMMARY | |
| RESUMEN | |
| CLIN 1: KENNEL BERM TOTAL | |
| TOTAL CLIN #1: BERMA DE PERRERA | |
| CLIN #2: FAC. 3100 BERMS TOTAL | |
| TOTAL CLIN #2: BERMAS DE INSTALACION 3100 | |
| CLIN #3: FAC. 3997 BERM TOTAL | |
| TOTAL CLIN #3: BERMA DE INSTALACION 3997 | |
| CLIN #4: BLDG 1012 BERM TOTAL | |
| TOTAL CLIN #4: BERMA DE EDIFICIO 1012 | |
| GRAND TOTAL | |
| GRAN TOTAL | |
PREPARED BY:
&"Times New Roman,Regular"Page &P of &N
CLIN #1
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | | | | | | PROPOSED TOTAL CONTRACT PRICE | | | | |
| EDI CNS MSA BARRICADES / EDI CONSTRUIR BARRICADAS DE POLVORINES | | | | | | | | | | |
| PURCHASE REQUEST NUMBER | | | PROJECT NUMBER | | | WORK LOCATION | | | | |
| | | | QUUG 25-1002 | | MORÓN AIR BASE, SPAIN | | | | |
| | UNIT | | MATERIAL COST | | | LABOR COST | | OTHER | LINE |
| LIN | ITEM | OF | | | | | | | DIRECT | COST |
| NO. | | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COST | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| CLIN 1: KENNEL BERM | | | | | | | | | |
| CLIN #1: BERMA DE PERRERA | | | | | | | | | |
| Material & Transporation | |
| Material y Transporte | |
| 1 | Fill, material only | |
| Relleno, solo material | m3 |
| 2 | Transport fill, includes transportation and unloading at site | |
| Transporte de relleno, incluso transporte y descarga en sitio | m3 |
| Material & Transporation Total | |
| Total Material y Transporte | |
| Moving & Installing Fill | |
| Movimiento y Colocación de Relleno | |
| 3 | Excavating | |
| Excavación | m3 |
| 4 | Hauling, excavated or borrow material | |
| Transporte de material excavado o de préstamo | m3 |
| 5 | Spread fill | |
| Extendido de relleno | m3 |
| 6 | Backfill, 150 mm to 300 mm lifts | |
| Relleno, tongadas de 150 mm a 300 mm | m3 |
| 7 | Soil testing, proctor compaction | |
| Ensayo de suelo, compactaciónProctor | u |
| Moving & Installing Fill Total | |
| Total Movimiento y Colocación de Relleno | |
| Rodent Barrier | |
| Barrera de Roedores | |
| 8 | AISI 304 stainless steel mesh, 50x25x0.9 mm | |
| Malla de acero inoxidable AISI 304 50x25x0,9 mm | m2 |
| Rodent Barrier Total | |
| Total Barrera de Roedores | |
| Landscaping | |
| Jardinería | |
| 9 | Seeding, irrigation, mowing and maintenance. | |
| Siembra, irrigación, corte y mantenimiento | m2 |
| Landscaping Total | |
| Total Jardinería | |
| Footing | |
| Cimentación | |
| 10 | Structural concrete HA30/B/20/XC2, including forms | |
| Hormigon estructural HA30/B/20/XC2, incluso encofrado | m3 |
| 11 | Reinforcing steel B500SD | |
| Armadura B500SD | kg |
| 12 | Concrete admixture, air entraining agent | |
| Aditivo de hormigó, agente inclusor de aire | g |
| Footing Total | |
| Total Cimentación | |
| Wall | |
| Muro | |
| 13 | Structural concrete HA30/B/20/XC2, including forms | |
| Hormigon estructural HA30/B/20/XC2, incluso encofrado | m3 |
| 14 | Reinforcing steel B500SD | |
| Armadura B500SD | kg |
| 15 | Concrete admixture, air entraining agent | |
| Aditivo de hormigó, agente inclusor de aire | g |
| Wall Total | |
| Total Muro | |
| Drainage Pipe with Weepholes | |
| Tubería de drenaje con orificios de desagüe | |
| 16 | PVC pipe 50 mm diameter, schedule 40, includes couplings 3 m OC and hangers 3 per 3 m | |
| Tubería de PVC de 50 mm de diámetro, calibre 40, incluye acoplamientos 3 m entre centros y colgadores 3 por 3 m | m |
| Drainage Pipe with Weepholes Total | |
| Total Tubería de drenaje con orificios de desagüe | |
| Drainage Stone | |
| Piedra de Drenaje | |
| 17 | Geotextile Fabric 3.3 mm | |
| Tejido geotextil 3.3 mm | m2 |
| 18 | Borrow, select granular fill | |
| Préstamo, relleno granular seleccionado | m3 |
| Drainage Stone Total | |
| Total Piedra de Drenaje | |
| SUMMARY |
| RESUMEN |
| Material & Transporation Total |
| Total Material y Transporte |
| Moving & Installing Fill Total |
| Total Movimiento y Colocación de Relleno |
| Rodent Barrier Total |
| Total Barrera de Roedores |
| Landscaping Total |
| Total Jardinería |
| Footing Total |
| Total Cimentación |
| Wall Total |
| Total Muro |
| Drainage Pipe with Weepholes Total |
| Total Tubería de drenaje con orificios de desagüe |
| Drainage Stone Total |
| Total Piedra de Drenaje |
| CLIN 1: KENNEL BERM TOTAL |
| TOTAL CLIN #1: BERMA DE PERRERA |
| TOTAL MATERIAL COST |
| TOTAL LABOR COST |
| TOTAL OTHER DIRECT COST |
| TOTAL LINE COST |
| OVERHEAD |
| PROFIT |
| TOTAL PROJECT EUROS |
PREPARED BY:
These costs and overhead and profit percentages will be applied in any possible future modifications
CLIN #2
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | | | | | | PROPOSED TOTAL CONTRACT PRICE | | | | |
| EDI CNS MSA BARRICADES / EDI CONSTRUIR BARRICADAS DE POLVORINES | | | | | | | | | | |
| PURCHASE REQUEST NUMBER | | | PROJECT NUMBER | | | WORK LOCATION | | | | |
| | | | QUUG 25-1002 | | MORÓN AIR BASE, SPAIN | | | | |
| | UNIT | | MATERIAL COST | | | LABOR COST | | OTHER | LINE |
| LIN | ITEM | OF | | | | | | | DIRECT | COST |
| NO. | | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COST | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| CLIN #2: FAC. 3100 BERMS | | | | | | | | | |
| CLIN #2: BERMAS DE INSTALACION 3100 | | | | | | | | | |
| Material & Transporation | |
| Material y Transporte | |
| 1 | Fill, material only | |
| Relleno, solo material | m3 |
| 2 | Transport fill, includes transportation and unloading at site | |
| Transporte de relleno, incluso transporte y descarga en sitio | m3 |
| Material & Transporation Total | |
| Total Material y Transporte | |
| Moving & Installing Fill | |
| Movimiento y Colocación de Relleno | |
| 3 | Excavating | |
| Excavación | m3 |
| 4 | Hauling, excavated or borrow material | |
| Transporte de material excavado o de préstamo | m3 |
| 5 | Spread fill | |
| Extendido de relleno | m3 |
| 6 | Backfill, 150 mm to 300 mm lifts | |
| Relleno, tongadas de 150 mm a 300 mm | m3 |
| 7 | Soil testing, proctor compaction | |
| Ensayo de suelo, compactación Proctor | u |
| Moving & Installing Fill Total | |
| Total Movimiento y Colocación de Relleno | |
| Rodent Barrier | |
| Barrera de Roedores | |
| 8 | AISI 304 stainless steel mesh, 50x25x0.9 mm | |
| Malla de acero inoxidable AISI 304 50x25x0,9 mm | m2 |
| Rodent Barrier Total | |
| Total Barrera de Roedores | |
| Landscaping | |
| Jardinería | |
| 9 | Seeding, irrigation, mowing and maintenance. | |
| Siembra, irrigación, corte y mantenimiento | m2 |
| Landscaping Total | |
| Total Jardinería | |
| SUMMARY |
| RESUMEN |
| Material & Transporation Total |
| Total Material y Transporte |
| Moving & Installing Fill Total |
| Total Movimiento y Colocación de Relleno |
| Rodent Barrier Total |
| Total Barrera de Roedores |
| Landscaping Total |
| Total Jardinería |
| CLIN #2: FAC. 3100 BERMS TOTAL |
| TOTAL CLIN #2: BERMAS DE INSTALACION 3100 |
| TOTAL MATERIAL COST |
| TOTAL LABOR COST |
| TOTAL OTHER DIRECT COST |
| TOTAL LINE COST |
| OVERHEAD |
| PROFIT |
| TOTAL PROJECT EUROS |
PREPARED BY:
These costs and overhead and profit percentages will be applied in any possible future modifications
CLIN #3
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | | | | | | PROPOSED TOTAL CONTRACT PRICE | | | | |
| EDI CNS MSA BARRICADES / EDI CONSTRUIR BARRICADAS DE POLVORINES | | | | | | | | | | |
| PURCHASE REQUEST NUMBER | | | PROJECT NUMBER | | | WORK LOCATION | | | | |
| | | | QUUG 25-1002 | | MORÓN AIR BASE, SPAIN | | | | |
| | UNIT | | MATERIAL COST | | | LABOR COST | | OTHER | LINE |
| LIN | ITEM | OF | | | | | | | DIRECT | COST |
| NO. | | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COST | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| CLIN #3: FAC. 3997 BERM | | | | | | | | | |
| CLIN #3: BERMA DE INSTALACION 3997 | | | | | | | | | |
| Material & Transporation | |
| Material y Transporte | |
| 1 | Fill, material only | |
| Relleno, solo material | m3 |
| 2 | Transport fill, includes transportation and unloading at site | |
| Transporte de relleno, incluso transporte y descarga en sitio | m3 |
| Material & Transporation Total | |
| Total Material y Transporte | |
| Moving & Installing Fill | |
| Movimiento y Colocación de Relleno | |
| 3 | Excavating | |
| Excavación | m3 |
| 4 | Hauling, excavated or borrow material | |
| Transporte de material excavado o de préstamo | m3 |
| 5 | Spread fill | |
| Extendido de relleno | m3 |
| 6 | Backfill, 150 mm to 300 mm lifts | |
| Relleno, tongadas de 150 mm a 300 mm | m3 |
| 7 | Soil testing, proctor compaction | |
| Ensayo de suelo, compactación Proctor | u |
| Moving & Installing Fill Total | |
| Total Movimiento y Colocación de Relleno | |
| Rodent Barrier | |
| Barrera de Roedores | |
| 8 | AISI 304 stainless steel mesh, 50x25x0.9 mm | |
| Malla de acero inoxidable AISI 304 50x25x0,9 mm | m2 |
| Rodent Barrier Total | |
| Total Barrera de Roedores | |
| Landscaping | |
| Jardinería | |
| 9 | Seeding, irrigation, mowing and maintenance. | |
| Siembra, irrigación, corte y mantenimiento | m2 |
| Landscaping Total | |
| Total Jardinería | |
| SUMMARY |
| RESUMEN |
| Material & Transporation Total |
| Total Material y Transporte |
| Moving & Installing Fill Total |
| Total Movimiento y Colocación de Relleno |
| Rodent Barrier Total |
| Total Barrera de Roedores |
| Landscaping Total |
| Total Jardinería |
| CLIN #3: FAC. 3997 BERM TOTAL |
| TOTAL CLIN #3: BERMA DE INSTALACION 3997 |
| TOTAL MATERIAL COST |
| TOTAL LABOR COST |
| TOTAL OTHER DIRECT COST |
| TOTAL LINE COST |
| OVERHEAD |
| PROFIT |
| TOTAL PROJECT EUROS |
PREPARED BY:
These costs and overhead and profit percentages will be applied in any possible future modifications
CLIN #4
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | | | | | | PROPOSED TOTAL CONTRACT PRICE | | | | |
| EDI CNS MSA BARRICADES / EDI CONSTRUIR BARRICADAS DE POLVORINES | | | | | | | | | | |
| PURCHASE REQUEST NUMBER | | | PROJECT NUMBER | | | WORK LOCATION | | | | |
| | | | QUUG 25-1002 | | MORÓN AIR BASE, SPAIN | | | | |
| | UNIT | | MATERIAL COST | | | LABOR COST | | OTHER | LINE |
| LIN | ITEM | OF | | | | | | | DIRECT | COST |
| NO. | | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COST | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| CLIN #4: BLDG 1012 BERM | | | | | | | | | |
| CLIN #4: BERMA DE EDIFICIO 1012 | | | | | | | | | |
| Material & Transporation | |
| Material y Transporte | |
| 1 | Fill, material only | |
| Relleno, solo material | m3 |
| 2 | Transport fill, includes transportation and unloading at site | |
| Transporte de relleno, incluso transporte y descarga en sitio | m3 |
| Material & Transporation Total | |
| Total Material y Transporte | |
| Moving & Installing Fill | |
| Movimiento y Colocación de Relleno | |
| 3 | Excavating | |
| Excavación | m3 |
| 4 | Hauling, excavated or borrow material | |
| Transporte de material excavado o de préstamo | m3 |
| 5 | Spread fill | |
| Extendido de relleno | m3 |
| 6 | Backfill, 150 mm to 300 mm lifts | |
| Relleno, tongadas de 150 mm a 300 mm | m3 |
| 7 | Soil testing, proctor compaction | |
| Ensayo de suelo, compactación Proctor | u |
| Moving & Installing Fill Total | |
| Total Movimiento y Colocación de Relleno | |
| Cut - Excavate & Haul Away | |
| Desmonte - Excavación y Retirada | |
| 8 | Excavating | |
| Excavación | m3 |
| 9 | Hauling, excavated or borrow material | |
| Transporte de material excavado o de préstamo | m3 |
| Cut - Excavate & Haul Away Total | |
| Total Desmonte - Excavación y Retirada | |
| Rodent Barrier | |
| Barrera de Roedores | |
| 10 | AISI 304 stainless steel mesh, 50x25x0.9 mm | |
| Malla de acero inoxidable AISI 304 50x25x0,9 mm | m2 |
| Rodent Barrier Total | |
| Total Barrera de Roedores | |
| Landscaping | |
| Jardinería | |
| 11 | Seeding, irrigation, mowing and maintenance. | |
| Siembra, irrigación, corte y mantenimiento | m2 |
| Landscaping Total | |
| Total Jardinería | |
| Footing | |
| Cimentación | |
| 12 | Structural concrete HA30/B/20/XC2, including forms | |
| Hormigon estructural HA30/B/20/XC2, incluso encofrado | m3 |
| 13 | Reinforcing steel B500SD | |
| Armadura B500SD | kg |
| 14 | Concrete admixture, air entraining agent | |
| Aditivo de hormigó, agente inclusor de aire | g |
| Footing Total | |
| Total Cimentación | |
| Wall | |
| Muro | |
| 15 | Structural concrete HA30/B/20/XC2, including forms | |
| Hormigon estructural HA30/B/20/XC2, incluso encofrado | m3 |
| 16 | Reinforcing steel B500SD | |
| Armadura B500SD | kg |
| 17 | Concrete admixture, air entraining agent | |
| Aditivo de hormigón, agente inclusor de aire | g |
| Wall Total | |
| Total Muro | |
| Drainage Pipe with Weepholes | |
| Tubería de drenaje con orificios de desagüe | |
| 18 | PVC pipe 50 mm diameter, schedule 40, includes couplings 3 m OC and hangers 3 per 3 m | |
| Tubería de PVC de 50 mm de diámetro, calibre 40, incluye acoplamientos 3 m entre centros y colgadores 3 por 3 m | m |
| Drainage Pipe with Weepholes Total | |
| Total Tubería de drenaje con orificios de desagüe | |
| Drainage Stone | |
| Piedra de Drenaje | |
| 19 | Geotextile Fabric | |
| Tejido geotextil | m2 |
| 20 | Borrow, select granular fill | |
| Préstamo, relleno granular seleccionado | m3 |
| Drainage Stone Total | |
| Total Piedra de Drenaje | |
| Civil Works Summary | |
| Resumen de Obra Civil | |
| Material & Transporation Total | |
| Total Material y Transporte | |
| Moving & Installing Fill Total | |
| Total Movimiento y Colocación de Relleno | |
| Cut - Excavate & Haul Away Total | |
| Total Desmonte - Excavación y Retirada | |
| Rodent Barrier Total | |
| Total Barrera de Roedores | |
| Landscaping Total | |
| Total Jardinería | |
| Footing Total | |
| Total Cimentación | |
| Wall Total | |
| Total Muro | |
| Drainage Pipe with Weepholes Total | |
| Total Tubería de drenaje con orificios de desagüe | |
| Drainage Stone Total | |
| Total Piedra de Drenaje | |
| Civil Works Total | |
| Total Obra Civil | |
| ELECTRICAL WORKS |
| TRABAJOS ELÉCTRICOS |
| Berm Electrical Line Diversion | |
| Desvío Línea Eléctrica en Berma | |
| 21 | Demolition of existing UG line | |
| Demolición de línea enterrada existente | JOB |
| 22 | Low Voltage Cable Cold Shrink Rubber Splicing | |
| Empalmes retráctiles en frío de baja tensión | Ea |
| 23 | High voltage A1 type prefabricated manhole with cover | |
| Arqueta prefabricada tipo A1 alta tension con tapa | Ea |
| 24 | New LV underground ductbank and accessorires | |
| Nuevo banco conductos línea enterrada de BT y accesorios | Lm |
| 25 | Low voltage A1 type prefabricated manhole with cover | |
| Arqueta prefabricada tipo A1 baka tension con tapa | Ea |
| 26 | Copper cable 1x10 mm2 RV-K 0.6/1 kV | |
| Cable de cobre 1x10 mm2 RV-K 0.6/1 kV | Lm |
| 27 | Copper cable 1x16 mm2 RV-K 0.6/1 kV | |
| Cable de cobre 1x16 mm2 RV-K 0.6/1 kV | Lm |
| 28 | Copper cable 1x70 mm2 RV-K 0.6/1 kV | |
| Cable de cobre 1x70 mm2 RV-K 0.6/1 kV | Lm |
| 29 | Copper cable 2x(1x6 mm2) RV-K 1000V | |
| Cable de cobre 2x(1x6 mm2) RV K 1000V | Lm |
| 30 | Copper cable 3 G 6 mm2 RVFV 1000V | |
| Cable de cobre 3 G 6 mm2 RVFV 1000V | Lm |
| Berm Electrical Line Diversion Total | |
| Total Desvío Línea Eléctrica en Berma | |
| Electrical Works Summary |
| Resumen de Trabajos Eléctricos |
| Berm Electrical Line Diversion Total |
| Total Desvío Línea Eléctrica en Berma |
| Electrical Works Total |
| Total Trabajos Eléctricos |
| CLIN #4: BLDG 1012 BERM SUMMARY |
| RESUMEN CLIN #4: BERMA DE EDIFICIO 1012 |
| Civil Works Total |
| Total Obra Civil |
| Electrical Works Total |
| Total Trabajos Eléctricos |
| CLIN #4: BLDG 1012 BERM TOTAL |
| TOTAL CLIN #4: BERMA DE EDIFICIO 1012 |
| TOTAL MATERIAL COST |
| TOTAL LABOR COST |
| TOTAL OTHER DIRECT COST |
| TOTAL LINE COST |
| OVERHEAD |
| PROFIT |
| TOTAL PROJECT EUROS |
PREPARED BY:
These costs and overhead and profit percentages will be applied in any possible future modifications