The document is a Schedule of Material Submittals for the EDI CNS MSA Barricades project (Project Number QUUG 25-1002) issued by the United States Air Forces in Europe - Air Forces Africa. The schedule outlines 34 specific material submittals required from the contractor, with submission deadlines ranging from contract start date plus 7-15 days to final inspection minus 15 days. Key submittal categories include warranty documentation, construction and progress schedules, work plans, mobility plans, quality control plans, environmental protection plans, as-built drawings, key staff information, health and safety plans, and various technical submittals related to concrete, geotextiles, electrical systems, and site preparation.
The associated federal contract opportunity is valued between $1,000,000 and $5,000,000, specifically for barricade construction at Moron Air Base in Spain. The solicitation (FA557525B0006) is restricted to local sources licensed and registered to conduct construction business in Spain, with a pre-proposal conference scheduled for 25 June 2025 and bid submissions due by 10:00 hours local time on 16 July 2025. Notably, the government has indicated that funds are not currently available, and the bid acceptance period should remain valid through 31 December 2025. Potential contractors must comply with the Defense Cooperation Agreement between the United States and Spain, which requires using Spanish materials, labor, and equipment when feasible.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Attachment 4 - CCE Blank.xlsx | XLSX spreadsheet | |
| Solicitation - FA557525B0006.pdf | ||
| Attachment 1a - Specifications ENG.pdf | ||
| Attachment 1b - Specifications ESP.pdf | ||
| Attachment 2 - Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||
| QUUG 25-1002 | PROJECT TITLE | |||
| EDI CNS MSA Barricades | SOLICITATION / CONTRACT NO. |
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 01 | |||||
| 1 | Warranty | 1 | Acceptance +15 | ||
| 2 | Construction Schedule | 1 | Contract Start +7 | BCE to review and approve. | |
| 3 | Progress Schedule | 1 | Contract Start +10 | ||
| 4 | Work Plan | 1 | Contract Start +7 | ||
| 5 | Mobility Plan | 1 | Contract Start +15 | ||
| 6 | Project Sign | 1 | Contract Start +15 | ||
| 7 | Quality Control Plan | 1 | Contract Start +15 | ||
| 8 | Environmental Protection Plan | 1 | Contract Start +15 | ||
| 9 | Waste & debris | 1 | Final Inspection-15 | ||
| 10 | As-Built drawings | 1 | Final Inspection -15 | ||
| 11 | Spatial Data | 1 | As-Built Drawings Approval +10 | Spatial data should be based on the approved As-Built drawings. | |
| 12 | Key Staff | 1 | Contract Start+15 | ||
| 13 | Health and Safety Plan | 1 | Contract Start+15 | ||
| 14 | O&M Manuals | 1 | Prior to FI |
| SECTION 03 30 00 | ||||
| 15 | Concrete batch plant inspection certification | 1 | ||
| 16 | Concrete quality mark | 1 | ||
| 17 | Concrete Control Test Program | 1 | ||
| 18 | Concrete Control Tests | 1 |
| SECTION 31 04 22 | |||
| 19 | Geotextile | 1 | |
| 20 | Execution control | 1 |
| SECTION 31 23 00.00 20 | |||
| 21 | Rodents Protection | 1 | |
| 22 | Filling material compaction density tests | 1 |
| SECTION 32 92 19 | ||
| 23 | Seed | 1 |
| 24 | Fertilizer | 1 |
| 25 | Topsoil | 1 |
| SECTION 33 71 02.00 20 | ||||||
| 26 | Conduits | 1 | ||||
| 27 | Underground Low-Voltage Cables | 1 | ||||
| 28 | Buried Warning and Identification Tape | 1 | ||||
| 29 | Ground wires | 1 | ||||
| 30 | Handholes | 1 | 1 | |||
| 31 | Handhole covers | 1 | 1 | 1 | ||
| 32 | Pre-manufactured low voltage splices | 1 | 1 | |||
| 33 | Field acceptance checks and tests | 1 | ||||
| 34 | Exterior Lighting Control Test | 1 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 25-1002 | TÍTULO DE PROYECTO: | |||
| CONSTRUIR BARRICADAS DE MSA | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 01 | |||||
| 1 | Garantía | 1 | Aceptación +15 | ||
| 2 | Programa de construcción | 1 | Comienzo Contrato +7 | A revisar y aprobar por el BCE | |
| 3 | Programa de de avance de obra | 1 | Comienzo Contrato +10 | ||
| 4 | Plan de trabajo | 1 | Comienzo Contrato +7 | ||
| 5 | Plan de movilidad | 1 | Comienzo Contrato +15 | ||
| 6 | Cartel del proyecto | 1 | Comienzo Contrato +15 | ||
| 7 | Plan de control de calidad | 1 | Comienzo Contrato +15 | ||
| 8 | Plan de protección medioambiental | 1 | Comienzo Contrato +15 | ||
| 9 | Residuos y escombros | 1 | Inspección Final-15 | ||
| 10 | Planos de ejecución | 1 | Inspección Final -15 | ||
| 11 | Datos espaciales | 1 | Aprobación planos As-Built +10 | Los datos espaciales estarán basados en los planos As-Built aprobados. | |
| 12 | Personal clave | 1 | Comienzo Contrato+15 | ||
| 13 | Programa de seguridad y salud | 1 | Comienzo Contrato+15 | ||
| 14 | Manuales de Funcionamiento y Mantenimiento | 1 | Antes de Inspección final (IF) |
| SECCIÓN 03 30 00 | ||||
| 15 | Certificado de inspección de la central de fabricación del hormigón | 1 | ||
| 16 | Distintivo de calidad del Hormigón | 1 | ||
| 17 | Programa de Ensayos de Control del Hormigón | 1 | ||
| 18 | Ensayos de Control del Hormigón | 1 |
| SECCIÓN 31 04 22 | |||
| 19 | Geotextil | 1 | |
| 20 | Control de ejecución | 1 |
| SECCIÓN 31 23 00.00 20 | |||
| 21 | Protección contra Roedores | 1 | |
| 22 | Ensayos de densidad de compactación del material de relleno | 1 |
| SECCIÓN 32 92 19 | ||
| 23 | Semillas | 1 |
| 24 | Fertilizantes | 1 |
| 25 | Terreno vegetal | 1 |
| SECCIÓN 33 71 02.00 20 | ||||||
| 26 | Conductos | 1 | ||||
| 27 | Cables de Baja Tensión Enterraods | 1 | ||||
| 28 | Cinta de Aviso e Identificación | 1 | ||||
| 29 | Conductores de tierra | 1 | ||||
| 30 | Arquetas | 1 | 1 | |||
| 31 | Tapas de arquetas | 1 | 1 | 1 | ||
| 32 | Empales de baja tensión pre-fabricados | 1 | 1 | |||
| 33 | Ensayos y pruebas en obra | 1 | ||||
| 34 | Pruebas Sistema de Control de Alumbrado Exterior | 1 |