Attachment 4 Bid Schedule.pdf
PDF 11 KB Posted
- Attached to
- LCDO FENCE & EROSION CONSTRUCTION FY21 Federal contract opportunity
- Solicitation number
- 140L0621Q0060
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ_Continuation_Pages_0002.pdf | ||
| Sol_140L0621Q0060_Amd_0002.pdf | ||
| Attachment_6_Updated_Bid_Worksheet_0001.pdf | ||
| Sol_140L0621Q0060_Amd_0001.pdf | ||
| Attachment_5_Questions_and_Answers_0001.pdf | ||
| Sol_140L0621Q0060.pdf | ||
| Attachment 2 Drawings and Specifications.pdf | ||
| Attachment 1 Statement of Work.pdf | ||
| Attachment 3 DOL Wage Determiniation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
LCDO FENCE AND EROSION CONTRACT
Item Estimated Unit Total No. Description Quantity Unit Price Amount
1. Remove Fence and 3,350 Linear $______ $ _____ Structures Foot
2. Barbed Wire Fence 10,680 Linear $______ $ ______ Installation (4 Wire) Foot
3. Barbed Wire Fence 5,880 Linear $______ $ _____ Installation (3 Wire) Foot
4. Stress Panel 9 Each $______ $ _____
5. Three Post Corner 11 Each $ __ $ _____
Panel
6. Angle Iron End Panel 12 Each $ __ $ _____
7. Wire Gate-Type A 6 Each $ ___ $ ___
8. Steel Gate 2 Each $ __ $ ___
9. Walk Thru 1 Each $_____ $ ___
10. Straw Wattle 2 Each $ ___ $ ___
11. Wire Checks 3 Each $ ___ $ ___
12. Rock Rundown 10 Each $ ____ $ ______
13. Zuni Bowl 5 Hour $ ____ $ _____
14. Mobilization 1 Lump Sum $ ____ $ _____
15. NMGRT 6.9375% 1 Lump Sum $ ____ $ _____
TOTAL BID (All or none)LCDO FENCE AND EROSION CONTRACT $ ______
Note: Bidders should show their bid price for each line item then submit one total bid under LCDO FENCE AND EROSION CONTRACT
Period of Performance 45 Calendar Days.
File details come from the government source that posted it. Updated .