Attachment 2 Drawings and Specifications.pdf
PDF 1 MB Posted
- Attached to
- LCDO FENCE & EROSION CONSTRUCTION FY21 Federal contract opportunity
- Solicitation number
- 140L0621Q0060
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ_Continuation_Pages_0002.pdf | ||
| Sol_140L0621Q0060_Amd_0002.pdf | ||
| Attachment_6_Updated_Bid_Worksheet_0001.pdf | ||
| Sol_140L0621Q0060_Amd_0001.pdf | ||
| Attachment_5_Questions_and_Answers_0001.pdf | ||
| Attachment 1 Statement of Work.pdf | ||
| Attachment 3 DOL Wage Determiniation.pdf | ||
| Attachment 4 Bid Schedule.pdf | ||
| Sol_140L0621Q0060.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISION 1 SECTION 01009
GENERAL REQUIRMENTS GENERAL INFORMATION AND REQUIREMENTS
01009-1
PART 1: GENERAL
1.1 SUMMARY
Remove existing fence material around two enclosures and dispose of. Build new 4 wire fence and gates for the two enclosures and construct a variety of small erosion control structures.
Build two new 3 wire barrier fences. Install two 21 feet wide metal gates. Government will furnish fencing materials, metal gates, and materials for erosion control structures.
A. Description of Work: Furnishing labor and equipment to remove existing fencing.
Furnishing labor, equipment, supplies, and concrete to install government-furnished material, to complete new fencing system and construct erosion structures as shown on the drawings and as specified herein.
B. Location: Work under this Contract is in Dona Ana and Sierra County, New Mexico.
The work locations are shown on the drawings.
C. Work Data Sheet: Designates the type and quantity of work required at each project location, and dimensions required for typical drawings.
1.2 REFERENCES
A. Referenced Specifications/Standards with Abbreviations and/or Acronyms: Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor, from the following:
ANSI American National Standards Institute 11 W 42nd St.
New York, NY 10036
ASTM American Society for Testing and Materials 100 Barr Harbor Dr.
West Conshohocken PA 19428-2959
ASTM A 116-88 Zinc-Coated (Galvanized) Steel Woven Wire Fence
Fabric ASTM A 121 REV-A-92 Zinc-Coated Galvanized) Steel
Smooth Wire ASTM A 121 REV-A-92 Zinc-Coated (Galvanized) Steel Barbed Wire ASTM A 584-92 Aluminum-Coated Steel Woven Wire Fence Fabric ASTM A 585-92 Aluminum Coated Steel Barbed Wire
01009-2
ASTM A 702-89 Steel Fence Posts and Assemblies, Hot Wrought (R1994)
OSHA Occupational Safety and Health Administration
US Department of Labor 200 Constitution Ave., NW Washington DC 20210
OSHA 2207-91 Construction Industry
NRCS Range Technical Note No. 40, May 2018 Hand-Built Structures for
Restoring Degraded Meadows in Sagebrush Rangelands from U.S.
Department of Agriculture State of Colorado Natural Resources Conservation Service
1.3 DEFINITIONS
A. Approvals: Approval of the submittals is an indication that the Contractor's submittals have been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting Officer's attention in writing.
After approval of an item, submit a substitute for approval when the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.
1.4 QUALITY ASSURANCE
A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.
B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Delivery: Protect products incorporated into the work from damage while in transit to the site. Products must be delivered in original unopened containers with manufacturer's name, brand designation, and contents legibly indicated. The containers shall bear the referenced specification number, type, and class as applicable.
B. Storage: Provide temporary storage facilities for products. Storage shall comply with the manufacturer's instructions. The storage area shall permit access for inspection and handling.
C. Handling: Load and unload products protecting them from damage.
01009-3
1.6 PROJECT/SITE CONDITIONS
A. Access to the Work: Access to the work shall be by existing highways, graveled roads, and dirt roads. No new roads shall be made.
B. Public or private access roads or trails damaged by the Contractor shall be restored, at the Contractor's expense, to the same condition they were in at the commencement of work.
1. No cross-country travel with motorized vehicles shall take place when ground is muddy. The Contractor shall repair all ruts and scarred ground created by construction, repair, or removal as directed by the Contracting Officer.
C. Rocky Ground: Some project sites may include rock formations which prevent steel posts or pipe from being driven. A rock drill will be required at these work sites to assure proper installation of steel posts and/or pipe.
D. Environmental Considerations:
1. Operations of the Contractor upon government premises including storage of materials, and equipment parking shall be confined to areas approved by the Contracting Officer. The construction site shall be kept clean and free of scrap material and debris during all phases of construction. Oil, grease, or fuel spilled at the construction site shall be cleaned up and disposed of as approved by the Contracting officer. In the event the surrounding landscape is disturbed, the Contractor shall restore that area at the Contractor's expense.
2. In the event the Contractor discovers sites containing evidence of possible scientific, prehistoric, historical, or archeological values, he shall immediately cease construction and notify the Contracting Officer. The Contracting officer will then take appropriate steps to mitigate damage to the data, B. Protection and Safety:
1. Damage: Repair of damage to new or existing construction and equipment resulting from construction procedures shall not be initiated prior to notification of the Contracting Officer.
1.7 SEQUENCING AND SCHEDULING
A. Work Schedule: The schedule shall be submitted at the pre-work conference. When requested, submit an updated schedule within 3 calendar days. As a minimum, the estimated start and completion dates shall be shown in the estimate.
B. Work shall be restricted to daylight hours between 6:00 am and 6:00 pm, Monday through Friday. Construction will not be allowed on weekends or holidays.
01009-4
PART 2: PRODUCTS
(There are no applicable requirements.)
PART 3: EXECUTION
3.1 PROJECT MEETINGS
A. Pre-Work Conference:
1. Will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.
2. The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.
3. Be prepared to summarize and explain procedures planned for the project and present the submittals requested in the specifications.
B. Progress Meetings:
1. To be held at the project site, or as determined by the Contracting Officer.
2. May be called by either the Contracting Officer or the Contractor. Request shall state who should attend and include an agenda.
C. Final Inspection:
1. To be held at the project site, or as determined by the Contracting Officer.
2. Notify the Contracting Officer in writing at least 3 working days before the completion date so the Government can schedule final inspection.
3. The Contractor shall record as-built changes on the drawings and deliver to the Contracting Officer.
4. The Contractor or the Contractor's authorized representative shall be present during this inspection.
3.2 PREPARATION
A. Work Layout: The contractor shall provide all surveying required to complete the work and to determine measurements, lines and grades necessary to execute the work under this contract. Baseline monuments or benchmarks disturbed or removed during construction shall be reset by the Contractor at the Contractor's expense.
01009-5
B. Work Limits and Control Points: Will be established by the Contracting Officer.
3.3 DISPOSAL OF DEBRIS
A. Requirements: Items or debris not designated as salvage for the Government shall become the property of the Contractor. Disposal of materials in a legal manner and payment of fees required is the Contractor's responsibility. Sale of material onsite is not allowed unless authorized in writing by the Contracting Officer. When hazardous materials are encountered during demolition operations, comply with applicable federal, state, and local regulations, laws, and ordinances concerning removal, handling, and protection against exposure or environmental pollution. Burning of removed materials is not permitted on the work site.
3.4 AS-BUILT DRAWINGS
A. General Requirements: A complete set of drawings, furnished by the Contracting Officer for this purpose only, shall be kept at the site. As the job progresses, continuously maintain as-built drawings of the work. The changes shall be noted legibly in red pencil or red ink. These drawings shall be submitted to the Contracting Officer prior to final inspection.
B. Installation Changes: Records shall be maintained of actual installations where at variance with the work shown, where changed, or where not otherwise located by dimension, elevation or other reference on the Contract drawings.
3.5 WARRANTY
A. Requirements: Materials and equipment furnished under this Contract shall be covered by the most favorable commercial warranties given to customers for such materials or equipment. The rights or remedies provided herein are in addition to and do not limit rights afforded to the Government by other clauses of this Contract. With respect to warranties, expressed or implied, from manufacturers or suppliers for materials or equipment furnished under the Contract the Contractor shall:
1. Obtain warranties that would be given in normal commercial practices.
2. Require warranties to be executed, in writing, for the benefit of the Government.
3. Submit warranties to the Contracting Officer prior to the final inspection.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT
01009-6
A. Payment: No direct payment for the work described under this section will be made.
Consideration for this item shall be included in the bid price for other items of the Contract.
END OF SECTION
DIVISION 1 SECTION 016400
GENERAL REQUIRMENTS GOVERNMENT-FUNRNISHED PROPERTY
016400-1
SECTION 016400 – GOVERNMENT-FURNISHED
PROPERTY PART 22 - GENERAL
22.1 SUMMARY
A. This Section includes fencing materials to be furnished by the Government and their locations.
22.2 DELIVERY, STORAGE, AND HANDLING
A. Location: The Government-Furnished Fencing and part of the erosion control property will be provided at the District Office: 1800 Marquess St, Las Cruces NM 88005. The rock material for erosion control will be located on site at Toby Hole and Lost Tank.
B. Time: Property will be available Monday through Friday, from 8:00 am to 3:30 pm except on holidays. An appointment is required to assure that a warehouseman is available. Appointments are made by calling the Contracting Officer a minimum of 24 hours prior to intended pickup time.
C. Receipt of Property: Upon pickup and receipt of materials, the Contractor will sign for acceptance on Government Form DI-105.
D. Return of Unused Property: Return unused materials to the same place and in the same condition as they were picked up unless the Contracting Officer states otherwise.
E. Loading, Offloading and Transporting Property: The Contractor is responsible for providing the necessary material-handling equipment to load and offload materials at the work site. The Contractor shall transport materials to the work site. Unless otherwise noted, a Government forklift will be available at the Wareyard.
PART 23 - PRODUCTS
23.1 MATERIALS
A. Materials to be furnished by the Government:
1. Barbed Wire.
2. Smooth Wire.
3. Green Topped T-Posts.
4. Prefabricated Metal Three Post Corner Panels.
DIVISION 1 SECTION 016400
GENERAL REQUIRMENTS GOVERNMENT-FUNRNISHED PROPERTY
016400-2
5. Prefabricated Metal Stress Panels.
6. Angle Iron End Panels
7. Fence Stays.
8. Fence Clips.
9. Steel Gates.
10. Woven Wire.
11. Straw Wattles.
12. Wooden Stakes for Wattles.
13. Rebar for Wire Checks
14. Rock for Zuni Bowls, Rock Rundowns, and Wire Checks.
PART 24 – EXECUTION
24.1 PROTECTION
The Contractor shall be responsible for protecting Government Furnished Property from damage or theft until installed and accepted. The Contractor shall be responsible for replacing damaged or lost materials at his own expense.
PART 25 - MEASUREMENT AND
PAYMENT
25.1 METHOD OF MEASUREMENT
A. Units: The work described in this Section will not be measured for payment.
25.2 BASIS OF PAYMENT
A. Payment: No direct payment for the work described under this Section will be made.
Consideration for this item shall be included in the bid price for other items of the Contract.
END OF SECTION 016400
DIVISION 2 SECTION 02827
SITE WORK FENCE REMOVAL
02827-1
PART 1: GENERAL
1.1 SUMMARY:
A. Description of work: Remove existing barbed wire fence and wood structures for Toby Hole and Lost Tank.
B. Related Sections:
General Information and Requirements Section 01009
Wire Fences and Gates Section 02824
1.2 PROJECT/SITE CONDITIONS:
A. Requirements: Access roads shall not be constructed along fence lines or to the jobsite unless written approval is granted by the Contracting Officer. Cross-country travel with wheeled or tracked vehicles shall be only to and along fence lines. No mechanized travel within Wilderness Study Area (WSA)
PART 2: PRODUCTS
2.1 MATERIALS:
A. Requirements: Furnish materials required to remove existing fence.
PART 3: EXECUTION
3.1 REMOVAL:
A. Removal of Existing Fence: Remove fence structure as shown on the drawings and dispose of debris offsite, or as approved by the Contracting Officer.
B. Wood Post may be cut level to ground if they cannot be pulled out.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: Fence removal will be paid for by the linear foot as measured on the ground next to the relocated fence prior to removal.
Pay Item Pay Unit
Remove Fence and Structures Feet
Mobilization/ Demobilization Job
NMGRT 7% Job
DIVISION 2 SECTION 02827
SITE WORK FENCE REMOVAL,REPLACMENT
02827-2
DIVISION 2 SECTION 02824
SITE WORK WIRE FENCES AND GATES
02824-1
PART 1: GENERAL
1.1 SUMMARY
A. Section Includes: Installing Government-furnished property, wire fences and gates.
B. Related Sections:
General Information and Requirements Section 01009
1.2 SUBMITTALS
A. General: Submittals shall be according to Section 01009 - General Information and Requirements.
1.3 QUALITY ASSURANCE
A. General: Installation of Government-furnished materials and accessories will be approved by the Contracting Officer Representative before requesting payment.
PART 2: PRODUCTS
2.1 GOVERNMENT-FURNISHED MATERIALS
See Section 016400
2.2 CONTRACTOR-FURNISHED MATERIALS
A. Post Grout: Furnish a rapid setting commercial product manufactured for anchoring posts.
Contractor is responsible for all other materials/incidentals that are required to complete the fence installation.
PART 3: EXECUTION
3.1 PREPARATION
A. Clearing: The contractor may clear the fence line, removing only the brush and trees which interfere with the construction of the fence line. Maximum clearing width is 4 feet on each side of the fence line. Provide minimum disturbance to existing grass and sod. Dispose of debris by spreading a minimum of 5ft from fence line.
3.2 INSTALLATION
02824-2
A. General: Steel posts shall not be used for end-panel, corner-panel, gate-panel, or stress-panel posts. Drive steel posts.
B. Ratio of Wood to Steel Line Posts: All steel posts.
C. Setting Posts: Dig holes for setting steel posts to the depth as shown on the Work Data Sheet. Set posts plumb and to the spacing and grades as shown on the drawings, unless staked otherwise. Space within 6 inches of that dimension shown on the drawings or in the Work Data Sheet. Holes shall provide adequate open space around the post to adequately grout the post solidly in position.
D. Driving Posts: Steel Posts: Drive into the ground to the depth shown on the drawings or until the anchor plate is slightly below the ground surface. Posts shall be driven plumb. When rock formations prevent driving remove anchor plate and excavate or drill holes a minimum of 18 inches deep and slightly larger than the diameter of the post. Place posts in the holes and grout the post solidly in position.
E. Corner Post, Gate Post, Corner Panel, Brace, End Panel, and Stress Panel Assemblies:
Construct as shown on the drawings or as staked in the field. Rock jacks shall not be substituted for these items. Construct stress panels on crests of hills, and a maximum of 1320 feet center-to-center for barbed wire sections. In addition, stress panels are required at points between which wire is to be stretched. Construct end panels at the end of fence runs unless shown otherwise on the drawings.
F. Wire: Stretch tightly and securely attach to steel posts with standard wire clips. Wire is properly stretched when it is springy to the touch. The wire shall be free to move through the wire clips as it expands and contracts. Terminate wire at each end post, gate post, corner post, or stress panel. Wrap wire around the post two times and tie off by wrapping around the incoming wire a minimum of four times.
G. Brace Wire: Double-loop and twist tight with a stick. For steel pipe panels, each wrap shall be looped once around the post. Leave one end of the stick long enough to fasten behind the horizontal brace to prevent wire from unwinding.
H. Gates:
1. Wire Gates: Fabricate from furnished materials and following spacing of fence.
Install according to the Work Data Sheet, and the drawings.
2. Steel Gates: Installed according to the Work Data Sheet, the drawings.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will be measured and paid for by the foot for each type of fence as measured along the ground surface next to the completed fence, including distance across gate openings, end, stress, and corner panels; cattle guards and
02824-3 drainage crossings. The quantities of end, stress, and corner panels, and gates to be paid for will be the actual number of these items. Note: Gates do not include adjacent end or corner panels. These are separate items.
4.2 BASIS OF PAYMENT
A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item Pay Unit
Barbed Wire Fence Installation (4-Wire) Feet
Barbed Wire Fence Installation (3-Wire) Feet
Stress Panel Each
Three-Post Corner Panel Each
Angle Iron End Panels Each
Wire Gate - Type A Each
Steel Gate Feet
Walk Thru Each
02824-4
DATA WORKSHEET
Fence type: 4-wire Type A barbed: Toby Hole and Lost Tank Type of top wire: _Barbed 12.5 gauge twisted double strand____________________ Type of intermediate wires: _Barbed 12.5 gauge twisted double strand ________ Type of bottom wire: _Barbless 12.5 gauge twisted double strand_______________
Wire locations/dimensions in inches (spacing):
E: 8 D: 12 C: 6 B: 4 A: 18 – from bottom
Line post spacing (L): 16 ft 6 inches Type of Stays: __Twisted galvanized wire_________________ Stay spacing (l): 16 ft 6 inches Length of steel posts (H1): 7 ft NA inches Depth of steel posts in ground (h1): 3 ft Dia: 3” w/ concrete 6” w/out Length of steel posts (H2): 5 ft 6 inches Depth of steel posts in ground (h2): 1 ft 6 inches Number of mechanical gate closers: _zero
02824-5
DATA WORKSHEET
Fence type: 3-wire Type A smooth: Dripping Springs Well and Pena Blanca Type of top wire: _Barbless 12.5 gauge twisted double strand_____________ Type of intermediate wires: _Barbless12.5 gauge twisted double strand __ __ Type of bottom wire: _Barbless 12.5 gauge twisted double strand__________
Wire locations/dimensions in inches (spacing):
D: 2 C: 12 B: 10 A: 16 – from bottom
Line post spacing (L): 16 ft 6 inches Type of Stays: __Twisted galvanized wire_________________ Stay spacing (l): 16 ft 6 inches Length of steel posts (H1): 7 ft NA inches Depth of steel posts in ground (h1): 3 ft Dia: 3” w/ concrete 6” w/out Length of steel posts (H2): 5 ft 6 inches Depth of steel posts in ground (h2): 1 ft 6 inches Number of mechanical gate closers: _zero
DIVISION 2
SITE WORK Erosion Structures
PART 1: GENERAL
1.1 SUMMARY
A. Section Includes: Installing erosion control structures at Toby Hole and Lost Tank.
PART 2: PRODUCTS
2.1 GOVERNMENT-FURNISHED MATERIALS
A. See Section 016400
PART 3: EXECUTION
3.2 PREPARATION
A. Clearing: The contractor may clear the area where structures will be placed at, removing only the brush and trees which interfere with the construction of the structures. Maximum clearing width is 4 feet on each side of the structures. Provide minimum disturbance to existing grass and sod. Dispose of debris by spreading a minimum of 5ft from work area.
3.3 INSTALLATION
Erosion work will follow the Range Technical Note No. 40, May 2018 Hand-Built Structures for Restoring Degraded Meadows in Sagebrush Rangelands from U.S. Department of Agriculture State of Colorado Natural Resources Conservation Service.
A. Straw Wattles: Layout along contours and stake in place between stakes marked by government.
B. Wire Checks: Construct in drainage bottom and stake in place where marked by government.
C. Rock Rundowns: Construct in locations marked by government.
D. Zuni Bowls: Construct in locations marked by government.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will be measured and paid for by the quantities of structures.
4.2 BASIS OF PAYMENT
02824-2
A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item Pay Unit
Straw Wattles Each
Wire Checks Each
Rock Rundowns Each
Zuni Bowls Each
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H
AutoCAD SHX Text h
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text
6'-6" MIN.
AutoCAD SHX Text L
AutoCAD SHX Text
9-GA. SMOOTH GALV. WIRE
AutoCAD SHX Text
ADD ADDITIONAL WIRE OF THE SAME MATERIAL AS BOTTOM WIRE
AutoCAD SHX Text OF FENCE & A ROCK DEADMAN (MIN. WEIGHT 50 LBS (22.5 kg)) WHEN
AutoCAD SHX Text SPACE BETWEEN BOTTOM WIRE & GROUND EXCEED 20" (508 mm)
AutoCAD SHX Text
LINE POST
AutoCAD SHX Text
(WOOD OR
AutoCAD SHX Text
STEEL)
AutoCAD SHX Text
%%UPANEL AT MINOR DEPRESSION
AutoCAD SHX Text
%%USTRESS PANEL
AutoCAD SHX Text h
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H
AutoCAD SHX Text h
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text 2"(51 mm) MIN.
AutoCAD SHX Text
TWISTED WIRE OR WOOD STAY
AutoCAD SHX Text
STEEL LINE POST
AutoCAD SHX Text
1. SEE SPECIFICATIONS FOR THE FOLLOWING:
AutoCAD SHX Text
A. RATIO OF STEEL TO WOOD LINE POSTS.
AutoCAD SHX Text
B. POST SPACING, LENGTH & DEPTH IN GROUND.
AutoCAD SHX Text
C. TYPE OF END PANEL TO BE USED.
AutoCAD SHX Text
D. TYPE OF WIRE TO BE USED.
AutoCAD SHX Text
E. SPACING BETWEEN WIRES.
AutoCAD SHX Text
F. NUMBER OF STAYS PER SPAN (L).
AutoCAD SHX Text
%%ULINE PANELS
AutoCAD SHX Text
%%UNOTES:
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text (1981 mm)
AutoCAD SHX Text
2. THE METRIC CONVERSIONS ARE PROVIDED IN PARENTHESIS
AutoCAD SHX Text
FOLLOWING THE ENGLISH UNITS.
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
MODE
AutoCAD SHX Text
EP
AutoCAD SHX Text
N:\PROJECTS\STANDARD DRAWINGS\STDDWGS2000\02824-1.DWG
AutoCAD SHX Text
DRAWING NO. 6
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SAFETY
AutoCAD SHX Text
ALWAYS THINK
AutoCAD SHX Text
DATE APRIL 26, 1997
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
AutoCAD SHX Text
LJP
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
METRIC CONVERSION ADDED
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
SCALE NONE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text 9/30/97
AutoCAD SHX Text
BY OTHERS
AutoCAD SHX Text
ENCLOSURE
AutoCAD SHX Text
BARBED WIRE FENCE
AutoCAD SHX Text
(4-WIRE)
AutoCAD SHX Text
WMW
AutoCAD SHX Text
J. KNOPIC
AutoCAD SHX Text
R. STOVALL
6 7
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
NEW MEXICO
AutoCAD SHX Text
LAS CRUCES FENCE AND EROSION PROJECTS
AutoCAD SHX Text
PROJECT LOCATION MAP
AutoCAD SHX Text
WILLIAM WILLIAMS
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
SCALE NONE
AutoCAD SHX Text
BAYLOR CANYON WELL BARRIER FENCE
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
AutoCAD SHX Text
LAS CRUCES DISTRICT OFFICE
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
JESSICA KNOPIC
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
RUSTY STOVALL
AutoCAD SHX Text
APRIL 1, 2021
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
WMW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text 21 FT Steel Gate
AutoCAD SHX Text 21 FT Steel Gate
AutoCAD SHX Text Three Smooth Wire Fence
AutoCAD SHX Text T. 23S.
AutoCAD SHX Text R. 03E.
AutoCAD SHX Text N
600 Ft in Length
SMOOTH WIRE FENCE WITH METAL POST
AutoCAD SHX Text
STAY 9-GA WIRE
AutoCAD SHX Text
SEE DETAIL "C"
AutoCAD SHX Text
SEE DETAIL "C"
AutoCAD SHX Text
DETAIL "C" ANCHOR DETAIL OF DIAGONAL METAL BRACE MEMBER
AutoCAD SHX Text
END VIEW
AutoCAD SHX Text
SIDE VIEW
AutoCAD SHX Text
STEEL PIPE GATE
AutoCAD SHX Text
BRACE 2" X 2" X " 14" STRUCTURAL ANGLE
AutoCAD SHX Text
END POST WITH BRACE SHALL BE BOLTED TOGETHER
AutoCAD SHX Text
END POST 2- " X 2- " X " 12" X 2- " X " 12" X " 14" STRUCTURAL ANGLE
AutoCAD SHX Text
TYP END INSTALLATION
AutoCAD SHX Text
SEE DETAIL "A"
AutoCAD SHX Text
BRACE ATTACHMENT DETAIL
AutoCAD SHX Text
TOP VIEW
AutoCAD SHX Text
BRACE POST
AutoCAD SHX Text
BRACE
AutoCAD SHX Text
BRACE
AutoCAD SHX Text
FRONT ELEVATION
AutoCAD SHX Text
BOLT WITH LOCK WASHER (NYLOCK)
AutoCAD SHX Text
2" MIN. CUT
AutoCAD SHX Text
ALTERNATE BRACE ATTACHMENT DETAIL
AutoCAD SHX Text
TOP VIEW
AutoCAD SHX Text
BOLT
AutoCAD SHX Text
BRACE POST
AutoCAD SHX Text
1- " BOTH LEGS14" BOTH LEGS
AutoCAD SHX Text
2" X 2" X " CLIP14" CLIP
AutoCAD SHX Text
BRACE POST
AutoCAD SHX Text
CLIP
AutoCAD SHX Text
BRACE
AutoCAD SHX Text
BRACE
AutoCAD SHX Text
FRONT ELEVATION
AutoCAD SHX Text
STRUCTURAL ANGLE POST 2- " X 2- " X "12" X 2- " X "12" X "14"
AutoCAD SHX Text
CONCRETE BASE TO BE 1'-0" SQUARE OR 1'-0" DIAMETER
AutoCAD SHX Text
DETAIL "B" ANCHOR DETAIL OF METAL POST
AutoCAD SHX Text
1" MIN. SLOPE
AutoCAD SHX Text
TOP VIEW
AutoCAD SHX Text
STRUCTURAL ANGLE BRACE 2 X 2 X "14"
AutoCAD SHX Text
SEE DETAIL "B"
AutoCAD SHX Text
STRUCTURAL ANGLE POST 2- " X 2- " X "12" X 2- " X "12" X "14"
AutoCAD SHX Text
CONCRETE BASE TO BE 2'-0" SQUARE OR 2'-0" DIAMETER
AutoCAD SHX Text
DETAIL "A" ANCHOR DETAIL OF METAL POST
AutoCAD SHX Text
1" MIN. SLOPE
AutoCAD SHX Text
CONCRETE FILLED PIPE 4" DIA.
AutoCAD SHX Text
METAL LINEAR POST (TYP) WT. 1.33 LB/FT
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SAFETY
AutoCAD SHX Text
ALWAYS THINK
AutoCAD SHX Text
DATE 4/13/2021
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
AutoCAD SHX Text
WMW
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
SCALE NONE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text 9/30/12
AutoCAD SHX Text
BY OTHERS
AutoCAD SHX Text
SMOOTH WIRE FENCE
AutoCAD SHX Text
(3-WIRE) (STEEL POST)
AutoCAD SHX Text
W. WILLIAMS
AutoCAD SHX Text
R. STOVALL
AutoCAD SHX Text
WMW
7 7
NEW MEXICO
AutoCAD SHX Text
LAS CRUCES FENCE AND EROSION PROJECTS
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
PROJECT LOCATION MAP
AutoCAD SHX Text
WILLIAM WILLIAMS
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
SCALE NONE
AutoCAD SHX Text
LOST TANK
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
AutoCAD SHX Text
LAS CRUCES DISTRICT OFFICE
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
JESSICA KNOPIC
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
RUSTY STOVALL
AutoCAD SHX Text
APRIL 1, 2021
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
WMW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text T. 16S.
AutoCAD SHX Text R. 01W.
AutoCAD SHX Text Wire Gate
AutoCAD SHX Text Wire Gate
AutoCAD SHX Text Locations For Erosion Controls
AutoCAD SHX Text Will Be Marked On Ground By
AutoCAD SHX Text Government: 5 Each Zuni Bowls And
AutoCAD SHX Text 5 Each Rock Rundowns.
AutoCAD SHX Text Leave Existing
AutoCAD SHX Text Fence
N
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
NEW MEXICO
AutoCAD SHX Text
LAS CRUCES FENCE AND EROSION PROJECTS
AutoCAD SHX Text
PROJECT LOCATION MAP
AutoCAD SHX Text
WILLIAM WILLIAMS
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
SCALE NONE
AutoCAD SHX Text
PENA BLANCA WSA BARRIER FENCE
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
AutoCAD SHX Text
LAS CRUCES DISTRICT OFFICE
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
JESSICA KNOPIC
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
RUSTY STOVALL
AutoCAD SHX Text
APRIL 1, 2021
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
WMW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text 4 Ft Wide Opening
AutoCAD SHX Text T. 24S.
AutoCAD SHX Text N
AutoCAD SHX Text 4 Ft Wide Opening
AutoCAD SHX Text Three Smooth Wire Fence
AutoCAD SHX Text 5,280 Ft in Length
R. 03E.
NEW MEXICO
AutoCAD SHX Text
LAS CRUCES FENCE AND EROSION PROJECTS
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
PROJECT LOCATION MAP
AutoCAD SHX Text
WILLIAM WILLIAMS
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
SCALE NONE
AutoCAD SHX Text
TOBY HOLE TANK
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
AutoCAD SHX Text
LAS CRUCES DISTRICT OFFICE
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
JESSICA KNOPIC
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
RUSTY STOVALL
AutoCAD SHX Text
APRIL 1, 2021
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
WMW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text Wire Gate
AutoCAD SHX Text Wire Gate
AutoCAD SHX Text Wire Gate
AutoCAD SHX Text Wire Gate
AutoCAD SHX Text T. 17S.
AutoCAD SHX Text R. 03W.
N
AS SHOWN
AutoCAD SHX Text N E W M E X I C 0
AutoCAD SHX Text Santa Fe
AutoCAD SHX Text C O L O R A D O
AutoCAD SHX Text Alamosa
AutoCAD SHX Text Alamogordo
AutoCAD SHX Text Carrizozo
AutoCAD SHX Text A R I Z O N A
AutoCAD SHX Text Silver City
AutoCAD SHX Text Truth or
AutoCAD SHX Text Consequences
AutoCAD SHX Text Lordsburg
AutoCAD SHX Text El Paso
AutoCAD SHX Text Las Cruces
AutoCAD SHX Text Deming
AutoCAD SHX Text Socorro
AutoCAD SHX Text Cortez
AutoCAD SHX Text Shiprock
AutoCAD SHX Text Gallup
AutoCAD SHX Text N
AutoCAD SHX Text Durango
AutoCAD SHX Text Bernalillo
AutoCAD SHX Text Aztec
AutoCAD SHX Text Farmington
AutoCAD SHX Text Albuquerque
AutoCAD SHX Text Espanola
AutoCAD SHX Text Chama
AutoCAD SHX Text T E X A S
AutoCAD SHX Text Carlsbad
AutoCAD SHX Text Roswell
AutoCAD SHX Text Hobbs
AutoCAD SHX Text Pecos
AutoCAD SHX Text Tucumcari
AutoCAD SHX Text Santa Rosa
AutoCAD SHX Text Las Vegas
AutoCAD SHX Text Vaughn
AutoCAD SHX Text Taos
AutoCAD SHX Text Trinidad
AutoCAD SHX Text Raton
AutoCAD SHX Text Ft. Sumner
AutoCAD SHX Text Clovis
AutoCAD SHX Text Clayton
AutoCAD SHX Text Walsenburg
AutoCAD SHX Text Ft. Garland
AutoCAD SHX Text Dalhart
AutoCAD SHX Text Boise
AutoCAD SHX Text City
AutoCAD SHX Text Cuba
AutoCAD SHX Text
U.S.DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
LAS CRUCES DISTRICT, NEW MEXICO
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
REVIEWED:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN MILES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WORK LOCATION MAP
AutoCAD SHX Text
RGL
AutoCAD SHX Text
EJC
AutoCAD SHX Text
JWH
AutoCAD SHX Text
WMW
AutoCAD SHX Text 4/17/21
AutoCAD SHX Text 1 7
AutoCAD SHX Text Grants
AutoCAD SHX Text Quemado
AutoCAD SHX Text Datil
AutoCAD SHX Text
- Work Area
AutoCAD SHX Text
LCDO FENCE AND EROSION CONTRACT
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text Y
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text Toby Hole
AutoCAD SHX Text Baylor Canyon Well
AutoCAD SHX Text Lost Tank
AutoCAD SHX Text Pena Blanca WSA
AutoCAD SHX Text
EXIT 32
AutoCAD SHX Text
CO RD E071
AutoCAD SHX Text
CO RD A13
AutoCAD SHX Text I-25
AutoCAD SHX Text
CO RD B059
AutoCAD SHX Text Dripping Springs Rd
AutoCAD SHX Text Baylor Canyon Rd
AutoCAD SHX Text I-10
AutoCAD SHX Text
EXIT 151
I-10
FIGURES AND ILLUSTRATIONS
EROSION CONTROL STRUCTURES
FOR
TOBY HOLE AND LOST TANK ENCLOSURES
Figure 2: Profile View of a Wire Check
Figure 1: Rock Rundown in a small gully
Figure 4: Example of a Zuni Bowl used to repair a head cut
Figure 3: Aerial View of a Wire Check
| 4wire enclosure TANDL-Layout1 |
| Sheets and Views |
| Layout1 |
| Baylor Canyon Well Project Map-Model |
| Sheets and Views |
| Model |
| Fence angle iron 3 wire-Layout2 |
| Sheets and Views |
| Layout2 |
| Lost Tank Project Map-Model |
| Sheets and Views |
| Model |
| Pena Blanca Project Map-Model |
| Sheets and Views |
| Model |
| Toby Hole Project Map-Model |
| Sheets and Views |
| Model |
| WORKMAP-Model |
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .