Attachment_5_Questions_and_Answers_0001.pdf

PDF 86 KB Posted

Attached to
LCDO FENCE & EROSION CONSTRUCTION FY21 Federal contract opportunity
Solicitation number
140L0621Q0060
Issued by
Department of the Interior Bureau of Land Management National Office

View the file

Other files for this federal contract opportunity

Other files attached to LCDO FENCE & EROSION CONSTRUCTION FY21, newest first.
File Type Posted
RFQ_Continuation_Pages_0002.pdf PDF
Sol_140L0621Q0060_Amd_0002.pdf PDF
Attachment_6_Updated_Bid_Worksheet_0001.pdf PDF
Sol_140L0621Q0060_Amd_0001.pdf PDF
Attachment 2 Drawings and Specifications.pdf PDF
Attachment 1 Statement of Work.pdf PDF
Attachment 3 DOL Wage Determiniation.pdf PDF
Attachment 4 Bid Schedule.pdf PDF
Sol_140L0621Q0060.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140L0621Q0060 Page 1 of 1 Attachment 5

LCDO Fence and Erosion Work

Las Cruces, NM

Contractor Q&A

140L0621Q0060 Amendment 1 – Attachment 5 Questions and Answers

Question 1: Is there an estimated quantity of concrete required for project?

Answer: The estimated quantity of concrete for anchoring the angle iron end panels and prefab pipe H-braces and corners is 25 cubic yards.

Question 2: Can a John Deere 650 Dozer with a 9'-10" blade be used for clearing brush from fence lines?

Answer: The clear width for installing fence is 4' on each side of fence. However, use of this size equipment is acceptable.

Question 3: Zuni Bowl Item 13 on Bid Schedule is showing Unit as Hour, is that how you want to calculate cost for constructing them?

Answer: No. The Units should be Each. For calculation purposes, average size of Zuni Bowls are 5 feet wide x 8 feet long x 2 feet high.

Updated Bid Schedule is attached.