This is a technical specification and construction drawing document prepared by NV5 for the State of New Hampshire's Portsmouth Circuit Court Boiler Replacement project located in Portsmouth, NH. The project involves the removal of existing boilers and installation of two new high-efficiency gas-fired condensing boilers. Acceptable manufacturers are limited to Lochinvar Corporation, Aerco Corporation, and Cleaver-Brooks. The work includes comprehensive mechanical, plumbing, and electrical system modifications, including gas piping reconnections, expansion tank installation, indirect waste routing, and integration of new control systems. Two mandatory pre-bid site walkthroughs are scheduled for March 7 and March 12, 2025 at 1:00 PM, with a bid opening on March 28, 2025 at 9:00 AM Eastern Time. The contract start date is May 23, 2025, with required completion by September 30, 2025, with potential extension for up to three additional months. The drawings detail both demolition and new work components in the boiler room basement area, including specifications for gas supply systems with drip legs, pressure regulation, ventless gas regulators, isolation valves, and proper condensate drainage.
Contractors must submit a lump sum total price for all labor and materials, including equipment startup and required training. All on-site employees require background checks. A Payment and Performance Bond equal to 100% of the contract amount is required. The State requires a minimum one-year warranty covering 100% of repair or replacement costs including parts, shipping, labor, and travel expenses. Contractors must obtain all necessary permits and comply with the latest edition of the State Plumbing and Gas Code and local amendments. Monthly payments will be made based on percentage of work completed, due 30 days after invoice receipt. The project includes mandatory waste diversion requirements with 75% of project waste to be diverted from landfills through recycling and reuse programs. Contractors must also submit rebate paperwork for condensing boilers, pumps, and variable frequency drives, with rebate funds credited back to the State. Contractors must be licensed in relevant trades including gas fitting, electrical work, and mechanical systems, and must coordinate extensively with State officials while maintaining building operations throughout construction.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
Caitlyn.M.Stubbs Stamp
05/02/24 ISSUED FOR REBID
4. Replace existing base with new base and add new base where none exists. Johnsonite or Roppe are acceptable products.
SRB Straight Resilient Base
05/02/24 ISSUED FOR REBID
ABBREVIATIONS
PIPING ABBREVIATIONS
D
G
HWR
HWS
(NAME)/ / / / / /
PIPING SYMBOLS
SD
S
BTU
FMT
FS
T
PS
AV
MV
EJ
R
CO
CALLOUT SYMBOLS
T
HVAC GENERAL NOTES HVAC DEMOLITION NOTES
NUMBER
SCALE
DRAWN BY
CHECKED BY
DATE
DATE DESCRIPTIONCHK
0220299
06/20/2023
STATE OF
NEW HAMPSHIRE
PORTSMOUTH, NH
DOVER, NH
CIRCUIT COURT
BOILERS REPLACEMENT
200 Brickstone Square
Andover, MA 01810-1488
T.978-296-6200
F.978-296-6201
W. www.nv5.com
This CADD Document is an instrument of professional service, and shall not be used, in whole or in part, for any project other than for which it was created without the expressed, written consent of NV5. Any unauthorized use, reuse, modification or alteration, including automated conversion of this document shall be at the user's sole risk without liability or legal exposure to NV5.
At the request of [IDENTIFY PARTY], this [NAME OF DELIVERABLE (REPORT, DRAWINGS, ETC.)] has been expedited to [Client] Hence, [client] is hereby notified that NV5 did not have an opportunity to conduct its industry standard quality control procedures. Accordingly, Client agrees that the [NAME OF DELIVERABLE] is subject to revision, including but not limited to contractor change orders or owner claims, in connection with [NAME OF DELIVERABLE].
SHEET OF 29
ABBREVIATIONS
NOTES AND
HVAC LEGEND
CIRCUIT COURT
PORTSMOUTH
NTS
CH
SM
MP000
09/06/2023
MECHANICAL - DEMOLITION
BOILER ROOM
SCALE: 1/4"=1'-0"
MECHANICAL - NEW WORK
BOILER ROOM
SCALE: 1/4"=1'-0"
8'4'0 1/4" = 1' - 0"
NUMBER
SCALE
DRAWN BY
CHECKED BY
DATE
DATE DESCRIPTIONCHK
0220299
06/20/2023
STATE OF
NEW HAMPSHIRE
PORTSMOUTH, NH
DOVER, NH
CIRCUIT COURT
BOILERS REPLACEMENT
200 Brickstone Square
Andover, MA 01810-1488
T.978-296-6200
F.978-296-6201
W. www.nv5.com
This CADD Document is an instrument of professional service, and shall not be used, in whole or in part, for any project other than for which it was created without the expressed, written consent of NV5. Any unauthorized use, reuse, modification or alteration, including automated conversion of this document shall be at the user's sole risk without liability or legal exposure to NV5.
At the request of [IDENTIFY PARTY], this [NAME OF DELIVERABLE (REPORT, DRAWINGS, ETC.)] has been expedited to [Client] Hence, [client] is hereby notified that NV5 did not have an opportunity to conduct its industry standard quality control procedures. Accordingly, Client agrees that the [NAME OF DELIVERABLE] is subject to revision, including but not limited to contractor change orders or owner claims, in connection with [NAME OF DELIVERABLE].
SHEET OF 29
NEW WORK PART PLANS
DEMOLITION AND
HVAC BASEMENT
CIRCUIT COURT
PORTSMOUTH
1/4" = 1'-0"
CH
SM
MP200
PORTSMOUTH - BOILER PIPING DIAGRAM
NUMBER
SCALE
DRAWN BY
CHECKED BY
DATE
DATE DESCRIPTIONCHK
0220299
06/20/2023
STATE OF
NEW HAMPSHIRE
PORTSMOUTH, NH
DOVER, NH
CIRCUIT COURT
BOILERS REPLACEMENT
200 Brickstone Square
Andover, MA 01810-1488
T.978-296-6200
F.978-296-6201
W. www.nv5.com
This CADD Document is an instrument of professional service, and shall not be used, in whole or in part, for any project other than for which it was created without the expressed, written consent of NV5. Any unauthorized use, reuse, modification or alteration, including automated conversion of this document shall be at the user's sole risk without liability or legal exposure to NV5.
At the request of [IDENTIFY PARTY], this [NAME OF DELIVERABLE (REPORT, DRAWINGS, ETC.)] has been expedited to [Client] Hence, [client] is hereby notified that NV5 did not have an opportunity to conduct its industry standard quality control procedures. Accordingly, Client agrees that the [NAME OF DELIVERABLE] is subject to revision, including but not limited to contractor change orders or owner claims, in connection with [NAME OF DELIVERABLE].
SHEET OF 29
HVAC PIPING DIAGRAM
CIRCUIT COURT
PORTSMOUTH
NTS
CH
SM
MP400
CONDENSING BOILER NEUTRALIZED
CONDENSATE SIGNAGE
NUMBER
SCALE
DRAWN BY
CHECKED BY
DATE
DATE DESCRIPTIONCHK
0220299
06/20/2023
STATE OF
NEW HAMPSHIRE
PORTSMOUTH, NH
DOVER, NH
CIRCUIT COURT
BOILERS REPLACEMENT
200 Brickstone Square
Andover, MA 01810-1488
T.978-296-6200
F.978-296-6201
W. www.nv5.com
This CADD Document is an instrument of professional service, and shall not be used, in whole or in part, for any project other than for which it was created without the expressed, written consent of NV5. Any unauthorized use, reuse, modification or alteration, including automated conversion of this document shall be at the user's sole risk without liability or legal exposure to NV5.
At the request of [IDENTIFY PARTY], this [NAME OF DELIVERABLE (REPORT, DRAWINGS, ETC.)] has been expedited to [Client] Hence, [client] is hereby notified that NV5 did not have an opportunity to conduct its industry standard quality control procedures. Accordingly, Client agrees that the [NAME OF DELIVERABLE] is subject to revision, including but not limited to contractor change orders or owner claims, in connection with [NAME OF DELIVERABLE].
SHEET OF 29
HVAC DETAILS
CIRCUIT COURT
PORTSMOUTH
NTS
CH
SM
MP600
NUMBER
SCALE
DRAWN BY
CHECKED BY
DATE
DATE DESCRIPTIONCHK
0220299
06/20/2023
STATE OF
NEW HAMPSHIRE
PORTSMOUTH, NH
DOVER, NH
CIRCUIT COURT
BOILERS REPLACEMENT
200 Brickstone Square
Andover, MA 01810-1488
T.978-296-6200
F.978-296-6201
W. www.nv5.com
This CADD Document is an instrument of professional service, and shall not be used, in whole or in part, for any project other than for which it was created without the expressed, written consent of NV5. Any unauthorized use, reuse, modification or alteration, including automated conversion of this document shall be at the user's sole risk without liability or legal exposure to NV5.
At the request of [IDENTIFY PARTY], this [NAME OF DELIVERABLE (REPORT, DRAWINGS, ETC.)] has been expedited to [Client] Hence, [client] is hereby notified that NV5 did not have an opportunity to conduct its industry standard quality control procedures. Accordingly, Client agrees that the [NAME OF DELIVERABLE] is subject to revision, including but not limited to contractor change orders or owner claims, in connection with [NAME OF DELIVERABLE].
SHEET OF 29
HVAC SCHEDULES
CIRCUIT COURT
PORTSMOUTH
NTS
CH
SM
MP700
SHEET INDEX
ISSUE
PR
OG
RE
SS
D
RA
W
IN
GS
SHEET NUMBER SHEET DESCRIPTION
PLUMBING ABBREVIATION LIST
(THIS IS A MASTER LIST, NOT ALL ABBREVIATIONS MAY APPEAR ON DRAWINGS.)
AD ACCESS DOOR / AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISH FLOOR
AP ACCESS PANEL
AUTO AUTOMATIC
BHP BRAKE HORSEPOWER
BMS BUILDING MANAGEMENT SYSTEM
BOH BACK OF HOUSE
BTU BRITISH THERMAL UNIT
°C DEGREES CELSIUS
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
DC DIRECT CURRENT
DDC DIRECT DIGITAL CONTROL
DDCFP DIRECT DIGITAL CONTROL FIELD PANEL
DF DRINKING FOUNTAIN
DFU DRAINAGE FIXTURE UNITS
DIA (~) DIAMETER
DN DOWN
E EXISTING
EFF EFFICIENCY
EMCS ENERGY MANAGEMENT CONTROL SYSTEM
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
°F DEGREES FAHRENHEIT
FLA FULL LOAD AMPS
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
FU FIXTURE UNITS
GAL GALLONS
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
H HEIGHT
HD HEAD
HOA HAND OFF AUTO
HP HORSEPOWER
HR HOUR
HS HAND SINK
HZ HERTZ
IBC INTERNATIONAL BUILDING CODE
IE INVERT ELEVATION
IFC INTERNATIONAL FIRE CODE
IFGC INTERNATIONAL FUEL GAS CODE
IMC INTERNATIONAL MECHANICAL CODE
IN INCH
IPC INTERNATIONAL PLUMBING CODE
KW KILOWATT
L LENGTH, LAVATORY
LBS POUNDS
MAX MAXIMUM
MBH 1000 BRITISH THERMAL UNITS PER HOUR
MCA MINIMUM CIRCUIT AMPS
MCC MOTOR CONTROL CENTER
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVER CURRENT PROTECTION
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
OFCI OWNER FURNISHED/CONTRACTOR
INSTALLED
P PUMP
PA PRESSURE AVAILABLE
PD PRESSURE DROP
PDI PLUMBING DRAINAGE INSTITUTE
PH PHASE
PRV PRESSURE REDUCING VALVE
PSI POUND PER SQUARE INCH
PSIA POUND PER SQUARE INCH ABSOLUTE
PSIG POUND PER SQUARE INCH GAUGE
RPM REVOLUTIONS PER MINUTE
S SINK, SOIL
SH SHOWER / STATIC HEAD
SP STATIC PRESSURE
SQ FT SQUARE FEET
SS SERVICE SINK
TAB TESTING AND BALANCING
TDH TOTAL DEVELOPED HEAD
TEL TOTAL EQUIVALENT LENGTH
TP TRAP PRIMER
TS TEMPERING STATION
TYP TYPICAL
U URINAL
UMC UNIFORM MECHANICAL CODE
UNO UNLESS NOTED OTHERWISE
UPC UNIFORM PLUMBING CODE
V VENT, VOLTS
W WIDTH, WASTE, WATT
WC WATER CLOSET
WFU WATER FIXTURE UNITS
WG WATER GAUGE
WH WATER HEATER
WP WATER PRESSURE
WPD WATER PRESSURE DROP
THIS PROJECT INVOLVES CONSTRUCTION INSIDE AN EXISTING STRUCTURE. CONTRACTORS, BY SUBMITTING A BID ARE DEEMED TO BE COMPLETELY FAMILIAR WITH THE EXISTING CONDITIONS OF THE BUILDING AS IT INFLUENCES THE WORK DESCRIBED. NO CLAIMS FOR EXTRA COMPENSATION WILL BE CONSIDERED FOR EXISTING CONDITIONS VISIBLE OR REASONABLY INFERABLE FROM A CAREFUL EXAMINATION OF THE EXISTING
BUILDING CONDITIONS.
CONTRACTOR SHALL INSPECT THE EXISTING FIELD CONDITIONS AT THE SITE (INCLUDING BUT NOT LIMITED TO SIZES, INVERTS AND POINTS OF CONNECTION) AND THE CONTRACT DOCUMENTS PRIOR TO THE START OF ANY WORK TO DETERMINE WHAT EFFECT THE EXISTING CONDITIONS WILL HAVE ON THE WORK POTENTIAL.
CONTRACTOR SHALL REPORT DISCREPANCIES TO THE ARCHITECT AND INCLUDE IN HIS BID ALL COSTS
REQUIRED TO MAKE HIS WORK MEET EXISTING CONDITIONS.
EXISTING CONDITIONS
CONTRACTOR SHALL COORDINATE THE WORK BETWEEN TRADES AND PREPARE SHOP DRAWINGS WHICH CLEARLY INDICATE THE WORK OF EACH TRADE AND THE SPATIAL RELATIONSHIP BETWEEN TRADES.
DUCTWORK ROUTING TAKES PRECEDENCE AND THE WORK OF THE OTHER TRADES SHALL BE COORDINATED ACCORDINGLY. PIPING AND DUCTWORK SYSTEMS SHALL NOT BE FABRICATED UNTIL SUCH COORDINATION AND PREPARATION OF SHOP DRAWINGS HAS BEEN COMPLETED. FABRICATION OR INSTALLATION OF WORK WHICH HAS NOT BEEN SO COORDINATED WHICH RESULTS IN CONFLICTS SHALL BE REPLACED AT NO ADDITIONAL COST. WHERE CONFLICTS ARISE DURING THE PREPARATION OF SHOP DRAWINGS, THE CONTRACTOR SHALL BRING THE CONFLICT TO THE ATTENTION OF THE ARCHITECT FOR RESOLUTION PRIOR
TO PROCEEDING FURTHER.
COORDINATION NOTE
SHEET INDEX
ISSUE
PP000 PLUMBING LEGEND, NOTES AND ABBREVIATIONS - PORTSMOUTH, NH
PP200 PLUMBING BASEMENT PART PLANS - PORTSMOUTH, NH
PP600 PLUMBING SCHEDULES AND DETAILS - PORTSMOUTH, NH
PLUMBING SYMBOL LEGEND
(THIS IS A MASTER LEGEND, NOT ALL SYMBOLS MAY APPEAR ON DRAWINGS.)
ABBR SYMBOL DESCRIPTION
SHEET NOTE
REVISION NUMBER
CW COLD WATER
IW INDIRECT WASTE
RPBP REDUCED PRESSURE BACKFLOW PREVENTER
SOV SHUT-OFF VALVE
CV CHECK VALVE
PRV PRESSURE REDUCING VALVE
MX MIXING VALVE
PIPE TRANSITION
WHA WATER HAMMER ARRESTOR
PIPE DOWN AND PIPE TEE DOWN
PIPE UP AND PIPE TEE UP
PIPE CAP
ANCHOR
FLOW ARROW
POC POINT OF CONNECTION TO EXISTING
POD POINT OF DISCONNECTION FROM EXISTING
ITEM TO BE REMOVED
IW
EQUIPMENT TYPE
EQUIPMENT NUMBER
E = EXISTING
PLAN/RISER TYPE
SHEET/RISER NUMBER
PLUMBING ABBREVIATION LIST
(THIS IS A MASTER LIST, NOT ALL ABBREVIATIONS MAY APPEAR ON DRAWINGS.)
AD ACCESS DOOR / AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISH FLOOR
AP ACCESS PANEL
AUTO AUTOMATIC
BHP BRAKE HORSEPOWER
BMS BUILDING MANAGEMENT SYSTEM
BOH BACK OF HOUSE
BTU BRITISH THERMAL UNIT
°C DEGREES CELSIUS
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
DC DIRECT CURRENT
DDC DIRECT DIGITAL CONTROL
DDCFP DIRECT DIGITAL CONTROL FIELD PANEL
DF DRINKING FOUNTAIN
DFU DRAINAGE FIXTURE UNITS
DIA (~) DIAMETER
DN DOWN
E EXISTING
EFF EFFICIENCY
EMCS ENERGY MANAGEMENT CONTROL SYSTEM
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
°F DEGREES FAHRENHEIT
FLA FULL LOAD AMPS
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
FU FIXTURE UNITS
GAL GALLONS
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
H HEIGHT
HD HEAD
HOA HAND OFF AUTO
HP HORSEPOWER
HR HOUR
HS HAND SINK
HZ HERTZ
IBC INTERNATIONAL BUILDING CODE
IE INVERT ELEVATION
IFC INTERNATIONAL FIRE CODE
IFGC INTERNATIONAL FUEL GAS CODE
IMC INTERNATIONAL MECHANICAL CODE
IN INCH
IPC INTERNATIONAL PLUMBING CODE
KW KILOWATT
L LENGTH, LAVATORY
LBS POUNDS
MAX MAXIMUM
MBH 1000 BRITISH THERMAL UNITS PER HOUR
MCA MINIMUM CIRCUIT AMPS
MCC MOTOR CONTROL CENTER
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVER CURRENT PROTECTION
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
OFCI OWNER FURNISHED/CONTRACTOR
INSTALLED
P PUMP
PA PRESSURE AVAILABLE
PD PRESSURE DROP
PDI PLUMBING DRAINAGE INSTITUTE
PH PHASE
PRV PRESSURE REDUCING VALVE
PSI POUND PER SQUARE INCH
PSIA POUND PER SQUARE INCH ABSOLUTE
PSIG POUND PER SQUARE INCH GAUGE
RPM REVOLUTIONS PER MINUTE
S SINK, SOIL
SH SHOWER / STATIC HEAD
SP STATIC PRESSURE
SQ FT SQUARE FEET
SS SERVICE SINK
TAB TESTING AND BALANCING
TDH TOTAL DEVELOPED HEAD
TEL TOTAL EQUIVALENT LENGTH
TP TRAP PRIMER
TS TEMPERING STATION
TYP TYPICAL
U URINAL
UMC UNIFORM MECHANICAL CODE
UNO UNLESS NOTED OTHERWISE
UPC UNIFORM PLUMBING CODE
V VENT, VOLTS
W WIDTH, WASTE, WATT
WC WATER CLOSET
WFU WATER FIXTURE UNITS
WG WATER GAUGE
WH WATER HEATER
WP WATER PRESSURE
WPD WATER PRESSURE DROP
THIS PROJECT INVOLVES CONSTRUCTION INSIDE AN EXISTING STRUCTURE. CONTRACTORS, BY SUBMITTING A BID ARE DEEMED TO BE COMPLETELY FAMILIAR WITH THE EXISTING CONDITIONS OF THE BUILDING AS IT INFLUENCES THE WORK DESCRIBED. NO CLAIMS FOR EXTRA COMPENSATION WILL BE CONSIDERED FOR EXISTING CONDITIONS VISIBLE OR REASONABLY INFERABLE FROM A CAREFUL EXAMINATION OF THE EXISTING
BUILDING CONDITIONS.
CONTRACTOR SHALL INSPECT THE EXISTING FIELD CONDITIONS AT THE SITE (INCLUDING BUT NOT LIMITED TO SIZES, INVERTS AND POINTS OF CONNECTION) AND THE CONTRACT DOCUMENTS PRIOR TO THE START OF ANY WORK TO DETERMINE WHAT EFFECT THE EXISTING CONDITIONS WILL HAVE ON THE WORK POTENTIAL.
CONTRACTOR SHALL REPORT DISCREPANCIES TO THE ARCHITECT AND INCLUDE IN HIS BID ALL COSTS
REQUIRED TO MAKE HIS WORK MEET EXISTING CONDITIONS.
EXISTING CONDITIONS
CONTRACTOR SHALL COORDINATE THE WORK BETWEEN TRADES AND PREPARE SHOP DRAWINGS WHICH CLEARLY INDICATE THE WORK OF EACH TRADE AND THE SPATIAL RELATIONSHIP BETWEEN TRADES.
DUCTWORK ROUTING TAKES PRECEDENCE AND THE WORK OF THE OTHER TRADES SHALL BE COORDINATED ACCORDINGLY. PIPING AND DUCTWORK SYSTEMS SHALL NOT BE FABRICATED UNTIL SUCH COORDINATION AND PREPARATION OF SHOP DRAWINGS HAS BEEN COMPLETED. FABRICATION OR INSTALLATION OF WORK WHICH HAS NOT BEEN SO COORDINATED WHICH RESULTS IN CONFLICTS SHALL BE REPLACED AT NO ADDITIONAL COST. WHERE CONFLICTS ARISE DURING THE PREPARATION OF SHOP DRAWINGS, THE CONTRACTOR SHALL BRING THE CONFLICT TO THE ATTENTION OF THE ARCHITECT FOR RESOLUTION PRIOR
TO PROCEEDING FURTHER.
COORDINATION NOTE
_none
1. PLUMBING WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE STATE PLUMBING
AND GAS CODE INCLUDING ALL LOCAL AMENDMENTS.
2. OBTAIN ALL PERMITS AND PAY ALL FEES ASSOCIATED WITH THIS WORK PRIOR TO COMMENCEMENT.
3. PIPING AND EQUIPMENT IS SHOWN DIAGRAMMATICALLY. THE ACTUAL ROUTING OF PIPING AND EXACT
LOCATION OF EQUIPMENT SHALL BE DETERMINED IN THE FIELD.
4. IN ADDITION TO REVIEWING AND COORDINATING WITH THE OTHER TRADES ( HVAC AND ELECTRICAL) THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH DETAILS OF CONSTRUCTION.
5. FURNISH AND INSTALL ALL NECESSARY PIPING, EQUIPMENT SUPPORTS AND ANY EQUIPMENT NOT
SHOWN ON DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS BUT NECESSARY TO PROVIDE A
COMPLETE AND WORKABLE SYSTEM.
6. PROVIDE ACCESS TO ALL VALVES ABOVE CEILINGS
7. FURNISH ACCESS PANELS TO THE GENERAL CONTRACTOR FOR INSTALLATION UNDER THE RELATED
TRADES.
8. INSTALL HORIZONTAL RUNS OF GAS PIPING TIGHT TO THE EXTERIOR OF THE BUILDING
9. INSTALL DIELECTRIC COUPLINGS BETWEEN DISSIMILAR MATERIALS.
10. PROVIDE DRIP LEGS FOR ALL GAS RISERS.
11. REQUIRED FIRE RESISTANCE RATING OF FLOORS, WALLS AND CEILINGS SHALL BE MAINTAINED WHEN
PIPE PENETRATIONS ARE MADE.
GENERAL NOTES
1. THE LOCATIONS OF EXISTING EQUIPMENT INCLUDING PIPING, DUCTWORK, EQUIPMENT, CONDUITS, ETC ARE SHOWN IN AN APPROXIMATE WAY ONLY. VISIT THE SITE PRIOR TO SUBMISSION OF THE BIDS AND COMMENCEMENT OF WORK TO BECOME FAMILIAR WITH THE ACTUAL CONDITIONS AND EXTENT OF THE
WORK.
2. TRACE AND LABEL ALL EXISTING SYSTEMS WITHIN THE DEMOLITION AREA AND BEYOND PRIOR TO
DISCONNECTION AND REMOVAL TO ENSURE THAT NO AREA OUTSIDE THE DEMOLITION AREA IS
AFFECTED. REVIEW IN DETAIL WITH THE GENERAL CONTRACTOR AND OWNER WHAT IS TO BE REMOVED AND REMAIN PRIOR TO WORK COMMENCING THE DEMOLITION. THERE SHALL BE NO INTERRUPTION OF
SERVICES OUTSIDE THE DEMOLITION AREA WITHOUT APPROVAL FROM THE OWNER'S
REPRESENTATIVE.
3. COORDINATE EQUIPMENT REMOVAL WITH ALL PARTIES TO PROVIDE DISCONNECTION. REMOVE
EQUIPMENT BY UNFASTENING AT THE SUPPORTS OR ATTACHMENTS. ALSO REMOVE THE
ATTACHMENTS FROM THE BUILDING, LEAVING NO COMPONENT OF THE ORIGINAL INSTALLATION.
4. EXERCISE CARE WITH EQUIPMENT THAT IS TO BE RELOCATED OR TURNED OVER TO THE OWNER.
EXAMINE THE EQUIPMENT BEFORE REMOVAL IN THE PRESENCE OF THE OWNER'S REPRESENTATIVE TO
DETERMINE ITS CONDITION. DELIVER OWNER-RETAINED EQUIPMENT TO AN ON-SITE LOCATION
DESIGNATED BY THE OWNER AND OBTAIN ACKNOWLEDGMENT OF RECEIPT IN ORIGINAL CONDITION.
5. INSTALL RELOCATED EQUIPMENT IN ORIGINAL CONDITION ENSURING NO DAMAGE.
6. PROMPTLY REPAIR ANY DAMAGE CAUSED DURING/BY THE EXECUTION OF WORK. DAMAGE INCLUDES
BUT IS NOT LIMITED TO DESTRUCTION OF ITEMS INTENDED TO REMAIN OR TO BE SALVAGED.
7. NOTIFY THE OWNER'S REPRESENTATIVE IMMEDIATELY OF ANY UNANTICIPATED HIDDEN CONDITIONS
ENCOUNTERED DURING THE DEMOLITION.
8. ALL ITEMS REMOVED SHALL BE OFFERED TO THE OWNER FOR SALVAGE. IF THE OWNER DOES NOT TAKE POSSESSION, DISPOSE OF THE ITEMS IN A SAFE AND LEGAL MANNER. ALL ITEMS CLASSIFIED AS
HAZARDOUS SHALL BE DISPOSED AS HAZARDOUS WASTES AND A UNIFORM HAZARDOUS WASTE
MANIFEST SHALL BE PROVIDED TO THE OWNER.
9. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING DURING DEMOLITION.
PREVENT INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE ADEQUATE SHORING AND
BRACING TO PREVENT COLLAPSE. IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION
BEFORE BEING DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT WINDBLOWN DUST.
10. DO NOT USE CUTTING TORCHES UNTIL WORK AREA IS CLEARED OF FLAMMABLE MATERIALS. AT CONCEALED SPACES, SUCH AS DUCT AND PIPE INTERIORS, VERIFY CONDITION AND CONTENTS OF
HIDDEN SPACE BEFORE STARTING FLAME-CUTTING OPERATIONS. MAINTAIN FIRE WATCH AND
PORTABLE FIRE-SUPPRESSION DEVICES DURING FLAME-CUTTING OPERATIONS. MAINTAIN ADEQUATE
VENTILATION WHEN USING CUTTING TORCHES.
11. NOTIFY UTILITY COMPANIES IN ACCORDANCE WITH THEIR REQUIREMENTS PRIOR TO DEMOLITION.
VERIFY THAT THE UTILITIES HAVE BEEN DISCONNECTED, VALVED, CAPPED AND MADE SAFE PRIOR TO
DEMOLITION.
12. DRAIN, PURGE, OR OTHERWISE REMOVE, COLLECT, AND PROPERLY DISPOSE OF CHEMICALS, LIQUIDS, GASES, EXPLOSIVES, ACIDS, FLAMMABLES, OR OTHER DANGEROUS MATERIALS BEFORE PROCEEDING
WITH DEMOLITION OPERATIONS.
13. PROPERLY LABEL ALL UNLABELED SERVICE PIPELINES AND VALVES TO REMAIN WITH COLOR PIPE MARKERS AND VALVE TAGS. MOUNT A VALVE AND SERVICE CHART IN THE AREA OF DEMOLITION THAT
IDENTIFIES ALL LABELED SERVICES. URN ONE COPY OF SAME OVER TO THE CM OWNER.
14. PRIOR TO DEMOLITION, MAKE SAFE ALL SERVICE PIPE TERMINATIONS TO THE AREA. PROVIDE VALVE
AND CAPS ON PRESSURE SERVICES TO THE AREA THAT ARE TO REMAIN IN SERVICE.
DEMOLITION NOTES
NUMBER
SCALE
DRAWN BY
CHECKED BY
DATE
DATE DESCRIPTIONCHK
RText (RText)
0220299
05/02/2024
STATE OF
NEW HAMPSHIRE
PORTSMOUTH, NH
DOVER, NH
CIRCUIT COURT
BOILERS REPLACEMENT
200 Brickstone Square
Andover, MA 01810-1488
T.978-296-6200
F.978-296-6201
W. www.nv5.com
This CADD Document is an instrument of professional service, and shall not be used, in whole or in part, for any project other than for which it was created without the expressed, written consent of NV5. Any unauthorized use, reuse, modification or alteration, including automated conversion of this document shall be at the user's sole risk without liability or legal exposure to NV5.
At the request of [IDENTIFY PARTY], this [NAME OF DELIVERABLE (REPORT, DRAWINGS, ETC.)] has been expedited to [Client] Hence, [client] is hereby notified that NV5 did not have an opportunity to conduct its industry standard quality control procedures. Accordingly, Client agrees that the [NAME OF DELIVERABLE] is subject to revision, including but not limited to contractor change orders or owner claims, in connection with [NAME OF DELIVERABLE].
SHEET OF 29
05/02/24 ISSUED FOR REBID
ABBREVIATIONS
NOTES AND
PLUMBING LEGEND
CIRCUIT COURT
PORTSMOUTH
NTS
RM
MD
PP000
05/06/2024
1 2 3
A
B
VAULT
B17
MECH ROOM
B16
STAIRS
B18
STAIRS
B15
2"
2"
REMOVE EXIST. 2" GAS PIPE TO BOILER.
CUT AND CONNECT NEW 2" GAS PIPE TO EXISTING 2"
GAS PIPE. INSTALL VALVE AND CAPPED FOR FUTURE
USE
CUT AND CAP ALL ASSOCIATED C.W.,
H.W. AND GAS PIPING CONNECTED TO
THE BOILER. REMOVAL OF EXISTING
BOILER (BY OTHERS)/ /
last
EXISTING WATER
SERVICE TO REMAIN
4" F.D.
4" F.D.
EXISTING ELECTRIC
WATER HEATER TANK TO
REMAIN.
(NO RECIRCULATION LINE)
CUT, VALVE AND CAP EXISTING 12"
C.W. FEED TO BOILER.
EXISTING HONEYWELL AL-1000
GAS METER WITH PRESSURE
REGULATOR TO REMAIN.
1 2 3
A
B
VAULT
B17
MECH ROOM
B16
STAIRS
B18
STAIRS
B15
2" 2"
CUT AND CONNECT NEW 2" GAS PIPE
TO EXISTING 2" GAS CAPPED OUTLET.
2"
PB-2
PB-1
114" GAS PIPE DROP
APPROXIMATELY
3'- 514" A.F.F.
114" GAS PIPE DROP
APPROXIMATELY
3'- 514" A.F.F.
NEW EXPANSION
TANK (BY OTHERS)
12" C.W. VALVED AND CAPPED
FEED TO NEW EXPANSION
TANK.
4" F.D.
CUT AND CONNECT
NEW 12" C.W. TO
EXISTING 12" C.W.
VALVED AND CAPPED OUTLET
2"
EXISTING ELECTRIC
WATER HEATER TANK TO
REMAIN.
(NO RECIRCULATION LINE)
4" F.D.
2"
EXISTING WATER
SERVICE TO REMAIN
EXISTING HONEYWELL AL-1000
GAS METER WITH PRESSURE
REGULATOR TO REMAIN.
12" 12"
12"
12"
12"
PROVIDE EACH BOILER IS A VENTLESS GAS
REGULATOR, DRIP LEG, ISOLATION VALVE
AND UNION. (TYP OF 2)
P100
P-600
NEW 1/2" RPBP TO
EXPANSION TANK
ROUTE FULL SIZED INDIRECT WASTE
LINE TO FLOOR DRAIN KEEPING THE
LINE TIGHT TO EXISTING BOILER CURB.
PLUMBING - DEMOLITION
BOILER ROOM
SCALE: 1/4"=1'-0"
P-200
PLUMBING - NEW WORK
BOILER ROOM
SCALE: 1/4"=1'-0"
P-200
8'4'0 1/4" = 1' - 0"
NUMBER
SCALE
DRAWN BY
CHECKED BY
DATE
DATE DESCRIPTIONCHK
RText (RText)
0220299
05/02/2024
STATE OF
NEW HAMPSHIRE
PORTSMOUTH, NH
DOVER, NH
CIRCUIT COURT
BOILERS REPLACEMENT
����%ULFNVWRQH�6TXDUH
$QGRYHU��0$�����������
7�������������
:��ZZZ�QY��FRP
This CADD Document is an instrument of professional service, and shall not be used, in whole or in part, for any project other than for which it was created without the expressed, written consent of NV5. Any unauthorized use, reuse, modification or alteration, including automated conversion of this document shall be at the user's sole risk without liability or legal exposure to NV5.
At the request of [IDENTIFY PARTY], this [NAME OF DELIVERABLE (REPORT, DRAWINGS, ETC.)] has been expedited to [Client] Hence, [client] is hereby notified that NV5 did not have an opportunity to conduct its industry standard quality control procedures. Accordingly, Client agrees that the [NAME OF DELIVERABLE] is subject to revision, including but not limited to contractor change orders or owner claims, in connection with [NAME OF DELIVERABLE].
AREA OF WORK
SHEET OF 29
05/02/24 ISSUED FOR REBID
NEW WORK PART PLANS
DEMOLITION AND
PLUMBING BASEMENT
CIRCUIT COURT
PORTSMOUTH
1/4" = 1'-0"
RM
MD
PP200
3" M
IN
TO EQUIPMENT
CAP
GAS SUPPLY INLET
TEE FITTING
GAS NIPPLE
TYPICAL GAS SEDIMENT TRAP DETAIL
FINISHED FLOOR 3"
M
IN
P621
GRADE
NATURAL GAS RISER DIAGRAM
LONGEST RUN EQUALS: 70'-0" (TDL) (<8"W.C.)
TOTAL CONNECTED LOAD AT METER: 1,450 CFH
PIPE SIZING BASED ON NFPA 54 (2012) SECTION
6.2(B) - 0.5"W.C MAX PRESSURE DROP. AS
REFERENCED BY 248 CMR. SCHEDULE 40 METALLIC
PIPE AT LESS THEN 2 PSI INLET.
SYSTEM, PRESSURE DROP = <0.5 IN. W.C.
70' = 1,450 CFH @ 2" MAIN AND 1-1/2" DROP
EXISTING GAS METER AND
REGULATOR. GAS COMPANY HAS
CONFIRMED EXISTING METER AND
REGULATOR IS SIZED CORRECTLY
FOR THE NEW GAS LOAD.
2" (1,450 CFH)
(2) 725 CFH (1,450CFH TOTAL)
BOILERS TO BE PROVIDED.
PROVIDE NEW 1-1/2"G DROPS
FROM EXISTING MAIN, PROVIDE
UNION, ISOLATION VALVE AND
VENTLESS PRESSURE
REGULATOR. (TYP OF 2)
NOT TO SCALE
PB-1
P001PORTSMOUTH GAS PIPING ARRANGEMENT
GM
FLOOR
EXTERIOR
PARTITION
PB-2
NOTE:
SEE P-200 PLAN FOR GAS EQUIPMENT, ROUTINGS AND SIZES.
REDUCED PRESSURE BACKFLOW PREVENTER P100
NOTES:
1. FURNISH TO OWNER ONE TEST KIT AND SPARE PARTS KIT.
2. THIS CONTRACTOR SHALL ACT AS THE OWNERS AGENT IN SEEKING APPROVAL
FROM ALL LOCAL AND STATE AUTHORITIES. THIS CONTRACTOR SHALL SUBMIT ALL
PLANS, SPECS. AND APPLICATIONS REQUIRED FOR APPROVAL AND PAY ALL FEES.
3. SEE FLOOR PLANS FOR SIZES.
4. MAINTAIN 1'-0" CLEARANCE FROM WALL.
5. TEST AND CERTIFY EACH INSTALLATION.
FINISHED
FLOOR
IN OUT
3' TO 4'
ABOVE FLOOR
CONT. BY HVAC
TEST COCK TYPICAL
PIPE TO
FLOOR DRAIN
FULL SIZE AIR GAP
STRAINER
SHUT OFF VALVE TYPICAL
ALL BRONZE REDUCED PRESSURE
BACKFLOW PREVENTER
ADJUSTABLE
FLOOR SUPPORT
PIPE SADDLESUPPORT NUT
P801
BAND HANGER
FOR PIPE SIZES 12" THRU 4"
BAND HANGER WITH INSULATED PIPE
PREFORMED
FIBERGLASS
INSULATION w/
VAPOR BARRIER
GALVANIZED
STEEL
INSULATION
SHIELD (12" LONG)
NOTES:
1. SEE SPECIFICATION FOR HANGER SIZES AND MATERIAL.
2. DISTANCE BETWEEN HANGERS SHALL BE IN ACCORDANCE WITH THE
APPLICABLE PLUMBING CODE.
3. HANGER ROD SHALL BE PER MANUFACTURER'S RECOMMENDATIONS.
SUPPORT NUT
P800
BAND HANGER
FOR PIPE SIZES 12" THRU 4"
BAND HANGER
NOTES:
1. SEE SPECIFICATION FOR HANGER SIZES AND MATERIAL.
2. DISTANCE BETWEEN HANGERS SHALL BE IN ACCORDANCE WITH THE APPLICABLE
PLUMBING CODE.
3. HANGER ROD SHALL BE PER MANUFACTURER'S RECOMMENDATIONS.
CL
CL
LOCKNUT
INSULATION
PIPING
A
12"OF A 12"OF A
INSULATION SHIELD
SCHEDULE
PIPE SIZE DIM A
GA.
OF
STEEL
UP TO 4" 12" 18
5" & 6" 18" 18
ABOVE 6" 24" 14
PIPE SHIELD DIAGRAM
WASHER
P809
EXISTING AND PROPOSED GAS FIRED EQUIPMENT SCHEDULE (PORTSMOUTH)
TAG NO. /
EQUIPMENT QTY. INPUT (EA.)
CFH
TOTAL INPUT
CFH
REQ'D
PRESS. LOCATION
PRESSURE
DROP FROM
METER
REMARKS
DEMOLISHED
BOILERS 1 1,357 1,357 4.4"-14"W.C.
BOILER /
MECHANICAL
ROOM
NO EXISTING REGULATOR,
DEMOLISH EXISTING
DROP UP MAIN, CAP AND
MAKE SAFE.
NEW BOILERS 2 725 1,450 4"-14"W.C.
BOILER /
MECHANICAL
ROOM
<0.5"W.C.
2012 NFPA 54
TABLE 6.2(b)
PROVIDE VENTLESS
LOCKUP STYLE GAS
REGULATOR TO REDUCE
PRESSURE. EQUIVALENT
LENGTH OF PIPING IS
70FT INCLUDING VALVES,
TEES AND ELBOWS
EXISTING
TOTAL
LOAD
1,357
PROPOSED
TOTAL
LOAD
1,450
2" (725 CFH)
1-1/2" (725 CFH)
ROUTE INDIRECT WASTE
TO THE NEAREST FLOOR
DRAIN AS SHOWN ON
PLANS.
NUMBER
SCALE
DRAWN BY
CHECKED BY
DATE
DATE DESCRIPTIONCHK
RText (RText)
0220299
05/02/2024
STATE OF
NEW HAMPSHIRE
PORTSMOUTH, NH
DOVER, NH
CIRCUIT COURT
BOILERS REPLACEMENT
200 Brickstone Square
Andover, MA 01810-1488
T.978-296-6200
F.978-296-6201
W. www.nv5.com
This CADD Document is an instrument of professional service, and shall not be used, in whole or in part, for any project other than for which it was created without the expressed, written consent of NV5. Any unauthorized use, reuse, modification or alteration, including automated conversion of this document shall be at the user's sole risk without liability or legal exposure to NV5.
At the request of [IDENTIFY PARTY], this [NAME OF DELIVERABLE (REPORT, DRAWINGS, ETC.)] has been expedited to [Client] Hence, [client] is hereby notified that NV5 did not have an opportunity to conduct its industry standard quality control procedures. Accordingly, Client agrees that the [NAME OF DELIVERABLE] is subject to revision, including but not limited to contractor change orders or owner claims, in connection with [NAME OF DELIVERABLE].
SHEET OF 29
05/02/24 ISSUED FOR REBID
AND DETAILS
PLUMBING SCHEDULES
CIRCUIT COURT
PORTSMOUTH
NTS
RM
RM
PP600
SWITCH LEGEND
SINGLE POLE SWITCH, RATED 20A, 120/277V
"a" LOWER CASE LETTER INDICATES FIXTURE SWITCH CONTROL
MOTOR RATED SWITCH FOR EMERGENCY BOILER SHUTOFF
S a
S B
ABBREVIATIONS
A/AMP AMPERE KWH KILOWATT HOURS
AC ALTERNATING CURRENT LTG LIGHTING
ADA AMERICAN WITH DISABILITIES
ACT MCB MAIN CIRCUIT BREAKER
AF AMPERE FRAME MEC MASSACHUSETTS ELECTRICAL
CODE
AFF ABOVE FINISHED FLOOR M/G MOTOR/GENERATOR SET
AFG ABOVE FINISHED GRADE MH MANHOLE
AIC AMPERE INTERRUPTING
CAPACITY MLO MAIN LUGS ONLY
AL ALUMINUM MTD MOUNTED
AT AMPERE TRIP MTG MOUNTING
ATS AUTOMATIC TRANSFER SWITCHNC NORMALLY CLOSED CONTACT
AWG AMERICAN WIRE GAUGE NEC NATIONAL ELECTRICAL CODE
B BURIED NO NORMALLY OPEN CONTACT
C CONDUIT NTS NOT TO SCALE
CA CABLE # NUMBER
CATV CABLE TELEVISION OPD OVER CURRENT PROTECTION
DEVICE
CCTV CLOSED CIRCUIT TELEVISION
SYSTEM POS PROVIDED UNDER OTHER
SECTIONS
CB CIRCUIT BREAKER PVC POLYVINYL CHLORIDE
CKT CIRCUITS PWR POWER
CPU CENTRAL PROCESSING UNIT RGS RIGID GALVANIZED STEEL
℄ CENTERLINE RMS ROOT MEAN SQUARE VALUE
dB DECIBEL RPM REVOLUTIONS PER MINUTE
DC DIRECT CURRENT SPD SURGE PROTECTIVE DEVICE
DWG DRAWING SN SOLID NEUTRAL
EC ELECTRICAL CONTRACTOR SWBD SWITCHBOARD
EMT ELECTRIC METALLIC TUBING TB TERMINAL BLOCK
FDR FEEDER TEL TELEPHONE
FLMT FLEXIBLE LIQUID TIGHT METALLIC
TUBING TERMN TERMINAL
FREQ FREQUENCY TSP TWISTED SHIELDED-PAIR
GEC GROUNDING ELECTRODE
CONDUCTOR TVSS TRANSIENT VOLTAGE SURGE
SUPPRESSER
GFI GROUND FAULT INTERRUPTING TYP TYPICAL
GND GROUND UG UNDERGROUND
HH HANDHOLE UNO UNLESS NOTED OTHERWISE
HP HORSEPOWER UPS UNINTERRUPTIBLE POWER
SUPPLY
HVAC HEATING, VENTILATING AND AIR
CONDITIONING UTP UNSHIELDED TWISTED-PAIR
HZ HERTZ V VOLTS
IG ISOLATED GROUND VA VOLT-AMPERE
JB JUNCTION BOX VSD VARIABLE SPEED DRIVE
KVA KILOVOLT-AMPERE W WATTS
KW KILOWATT WP WEATHERPROOF
WIRING DEVICE LEGEND
DUPLEX RECEPTACLE, GROUNDING TYPE, RATED 20A, 125V
"5"- INDICATES CIRCUIT NUMBER
"GFI"- INDICATES INTEGRAL GROUND FAULT CIRCUIT INTERRUPTER
DOUBLE DUPLEX RECEPTACLE, GROUNDING TYPE, RATED 20A, 125V
JUNCTION BOX
GFI
J
MOTOR & CONTROLS LEGEND
MAGNETIC MOTOR STARTER, REFER TO MAGNETIC MOTOR STARTER & VFD
SCHEDULE FOR TYPE, SIZE AND ENCLOSURE
EQUIPMENT CONTROL PANEL
VARIABLE SPEED DRIVE
DISCONNECT SWITCH RATED 30AMP, 3-POLE, IN NEMA TYPE 1 ENCLOSURE,
UNLESS OTHERWISE NOTED
"3R" - INDICATES NEMA TYPE 3R ENCLOSURE
"2P" - INDICATES 2 POLE SINGLE PHASE DISCONNECT
"60AS" - INDICATES 60A SWITCH
FUSED DISCONNECT SWITCH, 3-POLE, IN NEMA TYPE 1 ENCLOSURE,
UNLESS OTHERWISE NOTED.
"3R" - INDICATES NEMA TYPE 3R ENCLOSURE
"60AS" - INDICATES 60AMP SWITCH
"50AF" - INDICATES 50AMP FUSES
EQUIPMENT TAG, TOP ALPHANUMERIC CORRESPONDS TO EQUIPMENT ID
LOWER INDICATES LOAD (KW, HP, ETC.)
CP
VFD
30AS
60AF
60AS
FB-4
7.5KW
POWER DISTRIBUTION
208Y/120 VOLT PANELBOARD, SURFACE MOUNTED
REFER TO SCHEDULE OF PANELBOARDS
DRY TYPE TRANSFORMER
UTILITY METER AND SOCKET
T
M
LIGHTING FIXTURE LEGEND
LIGHTING FIXTURE (SEE LIGHTING FIXTURE SCHEDULE)
"FR2" - INDICATES LIGHTING FIXTURE TYPE
"2" - INDICATES CIRCUIT NUMBER
"a" - INDICATES SWITCH CONTROL
"NL"- INDICATES NIGHT LIGHT (UNSWITCHED) CIRCUIT
EXIT SIGN LIGHTING FIXTURE, CEILING, PENDANT MOUNTED,
ARROWS AND EXIT FACE (SHADED) AS INDICATED
EMERGENCY LIGHTING BATTERY UNIT WITH DOUBLE LAMP HEADS
FR2
2,a
ES2
ES1
EB1BRANCH CIRCUIT & FEEDER LEGEND
BRANCH CIRCUIT OR FEEDER CONCEALED IN FINISHED AREAS
BRANCH CIRCUIT OR FEEDER TURNING UP TOWARDS OBSERVER
BRANCH CIRCUIT OR FEEDER TURNING DOWN AWAY FROM OBSERVER
BRANCH CIRCUIT HOME RUN TICKS INDICATE QUANTITY OF
CONDUCTORS, GROUND CONDUCTORS ARE NOT INDICATED. NO TICKS
INDICATES 2#12 & 1#12G IN 3/4"C MINIMUM. R22A-1,3,5 INDICATES PANEL
AND CIRCUIT DESIGNATION FROM WHICH HOMERUN SHALL ORIGINATE.
EACH CIRCUIT SHALL BE 20A-1P (20AMP SINGLE POLE) UNLESS NOTED
OTHERWISE.
R22A-1,3,5
FIRE ALARM LEGEND
FIRE ALARM CONTROL PANEL
FIRE ALARM MANUAL PULL STATION
FIRE ALARM AUDIBLE AND VISUAL DEVICE, NUMERAL INDICATES CANDELA
VALUE
FIRE ALARM SMOKE DETECTOR, PHOTO ELECTRIC UNLESS NOTED
OTHERWISE
CARBON MONOXIDE SENSOR
FACP
F
110cd
F WG
S
CO
EXISTING EQUIPMENT LEGEND
XM EXISTING EQUIPMENT TO REMAIN
X EXISTING EQUIPMENT TO BE REMOVED
XR EXISTING EQUIPMENT TO BE RELOCATED
XRW EXISTING EQUIPMENT TO BE REWORKED
XN NEW LOCATION OF EXISTING RELOCATED EQUIPMENT
NR EXISTING EQUIPMENT TO BE REMOVED AND NEW EQUIPMENT TO BE
INSTALLED ON EXISTING BRANCH/FEEDER
EXISTING EQUIPMENT FOR INFORMATION ONLY-
INDICATED BY SYMBOL WITH LIGHT AND OUT OF FUNCTION LINE
TYPE
EXISTING EQUIPMENT TO BE REWORKED-
INDICATED BY SYMBOL WITH DASHED AND IN FUNCTION LINE TYPE
NUMBER
SCALE
DRAWN BY
CHECKED BY
DATE
DATE DESCRIPTIONCHK
RText (RText)
0220299
05/02/2024
STATE OF
NEW HAMPSHIRE
PORTSMOUTH, NH
DOVER, NH
CIRCUIT COURT
BOILERS REPLACEMENT
200 Brickstone Square
Andover, MA 01810-1488
T.978-296-6200
F.978-296-6201 W. www.nv5.com
This CADD Document is an instrument of professional service, and shall not be used, in whole or in part, for any project other than for which it was created without the expressed, written consent of NV5. Any unauthorized use, reuse, modification or alteration, including automated conversion of this document shall be at the user's sole risk without liability or legal exposure to NV5.
At the request of [IDENTIFY PARTY], this [NAME OF DELIVERABLE (REPORT, DRAWINGS, ETC.)] has been expedited to [Client] Hence, [client] is hereby notified that NV5 did not have an opportunity to conduct its industry standard quality control procedures. Accordingly, Client agrees that the [NAME OF DELIVERABLE] is subject to revision, including but not limited to contractor change orders or owner claims, in connection with [NAME OF DELIVERABLE].
SHEET OF 29
05/02/24 ISSUED FOR REBID
ABBREVIATIONS
NOTES AND
ELECTRICAL LEGEND
CIRCUIT COURT
PORTSMOUTH
NTS
RAR
DJF
EP000
B
VAULT
B17
MECH ROOM
B16
STAIRS
B15
DISCONNECT AND MAKE
SAFE EXISTING BOILER TO
BE REMOVED BY DIVISION 23
P-1
P-2
XM
XM
X
C P
NR NR
NR
NR
NR
NR NR
MAIN DISTRIBUTION PANEL
EXISTING BOILER
CONTROL PANEL
XM
XM
XM
FA
C P
XM
XRW
XM
XM
EXISTING PANEL 'PDP'
225A,120/208V,3Ø,4W
EXISTING PANEL 'PP1'
100A,120/208V,3Ø,4W
EXISTING FIRE ALARM
CONTROL PANEL
T
EXISTING IT RACK
XM
XM
X M
M XM
XM XMS
XMS
XM
EWH
XM
S
XM
B
B-1 X
ELECTRICAL - DEMOLITION
BOILER ROOM
SCALE: 1/4"=1'-0"
EP100
1. REFER TO THE ARCHITECTURAL DRAWINGS FOR THE EXTENT OF THE DEMOLITION SCOPE OF
WORK AND AREA. THE DEMOLITION PLANS INDICATE THE GENERAL INTENT AND ARE NOT
INTENDED TO SHOW ALL ITEMS TO BE REMOVED OR RETAINED. THE ELECTRICAL SCOPE MAY
EXTEND BEYOND THE AREA DEFINED BY THE ARCHITECTURAL DEMOLITION LIMITS TO FULLY
COMPLY WITH VARIOUS REQUIREMENTS OF THE CONTRACT DOCUMENTS.
2. THE ELECTRICAL DEMOLITION PLANS ARE NOT INTENDED TO SHOW ALL ITEMS TO BE REMOVED
OR RETAINED. DISCONNECT AND MAKE SAFE DEVICES AND EQUIPMENT LOCATED ON WALLS
AND/OR CEILINGS TO BE REMOVED. NOTIFY THE OWNER'S REPRESENTATIVE IMMEDIATELY OF
ANY UNANTICIPATED HIDDEN CONDITIONS ENCOUNTERED DURING THE DEMOLITION.
3. PERFORM ELECTRICAL DEMOLITION WORK AS SHOWN ON THE DRAWINGS AND AS SPECIFIED
IN COOPERATION WITH THE OTHER TRADES AND AS SCHEDULED AND APPROVED BY THE
OWNER'S REPRESENTATIVE. DISCONNECT AND MAKE SAFE ALL ELECTRICAL EQUIPMENT
IDENTIFIED FOR REMOVAL ON THE ELECTRICAL, HVAC, PLUMBING, AND FIRE PROTECTION
PLANS.
4. THE LOCATIONS OF EXISTING EQUIPMENT INCLUDING PIPING, DUCTWORK, EQUIPMENT,
CONDUITS, ETC ARE SHOWN IN AN APPROXIMATE WAY ONLY. VISIT THE SITE PRIOR TO
SUBMISSION OF THE BIDS AND COMMENCEMENT OF WORK TO BECOME FAMILIAR WITH THE
ACTUAL CONDITIONS AND EXTENT OF THE WORK.
5. POWER OUTAGES CAUSED BY DEMOLITION THAT AFFECT OTHER AREAS SHALL BE HELD TO A
MINIMUM. SHUTDOWNS SHALL BE COORDINATED WITH USERS AND THE OWNER. NIGHT,
WEEKEND, AND/OR HOLIDAY TIME REQUIRED TO PERFORM ELECTRICAL DEMOLITION WORK OR
NEW ELECTRICAL WORK SHALL BE CARRIED AS PART OF THE CONTRACT COST.
6. CIRCUIT TRACE AND LABEL ALL EXISTING BRANCH CIRCUITS AND FEEDERS WITHIN THE AREA OF DEMOLITION SCOPE PRIOR TO DE-ENERGIZING AND DISCONNECTION. ALL CIRCUITS WITHIN
PANELBOARDS IDENTIFIED FOR REMOVAL SHALL BE TRACED AND LABELED TO ENSURE THAT
NO AREA OUTSIDE THE DEMOLITION SCOPE LIMIT IS AFFECTED. THERE SHALL BE NO
INTERRUPTION OF SERVICES OUTSIDE THE DEMOLITION AREA WITHOUT APPROVAL FROM THE
OWNER'S REPRESENTATIVE.
7. DE-ENERGIZE AND REMOVE ALL CONDUCTORS AND RACEWAYS TO THEIR POINTS OF ORIGIN
WITHIN THE AREA OF DEMOLITION SCOPE. ITEMS IDENTIFIED FOR DEMOLITION SHALL NOT BE
ABANDONED IN PLACE. RACEWAYS THAT ENTER MASONRY WALLS AND FLOORS SHALL BE CUT
FLUSH AT THE SURFACE FOR PATCHING BY OTHERS. ALL CIRCUIT BREAKERS ASSOCIATED
WITH THE DEMOLITION SCOPE SHALL BE DE-ENERGIZED AND LABELED SPARE.
8. PROMPTLY REPAIR ANY DAMAGE CAUSED DURING/BY THE EXECUTION OF WORK. DAMAGE
INCLUDES BUT IS NOT LIMITED TO DESTRUCTION OF ITEMS INTENDED TO REMAIN OR TO BE
SALVAGED.
9. EXERCISE CARE WITH EQUIPMENT THAT IS TO BE RELOCATED OR TURNED OVER TO THE
OWNER. EXAMINE THE EQUIPMENT BEFORE REMOVAL IN THE PRESENCE OF THE OWNER'S
REPRESENTATIVE TO DETERMINE ITS CONDITION. DELIVER OWNER-RETAINED EQUIPMENT TO
AN ON-SITE LOCATION DESIGNATED BY THE OWNER AND OBTAIN ACKNOWLEDGMENT OF
RECEIPT IN ORIGINAL CONDITION.
10. ALL ITEMS REMOVED SHALL BE OFFERED TO THE OWNER FOR SALVAGE. IF THE OWNER DOES
NOT TAKE POSSESSION, DISPOSE OF THE ITEMS IN A SAFE AND LEGAL MANNER. ALL ITEMS
CLASSIFIED AS HAZARDOUS SHALL BE DISPOSED AS HAZARDOUS WASTES AND A UNIFORM
HAZARDOUS WASTE MANIFEST SHALL BE PROVIDED TO THE OWNER.
11. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING DURING
DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE ADEQUATE
SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY REPAIR DAMAGED PROPERTY
TO THE CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT
WINDBLOWN DUST.
12. THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN FULLY FUNCTIONAL DURING THE ENTIRE
DEMOLITION AND CONSTRUCTION PERIOD. REUSE OF EXISTING FIRE ALARM SYSTEM
RACEWAYS SHALL NOT BE ALLOWED. ALL REQUIRED SYSTEM SHUTDOWNS SHALL BE
COORDINATED WITH AND APPROVED BY THE OWNER'S REPRESENTATIVE AND THE AUTHORITY
HAVING JURISDICTION. DEMOLITION OF THE EXISTING SYSTEM SHALL NOT COMMENCE UNTIL
THE NEW SYSTEM HAS BEEN COMPLETELY INSTALLED, TESTED AND APPROVED BY THE
AUTHORITY HAVING JURISDICTION.
13. CREATE AND SUBMIT IMPAIRMENT PLANS TO THE OWNER AND AHJ IF ANY PORTION OF THE
EXISTING FIRE ALARM SYSTEM IS TAKEN OUT OF SERVICE DURING THE EXECUTION OF THE
PROJECT.
14. REMOVED FLUORESCENT AND HID LAMPS AND BATTERIES SHALL BE RECYCLED BY A FACILITY
APPROVED BY THE OWNER'S REPRESENTATIVE.
15. ALL BALLASTS IN LIGHTING FIXTURES TO BE DISPOSED SHALL BE VERIFIED TO BE PCB FREE.
ALL BALLASTS MANUFACTURED PRIOR TO 1979 AND NOT LABELED AS PCB FREE SHALL BE
CONSIDERED TO CONTAIN PCBS. PROVIDE WRITTEN VERIFICATION TO THE OWNER'S
REPRESENTATIVE THAT CONFIRMS PCB FREE WASTE. WHERE PCB FREE WASTE CANNOT
BE VERIFIED, BALLASTS SHALL BE RECYCLED BY A FACILITY APPROVED BY THE OWNER'S
REPRESENTATIVE, WITH PCB COMPONENTS ELIMINATED BY A HIGH TEMPERATURE
INCINERATION.
ELECTRICAL DEMOLITION NOTES
1 2 3
A
B
VAULT
B17
MECH ROOM
B16
STAIRS
B15
PP-5PP-4
LS1
NR
PB-2PB-1
P-1
P-2
XM
XM
C P
MAIN DISTRIBUTION PANEL
EXISTING BOILER
CONTROL PANEL
XM
XM
XM
FA
C
P
XM
XRW
XM
XM
EXISTING PANEL 'PDP'
225A,120/208V,3Ø,4W
EXISTING PANEL 'PP1'
100A,120/208V,3Ø,4W
EXISTING FIRE ALARM
CONTROL PANEL
T
EXISTING IT RACK
XM
XM
X M
M XM
XM
XMS
XM
EWH
XM
LS1 NR
LS1
NR
LS1
NR
SS
S
XM
BXMS
SB
PROVIDE BOILER SHUTDOWN
SWITCH, SEE DETAIL E316
ON DRAWING EP300 FOR
ADDITIONAL INFORMATION
LS1E
NR
LS1E
NR
LS1E
NR
POWER NOTES:
1. REFER TO DRAWING EP000 FOR LEGEND, SYMBOLS AND GENERAL NOTES.
2. REFER TO ARCHITECTURAL AND MECHANICAL DRAWINGS FOR ASSOCIATED
NOTES, DETAILS, HEIGHTS AND EXACT LOCATIONS OF ALL EQUIPMENT.
3. CIRCUIT NUMBERS DENOTE CIRCUITING INTENT. EXACT NUMBER
DESIGNATIONS SHALL BE DETERMINED IN THE FIELD AND REFLECTED ON THE
AS BUILT DRAWINGS. INTERCONNECTING BRANCH WIRING SHALL BE SIZED
EQUAL TO THE HOMERUN UNLESS NOTED OTHERWISE.
4. VOLTAGE DROP HAS BEEN CONSIDERED IN THE DESIGN OF ALL BRANCH
CIRCUITRY AND FEEDER SIZES BASED ON EQUIPMENT LAYOUTS AND
SHORTEST CONDUCTOR/RACEWAY ROUTING. THE ELECTRICAL CONTRACTOR
SHALL BE RESPONSIBLE FOR DEVIATIONS TAKEN THAT WILL INCREASE
CONDUCTOR/RACEWAY LENGTHS. BRANCH CIRCUITS LONGER THAN 75' FOR
120V FROM PANEL TO LAST OUTLET SHALL BE INCREASED A MINIMUM OF ONE
SIZE ABOVE THAT SPECIFIED TO LIMIT VOLTAGE DROP TO LESS THAN 3%.
FEEDERS SHALL FOLLOW SIMILAR GUIDELINES AND BE LIMITED TO A 2%
DROP.
5. POWER BRANCH CIRCUITRY SHALL BE INSTALLED IN CONDUIT.
6. MAINTAIN CONTINUITY OF BRANCH CIRCUITRY ASSOCIATED WITH ALL
EXISTING POWER AND LIGHTING DEVICES TO REMAIN.
ELECTRICAL NEW WORK NOTES
ELECTRICAL - NEW WORK
BOILER ROOM
SCALE: 1/4"=1'-0"
EP100
8'4'0 1/4" = 1' - 0"
NUMBER
SCALE
DRAWN BY
CHECKED BY
DATE
DATE DESCRIPTIONCHK
RText (RText)
0220299
05/02/2024
STATE OF
NEW HAMPSHIRE
PORTSMOUTH, NH
DOVER, NH
CIRCUIT COURT
BOILERS REPLACEMENT
200 Brickstone Square
Andover, MA 01810-1488
T.978-296-6200
F.978-296-6201
W. www.nv5.com
This CADD Document is an instrument of professional service, and shall not be used, in whole or in part, for any project other than for which it was created without the expressed, written consent of NV5. Any unauthorized use, reuse, modification or alteration, including automated conversion of this document shall be at the user's sole risk without liability or legal exposure to NV5.
At the request of [IDENTIFY PARTY], this [NAME OF DELIVERABLE (REPORT, DRAWINGS, ETC.)] has been expedited to [Client] Hence, [client] is hereby notified that NV5 did not have an opportunity to conduct its industry standard quality control procedures. Accordingly, Client agrees that the [NAME OF DELIVERABLE] is subject to revision, including but not limited to contractor change orders or owner claims, in connection with [NAME OF DELIVERABLE].
SHEET OF 29
05/02/24 ISSUED FOR REBID
NEW WORK PART PLANS
DEMOLITION AND
ELECTRICAL BASEMENT
CIRCUIT COURT
PORTSMOUTH
1/4" = 1'-0"
RAR
DJF
EP100
B
VAULT
B17
MECH ROOM
B16
STAIRS
B15
MAIN DISTRIBUTION PANEL
XM
XM
FA
C P
XM
XM
EXISTING PANEL 'PDP'
225A,120/208V,3Ø,4W
EXISTING PANEL 'PP1'
100A,120/208V,3Ø,4W
EXISTING FIRE ALARM
CONTROL PANEL
S
XR
S
XR
XMS
XM F
XM F
TSS
X
S
XM
B
FIRE ALARM - DEMOLITION
BOILER ROOM
SCALE: 1/4"=1'-0"
EP200
FIRE ALARM RISER DIAGRAM NOTES:
1. THIS DRAWING IS INTENDED TO ILLUSTRATE MAJOR EQUIPMENT AND THE INTENDED
INTERCONNECTIONS. REFER TO THE FLOOR PLANS FOR EXACT LOCATIONS AND QUANTITIES OF
DEVICES. REFER TO THE MANUFACTURER'S WIRING DIAGRAMS FOR INTERCONNECTION
REQUIREMENTS. INTERCONNECTION DETAILS SHALL BE INCLUDED IN THE SHOP DRAWINGS WITH
COMPONENT CUT SHEETS FOR REVIEW AND APPROVAL.
2. ALL FINAL CONNECTIONS INTO THE EXISTING FIRE ALARM SYSTEM SHALL BE PERFORMED BY THE
OWNER'S FIRE ALARM MAINTENANCE CONTRACTOR. THE ELECTRICAL CONTRACTOR SHALL CARRY
ALL ASSOCIATED COSTS FOR FINAL CONNECTION AND ASSOCIATED TESTING.
3. ALL NEW FIRE ALARM DEVICES SHALL MATCH EXISTING MANUFACTURER AND BE CROSSED LISTED
FOR CONNECTION TO THE EXISTING SYSTEM.
4. EXISTING SMOKE DETECTORS, PULL STATIONS, AUDIO/VISUAL DEVICES, HEAT DETECTORS, ETC.
WITHIN THE BUILDING SHALL BE MAINTAINED, UNLESS OTHERWISE NOTED. DEVICES IDENTIFIED
FOR REMOVAL SHALL BE RETAINED UNTIL NEW SYSTEM OPERATIONAL AND APPROVED. PROVIDE
CONTROL MODULES, WIRING, PROGRAMMING OF SYSTEM AS REQUIRED TO MAINTAIN SYSTEM
OPERATION OF EXISTING DEVICES. REPROGRAM SYSTEM AND MODIFY EXISTING ANNUNCIATOR(S)
TO ACCOMMODATE THE NEW DEVICES AND FUNCTIONS.
5. FIRE ALARM SYSTEM MODIFICATION SHALL BE IN CONFORMANCE WITH THE LATEST FIRE
DEPARTMENT RULES AND REGULATIONS.
1.REFERENCE TO NFPA 72 ARE TO THE 2019 EDITION.
2.THIS DRAWING CONSTITUTES THE TIER ONE FLOOR PLAN SUBMISSION IN
ACCORDANCE WITH THE NH DIVISION OF FIRE SAFETY. THESE REQUIREMENTS
INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING:
a.FLOOR PLAN ILLUSTRATING ALL ROOM USES.
b.LOCATION OF ALL INITIATING DEVICES. CEILING TYPE AND HEIGHT ARE
INCLUDED WHERE DETECTION ILLUSTRATED AND UNUSUAL CONDITIONS
APPLY SUCH AS HEIGHT OVER 10 FEET OR WHERE BEAMS AND JOISTS ARE
PRESENT.
c.INTERFACE OF FIRE SAFETY FUNCTIONS SUCH AS DOOR UNLOCKING, SOUND
SYSTEM MUTING AND ILLUMINATION TO 100% (WHERE REQUIRED).
d.LOCATION OF ALL NOTIFICATION APPLIANCES WITH STROBE CANDELA
RATINGS.
e.LOCATION OF ALL FIRE ALARM CONTROL PANELS AND ANNUNCIATORS.
f. POWER SOURCE FOR ALL PANELS AND POWER SUPPLIES.
3.THE INSTALLING CONTRACTOR IS RESPONSIBLE FOR THE DEVELOPMENT AND
SUBMISSION OF THE REQUIRED SHOP DRAWINGS. SHOP DRAWINGS SHALL BE
SUBMITTED TO THE ENGINEER FOR REVIEW AND BE OF SUFFICIENT QUALITY TO
BE APPROVED PRIOR TO THE CONTRACTORS SUBMISSION TO THE AHJ FOR
PERMIT.
4.NFPA 72 SHOP DRAWING REQUIREMENTS INCLUDE, BUT ARE NOT LIMITED TO
THE FOLLOWING:
a.NAME, LICENSE NUMBER AND LICENSE EXPIRATION DATE OF THE
INSTALLING CONTRACTOR.
b.RISER DIAGRAM WITH ALL DEVICES, INTERCONNECTING WIRING AND
CIRCUITING INTENT.
c.CALCULATIONS FOR POWER SUPPLY (DC AND AMPLIFIERS WHERE USED), BATTERY CAPACITY AND VOLTAGE DROP.
d.MANUFACTURER'S CUT SHEETS FOR ALL DEVICES AND MATERIALS.
e.THE ACTUAL BUILDING FA SEQUENCE OF OPERATIONS OBTAINED FROM THE
OWNER'S FA MAINTENANCE CONTRACTOR
f. FLOOR PLANS DERIVED FROM THE TIER ONE SUBMISSION PLANS WITH THE
FOLLOWING INFORMATION MODIFIED/ADDED:
i. ACAD PLANS WILL BE MADE AVAILABLE FOR THE CONTRACTORS USE
INCLUDING ALL TIER ONE INFORMATION IN ACCORDANCE WITH THE
CONTRACTUAL REQUIREMENTS. THE DOCUMENT SHALL CLEARLY INDICATE
THE CONTRACTOR'S OWNERSHIP OF ILLUSTRATED INFORMATION.
ii. CONDUIT ROUTING AND CONDUCTOR TYPE AND COUNT BETWEEN ALL
DEVICES ILLUSTRATING INSTALLATION INTENT. WHERE REQUIRED BY THE
RISER AND/OR SPECIFICATIONS, CLEARLY ILLUSTRATE CLASS A
SEPARATIONS.
iii. AUDIBLE DEVICE TAP SETTINGS WHERE ADJUSTABLE.
iv. INITIATING DEVICE ADDRESSES WHERE MANUFACTURER CAN APPLY
THEM PRIOR TO INSTALLATION ON THE SLC.
5.NFPA 72 RECORD DRAWINGS INCLUDE, BUT ARE NOT LIMITED TO THE
FOLLOWING:
a.AS-BUILT PLANS DERIVED FROM THE TIER TWO FLOOR PLANS ILLUSTRATING
INSTALLED CONDITIONS, DEVICE ADDRESSES, FINAL TAP SETTINGS AND
AUDIBLE AMBIENT AND TEST DB READINGS THROUGHOUT THE SPACE.
b.WRITTEN VERSION OF SEQUENCE OF OPERATION SHALL BE INCLUDED.
c.O&M MANUAL PER NFPA 72 REQUIREMENTS.
d.SYSTEM RECORD OF COMPLETION FORM PER NFPA 72 FIGURES 7.8.2(a) THRU (f) SECTIONS AS APPLICABLE TO THE PROJECT SCOPE.
e.SYSTEM RECORD OF INSPECTION AND TESTING FORM PER NFPA 72 FIGURE 7.8.2(g) THRU (l) SECTIONS AS APPLICABLE TO THE PROJECT SCOPE.
f. CONFIRMATION THAT A RECORD COPY OF THE SITE SPECIFIC SOFTWARE
HAS BEEN DELIVERED TO THE OWNER'S REPRESENTATIVE.
FIRE ALARM PERMIT SUBMISSION NOTES
FIRE ALARM NOTES:
1. REFER TO DRAWING ED000 FOR LEGEND, SYMBOLS AND GENERAL NOTES.
2. FIRE ALARM BRANCH CIRCUITRY MAY BE TYPE MC CABLE WHERE
CONCEALED ABOVE SUSPENDED CEILINGS AND IN METAL STUD WALLS.
3. MC CABLE FOR FIRE ALARM SERVICE SHALL HAVE A RED IDENTIFIER ALONG
ITS ENTIRE LENGTH. JUNCTION BOX COVERS AND CONDUIT COUPLINGS FOR
ALL FIRE ALARM WIRING RACEWAYS SHALL BE PAINTED RED PRIOR TO
INSTALLATION.
4. MAINTAIN CONTINUITY OF BRANCH CIRCUITRY ASSOCIATED WITH ALL
EXISTING FIRE ALARM DEVICES TO REMAIN.
PARTIAL FIRE ALARM RISER DIAGRAM
SCALE: N.T.S.
BOILER ROOM - DEMOLITION
S
XM XR
REMAINING
DEVICES
EXISTING
FIRE
ALARM
CONTROL
PANEL TSS
X
BOILER ROOM - NEW WORK
S
XM XN
REMAINING
DEVICES
EXISTING
FIRE
ALARM
CONTROL
PANEL TSS
INTERCEPT EXISTING FIRE ALARM CIRCUIT,
EXTEND WIRING AS NECESSARY TO NEW AND
RELOCATED DEVICES, TYP.
CO
ZMM
REMAINING
DEVICES
XM
F
XM
F
REMAINING
DEVICES
XM
F
XM
F
60cd F
15cd F
1 2 3
A
B
VAULT
B17
MECH ROOM
B16
STAIRS
B15
MAIN DISTRIBUTION PANEL
XM
XM
FA
C
P
XM
XM
EXISTING PANEL 'PDP'
225A,120/208V,3Ø,4W
EXISTING PANEL 'PP1'
100A,120/208V,3Ø,4W
EXISTING FIRE ALARM
CONTROL PANEL
S
XN
S
XMF
XM F
XN
TSS TSS
PROVIDE FIROMATIC THERMAL
SAFETY SWITCH WITHIN 2' OF BOILER
AND LOCKABLE BOILER SHUTOFF SWITCH
AT EACH BOILER
C O
SB
PROVIDE BOILER SHUTDOWN
SWITCH, SEE DETAIL E316
ON DRAWING E-300 FOR
ADDITIONAL INFORMATION
PROVIDE CO DETECTION
SEE DETAIL E807 FOR ON
DRAWING EP300 FOR ADDITIONAL
INFORMATION
PDP-18
60cd F
15cd F
FIRE ALARM - NEW WORK
BOILER ROOM
SCALE: 1/4"=1'-0"
EP200
8'4'0 1/4" = 1' - 0"
NUMBER
SCALE
DRAWN BY
CHECKED BY
DATE
DATE DESCRIPTIONCHK
RText (RText)
0220299
05/02/2024
STATE OF
NEW HAMPSHIRE
PORTSMOUTH, NH
DOVER, NH
CIRCUIT COURT
BOILERS REPLACEMENT
200 Brickstone Square
Andover, MA 01810-1488
T.978-296-6200
F.978-296-6201 W. www.nv5.com
This CADD Document is an instrument of professional service, and shall not be used, in whole or in part, for any project other than for which it was created without the expressed, written consent of NV5. Any unauthorized use, reuse, modification or alteration, including automated conversion of this document shall be at the user's sole risk without liability or legal exposure to NV5.
At the request of [IDENTIFY PARTY], this [NAME OF DELIVERABLE (REPORT, DRAWINGS, ETC.)] has been expedited to [Client] Hence, [client] is hereby notified that NV5 did not have an opportunity to conduct its industry standard quality control procedures. Accordingly, Client agrees that the [NAME OF DELIVERABLE] is subject to revision, including but not limited to contractor change orders or owner claims, in connection with [NAME OF DELIVERABLE].
SHEET OF 29
05/02/24 ISSUED FOR REBID
NEW WORK PART PLANS
DEMOLITION AND
FIRE ALARM BASEMENT
CIRCUIT COURT
PORTSMOUTH
1/4" = 1'-0"
RAR
DJF
EP200
MOTOR TERMINAL BOX
E207
RIGID STEEL CONDUIT (TYP.)
EQUIPMENT
PAD (TYP.)
72"
CWP-2
RIGID STEEL
CONDUIT
TRANSITION TO
LIQUIDTIGHT
FLEXIBLE METAL
CONDUIT
LIQUIDTIGHT FLEXIBLE
METAL CONDUIT
LENGTH NOT TO
EXCEED 36"
O AH
RESET
HOLE PIPE CLAMP (TYP.)
MALLEABLE IRON ONE
CEILING
WALL MOUNTED
CONTROL STATION
STARTER/DISCONNECT
WITHIN LINE-OF-SIGHT
OF THE MOTOR
NOTES:
1. ALL RACEWAYS BELOW 8'-0" A.F.F. SHALL BE GALVANIZED RIGID STEEL CONDUIT
UNLESS SPECIFICALLY NOTED OTHERWISE.
2. LIQUIDTIGHT FLEXIBLE METAL CONDUIT SHALL BE SUPPORTED IN ACCORDANCE WITH
N.E.C. ARTICLE 350 REQUIREMENTS, LENGTHS UP TO 36" MAY BE UNSUPPORTED
WHERE FLEXIBILITY IS REQUIRED, SUCH AS AT THE MOTOR CONNECTION.
3. MAINTAIN WORK SPACE CLEARANCES AT STARTER IN ACCORDANCE WITH NEC 110.26
MAX
UNSUPPORTED
HORIZONTAL SPANS
FROM THE WALL TO
THE PAD SHALL NOT
EXCEED 24".
MOTOR MOUNTING DETAIL
(FEED FROM WALL DIRECT CONNECT)
FINISHED FLOOR
TYPICAL ELECTRICAL
EQUIPMENT SUPPORT DETAIL E208
NOTES:
1. THIS DRAWING IS INTENDED TO ILLUSTRATE DESIGN INTENT ONLY. FABRICATE A STEEL
CHANNEL SUPPORT SYSTEM TO ACCOMMODATE MOUNTING OF A NEW STARTER,
DISCONNECT SWITCH, RECEPTACLE, ETC. REFER TO FLOOR PLANS AND COORDINATE
WITH MECHANICAL CONTRACTOR FOR THE EXACT LOCATION AND MOUNTING HEIGHT OF
ELECTRICAL EQUIPMENT. PROVIDE ALL NECESSARY EQUIPMENT, SUPPORTS, HARDWARE,
ETC. TO FACILITATE A COMPLETE AND SECURE CONDUIT AND ELECTRICAL EQUIPMENT
INSTALLATION.
STEEL CHANNEL
EQUAL TO
UNISTRUT #P1000
SERIES
EL CONNECTOR
(TYP)
LAG BOLT
CONNECTION
TO FLOOR
PROVIDE
HARDWARE TO
SECURELY FASTEN
COMBINATION
MOTOR STARTER
BOX TO STRUT
SUPPORT SYSTEM
CONDUIT
(RGS BELOW 8'-0")
STEEL CHANNEL
EQUAL TO UNISTRUT
#P1000 SERIES
ATTACH STEEL
CHANNEL TO
EXISTING CEILING
STRUCTURE
PROVIDE NECESSARY
HARDWARE TO
SECURELY FASTEN
CONDUIT TO STRUT
SUPPORT SYSTEM
(TYP)
ELECTRICAL
ENCLOSURE
STRUCTURE ABOVE
E316
N
ESO
DOOR
#1
NEMA 1 ENCLOSED
ELECTRICALLY HELD
CONTACTOR
CONTACT QUANTITY
TO MATCH CIRCUITS
REQUIRED
LOCAL MOTOR RATED
SWITCH IN 4" SQ. WITH
RAISED COVER. PROVIDE
LOCKING MEANS FOR
"LOCK-OUT-TAG-OUT"
CAPABILITIES
(TYPICAL)
PB
PB
C
CP CP
NOTES:
1. EMERGENCY SHUT OFF (ESO) DISCONNECT SWITCHES MOUNTED AT 6'-0" AFF AT
EACH ENTRY TO THE EQUIPMENT ROOM. PROVIDE RED SHUTOFF PLATES.
2. WIRE ALL ESO DISCONNECT SWITCHES IN SERIES TO SHUT DOWN ALL BURNERS IF
ANY DISCONNECT IS OPENED.
ASME RATED, FOSSIL FUEL FIRED BOILER
AND WATER HEATER SHUT DOWN SCHEMATIC
EQUIPMENT
BURNER
(TYP)
E807FOSSIL FUEL FIRED APPLIANCE CO
DETECTION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .