attachment-2-bid-3013-25.pdf
PDF 2 MB Posted
- Solicitation number
- Bid 3013-25
- Issued by
- Rockingham County, New Hampshire
About this file
Portsmouth Circuit Court Boiler Removal and Installation Services
This comprehensive technical specification document outlines the requirements for the New Hampshire Department of Administrative Services' boiler removal and installation project at the Portsmouth Circuit Court located at 111 Parrott Avenue. The project involves the complete removal of existing boilers and installation of two new high-efficiency gas-fired condensing boilers from approved manufacturers (Lochinvar Corporation, Aerco Corporation, or Cleaver-Brooks), along with all associated mechanical, plumbing, electrical, and fire alarm system modifications. Deliverables include reconnection of natural gas piping from the existing utility meter, make-up water connections, condensate drain piping, fire stopping at all penetrations, selective demolition of existing systems, gypsum board ceiling repairs, painting, HVAC controls integration, and complete electrical work including fire alarm system modifications. Two mandatory pre-bid site walkthroughs are scheduled for March 7 and March 12, 2025 at 1:00 PM, with the bid opening on March 28, 2025 at 9:00 AM Eastern Time. The contract start date is May 23, 2025, with required project completion by September 30, 2025, and potential extension for up to three additional months.
The contractor must submit lump sum pricing for all labor, materials, and services, with monthly payments made based on percentage of work completed, due 30 days after invoice. A Payment and Performance Bond equal to 100% of the contract amount is required. The specification establishes strict compliance requirements with multiple codes including the National Electrical Code (NEC), NFPA standards, state building codes, and local regulations. All contractors must be licensed in relevant trades and obtain background checks for on-site employees. The State mandates a minimum one-year warranty covering 100% of repair or replacement costs including parts, shipping, labor, and travel. Additional requirements include submittal of rebate paperwork for condensing boilers, pumps, and variable frequency drives, with rebate funds credited back to the State, and achievement of 75% waste diversion from landfills through recycling and reuse programs. The specifications span multiple divisions covering selective demolition, fire stopping, joint sealants, access panels, gypsum board systems, painting, plumbing, HVAC, electrical work, and fire alarm system modifications, each with detailed product standards, installation procedures, testing requirements, and submittal protocols.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
81224, Contract D – Portsmouth Circuit Court Boilers
Product Requirements
01600 - 1
SECTION 01600
PRODUCT REQUIREMENTS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Products.
B. Product delivery requirements.
C. Product storage and handling requirements.
D. Product options.
E. Product substitution procedures.
F. Equipment electrical characteristics and components.
1.2 PRODUCTS
A. Furnish products of qualified manufacturers suitable for intended use. Furnish products of each type by single manufacturer unless specified otherwise.
B. All materials and equipment shall be new, except as specifically permitted by Contract
Documents.
C. Furnish interchangeable components from same manufacturer for components being replaced.
D. The use of asbestos containing materials shall be prohibited.
1.3 PRODUCT DELIVERY REQUIREMENTS
A. Transport and handle products in accordance with manufacturer's instructions.
B. Promptly inspect shipments to ensure products comply with requirements, quantities are correct, and products are undamaged.
C. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage.
1.4 PRODUCT STORAGE AND HANDLING REQUIREMENTS
A. Store and protect products in accordance with manufacturers' instructions.
B. Store with seals and labels intact and legible.
01600 - 2
C. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to product.
D. For exterior storage of fabricated products, place on sloped supports above ground.
E. Provide bonded off-site storage and protection when site does not permit on-site storage or protection only with prior approval from the Contract Administrator.
F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.
G. Store loose granular materials on solid flat surfaces in well-drained area. Prevent mixing with foreign matter.
H. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.
I. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.
1.5 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Any product meeting those standards or description.
B. Products Specified by Naming One or More Manufacturers with or without provision for substitutions: Products of one of manufacturers named and meeting specifications, no options or substitutions allowed. Submit request for substitution for any manufacturer not named in accordance with the following article.
1.6 PRODUCT SUBSTITUTION PROCEDURES
A. Where Bidding Documents stipulate particular Products, substitution requests will ONLY be considered before receipt of Bids. Submit requests per the requirements specified in this section.
1. All requests shall be submitted to the Contract Administrator not later than five
(5) working days before the hour and day set for bid opening. Incomplete requests or requests received after this deadline will not be considered.
2. All requests that are approved and are acceptable to the Department will be issued as part of an Addendum to each Bidder who has received a set of bidding documents, so that all Bidders may avail themselves of the change in submitting their Proposals.
B. Substitutions may be considered after bid opening when a product becomes unavailable through no fault of the Contractor. The Contractor shall apply to the Contract
Administrator, in writing, within ten (10) days of his realizing his inability to furnish the article specified, describing completely the substitution he desires to make. The
Contractor shall include a dated written statement from the manufacturer outlining an explanation for the unavailability of the product. Substitutions for reasons of lead times, i.e., the time between when the Contractor orders necessary materials from the vendor
01600 - 3 and anticipated delivery, will only be reviewed if the lead time is more than the length of the contract time. The Department may extend the contract time to accommodate the product specified. No additional costs from the Contractor will be considered due to the fact that the Contractor shall verify lead times and coordinate with contract time during the bidding phase.
C. Document each request with complete data substantiating compliance of proposed
Substitution with Contract Documents.
D. A request constitutes a representation that Bidder:
1. Has investigated proposed product and determined that it meets or exceeds quality level of specified product.
2. Will provide same warranty for Substitution as for specified product.
3. Will coordinate installation and make changes to other Work which may be required for the Work to be complete with no additional cost to the State.
4. Waives claims for additional costs or time extension which may subsequently become apparent.
5. Will reimburse Department and Architect and/or Engineer for review or redesign services associated with re-approval by authorities having jurisdiction.
E. Substitutions will not be considered when they are indicated or implied on Shop Drawing or Product Data submittals, without separate written request, or when acceptance will require revision to Contract Documents.
F. Substitution Submittal Procedure:
1. Submit three copies of request for Substitution for consideration. Limit each request to one proposed Substitution.
2. Submit Shop Drawings, Product Data, and certified test results attesting to proposed product equivalence. Burden of proof is on proposer.
3. The Department will notify Bidders in writing of decision to accept by issuing an addendum.
PART 2 PRODUCTS
PART 3 EXECUTION
Not Used.
END OF SECTION
81224, Contract D – Portsmouth Circuit Court Boilers June 22, 2023
SELECTIVE DEMOLITION
02 41 19 - 1
SECTION 02 41 19
SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of equipment, finishes, building components or structure in coordination with the installation of the New Boilers and their associated systems.
2. Removal, reinstallation, and replacement of interior finishes in coordination with the installation of new architectural finishes and the New Boilers systems.
3. Items to be salvaged as noted in the documents.
4. Legal off-site disposal of all abandoned equipment, demolition debris and construction waste generated by any section other than hazardous waste unless specifically within individual sections.
B. Related Requirements:
1. Section 01100 "Summary" for restrictions on use of the premises, Owner-occupancy requirements, and phasing requirements.
2. Section 01700 "Execution Requirements" for cutting and patching procedures.
3. Section 07 84 13 “Penetration Firestopping”, for firestopping walls and/or ceilings from utility penetrations through building enclosures.
4. Section 23 00 00 “HVAC” for scope of work for Boiler replacement.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse.
C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
E. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.
F. Disposal: The removal and legal disposition of unwanted materials generated by the work of this project.
1.4 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For refrigerant recovery technician.
B. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for dust control and for noise control. Indicate proposed locations and construction of barriers.
C. Submit mapping of areas required for coring and cutting new structural penetrations.
D. Schedule of Selective Demolition Activities: Indicate the following:
02 41 19 - 2
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Use of elevator and stairs.
5. Coordination of Owner's continuing occupancy of portions of existing building and of
Owner's partial occupancy of completed Work.
E. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.
1.6 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.7 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: It is expected that hazardous materials will be NOT encountered in the Work.
1. If suspected hazardous materials are encountered that are not identified within the
Project Documents, immediately notify Owner.
E. Storage or sale of removed items or materials on-site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1.8 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties. Notify warrantor before proceeding.
B. Notify warrantor on completion of selective demolition and obtain documentation verifying that existing system has been inspected and warranty remains in effect. Submit documentation at Project closeout.
1.9 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with Owner's operations.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
02 41 19 - 3
B. Review Project Record Documents of existing construction or other existing conditions and information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
3.3 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
3. Cover and protect furniture, furnishings, and equipment that have not been removed.
4. Comply with requirements for temporary enclosures and dust control, specified in
Section 01500 "Temporary Facilities and Controls."
B. Remove temporary barricades and protections where hazards no longer exist.
3.4 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches.
5. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
6. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
7. Dispose of demolished items and materials promptly.
8. Remove gypsum wall board to enable the installation of wood blocking for television screens and equipment.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and reinstalled in their original locations after selective demolition operations are complete.
02 41 19 - 4
3.5 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Burning: Do not burn demolished materials.
3.6 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
3.7 SELECTIVE DEMOLITION SCHEDULE
A. Items to be removed and re-installed:
1. Salvaged items noted on the documents.
B. Items to be removed and salvaged for Owner:
1. NONE
PENETRATION FIRESTOPPING
07 84 13 - 1
SECTION 07 8413
PENETRATION FIRESTOPPING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 DESCRIPTION OF WORK
A. Work Included: Provide labor, materials, and equipment necessary to complete the work of this Section, including but not limited to the following:
1. Through-penetration firestop systems for new and existing penetrations through fire-resistance-rated construction, including both empty openings and openings containing penetrating items.
2. Through-penetration firestop systems for new and existing penetrations through vertical and horizontal construction separating rooms even if the existing assembly is not fire rated.
3. At conditions currently concealed, include 12 dozen 6-inch diameter utility penetrations that need firestopping in the Scope of Work.
B. Items To Be Installed Only: Not Applicable.
C. Items To Be Furnished Only: Not Applicable.
D. Related Work: The following items are not included in this Section and will be performed under the designated Sections:
1. Section 02 4119 “Selective Demolition”, for work associated for the new HVAC equipment.
2. See HVAC Drawings, for equipment and utilities work.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.4 INFORMATIONAL SUBMITTALS
A. Product Test Reports: For each penetration firestopping system, for tests performed by a qualified testing agency.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: A firm that has been approved by FM Global according to FM Global 4991, "Approval of Firestop Contractors," or been evaluated by UL and found to comply with its "Qualified Firestop Contractor Program Requirements."
1.6 PROJECT CONDITIONS
A. Environmental Limitations: Do not install penetration firestopping system when ambient or substrate temperatures are outside limits permitted by penetration firestopping system manufacturers or when substrates are wet because of rain, frost, condensation, or other causes.
B. Install and cure penetration firestopping materials per manufacturer's written instructions using natural means of ventilations or, where this is inadequate, forced-air circulation.
1.7 COORDINATION
A. Coordinate construction of openings and penetrating items to ensure that penetration firestopping systems can be installed according to specified firestopping system design.
B. Coordinate sizing of sleeves, openings, core-drilled holes, or cut openings to accommodate penetration firestopping systems.
07 84 13 - 2
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Fire-Test-Response Characteristics:
1. Perform penetration firestopping system tests by a qualified testing agency acceptable to authorities having jurisdiction.
2. Test per testing standards referenced in "Penetration Firestopping Systems" Article.
Provide rated systems complying with the following requirements:
a. Penetration firestopping systems shall bear classification marking of a qualified testing agency.
1) UL in its "Fire Resistance Directory."
2.2 PENETRATION FIRESTOPPING SYSTEMS
A. Penetration Firestopping Systems: Systems that resist spread of fire, passage of smoke and other gases, and maintain original fire-resistance rating of construction penetrated. Penetration firestopping systems shall be compatible with one another, with the substrates forming openings, and with penetrating items if any.
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. 3M Fire Protection Products.
b. Hilti, Inc.
c. Tremco, Inc.
B. Penetrations in Fire-Resistance-Rated Walls: Penetration firestopping systems with ratings determined per ASTM E 814 or UL 1479, based on testing at a positive pressure differential of 0.01-inch wg.
1. Penetration Firestopping: Not less than 1 hour, C. Penetrations in Horizontal Assemblies: Penetration firestopping systems with ratings determined per ASTM E 814 or UL 1479, based on testing at a positive pressure differential of 0.01-inch wg.
1. F-Rating: At least one hour, but not less than the fire-resistance rating of constructions penetrated.
2. T-Rating: At least one hour, but not less than the fire-resistance rating of constructions penetrated except for floor penetrations within the cavity of a wall.
3. W-Rating: Provide penetration firestopping systems showing no evidence of water leakage when tested according to UL 1479.
D. Penetrations in Smoke Barriers: Penetration firestopping systems with ratings determined per
UL 1479, based on testing at a positive pressure differential of 0.30-inch wg.
1. L-Rating: Not exceeding 5.0 cfm/sq. ft. of penetration opening at and no more than 50-cfm cumulative total for any 100 sq. ft. at both ambient and elevated temperatures.
E. Exposed Penetration Firestopping Systems: Flame-spread and smoke-developed indexes of less than 25 and 450, respectively, per ASTM E 84.
F. Accessories: Provide components for each penetration firestopping system that are needed to install fill materials and to maintain ratings required. Use only those components specified by penetration firestopping system manufacturer and approved by qualified testing and inspecting agency for conditions indicated.
1. Permanent forming/damming/backing materials.
2. Substrate primers.
2.3 FILL MATERIALS
A. Latex Sealants: Single-component latex formulations that do not re-emulsify after cure during exposure to moisture.
B. Pillows/Bags: Reusable heat-expanding pillows/bags consisting of glass-fiber cloth cases filled with a combination of mineral-fiber, water-insoluble expansion agents, and fire-retardant additives. Where exposed, cover openings with steel-reinforcing wire mesh to protect pillows/bags from being easily removed.
http://www.specagent.com/LookUp/?ulid=11857&mf=04&src=wd#http://www.specagent.com/LookUp/?ulid=11857&mf=04&src=wd
07 84 13 - 3
C. Silicone Foams: Multicomponent, silicone-based liquid elastomers that, when mixed, expand and cure in place to produce a flexible, non-shrinking foam.
D. Silicone Sealants: Single-component, silicone-based, neutral-curing elastomeric sealants.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Installer present, for compliance with requirements for opening configurations, penetrating items, substrates, and other conditions affecting performance of the Work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Surface Cleaning: Before installing penetration firestopping systems, clean out openings immediately to comply with manufacturer's written instructions and with the following requirements:
1. Remove from surfaces of opening substrates and from penetrating items foreign materials that could interfere with adhesion of penetration firestopping materials.
2. Clean opening substrates and penetrating items to produce clean, sound surfaces capable of developing optimum bond with penetration firestopping materials. Remove loose particles remaining from cleaning operation.
3. Remove laitance and form-release agents from concrete.
B. Prime substrates where recommended in writing by manufacturer using that manufacturer's recommended products and methods. Confine primers to areas of bond; do not allow spillage and migration onto exposed surfaces.
3.3 INSTALLATION
A. General: Install penetration firestopping systems to comply with manufacturer's written installation instructions and published drawings for products and applications.
B. Install forming materials and other accessories of types required to support fill materials during their application and in the position needed to produce cross-sectional shapes and depths required to achieve fire ratings.
1. After installing fill materials and allowing them to fully cure, remove combustible forming materials and other accessories not forming permanent components of firestopping.
C. Install fill materials by proven techniques to produce the following results:
1. Fill voids and cavities formed by openings, forming materials, accessories, and penetrating items to achieve required fire-resistance ratings.
2. Apply materials so they contact and adhere to substrates formed by openings and penetrating items.
3. For fill materials that will remain exposed after completing the Work, finish to produce smooth, uniform surfaces that are flush with adjoining finishes.
3.4 IDENTIFICATION
A. Wall Identification: Permanently label walls containing penetration firestopping systems with the words "FIRE AND/OR SMOKE BARRIER - PROTECT ALL OPENINGS," using lettering not less than 3 inches high and with minimum 0.375-inch strokes.
1. Locate in accessible concealed floor, floor-ceiling, or attic space at 15 feet from end of wall and at intervals not exceeding 30 feet.
B. Penetration Identification: Identify each penetration firestopping system with legible metal or plastic labels. Attach labels permanently to surfaces adjacent to and within 6 inches of penetration firestopping system edge so labels are visible to anyone seeking to remove penetrating items or firestopping systems. Use mechanical fasteners or self-adhering-type labels with adhesives capable of permanently bonding labels to surfaces on which labels are placed.
Include the following information on labels:
07 84 13 - 4
1. The words "Warning - Penetration Firestopping - Do Not Disturb. Notify Building Management of Any Damage."
2. Contractor's name, address, and phone number.
3. Designation of applicable testing and inspecting agency.
4. Date of installation.
5. Manufacturer's name.
6. Installer's name.
3.5 CLEANING AND PROTECTION
A. Clean off excess fill materials adjacent to openings as the Work progresses by methods and with cleaning materials that are approved in writing by penetration firestopping system manufacturers and that do not damage materials in which openings occur.
B. Provide final protection and maintain conditions during and after installation that ensure that penetration firestopping systems are without damage or deterioration at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, immediately cut out and remove damaged or deteriorated penetration firestopping material and install new materials to produce systems complying with specified requirements.
3.6 PENETRATION FIRESTOPPING SYSTEM SCHEDULE
A. Where UL-classified systems are indicated, they refer to system numbers in UL's "Fire Resistance Directory" under product Category XHEZ.
JOINT SEALANTS
07 9200 - Page 1 of 5
SECTION 07 9200
JOINT SEALANTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following:
1. Silicone joint sealants.
2. Nonstaining silicone joint sealants.
3. Urethane joint sealants.
4. Immersible joint sealants.
5. Silane-modified polymer joint sealants.
6. Mildew-resistant joint sealants.
7. Polysulfide joint sealants.
8. Butyl joint sealants.
9. Latex joint sealants.
1.3 ACTION SUBMITTALS
A. Product Data:
1. Joint sealants.
2. Joint-sealant backing materials.
B. Samples for Initial Selection: Manufacturer's standard color charts consisting of strips of cured sealants showing the full range of colors available for each product exposed to view.
C. Samples for Verification: For each type and color of joint sealant required, provide Samples with joint sealants in 1/2-inch-wide joints formed between two 6-inch-long strips of material matching the appearance of exposed surfaces adjacent to joint sealants.
D. Joint-Sealant Schedule: Include the following information:
1. Joint-sealant application, joint location, and designation.
2. Joint-sealant manufacturer and product name.
3. Joint-sealant formulation.
4. Joint-sealant color.
1.4 CLOSEOUT SUBMITTALS
A. Manufacturers' special warranties.
B. Installer's special warranties.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: Authorized representative who is trained and approved by manufacturer.
B. Testing Agency Qualifications: Qualified in accordance with ASTM C1021 to conduct the testing indicated.
1.6 FIELD CONDITIONS
A. Do not proceed with installation of joint sealants under the following conditions:
1. When ambient and substrate temperature conditions are outside limits permitted by joint-sealant manufacturer or are below 40 deg F.
2. When joint substrates are wet.
3. Where joint widths are less than those allowed by joint-sealant manufacturer for applications indicated.
07 9200 - Page 2 of 5
4. Where contaminants capable of interfering with adhesion have not yet been removed from joint substrates.
1.7 WARRANTY
A. Special Installer's Warranty: Installer agrees to repair or replace joint sealants that do not comply with performance and other requirements specified in this Section within specified warranty period.
1. Warranty Period: Two years from date of Substantial Completion.
B. Special Manufacturer's Warranty: Manufacturer agrees to furnish joint sealants to repair or replace those joint sealants that do not comply with performance and other requirements specified in this Section within specified warranty period.
1. Warranty Period: Five years from date of Substantial Completion.
C. Special warranties specified in this article exclude deterioration or failure of joint sealants from the following:
1. Movement of the structure caused by stresses on the sealant exceeding sealant manufacturer's written specifications for sealant elongation and compression.
2. Disintegration of joint substrates from causes exceeding design specifications.
3. Mechanical damage caused by individuals, tools, or other outside agents.
4. Changes in sealant appearance caused by accumulation of dirt or other atmospheric contaminants.
PART 2 - PRODUCTS
2.1 SOURCE LIMITATIONS
A. Obtain joint sealants from single manufacturer for each sealant type.
2.2 JOINT SEALANTS, GENERAL
A. Compatibility: Provide joint sealants, backings, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by joint-sealant manufacturer, based on testing and field experience.
B. Colors of Exposed Joint Sealants: As selected by Architect from manufacturer's full range.
2.3 SILICONE JOINT SEALANTS
A. Single-Component, Nonsag, Neutral-Curing Silicone Joint Sealant: ASTM C 920, type S, Grade NS, Class 50, for Use NT.
1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following:
a. Dow Corning Corporation; 791 or 795
b. Pecora Corporation; 864 or 895
c. Tremco Incorporated; Spectrem 3
d. May National Associates, Inc.,; Bondaflex Sil 295.
e. Or equal.
B. Single-Component, Nonsag, Neutral-Curing Silicone Joint Sealant: ASTM C 920, type S, Grade NS, Class 100/50, for Use NT.
1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following:
a. Dow Corning Corporation; 790
b. Pecora Corporation; 890FTS
c. Tremco Incorporated; Spectrem 1
C. Mildew Resistant, Single Component, Acid-Curing Silicone Joint Sealant: ASTM C 920, Type S, Grade NS, Class 25, for use NT.
1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following:
a. BASF Building Systems; Omniplus.
b. Down Corning Corporations, 786 Mildew Resistant.
07 9200 - Page 3 of 5
c. GE Advanced Materials; Sanitary SCS1700.
d. May National Associates, Inc.; Bondaflex Sil 100 WF.
e. Tremco Incoroporated, Tremsil 200 Sanitary.
f. Or equal.
2.4 URETHANE JOINT SEALANTS
A. Single-Component, Nonsag, Urethan Joint Sealant: ASTM C920, Type S, Grade NS, Class 25, for Use NT.
1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following:
a. BASF Building Systems; MasterSeal NP1 or Ultra..
b. Sika Corporation, Construction Products Division; Sikaflex - 1a.
c. May National Associates, Inc.; Bondaflex PUR 25 or Bondaflex PUR 40FC.
d. Pecora Corporation; Dynatrol I-XL.
e. Polymeric Systems, Inc., Flexiprene 1000
f. Or equal.
2. Locations:
B. Single-Component, Nonsag, Traffic-Grade, Urethane Joint Sealant: ASTM C 920. Type S, Grade NS, Class 25, for Use T.
1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following:
a. BASF Building Systems; Sonolastic Ultra.
b. Sika Corporation, Construction Products Division; Sikaflex - 1a.
c. Tremco Incorporated; Vulkem 116.
d. May National Associates, Inc.; Bondaflex PUR 40FC.
e. Or equal.
2.5 ACRYLIC LATEX JOINT SEALANTS
A. Acrylic Latex: Acrylic latex or siliconized acrylic latex, ASTM C834, Type OP, Grade NF.
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Adfast.
b. Pecora Corporation.
c. Tremco Incorporated.
d. Or equal.
2.6 JOINT-SEALANT BACKING
A. Sealant Backing Material, General: Nonstaining; compatible with joint substrates, sealants, primers, and other joint fillers; and approved for applications indicated by sealant manufacturer based on field experience and laboratory testing.
B. Cylindrical Sealant Backings: ASTM C1330, Type C (closed-cell material with a surface skin), Type O (open-cell material), Type B (bicellular material with a surface skin) , or any of the preceding types, as approved in writing by joint-sealant manufacturer for joint application indicated, and of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance.
C. Bond-Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint-filler materials or joint surfaces at back of joint. Provide self-adhesive tape where applicable.
2.7 MISCELLANEOUS MATERIALS
A. Primer: Material recommended by joint-sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate tests and field tests.
http://www.specagent.com/Lookup?ulid=9454 http://www.specagent.com/Lookup?uid=123457230257 http://www.specagent.com/Lookup?uid=123457230259
07 9200 - Page 4 of 5
B. Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers of sealants and sealant backing materials, free of oily residues or other substances capable of staining or harming joint substrates and adjacent nonporous surfaces in any way, and formulated to promote optimum adhesion of sealants to joint substrates.
C. Masking Tape: Nonstaining, nonabsorbent material compatible with joint sealants and surfaces adjacent to joints.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting performance of the Work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions and the following requirements:
1. Remove all foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufacturer), old joint sealants, oil, grease, waterproofing, water repellents, water, surface dirt, and frost.
2. Clean porous joint substrate surfaces by brushing, grinding, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining after cleaning operations above by vacuuming or blowing out joints with oil-free compressed air. Porous joint substrates include the following:
a. Concrete.
b. Masonry.
c. Unglazed surfaces of ceramic tile.
d. Exterior insulation and finish systems.
3. Remove laitance and form-release agents from concrete.
4. Clean nonporous joint substrate surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants. Nonporous joint substrates include the following:
a. Metal.
b. Glass.
c. Porcelain enamel.
d. Glazed surfaces of ceramic tile.
B. Joint Priming: Prime joint substrates where recommended by joint-sealant manufacturer or as indicated by preconstruction joint-sealant-substrate tests or prior experience. Apply primer to comply with joint-sealant manufacturer's written instructions. Confine primers to areas of joint-sealant bond; do not allow spillage or migration onto adjoining surfaces.
C. Masking Tape: Use masking tape where required to prevent contact of sealant or primer with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove tape immediately after tooling without disturbing joint seal.
3.3 INSTALLATION OF JOINT SEALANTS
A. General: Comply with joint-sealant manufacturer's written installation instructions for products and applications indicated, unless more stringent requirements apply.
B. Sealant Installation Standard: Comply with recommendations in ASTM C1193 for use of joint sealants as applicable to materials, applications, and conditions indicated.
07 9200 - Page 5 of 5
C. Install sealant backings of type indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.
1. Do not leave gaps between ends of sealant backings.
2. Do not stretch, twist, puncture, or tear sealant backings.
3. Remove absorbent sealant backings that have become wet before sealant application, and replace them with dry materials.
D. Install bond-breaker tape behind sealants where sealant backings are not used between sealants and backs of joints.
E. Install sealants using proven techniques that comply with the following and at the same time backings are installed:
1. Place sealants so they directly contact and fully wet joint substrates.
2. Completely fill recesses in each joint configuration.
3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability.
F. Tooling of Nonsag Sealants: Immediately after sealant application and before skinning or curing begins, tool sealants according to requirements specified in subparagraphs below to form smooth, uniform beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint.
1. Remove excess sealant from surfaces adjacent to joints.
2. Use tooling agents that are approved in writing by sealant manufacturer and that do not discolor sealants or adjacent surfaces.
3. Provide concave joint profile in accordance with Figure 8A in ASTM C1193 unless otherwise indicated.
3.4 CLEANING
A. Clean off excess sealant or sealant smears adjacent to joints as the Work progresses by methods and with cleaning materials approved in writing by manufacturers of joint sealants and of products in which joints occur.
3.5 PROTECTION
A. Protect joint sealants during and after curing period from contact with contaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out, remove, and repair damaged or deteriorated joint sealants immediately so installations with repaired areas are indistinguishable from original work.
ACCESS PANELS
08 31 13 - 1
SECTION 08 31 13
ACCESS PANELS
PART 1 - GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, Part A and Division 01 Specification Sections, apply to this Section.
1.02 SUMMARY
A. Section Includes:
1. 1-hour rated access doors and frames
B. Related Requirements:
1. Section 09 54 00 “Gypsum Board Suspended Ceiling System”.
2. Section 09 91 23 “Painting”.
3. Division 22 – Plumbing.
4. Division 23 – Heating, Ventilating and Air Conditioning.
5. Division 26 – Electrical.
1.03 COORDINATION
A. Coordinate selection of shop primers with topcoats to be applied over them. Comply with paint and coating manufacturers' written recommendations to ensure that shop primers and topcoats are compatible with one another.
B. Coordinate installation of anchorages. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded. Deliver such items to Project site in time for installation.
C. Coordinate locations of hanger rods and struts with other work so that they do not encroach access area.
1.04 ACTION SUBMITTALS
A. Product Data: For the following:
1. Access Panel System
1.05 INFORMATIONAL SUBMITTALS
A. Paint Compatibility Certificates: From manufacturers of topcoats applied over shop primers certifying that shop primers are compatible with topcoats.
1.06 FIELD CONDITIONS
A. Field Measurements: Verify actual locations of walls and other construction contiguous with metal fabrications by field measurements before fabrication.
PART 2 - PRODUCTS
2.01 PRODUCTS
A. Flush, gasketed Fire Rated access doors and frames with concealed flanges by Karp Industries KRP-150 FR or PF, Acudor or Equal,
1. Material: Steel, 22 gauge, minimum size as required for service access.
B. Finishes:
1. Steel: Factory finished.
2. Color: White.
C. Sizes: General Contractor. shall coordinate size of access doors with HVAC and Plumbing drawings.
ACCESS PANELS
08 31 13 - 2
PART 3 - EXECUTION
3.01 SUPPORTS
A. General: Install framing and supports to comply with requirements of items being supported, including manufacturers' written instructions and requirements indicated on Shop Drawings.
GYPSUM BOARD SUSPENDED CEILING SYSTEMS
09 54 00 - 1
SECTION 09 54 00
GYPSUM BOARD SUSPENDED CEILING SYSTEM
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Description of work: Provide labor, materials, and equipment necessary to complete the work of this Section, including but not limited to the following:
1. Metal suspension system framing members for Gypsum Board Assemblies
2. Gypsum Wall board, Main Tees, Cross Tees, Perimeter Angles, Perimeter Channels, Hanger Wire, and Accessories.
3. Finishing of gypsum board surfaces - Level 4.
B. Related Work: The following items of work are not included in this Section and are specified under the designated Sections.
1. Section 02 41 19 ‘Selective Demolition” for scope of reinstallation of framing and gypsum board required as part of selective demolition.
2. Section 07 84 13 “Penetration Firestopping”, for penetrations through rated gypsum board ceiling and visible structural penetrations.
3. Section 09 91 23 ‘Painting”, for primers and finish coats applied to gypsum board surfaces.
4. Division 22 – Plumbing
5. Division 23 – HVAC
6. Division 26 – Electrical.
C. Items To Be Installed Only:
1. Section 083113 “Access Panels”, access to utilities as required for all trades.
2. Divisions 21, 22, 23 & 26 Sections for access panels furnished under those Sections.
1.3 SUBMITTALS
A. Product Data: For each type of product.
1. Submit manufacturer's specifications and installation instructions with Project conditions and materials clearly identified or detailed for each required system.
B. Samples: For each type of system.
1. 12-inch-long samples of suspension system components
2. Label each Sample for location.
1.4 QUALITY ASSURANCE
A. Reference Standards:
1. ASTM A 641 Standard Specification for Zinc-Coated (Galvanized) Carbon Steel Wire
2. ASTM A 645 Standard for Nonstructural Framing Members
3. ASTM A 653 Standard Specification for Steel Sheet, Zinc-Coated, (Galvanized) by the
Hot-Dipped Process
4. ASTM C635, Standard Specifications for Metal Suspension Systems
5. ASTM C636, Recommended Practice for Installation of Metal Suspension Systems
6. CISCA Ceiling Systems Installation Handbook
7. ASTM C645, Standard Specification for Non-Bearing (Axial) Steel Studs, Runners, (Track), and Rigid Furring Channels for Screw Application of Gypsum Board
8. ASTM C754, Specification for Installation of Steel framing Members to Receive Screw-
Attach Gypsum Boards
09 54 00 - 2
9. ASTM C840 Specification for Application & Finishing of Gypsum Board
10. (ASTM E119, Standard Test Methods for Fire Tests of Building Construction and
Materials)
11. (Underwriters Laboratories Inc. (UL) Fire Resistance Directory)
12. NOA # 17-09-19.03, TAS 202 and TAS 203
1.5 DELIVERY, STORAGE, AND HANDLING
A. Delivery:
1. Deliver material to site promptly without undue exposure to weather.
2. Deliver in manufacturer's unopened containers or bundles, fully identified with name, brand, type and grade.
B. Inspection:
1. Promptly inspect delivered materials, file freight claims for damage during shipment, and order replacement materials as required. Any damaged materials shall be promptly removed from the job site.
C. Storage:
1. Store above ground in dry, ventilated space.
2. Protect materials from soiling, rusting, and damage.
3. Store board to be directly applied to masonry walls at 70°F for 24 hours prior to installation.
D. Handling:
1. Handle in such a manner to insure against racking, distortion or physical damage of any
1.6 COORDINATION WITH OTHER WORK
A. General:
1. Coordinate with other work including mechanical and electrical work and partition systems. Installation of conduit and ductwork above suspension system shall be complete before installation of suspension system.
B. Protection:
1. Follow good safety and industrial hygiene practices during handling and installation of all products and systems, with personnel to take necessary precautions and wear appropriate personal protective equipment as needed. Read Material Safety Data Sheets and related literature for important information on products before installation. Contractor to be solely responsible for all personal safety issues during and subsequent to installation; architect, specifier, owner and manufacturer will rely on contractor’s performance in such regard.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Basis-of-Design Product: Subject to compliance with requirements, provide products by USG Interiors.
2.2 SUSPENSION SYSTEMS
A. USG Drywall Suspension Systems – Commercial quality, cold-rolled steel, hot dipped galvanized finish.
1. Main Tees: Fire-Rated Heavy-Duty classification 1.617” high x 144” long, integral reversible splice with knurled face. (DGLW-26 1-1/2” Face and 1.617” high)
2. Cross Members: Fire-Rated members with knurled face. Cross Tees: DGLW-424 cross tee 1-1/2” high x 48” long with 1-1/2” wide face; DGLW-224 Fire-Rated: 1-1/2” high x 24” long with 1-1/2” face quick release cross tee ends for positive locking and removability without tools.
3. Accessory Cross Tees: Cross tees must have knurled faces and quick release cross tee ends for positive locking and removability without tools.
a. DGW-6026DM: 1.617 inches high x 5 feet long with a 1-1/2 inch face
09 54 00 - 3
b. DGW-7226DM: 1.617 inches high x 6 feet long with a 1-1/2 inch face
c. DGW-8426DM: 1.617 inches high x 7 feet long with a 1-1/2 inch face
d. DGW-9626DM: 1.617 inches high x 8f eet long with a 1-1/2 inch face
4. Wall Moldings: Single web with knurled face
a. DGWM-24: 1-1/2 inch x 1 inch x 144 inch long wall molding
b. DGCM-27: 144 inch x 1-5/8 inch x 1 inch x 1 inch channel molding
c. DGLC-12: 144 inch x 1-3/4 inch” x 1 inch x 1 inch index channel molding
5. Accessories
a. Flat Strap and Backing Plate: Steel sheet for blocking and bracing in length and width required to provide support for Gypsum Wallboard around ceiling penetrations.
1) Minimum Base-Metal Thickness: 24 gauge
b. DGSC-180: Splice Clip
c. DGTC-90: Transition Clip
d. DGWC: Wall Attachment Clip
e. DGSP-180: Splice Plate
f. DGHUB: Dome Hub
g. CMAC-1: Close Mount Attachment Clip
6. Wire: Hanger Wire 12 ga., galvanized or as noted on drawings
B. USG Drywall Wall-to-Wall Suspension Systems – Commercial quality, cold-rolled steel, hot dipped galvanized finish for use in corridors and short span applications.
1. Main Tees: 1HR Fire-Rated Heavy-Duty classification 1.617inch high x [6’] [8’] [10’] [12’]
[14’] [Custom] long, integral reversible splice with 1-1/2 inch knurled face.
2. Wall Moldings: Single web with knurled face, 1-1/2 inch x 1 inch x 12’ long, DGWM24
3. Wall Channel: Single web with knurled face, 1-5/8 inch x 1 inch x 12’ long, DGCM27
4. Locking Wall Channel: Single web with knurled face, 1-3/4 inch x 1 inch x 12’ long, DGLC-12
C. Grid Suspension Assemblies: Listed products establish standard of quality and are manufactured by United States Gypsum Company (USG), Chicago, IL
2.3 GYPSUM BOARD
A. Gypsum Board
1. ASTM C36, regular type except where Type X or Type C fire-resistant type is indicated or required to meet UL assembly types.
2. Edges: Tapered
3. Thickness: 5/8 inch.
4. Acceptable products:
a. Typical partitions and ceilings: Equivalent to SHEETROCK Brand Ultralight FC 30, SHEETROCK Brand SW, FIRECODE or FIRECODE "C" Gypsum Panels by
USG.
b. SHEETROCK brand Gypsum Panels, FIRECODE Core meet the definition of a Type X gypsum board for fire-rated assemblies in the Gypsum Association Fire Resistance Design Manual. Edges: SW tapered or tapered.
B. Ceiling board
1. ASTM C36, non-sag type
2. Acceptable product: Equivalent to SHEETROCK® Brand UltraLight Panels by USG
3. Thickness:
4. 5/8 inch, unless otherwise indicated.
C. Mold-resistant gypsum board
1. ASTM C1396, regular except where Type X (FIRECODE) or Type C (FIRECODE C) indicated or required to meet UL assembly types
2. Edges: Tapered
3. Thickness: 5/8 inch.
4. Acceptable product: Equivalent to SHEETROCK brand MOLD TOUGH gypsum panels by USG
09 54 00…