About this file

This is a Submittal Register form that outlines the contractor's required documentation submissions for the "Sustain Store Front Doors & EIFS, B755" construction project at Minneapolis Air Reserve Station. The register specifies what materials must be submitted for government approval prior to construction work commencing on the facility repairs.

The submittal register requires the contractor to provide preconstruction documentation including a list of contact personnel, baseline construction schedule, and the submittal register itself. For the EIFS work (Section 07 24 00), the contractor must submit product data for base coat, reinforcing fabric, finish coat, joint sealant, sealant primer, bond breaker, and backer rod, along with warranty information and sample boards. Material samples for clay or shale brick and mortar mix are required under Section 04 20 00. The contractor must also submit qualification certificates for the EIFS installer and manufacturer's instructions. For the door work (Section 08 11 13), product data submissions are required for doors and frames. The register provides columns for tracking contractor submission dates, approval authority review dates, and material needed-by dates, establishing a structured approval workflow to ensure all work meets contract specifications before installation begins.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
SUSTAIN STORE FRONT DOORS & EIFS, B755CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 14 00SD-01 Preconstruction Submittals
List of Contact Personnel1.3.1.1
01 32 16.00 20SD-01 Preconstruction Submittals
Baseline Construction Schedule1.2G
01 33 00SD-01 Preconstruction Submittals
Submittal Register1.7G
04 20 00SD-03 Product Data
Clay or Shale BrickG
Mortar MixG
SD-04 Samples
Clay or Shale BrickG
07 24 00SD-03 Product Data
Base Coat2.3
Reinforcing Fabric2.4
Finish Coat2.5
Joint Sealant2.6
Sealant Primer
Bond Breaker2.7
Backer Rod2.8
Warranty1.7
SD-04 Samples
Sample Boards1.2.1G
SD-07 Certificates
Qualification of EIFS Installer
SD-08 Manufacturer’s Instructions
Manufacturer's Instructions3.2
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
SUSTAIN STORE FRONT DOORS & EIFS, B755CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
08 11 13SD-03 Product Data
DoorsG
Frames2.3G