Attachment 4 B755 Submittal Register.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Repair Doors and EIFS, B755 Federal contract opportunity
- Solicitation number
- FA663326Q0001
About this file
This is a Submittal Register form that outlines the contractor's required documentation submissions for the "Sustain Store Front Doors & EIFS, B755" construction project at Minneapolis Air Reserve Station. The register specifies what materials must be submitted for government approval prior to construction work commencing on the facility repairs.
The submittal register requires the contractor to provide preconstruction documentation including a list of contact personnel, baseline construction schedule, and the submittal register itself. For the EIFS work (Section 07 24 00), the contractor must submit product data for base coat, reinforcing fabric, finish coat, joint sealant, sealant primer, bond breaker, and backer rod, along with warranty information and sample boards. Material samples for clay or shale brick and mortar mix are required under Section 04 20 00. The contractor must also submit qualification certificates for the EIFS installer and manufacturer's instructions. For the door work (Section 08 11 13), product data submissions are required for doors and frames. The register provides columns for tracking contractor submission dates, approval authority review dates, and material needed-by dates, establishing a structured approval workflow to ensure all work meets contract specifications before installation begins.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 30 Offer Due 4-30-26 Amendment FA663326Q00010003.pdf | ||
| Offer Due Date 4-30-26 Amendment - FA663326Q00010003.pdf | ||
| SF 30 Offer Due Date Amendment FA663326Q00010002.pdf | ||
| Attachment 1 B755 Statement Of Work (SOW).pdf | ||
| Attachment 5 20260302 Wage Determination.pdf | ||
| Attachment 2 B755 Specifications.pdf | ||
| Attachment 3 B755 Drawings.pdf | ||
| Solicitation Amendment - FA663326Q00010001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SUBMITTAL REGISTER | CONTRACT NO. | |||
| TITLE AND LOCATION | ||||
| SUSTAIN STORE FRONT DOORS & EIFS, B755 | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | S P E C | |||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 14 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| List of Contact Personnel | 1.3.1.1 | |||||||||||||||||
| 01 32 16.00 20 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Baseline Construction Schedule | 1.2 | G | ||||||||||||||||
| 01 33 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Submittal Register | 1.7 | G | ||||||||||||||||
| 04 20 00 | SD-03 Product Data | |||||||||||||||||
| Clay or Shale Brick | G | |||||||||||||||||
| Mortar Mix | G | |||||||||||||||||
| SD-04 Samples | ||||||||||||||||||
| Clay or Shale Brick | G | |||||||||||||||||
| 07 24 00 | SD-03 Product Data | |||||||||||||||||
| Base Coat | 2.3 | |||||||||||||||||
| Reinforcing Fabric | 2.4 | |||||||||||||||||
| Finish Coat | 2.5 | |||||||||||||||||
| Joint Sealant | 2.6 | |||||||||||||||||
| Sealant Primer | ||||||||||||||||||
| Bond Breaker | 2.7 | |||||||||||||||||
| Backer Rod | 2.8 | |||||||||||||||||
| Warranty | 1.7 | |||||||||||||||||
| SD-04 Samples | ||||||||||||||||||
| Sample Boards | 1.2.1 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Qualification of EIFS Installer | ||||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Manufacturer's Instructions | 3.2 | |||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| SUSTAIN STORE FRONT DOORS & EIFS, B755 | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 08 11 13 | SD-03 Product Data | |||||||||||||||||
| Doors | G | |||||||||||||||||
| Frames | 2.3 | G |
File details come from the government source that posted it. Updated .